B08_Attachment 0009 TE-05 -- PM Schedule for Wheelchair Elevators.pdf

PDF 382 KB Posted

Attached to
Elevator Repairs and Maintenance Services
Solicitation number
W519TC-24-R-2048
Issued by

About this file

This document is a Technical Exhibit detailing the preventive maintenance schedule for wheelchair elevators at the Rock Island Arsenal. It outlines 17 specific maintenance tasks that must be performed on a monthly, quarterly, semi-annual, or annual basis. These tasks include checking for deficiencies, monitoring electrical parameters, inspecting mechanical components, lubricating moving parts, and verifying proper functionality of safety systems and controls.

The related federal contract opportunity is for Elevator Repairs and Maintenance Services at the Rock Island Arsenal. The Army Contracting Command - Rock Island is seeking proposals for this requirement, which involves providing all labor, materials, and equipment necessary to maintain and repair the elevators on the installation. The contract will be awarded to support the Department of the Army Materiel Command Contracting Command at the Rock Island Arsenal.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAG-RIA -- Technical Exhibit 05 PM Schedules for WheelChair

Elevators

M Q S A

(Monthly) (Quarterly) (SemiAnnual) (Annual)

1 Check with operating personnel for any deficiencies. Yes Yes

2 Check voltage and amperage under load. Yes Yes

3 Check bolts securing drive cabinet and base, tighten accordingly. Yes Yes

4 Check belt tension. Yes Yes

5 Check lift nut assembly. Yes Yes

6 Check cam rollers. Yes Yes

7 Check wear pads for excessive wear. Yes Yes

8 Inspect motor and shaft pulleys. Yes Yes

9 Check Acme screw alignment. Yes Yes

10 Inspect and lubricate upper and lower bearings. Yes Yes

11 Check fastening of cable harness. Yes Yes

12 Check alignment of platform and doors. Yes Yes

13 Check door interlock switch for proper operation. Yes Yes

14 Check operation of final limit switch and emergency stop/alarm. Yes Yes

15 Check call/send controls at each station and on platform. Yes Yes

16 Lube hinge of flip up ramp. Yes Yes

17 Fill out maintenance checklist and report deficiencies. Yes Yes

Task Number

PM Description

Frequency

File details come from the government source that posted it. Updated .