This is a Questions and Answers document for solicitation 140P4326R0009, issued by the National Park Service for security upgrades at Lowell National Historical Park.
The document addresses three clarification questions submitted by contractors regarding the construction of security and egress doors at the CH Mezzanine and Boott Mill #6 on floors 3 and 5. For the 3rd Floor Lobby, the government clarified that the non-loadbearing wall's top track fastens to an existing Heart Pine timber beam, with no ceiling demolition required. However, contractors must relocate or adjust existing surface-mounted electrical, HVAC control, and fire alarm conduits in this location. The area has no secondary ceiling system, with exposed structural timbers and wood decking above. For the 5th Floor Lobby at Boott Mill, the existing metal stud partition with gypsum wallboard will remain in place, with the scope excluding complete demolition and replacement per Note NC-3 on drawing sheet 4 of 4. Additionally, the solid wood baseboard trim specified in Note NC-4 is defined as a 4-inch wood base with ¾-inch thickness. The questions and answers were reviewed and responded to by David Michael Lieb, RA, Contracting Officer's Representative, on June 9, 2026.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NUMBER: 140P4326R0009
PARK - PMIS: 314055 / 335201
PROJECT TITLE: The National Park Service, Lowell National Historical Park - Security Upgrades, SOCILITATION QUESTIONS 03: 06/09/2026
LOWE 335201 “CONSTRUCT SECURITY AND EGRESS DOORS AT CH MEZZANINE +
BOOTT MILL #6 / FLOORS 3 AND 5” drawings
Q31. On the “CONSTRUCT SECURITY AND EGRESS DOORS AT CH MEZZANINE + BOOTT MILL #6 / FLOORS 3 AND 5” drawings, sheet 2 of 4, detail 3 -Interior Elevation At 3rd Floor Lobby, what does the top of the new wall fasten into? Is any existing ceiling demolition required to fasten the top of wall framing? What is the existing ceiling assembly in this area? Are there any existing utilities in place that would complicate framing and securing top of the new wall?
A31. Government responses:
1. The 3rd floor wall is non-loadbearing and the top track would fasten to the underside of an existing Heart Pine timber beam.
2. Where the wall is to be located will require moving/adjusting the locations of existing surface mounted conduits for electrical, HVAC (controls) and Fire Alarm pull station controls.
3. There is no secondary ceiling system in this location, exposed / open to underside of structural timbers and wood decking above.
Q32. Same questions regarding page 3 of 4, detail 3, BOOTT MILL - INTERIOR ELEVATION AT 5TH FLOOR LOBBY, plus, what is the intended height of the new wall?
A32. Please REF. 335201 drawing set sheet 3 of 4, elevation 3 Boott Mill – Interior Elevation at 5th Floor Lobby. The wall in this location is an existing metal stud partition with GWB. The scope does not include complete demo and replacement, REF: Please refer to Note NC-3 sheet 4 of 4.
Q33. What is the size and profile of the solid wood baseboard trim mentioned in Note
NC-4?
A33. 4” wood base, plan for ¾” thickness.
Reviewed and responded by:
David Michael Lieb, RA, Contracting Officer’s Representative