B08_Attachment 0012 TE-08 -- Schedule of Deliverables.pdf

PDF 135 KB Posted

Attached to
Elevator Repairs and Maintenance Services Federal contract opportunity
Solicitation number
W519TC-24-R-2048
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This document is a Technical Exhibit (TE-08) that outlines the Schedule of Deliverables for an Elevator Repairs and Maintenance Services contract for the Rock Island Arsenal, Rock Island, Illinois.

The key details include: Employee Certification and Experience, Written QC and EI procedures, Contractor Personnel Roster, AT Level 1 Certificate, iWATCH Training Certificate, Operations Security (OPSEC) Training Certificate, Strike Plan, Inspection and Test Check List, Replacement Parts reports, Preventative Maintenance Schedule and Logs, Web-Based Reporting and Tracking System, and Certificate of Operation or Report of Deficiencies. The deliverables have varying frequencies, ranging from within 15 days of award to annually, and are to be submitted electronically or in hard copy to the Contracting Officer (KO) and/or the Contracting Officer's Representative (COR). This Technical Exhibit is associated with Solicitation Number W519TC-24-R-2048 for Elevator Repairs and Maintenance Services at the Rock Island Arsenal, issued by the Army Contracting Command - Rock Island.

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Repairs and Maintenance Services, newest first.
File Type Posted
B08_W519TC-24-R-2048 Amendment 0003.pdf PDF
B08_W519TC-24-R-2048 Amendment 0002.pdf PDF
B08_UPDATED Attachment 0004 PWS.pdf PDF
B08_UPDATED Attachment 0003 Price Matrix Elevator Maintenance.xlsx XLSX spreadsheet
B08_W519TC-24-R-2048 Amendment 0001.pdf PDF
E01_W519TC-24-R-2048 16SEP2024 final.pdf PDF
B08_Attachment 0009 TE-05 -- PM Schedule for Wheelchair Elevators.pdf PDF
B08_Attachment 0011 TE-07 --Performance Requirements Summary (PRS).pdf PDF
B08_Attachment 0001 Site Visit Map.pdf PDF
B08_Attachment 0003 Price Matrix Elevator Maintenance.xlsx XLSX spreadsheet
B08_Attachment 0005 TE-01 -- Elevator Locations Drawings Revision.pdf PDF
B08_Attachment 0008 TE-04 -- PM Schedule for Traction Cable and Electric Elevators.pdf PDF
B08_Attachment 0014 VENDOR GUIDE Contract Opportunities All Topics.pptx PPTX presentation
B08_Attachment 0002 Service Contract Wage Determination 2006-0035 08FEB2024.pdf PDF
B08_Attachment 0004 PWS.pdf PDF
B08_Attachment 0006 TE-02 -- Elevator Inventory.pdf PDF
B08_Attachment 0007 TE-03 -- PM Schedule for Hydraulic Elevator.pdf PDF
B08_Attachment 0010 TE-06 -- Periodic Inspection and Test for Elevators.pdf PDF
B08_Attachment 0013 TE-09 -- ELEVATOR LOG CHECK-IN-CHECK-OUT SHEET.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAG-RIA -- TECHNICAL EXHIBIT 08

SCHEDULE OF DELIVERABLES

Deliverable Frequency Number of Copies

Medium/ Format

Submit To

Employee Certification and Experience (2.4.2)

NLT fifteen (15) days of award date, annually fifteen

(15) days prior to the end of the performance period, NLT fifteen (15) days prior to the commencement of work to be performed, and NLT fifteen (15) days after license(s) expiring date.

one per Mechanic

Electronic

(PDF)

KO,

COR

Written QC and EI procedures (2.4.2.1)

NLT thirty (30) days of award date, annually thirty (30) days prior to the end of the performance period Contractor shall review, update if required, and submit their quality control/elevator inspection procedures.

One plan Electronic

(PDF)

KO,

COR

Contractor Personnel Roster (2.4.6)

NLT fifteen (15) calendar days after award date, NLT fifteen (15) calendar prior to each Contract start date of period of performance. The Contractor shall maintain this roster and submit changes, as required one per Mechanic

Electronic

(PDF)

KO,

COR

AT Level 1 Certificate (2.5.6.1)

NLT thirty (30) calendar days after contract award date and on a recurring annual basis; and NLT five (5) calendar days of new employees and Sub-Contractor personnel start date and on a recurring annual basis.

one per individual

Electronic

(PDF)

COR

iWATCH Training Certificate (2.5.6.3)

NLT thirty (30) calendar days after contract award date and on a recurring annual basis; and NLT five (5) calendar days of new employees and Sub-Contractor personnel start date and on a recurring annual basis.

one per individual

Electronic

(PDF)

COR

Operations Security (OPSEC) Training Certificate (2.5.6.4)

NLT thirty (30) calendar days after contract award date and on a recurring annual basis; and NLT five (5) calendar days of new employees and Sub-Contractor personnel start date and on a recurring annual basis.

one per individual

Electronic

(PDF)

COR

Strike Plan (2.14) NLT thirty (30) days of award date, annually thirty (30) days prior to the end of the performance period Contractor shall review, update if required, and submit the procedure to ensure work under this contract is not impacted by employee strikes.

one plan Electronic

(PDF)

KO,

COR

Inspection and Test Check List (4.3)

NLT thirty (30) calendar days after contract award date.

one per elevator

Electronic (PDF)/hard copy

COR

Replacement Parts.

(4.5.3.3)

As required per service call IAW the terms and conditions of the contract.

one report for all parts

Electronic

(PDF)

COR

Preventative Maintenance Schedule (2.11 & 4.5)

NLT 1st calendar day of the month IAW the terms and conditions of the contract.

one per elevator

Electronic

(PDF)

COR

Preventative Maintenance Log of Each Elevator (2.11 & 4.5.3.5)

NLT ten (10) calendar days following the completion of the monthly inspection IAW the terms and conditions of the contract. NLT ten (10) calendar days after contract completion.

one per elevator hard copy

COR

USAG-RIA -- TECHNICAL EXHIBIT 08

SCHEDULE OF DELIVERABLES

Deliverable Frequency Number of Copies

Medium/ Format

Submit To

Web Based Reporting and Tracking System (4.5.3.6)

NLT thirty (30) calendar days after contract award date.

one Database

Web Page COR

Certificate of Operation or report of Deficiencies (4.9)

NLT 180 calendar days after award date. one per elevator hard copy of Certificate Electronic Copy of Report of Deficiencies

COR

File details come from the government source that posted it. Updated .