This document is a Technical Exhibit detailing the preventive maintenance schedule for wheelchair elevators at the Rock Island Arsenal. It outlines 17 specific maintenance tasks that must be performed on a monthly, quarterly, semi-annual, or annual basis. These tasks include checking for deficiencies, monitoring electrical parameters, inspecting mechanical components, lubricating moving parts, and verifying proper functionality of safety systems and controls.

The related federal contract opportunity is for Elevator Repairs and Maintenance Services at the Rock Island Arsenal. The Army Contracting Command - Rock Island is seeking proposals for this requirement, which involves providing all labor, materials, and equipment necessary to maintain and repair the elevators on the installation. The contract will be awarded to support the Department of the Army Materiel Command Contracting Command at the Rock Island Arsenal.

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Repairs and Maintenance Services, newest first.
File Type Posted
B08_W519TC-24-R-2048 Amendment 0003.pdf PDF
B08_W519TC-24-R-2048 Amendment 0002.pdf PDF
B08_UPDATED Attachment 0004 PWS.pdf PDF
B08_UPDATED Attachment 0003 Price Matrix Elevator Maintenance.xlsx XLSX spreadsheet
B08_W519TC-24-R-2048 Amendment 0001.pdf PDF
E01_W519TC-24-R-2048 16SEP2024 final.pdf PDF
B08_Attachment 0011 TE-07 --Performance Requirements Summary (PRS).pdf PDF
B08_Attachment 0012 TE-08 -- Schedule of Deliverables.pdf PDF
B08_Attachment 0003 Price Matrix Elevator Maintenance.xlsx XLSX spreadsheet
B08_Attachment 0005 TE-01 -- Elevator Locations Drawings Revision.pdf PDF
B08_Attachment 0008 TE-04 -- PM Schedule for Traction Cable and Electric Elevators.pdf PDF
B08_Attachment 0014 VENDOR GUIDE Contract Opportunities All Topics.pptx PPTX presentation
B08_Attachment 0001 Site Visit Map.pdf PDF
B08_Attachment 0002 Service Contract Wage Determination 2006-0035 08FEB2024.pdf PDF
B08_Attachment 0004 PWS.pdf PDF
B08_Attachment 0006 TE-02 -- Elevator Inventory.pdf PDF
B08_Attachment 0007 TE-03 -- PM Schedule for Hydraulic Elevator.pdf PDF
B08_Attachment 0010 TE-06 -- Periodic Inspection and Test for Elevators.pdf PDF
B08_Attachment 0013 TE-09 -- ELEVATOR LOG CHECK-IN-CHECK-OUT SHEET.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAG-RIA -- Technical Exhibit 05 PM Schedules for WheelChair

Elevators

M Q S A

(Monthly) (Quarterly) (SemiAnnual) (Annual)

1 Check with operating personnel for any deficiencies. Yes Yes

2 Check voltage and amperage under load. Yes Yes

3 Check bolts securing drive cabinet and base, tighten accordingly. Yes Yes

4 Check belt tension. Yes Yes

5 Check lift nut assembly. Yes Yes

6 Check cam rollers. Yes Yes

7 Check wear pads for excessive wear. Yes Yes

8 Inspect motor and shaft pulleys. Yes Yes

9 Check Acme screw alignment. Yes Yes

10 Inspect and lubricate upper and lower bearings. Yes Yes

11 Check fastening of cable harness. Yes Yes

12 Check alignment of platform and doors. Yes Yes

13 Check door interlock switch for proper operation. Yes Yes

14 Check operation of final limit switch and emergency stop/alarm. Yes Yes

15 Check call/send controls at each station and on platform. Yes Yes

16 Lube hinge of flip up ramp. Yes Yes

17 Fill out maintenance checklist and report deficiencies. Yes Yes