B08_Attach_9_Contract_Price_Schedule___Blank.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- 140P2023R0028
About this file
This is a price schedule template for a National Park Service solicitation to demolish and replace disaster damaged facilities at Uekahuna Bluff and the Jaggar Museum and realign Crater Rim Drive and expand the entrance station at Hawaii Volcanoes National Park. The template includes 11 contract line items for base requirements including demolishing buildings, repairing structures, replacing equipment, and redesigning systems. There are also 3 option items for additional work that could be awarded. Offerors must submit pricing for all base and option items. Pricing is to be lump sum for line items 1 through 8 and options 9 through 11. The total proposed price should include the base price plus all option prices. Measurement and payment details are in specification section 01 27 00.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | 140P2023R0028 | ||||
| PARK - PMIS: | HAVO - 305150, 315026, 250523, 254676, 196582, 258076 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Summit Area | ||||
| Project Title: | Disaster Recovery | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | PMIS 305150E - Uēkahuna Building Demolition | 1 | Lump Sum | $0.00 | |
| 2 | PMIS 318523 - Uēkahuna Comfort Station Repair | 1 | Lump Sum | $0.00 | |
| 3 | PMIS 250523 - Uēkahuna Water Tank Demo & Replacement | 1 | Lump Sum | $0.00 | |
| 4 | PMIS 305150A - Uēkahuna Overlook Repair & Improvements | 1 | Lump Sum | $0.00 | |
| 5 | PMIS 315026 - Crater Rim Drive Intersection & Realignment | 1 | Lump Sum | $0.00 | |
| 6 | PMIS 254676 - Replace Generator at Park Entrance | 1 | Lump Sum | $0.00 | |
| 7 | PMIS 196582 - Replace Water Distribution System Redesign | 1 | Lump Sum | $0.00 | |
| 8 | PMIS 258076 - Replace Fiber Optic Lines | 1 | Lump Sum | $0.00 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 8) --------------------------------------------------------------------------------- | $0.00 | ||||
| 9 | OPTION A, PMIS 305150A Uēkahuna Bluff Crater-Side Barrier | 1 | Lump Sum | $0.00 | |
| 10 | OPTION B, PMIS 305150A Uēkahuna Bluff Trail & Inside Barrier | 1 | Lump Sum | $0.00 | |
| 11 | OPTION C, PMIS 305150A Uēkahuna Temporary Public Access Facilities | 1 | Lump Sum | $0.00 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 9 through 11) ----------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 11) -------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
File details come from the government source that posted it. Updated .