B08 Attachment 0018 - PWS Annex B - Supply PRS.docx

DOCX document 40 KB Posted

Attached to
EAGLE Dugway Proving Ground, UT: W519TC-25-R-0008
Solicitation number
W519TC25R0008
Issued by

About this file

This is a Performance Requirements Standards (PRS) annex to a Performance Work Statement (PWS) that establishes quality and timeliness standards for supply and services activities at an Installation Supply Support Activity (ISSA). The document outlines specific performance metrics for various supply chain tasks including maintaining signature cards, processing Found on Installation (FOI) items, handling DLADS withdrawals, inventory management, and processing turn-in documents.

The standards cover critical supply operations with varying Acceptable Quality Levels (AQL) from 90-100%, with the highest standards (100% AQL) applied to sensitive items like weapons and COMSEC equipment. Key timeliness requirements include same-day processing for DLADS withdrawals, 1-day processing for warehouse denials and turn-in documents, 2-day processing for inventory adjustments, and 3-day processing for Supply Discrepancy Reports. The document also establishes standards for hazardous material handling through GCSS-Army and EESOH-MIS systems, forklift fleet maintenance, and packaging/crating services. This PRS appears to be part of a larger solicitation for maintenance, supply and transportation services at Dugway Proving Ground, Utah.

View the file

Other files

File Type Posted
E01 W519TC-25-R-0008 Amendment 0003.pdf PDF
E01 W519TC25R0008 Amendment 0002.pdf PDF
E01 W519TC25R0008 Amendment 0001.pdf PDF
W519TC25R0008.pdf PDF
B08 Attachment 0011 - Contract References Spreadsheet (01.23.2024).xlsx XLSX spreadsheet
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf PDF
B08 Attachment 0007 - Dept of Labor Wage Determ 2015-5489 REV25.pdf PDF
B08 Attachment 0005 - Cost-Price Matrix 11Feb2025.xlsx XLSX spreadsheet
B08 Attachment 0019 - PWS Annex C - Transportation PRS.docx DOCX document
B08 Attachment 0010 - Blocked File Extensions.pdf PDF
B08 Attachment 0001 - Performance Work Statement (PWS) DPG 15JAN25.pdf PDF
B08 Attachment 0020 - PWS Annex D Environmental Requirements.docx DOCX document
B08 Attachment 0021 - PWS Annex E Definitions Acronyms and Abbreviations.docx DOCX document
B08 Attachment 0015 - Subcontractor Cost Information Submission.pdf PDF
B08 Attachment 0017 - PWS Annex A - Maintenance PRS.docx DOCX document
B08 Attachment 0003 - Performance Questionnaire.pdf PDF
B08 Attachment 0022 - PWS Annex F Publications and Forms.docx DOCX document
B08 Attachment 0013 - Mission Essential Contractor Services DPG.pdf PDF
B08 Attachment 0002 - Staffing and Labor Mix.xlsx XLSX spreadsheet
B08 Attachment 0009 - Purchasing Invoicing Guide DPG.pdf PDF
B08 Attachment 0004 - Letter of Consent.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Annex B - Supply Performance Requirement Standards (PRS)

Task/Requirement
Standard
Sampling Method, Lot & Acceptable Quality Level (AQL)

SUPPLY AND SERVICES – GENERAL

INSTALLATION SUPPLY SUPPORT ACTIVITY (RETAIL SUPPLY SVCS)

5.19.1 Maintain a file of customer signature cards for supported units/activities.

Timeliness: Signature cards updated within 10 business days of expiration.

Quality: Signature cards maintained IAW local directives, AR 710-2, and AR 710-4.

Surveillance activity checklist

Lot: Inspect all signature cards maintained at the time of surveillance.

AQL: 99%

5.19.1 Maintain a voucher register for Found on Installation (FOI) items.

Timeliness: Document numbers assigned from the voucher register the same day the FOI is discovered.

Quality: Register maintained IAW local directives, AR 710-2, AR 710-4 and DA PAM 710-2-2.

Random sampling

Lot: The number of document numbers assigned from the register at the time of surveillance.

AQL: 90%

5.19.1 Process DLADS withdrawal documents.

Timeliness: DLADS withdrawals processed the same day received.

Quality: Register maintained IAW local directives, AR 710-2, AR 710-4 and DA PAM 710-2-2.

Random sampling

Lot: The number of DLADS withdrawal documents processed at the time of surveillance.

AQL: 90%

5.19.1 Perform inventory adjustment functions for annual, cyclic, and special (sensitive items and weapons) inventories, and location surveys.

Timeliness: IAR’s processed within 2 days of notification of requirement.

Quality: IAR’s processed IAW AR 710-4, AR 735-5, and local directives.

Random sampling

Lot: The number of IAR’s processed at the time of surveillance.

AQL: 90%

5.19.1 Screen turn-in documents for redirect to DLADS.

Timeliness: Turn-in documents screened within 1 business day.

Quality: Turn-in documents processed IAW DA PAM 710-2-2, AR 710-4 and local directives.

Random sampling

Lot: The number of documents processed at the time of surveillance.

AQL: 90 %

5.19.1 Process warehouse denials.

Timeliness: Warehouse denials processed within 1 business day.

Quality: Warehouse denials processed IAW AR 710-2, AR 710-4, GCSS-A manuals, ADSM-18-L1Y-AJT-ZZZ-EM, and local directives.

Random sampling

Lot: The number of warehouse denials processed at the time of surveillance.

5.19.1 Report excess CL VII vehicles, trailers and construction equipment.

Timeliness: Excess CL VII items reported within 1 business day of report of excess.

Quality: Excess CL VII items reported and kept in a suspense file until disposition instructions are received IAW GCSS-A Manual ADSM-18-LIY-AJT-ZZZ-EM.

Surveillance activity checklist

Lot: Inspect all CL VII items reported at the time of surveillance.

AQL 90%

5.19.1 Prepare a Supply Discrepancy Report (SDR) SF 364, for discrepancies of shortage, damages, or overages of shipments received.

Timeliness: SDRs prepared and processed within 3 business days after discovery of damages or discrepancies.

Quality: SDRs prepared IAW DA PAM 25-30 and local directives.

Random sampling

Lot: The number of SDRs processed at the time of surveillance.

5.19.1 Perform causative research and annual, cyclic, and special (sensitive items and weapons) inventories and location surveys.

Timeliness: Causative research completed within 2 days of notification of requirement.

Quality: Causative research conducted IAW AR 710-2, AR 710-4, AR 735-5, and local directives.

Random sampling

Lot: The number of Causative research processed at the time of surveillance.

5.19.3 Process receipt documents.

Timeliness: Shipments received, inspected and inventoried daily.

Quality: Receipt documents processed IAW DA PAM 25-30, AR 710-2, AR 710-4, and local directives.

Random sampling

Lot: The number of receipt documents processed at the time of surveillance.

AQL: 90%

5.19.3 Process Central Receiving Point (CRP) receipts.

Timeliness: Receipt documents processed within 1 business day.

Quality: Turn-in documents processed IAW DA PAM 710-2-2, AR 710-4, and local directives.

Random sampling

Lot: The number of receipts processed at the time of surveillance.

AQL: 90%

5.19.3 Maintain customer signature cards, DA form 1687 for issues from the CRP.

Timeliness: Signature cards updated within 10 business days of expiration.

Quality: Signature cards maintained IAW AR 710-2, AR 710-4, and local directives.

Surveillance activity checklist

Lot: Inspect all signature cards maintained at the time of surveillance.

AQL: 99%

5.19.3 Notify customer upon receipt of “Push Shipments” that items are ready for pick up.

Timeliness: Customer notified within 1 business day.

Quality: Push shipments annotated in a logbook with the date received, unit/activity recipient name, and phone number, date contacted IAW AR 710-2, and AR 710-4.

Random sampling

Lot: The number of push shipments annotated in the logbook at the time of surveillance.

AQL: 90%

5.19.4 Operate and maintain the FEDEX PowerShip 2 system.

Timeliness: Express Packages prepared and processed within 2 business days of receipt.

Quality: Turn-in documents processed IAW FEDEX PowerShip instructions.

Random sampling

Lot: The number of Express Packages shipped at the time of surveillance.

AQL: 90%

5.19.4 Maintain a logbook recording FEDEX tracking numbers.

Timeliness: Tracking numbers recorded daily in the logbook.

Quality: Tracking numbers maintained in the logbook IAW DA PAM 710-2-2, AR 710-4, and local directives.

Random sampling

Lot: The number of FEDEX tracking numbers logged at the time of surveillance.

AQL: 90%

5.19.4 Maintain source document files for FEDEX documentation.

Timeliness: Documents filed with no more than a 2-day backlog.

Quality: Documents filed IAW AR 710-2, AR 710-4, and local directives.

Random sampling

Lot: The number of documents filed on the day of surveillance.

AQL: 90%

5.19.4 Submit daily summary transmittal and keep on file for verifying FEDEX billing invoices.

Timeliness: Transmittals submitted daily.

Quality: Summary transmittals submitted IAW FEDEX PowerShip instructions.

Random sampling

Lot: The number of transmittals processed on the day of surveillance.

5.19.5 Perform a monthly Arms Room inventory.

Timeliness: Arms Room inventory completed by the end of the last business day of the month.

Quality: Conduct inventory of all CCI and sensitive equipment IAW AR DA PAM 710-2-2, AR 190-11, AR 710-2, AR 710-4, and AR 735-5.

Surveillance activity checklist

Lot: Inspect all items listed on the most recent inventory at the time of surveillance.

AQL: 100%

5.19.5 Process turn-ins for small arms.

Timeliness: Turn-ins of small arms processed, and excess reported within 4 duty hours of receipt.

Quality: Turn-ins of small arms processed IAW AR 710-2, AR 710-4, and local directives.

Surveillance activity checklist

Lot: Inspect all small arms turn-in documents processed at the time of surveillance.

AQL: 100%

5.19.5 Receive sensitive/special controlled items (i.e. rifles, carbines, machine guns, pistols, fire control equipment, missile training equipment, night vision goggles, devices, and unclassified/classified COMSEC material).

Timeliness: Receipts processed the same day items are received.

Quality: Receipt documents processed IAW AR 710-2, AR 710-4, AR 190-11, and local directives.

Surveillance activity report.

Lot: Inspect all sensitive/special controlled item receipt documents processed at the time of surveillance.

AQL: 100%

5.19.5 Provide Packing and Crating services of shipments of weapons and COMSEC items.

Timeliness: Turn-in items packaged within 1 business day

Quality: Turn-in items packaged IAW DA PAM 710-2-2, AR 710-4, and local directives.

Random sampling

Lot: The number of documents processed at the time of surveillance.

AQL: 100%

5.19.5 Ensure that serial numbers for sensitive items are recorded on turn-in documents.

Timeliness: Turn-in documents screened within 1 business day.

Quality: Turn-in documents processed IAW ADSM-18-LIY-AJT-ZZZ-EM and local directives.

Random sampling

Lot: The number of sensitive item turn-ins processed at the time of surveillance.

AQL: 100%

5.19.5 Provide Packing and Crating services.

Timeliness: Shipments processed within 2 business days of receiving shipping instructions.

Quality: Shipments processed IAW instructions received from the NICP.

Random sampling

Lot: The number of shipment documents processed on the day of surveillance.

AQL: 90%

5.19.5 Process turn-in documents.

Timeliness: Turn-in documents processed within 1 business day of receipt.

Quality: Turn-in documents processed IAW AR 710-2, AR 710-4, DA PAM 710-2-2, and local directives.

Random sampling

Lot: The number of turn-in documents processed on the day of surveillance.

5.19.6 Perform care of supply in storage (COSIS).

Timeliness: Perform required inspections that identify discrepant packaging within the required cyclic times or by the Stock Readiness Program.

Quality: IAW Stock Readiness Program Business Rules, AR 710-2, AR 710-4, AR 740-3, DA PAM 700-32, DODM 4140.27, MIL-STD-2073-1, and local directives.

Random sampling

Lot: Number of COSIS inspections performed within the established timeframes.

AQL: 95%

5.19.6.1 Determine crating and packaging requirements for storage.

Timeliness: Determination made the same day received.

Quality: Determination made IAW Stock Readiness Program Business Rules, AR 740-3, 2 MIL-STD-2073-1, DA PAM 700-32, and local directives.

Random sampling

Lot: The number of determinations completed documents at the time of surveillance.

AQL: 90%

5.19.6.1 Package turn-ins for redirect to DLADS or to depot.

Timeliness: Turn-in items packaged within 1 business day.

Quality: Turn-in items packaged IAW MIL-STD-2073-1, DA PAM 700-32, AR 740-3, and local directives.

Random sampling

Lot: The number of documents processed at the time of surveillance.

AQL: 90%

5.19.8 Perform repairs and scheduled preventive maintenance on Supply Division’s forklift fleet and associated equipment.

Timeliness: Repairs and scheduled preventive maintenance actions performed daily.

Quality: Repairs and scheduled preventive maintenance actions performed IAW local SOPs.

Random sampling

Lot: The number of PM actions performed at the time of surveillance.

5.19.8 Prepare and process DA form 2407 (work orders) for vehicle/equipment repair.

Timeliness: DA form 2407’s prepared for vehicles and equipment by COB next business day.

Quality: DA form 2407’s prepared for vehicles and equipment IAW AR 710-2, and AR 710-4.

Random sampling

Lot: The number of DA 2407’s processed at the time of surveillance.

5.19.8 Report excess CL VII vehicles, trailers and construction equipment.

Timeliness: Excess CL VII items reported within 1 business day of report of excess.

Quality: Excess CL VII items reported and kept in a suspense file until disposition instructions are received IAW LIS Manual ADSM-18-LIY-AJT-ZZZ-EM.

Surveillance activity checklist

Lot: Inspect all CL VII items reported at the time of surveillance.

AQL 90%

Hazardous Material Control Point (HMCP)

5.20.1 Process HAZMAT received at the ISSA through GCSS-Army and manage in the Army’s Material Management System, Enterprise Environmental & Safety Occupational Health-Management Information System (EESOH-MIS).

Timeliness: Process and label HAZMAT through EESOH-MIS immediately upon receipt

Quality: The number of SDS printed at the time of surveillance. AR 200-1, TM 38-410 Random sampling

Lot: Percentage HAZMAT items labeled upon receipt: 100-95% green, <95% -90% amber, <90% -80% red, <80% black

5.20.3 Process turn-ins for stock that shelf life has expired or became unserviceable in storage.

Timeliness: Process turn-in within 1 business day of identification of items for turn-in.

Quality: Turn-in processed to evacuate items identifies.

Random sampling

Lot: The number of items found in warehouse that should have been turned in.

AQL: 90%

5.20.4 Issue items to customers from stock.

Timeliness: Issue items within with-in 1 business day of receipt.

Quality: Ensure items are documented and customer signs receipt.

Random sampling

Lot: The number of lines issued within 1 business day.

AQL: 90%

5.20.4 Process request for stock and for customer immediate use.

Timeliness: Process request within 1 business day or items reaching reorder point in warehouse.

Quality: Request processed thru approving authority to obtain funding approval to requisition within 1 business day of request or items reaching reorder point.

Random sampling

Lot: The number of requisitions processed within 1 business day.

AQL: 90%

5.20.5 Print Safety Data Sheet (SDS) and attach to each individual MRO for HAZMAT.

Timeliness: SDS produced and attached daily.

Quality: SDS printed and attached to MRO’s IAW directive IAW AR 710-4.

Random sampling

Lot: The number of SDS printed and attached at the time of surveillance.

File details come from the government source that posted it. Updated .