B08 - Attachment 0024 - FICA PWS Annex B - Supply PRS - 26JUN2025.pdf

PDF 133 KB Posted

Attached to
EAGLE Fort Irwin, CA W519TC-25-R-0009
Solicitation number
W519TC25R0009
Issued by

About this file

This document is an Annex B - Supply Performance Requirements Summary (PRS) for the U.S. Army's Installation Supply and Services Division (ISSD), specifically covering Central Issue Facility (CIF) Storefront Operations and Hazardous Material (HAZMAT) management. The CIF Storefront section outlines requirements for processing Organizational Clothing and Individual Equipment (OCIE) services, including soldier record processing within 5 working days, supporting retained issue for active-duty soldiers, accepting OCIE turn-ins, reporting excess items to the Central Management Office, and conducting annual 100% inventory control checks.

The HAZMAT section details guidelines for Hazardous Material Control, including processing and labeling materials through the Enterprise Environmental & Safety Occupational Health-Management Information System (EESOH-MIS), storing items with hazard classification, managing shelf-life of materials, and preparing expired Class III (P) products for recycling. Both sections use random sampling methods with Acceptable Quality Levels (AQLs) ranging from 90-100%, and reference multiple Army regulations and procedures to ensure compliance with standard operating protocols for supply and hazardous material management.

View the file

Other files

File Type Posted
Fort Irwin W519TC-25-R-0009 Solicitation - Amendment 0003.pdf PDF
Fort Irwin W519TC-25-R-0009 Solicitation - Amendment 0002.pdf PDF
W519TC-25-R-0009-0001.pdf PDF
B08 - Attachment 0011 - Contract References Spreadsheet - 23JAN2024.xlsx XLSX spreadsheet
B08 - Attachment 0015 - Subcontractor Cost Information Submission - 23SEP2025.pdf PDF
B08 - Attachment 0005 - Cost Price Matrix - 29SEP2025.xlsx XLSX spreadsheet
B08 - Attachment 0033 - PWS Appendix B - NTC Sewing - 04AUG2025.pdf PDF
B08 - Attachment 0004 - Letter of Consent - 29SEP2025.pdf PDF
B08 - Attachment 0026 - FICA PWS Annex D - Environmental Requirements - 07AUG2025.pdf PDF
B08 - Attachment 0027 - FICA PWS Annex E - Definitions Acronyms and Abbreviations - 07AUG2025.pdf PDF
B08 - Attachment 0001 - Performance Work Statement (PWS) - 10JUL2025.pdf PDF
B08 - Attachment 0010 - Blocked File Extensions - 21JAN2016.pdf PDF
B08 - Attachment 0002 - Staffing and Labor Mix - 01JUN2023.xlsx XLSX spreadsheet
B08 - Attachment 0006 - Preaward Survey of Prospective KTR Accounting Sys (SF 1408) - 11SEP2025.pdf PDF
B08 - Attachment 0013 - Mission Essential Contractor Services - 04DEC2024.pdf PDF
B08 - Attachment 0007 - Department of Labor Wage Determination - 03DEC2025.pdf PDF
B08 - Attachment 0009 - Purchasing Invoicing Guide - 11SEP2025.pdf PDF
B08 - Attachment 0028 - FICA PWS Annex F - Publications and Forms - 07AUG2025.pdf PDF
B08 - Attachment 0034 - Q and A Template - 29SEP2025.xlsx XLSX spreadsheet
B08 - Attachment 0023 - FICA PWS Annex A - Maintenance PRS - 26JUN2025.pdf PDF
B08 - Attachment 0003 - Performance Questionnaire - 11SEP2025.pdf PDF
B08 - Attachment 0025 - FICA PWS Annex C - Transportation PRS - 29JUL2025.pdf PDF
B08 - Attachment 0032 - PWS Appendix A - NTC G4 TMP - 31JUL2025.pdf PDF
W519TC-25-R-0009 - FICA.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex B - Supply PRS

Task/Requirement Standard Sampling Method, Lot & Acceptable

Quality Level (AQL)

INSTALLATION SUPPLY AND SERVICES DIVISION (ISSD) – GENERAL

CENTRAL ISSUE FACILITY (CIF) Storefront Operations

5.15.1 Provide core Organizational Clothing and Individual Equipment (OCIE) services in accordance with The Department of the U.S. Army.

Timeliness: Process soldiers records within 5 Working days

Quality: IAW local directives, AR 710-2, para 2-14

Random sampling

Lot: The number of soldiers requiring issue of items IAW HQDA Policy.

AQL: 95%

5.15.2 Provide new procedural steps to support retained issue for active-duty component Soldiers, and business rules to ensure the Soldiers success in clearing the installation.

Timeliness: Process soldier records and update within 5 working days.

Quality: CIF Storefront will ensure all soldiers that process through will have support and knowledge of process.

Random sampling

Lot: The number of soldiers supported in a month.

AQL: 90%

5.15.3 Accept turn-ins of OCIE.

Timeliness: 30 days prior to out-processing at this location to schedule turn-in appointments for Direct Exchange prior to retirement and Expiration of Term of Service.

Quality: Soldier will receive a stamped clearance document for all items accepted for turn-in.

Random sampling

Lot: CIF Store Front ships to RLSC and RLSC delivers response message to clear CIF ISM within 3-5 business days

5.15.3 Excess OCIE items reported to Central Management Office (CMO) for redistribution prior to initializing any turn-in action.

Timeliness: Excess OCIE items reported to CMO within 15 working days of discovery that the items are excess.

Quality: Divest of OCIE above four years of supply or IAW End of Life lists provided by CMO policy.

Random sampling

Lot: The number of OCIE LIN’s reported to the CMO at the time of surveillance.

AQL: 90%

5.15.4 Conduct 100% control check of inventory

Timeliness: Once a year to ensure accuracy.

Quality: Special measurement items ordered IAW directive IAW AR 700-84.

Random sampling

Lot: The number of accurate locations verified.

AQL: 100%

HAZARDOUS MATERIAL (HAZMAT)

5.20.1 Support Garrison Commander

guidelines for Hazardous

Material Control.

Timeliness: Ensure most recent copy is on hand at HMCP.

Quality: AR 200-1, AR 385-10, AR 700-

141, DA PAM 710-7 (In Revision), DA

Pam 710-2, AUL (Authorized Use List)

Random sampling

Lot: Compliance at time of sampling.

AQL: 95%

5.20.2 Process HAZMAT received at the ISSA through GCSS-Army and manage in the Army’s Material Management System, Enterprise Environmental & Safety Occupational Health- Management Information System (EESOH-MIS).

Timeliness: Process and label HAZMAT through EESOH-MIS immediately upon receipt

Quality: The number of SDS printed at the time of surveillance. AR 200-1, TM

38-410

Random sampling

Lot: Percentage HAZMAT items labeled upon receipt: 100-95% green, <95% -90% amber, <90% -80% red, <80% black

5.20.3 Store items with hazard

classification (Unit responsible for establishing Authorized Use

Lists (AUL) at the 50% level.

Timeliness: Perform location maintenance, to include shelf-life management, inventories of all Authorized to Forecast (ATF) and relocation of assets (bin-to-bin) and create new locations as required.

Quality: Material Release Orders

(MROs) Class III (P) in accordance with

HMCP internal procedures, AR 710-2 and DA PAM 710 2-2.

Random sampling

Lot: Compliance at time of sampling.

AQL: 90%

5.20.4 Manage shelf-life and turn in

expired HAZMAT (material not coded condition A or B)

Timeliness: HMCP sites will not accept Type 1 shelf-life items with no less than 24 months of remaining shelf-life and Type II shelf-life items with no less than 12 months of remaining shelf life.

Quality: Logistics Readiness Center

(LRC) Shelf-Life Management

Procedures; first in first out rotation of that materiel to limit environmental waste. TM 38-410; 29 CFR (Code of

Federal Regulations); DTR 4500.9R, Random sampling

Lot: Established AUL will use the materiel available IAW shelf life in order to limit stock on shelves.

5.20.5 Prepare and turn-in Class III (P)

products to DPW Recycle

Center once products expiration date has been exceeded, or when product can no longer be extended.

Timeliness: The contractor shall ensure that adequate packing materials are on hand and or requisitioned to delivery of expired products to the recycle center.

Quality: Ensure that products are cleaned and properly packaged or palletized prior to delivery to the recycle center.

Random sampling

Lot: Process request within 1 business day.

File details come from the government source that posted it. Updated .