B08 - Attachment 0023 - FICA PWS Annex A - Maintenance PRS - 26JUN2025.pdf

PDF 173 KB Posted

Attached to
EAGLE Fort Irwin, CA W519TC-25-R-0009
Solicitation number
W519TC25R0009
Issued by

About this file

This document is an Annex A – Maintenance Performance Requirements Summary (PRS) detailing comprehensive maintenance service requirements across multiple domains. The maintenance services span materiel maintenance (general and support), programs/efforts, allied trades, repair parts management, production control, and food service equipment maintenance. Key performance areas include equipment repair shops, technical inspections, welding, metal machining, supply services, production control management, and food service equipment repair and maintenance.

The document specifies precise quality standards for each maintenance task, with Acceptable Quality Levels (AQL) ranging from 90-100%. Sampling methods are predominantly random and scheduled periodically, with lots typically consisting of in-process and completed work, existing records, and files. Each task references specific Army regulations, technical manuals, and standards that must be followed, such as AR 750-1, DA PAM 750-8, and various equipment-specific technical manuals. Notably, some sensitive item and small arms maintenance tasks require 100% quality compliance, while most other maintenance tasks have a 95% AQL, indicating high performance expectations across maintenance operations.

View the file

Other files

File Type Posted
Fort Irwin W519TC-25-R-0009 Solicitation - Amendment 0003.pdf PDF
Fort Irwin W519TC-25-R-0009 Solicitation - Amendment 0002.pdf PDF
W519TC-25-R-0009-0001.pdf PDF
B08 - Attachment 0011 - Contract References Spreadsheet - 23JAN2024.xlsx XLSX spreadsheet
B08 - Attachment 0015 - Subcontractor Cost Information Submission - 23SEP2025.pdf PDF
B08 - Attachment 0005 - Cost Price Matrix - 29SEP2025.xlsx XLSX spreadsheet
B08 - Attachment 0033 - PWS Appendix B - NTC Sewing - 04AUG2025.pdf PDF
B08 - Attachment 0004 - Letter of Consent - 29SEP2025.pdf PDF
B08 - Attachment 0026 - FICA PWS Annex D - Environmental Requirements - 07AUG2025.pdf PDF
B08 - Attachment 0027 - FICA PWS Annex E - Definitions Acronyms and Abbreviations - 07AUG2025.pdf PDF
B08 - Attachment 0001 - Performance Work Statement (PWS) - 10JUL2025.pdf PDF
B08 - Attachment 0010 - Blocked File Extensions - 21JAN2016.pdf PDF
B08 - Attachment 0002 - Staffing and Labor Mix - 01JUN2023.xlsx XLSX spreadsheet
B08 - Attachment 0006 - Preaward Survey of Prospective KTR Accounting Sys (SF 1408) - 11SEP2025.pdf PDF
B08 - Attachment 0013 - Mission Essential Contractor Services - 04DEC2024.pdf PDF
B08 - Attachment 0007 - Department of Labor Wage Determination - 03DEC2025.pdf PDF
B08 - Attachment 0009 - Purchasing Invoicing Guide - 11SEP2025.pdf PDF
B08 - Attachment 0028 - FICA PWS Annex F - Publications and Forms - 07AUG2025.pdf PDF
B08 - Attachment 0034 - Q and A Template - 29SEP2025.xlsx XLSX spreadsheet
B08 - Attachment 0024 - FICA PWS Annex B - Supply PRS - 26JUN2025.pdf PDF
B08 - Attachment 0003 - Performance Questionnaire - 11SEP2025.pdf PDF
B08 - Attachment 0025 - FICA PWS Annex C - Transportation PRS - 29JUL2025.pdf PDF
B08 - Attachment 0032 - PWS Appendix A - NTC G4 TMP - 31JUL2025.pdf PDF
W519TC-25-R-0009 - FICA.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex A – Maintenance PRS

Task/Requirement Standard Sampling Method, Lot & Acceptable

Quality Level (AQL)

MATERIEL MAINTENANCE – GENERAL

5.1.1 Establish, operate, and manage equipment repair shops, and supporting functions.

Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance and ISM Operating Manual.

Random sampling (shop/activity scheduled periodically)

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.

AQL: 95%

5.1.4 Perform technical inspections in accordance with the maintenance request.

Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance (COR) guidance.

Random (shop/activity scheduled periodically)

Lot: All in-process and completed work orders, files, logs, and SOPs at time of

MATERIEL MAINTENANCE SUPPORT

5.2.1 Perform repairs IAW work request and applicable equipment TMs or equivalent publications.

Quality: Repairs will be IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment Technical Manuals (TMs), Technical Bulletins (TBs), Modification Work Orders (MWOs), Safety of Use Messages (SOUMs), Special Technical Inspection and Repairs (STIRs), other applicable Government technical publications, or OEM equivalent publications when a Government technical publication is not available.

Random sampling

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing

5.2.1 Ensure minimum rejection rates for mechanical and electrical repair work completed are met in order to meet first time pass rates.

Quality: IAW AR 750-1 and DA PAM 750-1

Random (shop/activity scheduled periodically)

Lot: Equipment that has completed the repair cycle and has been deemed as ready for issue (RFI) back to the customer.

AQL: 97% for mechanical AQL: 98% for electrical

5.2.12 Perform all air conditioning & refrigeration maintenance / repair services.

Quality: IAW40 CFR, Part 82, and applicable state and federal regulations, and the installation environmental regulations and directives. Quality: Special measurement items ordered IAW directive IAW AR 700-84.

Random (shop/activity scheduled periodically)

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing

MATERIEL MAINTENANCE – PROGRAMS/EFFORTS

5.3.8 Maintain, repair, and replace tires on rims.

Quality: IAW TM 9-2610-200-14

Random (shop/activity scheduled periodically)

Lot: The number of line items on receipts processed on the day of surveillance.

5.3.9 Provide wheel alignment support.

Quality: IAW applicable TMs and standards.

Random (shop/activity scheduled periodically)

Lot: All in process and completed work related to replacing front axle components (tie-rod/sway bar).

5.3.10 Perform glass repairs for vehicles.

Quality: Glass shall be installed to original design configurations with seals that are air and watertight.

Random (shop/activity scheduled periodically)

Lot: All in process and completed glass repair work as well as all existing logs and files at time of surveillance.

5.3.11 Perform maintenance and services of sensitive items.

Quality: AR 190-11, AR 710-2, and AR 750-1.

Monthly

Lot: All parts/items in process

AQL: 100%

5.3.11 Maintain physical security of the Material Maintenance Arms room and sensitive items.

Timeliness: Notify the COR immediately of the discovery of a missing sensitive item or major administrative discrepancy.

Quality: IAW AR 190-11, AR 710-2, AR 750-1, DA PAM 750-8, and local SOPs.

Random (shop/activity scheduled periodically)

Lot: All in process and completed sensitive item work as well as all existing records and files within the shop or activity undergoing surveillance.

5.3.12 Management of Small Arms Repair Parts (SARP).

Quality: IAW AR 710-2, AR 750-1, and ASC Supplement 750-1

Monthly

Lot: All parts in process

ALLIED TRADES

5.4.1 Perform welding, and Non-destructive testing as required.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work performed IAW work request and applicable military and industry standards. Welding performed by AWS certified welders;

NDI performed by ANSI/ASNT CP-189 certified persons.

Random (shop/activity scheduled periodically)

Lot: All in process and completed welding, as well as all existing logs and files at time of surveillance.

AQL: 95%

5.4.2 Perform metal machining, and fabrication operations and Non-destructive testing as required.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work performed IAW work request and applicable military and industry standards. NDI performed by ANSI/ASNT CP-189 certified persons.

Random (shop/activity scheduled periodically)

Lot: All in process and completed metal machining and fabrication work as well as all existing logs and files at time of

REPAIR PARTS AND MATERIEL MANAGEMENT TASKS

5.5.1 Perform shop supply services;

use the automated Army supply system as the primary means of attaining materiel.

Quality: IAW AR 750-1, AR 710-2, DA

PAM 25-30, AR 725-50, DA PAM 710-2-

2; AR 740-1; AR 735-5; AR 710-1; AR

710-3; DA PAM 710-7; AR 710-3, AR

710-4; FEDLOG; and LIS user’s manual

Random (shop/activity scheduled periodically)

Lot: All in-process and completed work orders, requisitions, requests, files, records, SOPs, and stockage at time of

5.5.6 Manage Standard Pricing (SP) items.

Timeliness: Meet SP turn- in criteria for timeliness of turn-ins.

Quality: IAW DFAS-IN Reg 37-1 Chapter 13, finance & accounting policy, implementation, unserviceable turn-ins, and current army guidance.

Periodic

Lot: The numbers of SP items processed during the period at time of surveillance.

PRODUCTION CONTROL

5.6.1 Operate a production control capability that effectively manages the maintenance workload; provide personnel technically capable of performing all tasks found in the applicable maintenance LIS End User Manual. Operate multiple equipment receiving points; provide order statuses.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: IAW work request, AR 750-1, DA PAM 750-1, DA PAM 750-8, applicable LIS publications, local policies and procedures.

Random

Lot: All in process and completed work as well as all existing logs and files at time of surveillance

AQL 95%

FOOD SERVICE EQUIPMENT

5.7.1 Provide preventive, scheduled, and unscheduled repair

services.

Quality: IAW Density list

Bi-Weekly

Lot: All in process and completed work as well as all existing records and files within the shop or activity undergoing

AQL: 90%

5.7.2 Perform inspections, services, and maintenance.

Quality: IAW applicable technical manual / manufacturer's instructions.

Random

Lot: All in process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.

AQL: 90%

5.7.3 Provide unscheduled

maintenance.

Timeliness: Unscheduled maintenance service calls are responded to within 24 hours or 1 business day of notification from DFAC maintenance

POC.

Random

Lot: All in process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.

AQL: 90%

5.7.4 Utilizing ODCs to perform

maintenance tasks.

Quality: ODCs approved by DFAC

Manager are utilized when contractor does not possess a unique skillset needed to complete a repair/service.

Random

Lot: All in process and completed work as well as all existing records and files within the shop or activity undergoing

AQL: 90%

File details come from the government source that posted it. Updated .