B09_Amd_04_02-C102_SITE_PLAN_(ENTR)_II-55_0004.pdf

PDF 356 KB Posted

Attached to
HAVO 305150 Demolish and Replace Volcano Disaster
Solicitation number
140P2023R0028
Issued by

About this file

This site plan drawing package is for the HAVO 305150 Demolish and Replace Volcano Disaster Damaged Facilities at Uekahuna Bluff and Jaggar Museum & HAVO 315026 Realign Crater Rim Drive and Expand Entrance Station to Improve Visitor Safety at Hawaii Volcanoes National Park, Island of Hawaii solicitation. The site plan drawings show layout details for the entrance station expansion, road realignment, and replacement of damaged facilities. Key elements include new signage, pavement, curb, and walkway locations; traffic loop and lighting installations; utility line placements; and demolition and construction areas. Notes provide specifications for signs, soil preparation, layout points, and indicate that separate drawings exist for replacing the water distribution system and fiber optic lines along the roadway. Overhead utility lines will also be relocated.

View the file

Other files

File Type Posted
B09_Amd_06_02_41_13_-_Site_Selective_Demolition_0006.pdf PDF
B09_Amd_06_33_16_00_-_Water_Utility_Storage_Tank_0006.pdf PDF
B09_Amd_06_01-X101_SITE_TESC___DEMO_PLAN_(UB)_I_0006.pdf PDF
B09_Amd_06_Pages_from_HAVO_124_41013B__id101233__HVO_and_Renovated_Annex_Asbuilts_1988_0006.pdf PDF
B09_Amd_06_01-C105_GRADING_PLAN_(UB)_II_0006.pdf PDF
B09_Amd_06_01-X102_SITE_TESC___DEMO_PLAN_(UB)_II_0006.pdf PDF
B09_Amd_06_Solicitation_QA_HAVO_140P2023R0028_0006.xlsx XLSX spreadsheet
B09_Amd_06_SF30_140P2023R0028_0006.pdf PDF
B09_Amd_06_01-X103_BUILDING_DEMO_PLAN_(GENERAL)_0006.pdf PDF
B09_Amd_06_01-C104_GRADING_PLAN_(UB)_I_0006.pdf PDF
Sol_140P2023R0028_Amd_0006.pdf PDF
Sol_140P2023R0028_Amd_0005.pdf PDF
B09_Amd_05_SF30_140P2023R0028_0005.pdf PDF
B09_Amd_05_Solicitation_QA_HAVO_140P2023R0028_0005.xlsx XLSX spreadsheet
B09_Amd_04_02-C118_COLLOCATED_UTILITY_PLAN-71_0004.pdf PDF
B09_Amd_04_02-C505_SITE_DETAILS_V-75_0004.pdf PDF
B09_Amd_04_02-C108_ALIGNMENT_CONTROL_PLAN-61_0004.pdf PDF
B09_Amd_04_02-C301_ROAD_SECTIONS_(ENTR)-70_0004.pdf PDF
B09_Amd_04_SF30_0004.pdf PDF
B09_Amd_04_Solicitation_QA_HAVO_140P2023R0028_0004.xlsx XLSX spreadsheet
Sol_140P2023R0028_Amd_0004.pdf PDF
B09_Amd_03_Site_Visit_sign_in_HAVO_305150_0003.pdf PDF
B09_Amd_03_Site_Visit_Tri_Fold_HAVO_305150_0003.pdf PDF
B09_Amd_03_SF30_HAVO_305150-315026__0003.pdf PDF
B09_Amd_03_BIL_Signage_2023_05_08_0003.pdf PDF
Sol_140P2023R0028_Amd_0003.pdf PDF
B09_Amd_03_HAVO_305150_315026__Prebid_Meeting_Notes_5-4-23_0003.docx DOCX document
B09_Amd_02_01_50_00_TemporaryFacilitiesAndControls_305150-315026_0002.pdf PDF
B09_Amd_02_02-C101-C103_SITE_PLAN_0002.pdf PDF
B09_Amd_02_Solicitation_QA_HAVO_140P2023R0028_0002.xlsx XLSX spreadsheet
B09_Amd_02_01_27_00_DefinitionOfContractLineItems_305150-315026_0002.pdf PDF
B09_Amd_02_HAVO_305150-315026_Contract_Price_Schedule___Blank_Price_0002.xlsx XLSX spreadsheet
B09_Amd_02_HAVO_305150-315026_Contract_Price_Schedule___Blank_Price_0002.pdf PDF
B09_Amd_02_02-C117_OVERHEAD_UTILITY_RELOCATION_PLAN_0002.pdf PDF
Sol_140P2023R0028_Amd_0002.pdf PDF
B09_Amd_02_02-C118_COLLOCATED_UTILITY_PLAN_0002.pdf PDF
B09_Amd_02_01_11_00_SummaryOfWork_305150-315026_0002.pdf PDF
B09_Amd_02_SF30_HAVO_305150-315026__0002.pdf PDF
Sol_140P2023R0028_Amd_0001.pdf PDF
B08_Amd_01_Q_A_0001.pdf PDF
B08_Attach_3_258076_Fiber_Optic_Line_Package.zip ZIP file
B08_Attach 1a1_305150-315026 Uekahuna Bluff and Park Entrance Package1a1.zip ZIP file
B08_Attach_2_196582_Water_Line_Package.zip ZIP file
B08_Attach_1b1_305150-31506_Uekahuna_Bluff_and_Park_Entrance_Package.zip ZIP file
B08_Attach_5_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Attach_9_Contract_Price_Schedule___Blank.xlsx XLSX spreadsheet
Sol_140P2023R0028.pdf PDF
B08_Attach_6_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_Attach_8_revLmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Attach_7_Solit_PSP_Vol_II_GenRefs.doc DOC document
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OHL

O H L

O H L

O H L

O H L

AutoCAD SHX Text Comm. Vault

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text M

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text Shed

AutoCAD SHX Text Booth 1

AutoCAD SHX Text Booth 2

AutoCAD SHX Text Overhang

AutoCAD SHX Text

CONCRETE CURB, SEE DETAIL ON SHEET 02-C505 (TYP.)02-C505 (TYP.) (TYP.)

AutoCAD SHX Text

VERTICAL STONE CURB, SEE DETAIL ON SHEET 01-C502 (TYP.)01-C502 (TYP.) (TYP.)

AutoCAD SHX Text

NEW STONE CURB TO TIE INTO EXISTING STONE CURB

AutoCAD SHX Text

EAC WALKWAY (TYP.) SEE DETAIL ON SHEET 01-C50101-C501

AutoCAD SHX Text

APPROX. LIMITS OF WORK (TYP.)

AutoCAD SHX Text

NEW TRAFFIC COUNTER LOOP (TYP.) SEE 02-E SHEETS FOR ELECTRICAL CONNECTION

AutoCAD SHX Text

DETECTABLE WARNING SURFACE (TYP.) SEE DETAIL ON SHEET 02-C50502-C505

AutoCAD SHX Text

AREA LIGHT, SEE 02-E SHEETS

AutoCAD SHX Text

VERIFY LOCATION AND MAINTAIN EXISTING UTILITIES WITHIN WORK LIMITS

AutoCAD SHX Text

45-DEGREE STRIPING IN ADMINISTRATIVE LANE

AutoCAD SHX Text SEE ELECTRICAL PLANS FOR WORK RELATED TO PMIS 254676/CLIN 6: REPLACE GENERATOR AT PARK ENTRANCE

AutoCAD SHX Text

SIGN (TYP.)

AutoCAD SHX Text NEW FIBER OPTIC AND WATER LINES TO BE LOCATED ALONG ROADWAY AND CONNECT TO EXISTING ENTRANCE STATION, SEE NOTE 8

AutoCAD SHX Text OVERHEAD HAWAIIAN TELCOM & SPECTRUM LINES TO BE RELOCATED, SEE SHEET 02-C11702-C117

AutoCAD SHX Text

HOT MIX ASPHALT PAVEMENT

AutoCAD SHX Text

CEMENT CONCRETE PAVEMENT

AutoCAD SHX Text

ADVANCE ROAD GUIDE SIGN

AutoCAD SHX Text

EXIT ROAD GUIDE SIGN

AutoCAD SHX Text

TRAFFIC REGULATORY SIGN

AutoCAD SHX Text

CONCRETE CURB

AutoCAD SHX Text

STONE CURB

AutoCAD SHX Text

EXPOSED AGGREGATE CONCRETE PAVEMENT

AutoCAD SHX Text

SITE PLAN NOTES:

AutoCAD SHX Text

1. SEE SIGNING AND STRIPING INFORMATION ON SHEETS SEE SIGNING AND STRIPING INFORMATION ON SHEETS 02-C114 TO 02-C116. TO 02-C116. 02-C116. . 2. SEE SHEET 02-C503 FOR SIGN INSTALLATION SEE SHEET 02-C503 FOR SIGN INSTALLATION 02-C503 FOR SIGN INSTALLATION FOR SIGN INSTALLATION DETAILS. 3. SEE SPECIFICATIONS FOR ADVANCE GUIDE SIGN AND SEE SPECIFICATIONS FOR ADVANCE GUIDE SIGN AND EXIT GUIDE SIGN PANELS. 4. SEE SHEETS 02-L101 TO 02-L103 FOR SOIL SEE SHEETS 02-L101 TO 02-L103 FOR SOIL 02-L101 TO 02-L103 FOR SOIL TO 02-L103 FOR SOIL 02-L103 FOR SOIL FOR SOIL PREPARATION OF AREAS TO BE REVEGETATED. 5. NEW TRAFFIC LOOPS: NEW TRAFFIC LOOPS: 5.1. MIN. SIZE OF 6' X 6' MIN. SIZE OF 6' X 6' 5.2. MIN. 3' FROM ADJACENT LANES MIN. 3' FROM ADJACENT LANES 5.3. MIN. 6' DISTANCE FROM OTHER LOOPS MIN. 6' DISTANCE FROM OTHER LOOPS 5.4. MIN. 4' DISTANCE FROM ROAD CLOSURE GATES MIN. 4' DISTANCE FROM ROAD CLOSURE GATES 6. SEE SHEET 02-C501 FOR EARTH CRACK - VOID SEE SHEET 02-C501 FOR EARTH CRACK - VOID 02-C501 FOR EARTH CRACK - VOID FOR EARTH CRACK - VOID FILL DETAILS. 7. SEE SHEETS 02-C104 TO 02-C107 FOR LAYOUT SEE SHEETS 02-C104 TO 02-C107 FOR LAYOUT 02-C104 TO 02-C107 FOR LAYOUT TO 02-C107 FOR LAYOUT 02-C107 FOR LAYOUT FOR LAYOUT POINTS. 8. NEW WATER AND FIBER OPTIC LINES FOR THE PARK NEW WATER AND FIBER OPTIC LINES FOR THE PARK SHALL BE LOCATED ALONG THE ROADWAY. REFER TO SEPARATE DRAWINGS: 8.1. PMIS 196582/CLIN 7: REPLACE WATER PMIS 196582/CLIN 7: REPLACE WATER DISTRIBUTION SYSTEM, REFER TO DRAWING SET NO. 124-145330 8.2. PMIS 258076/CLIN 8: REPLACE FIBER OPTIC PMIS 258076/CLIN 8: REPLACE FIBER OPTIC LINES, REFER TO DRAWING SET N0. 124-175265 9. EXISTING OVERHEAD HAWAIIAN TELCOM & SPECTRUM EXISTING OVERHEAD HAWAIIAN TELCOM & SPECTRUM LINES SHALL BE RELOCATED. SEE SHEET 02-C117.02-C117..

AutoCAD SHX Text

1. SEE SIGNING AND STRIPING INFORMATION ON SHEETS SEE SIGNING AND STRIPING INFORMATION ON SHEETS 02-C114 TO 02-C116. TO 02-C116. 02-C116. . 2. SEE SHEET 02-C503 FOR SIGN INSTALLATION SEE SHEET 02-C503 FOR SIGN INSTALLATION 02-C503 FOR SIGN INSTALLATION FOR SIGN INSTALLATION DETAILS. 3. SEE SPECIFICATIONS FOR ADVANCE GUIDE SIGN AND SEE SPECIFICATIONS FOR ADVANCE GUIDE SIGN AND EXIT GUIDE SIGN PANELS. 4. SEE SHEETS 02-L101 TO 02-L103 FOR SOIL SEE SHEETS 02-L101 TO 02-L103 FOR SOIL 02-L101 TO 02-L103 FOR SOIL TO 02-L103 FOR SOIL 02-L103 FOR SOIL FOR SOIL PREPARATION OF AREAS TO BE REVEGETATED. 5. NEW TRAFFIC LOOPS: NEW TRAFFIC LOOPS: 5.1. MIN. SIZE OF 6' X 6' MIN. SIZE OF 6' X 6' 5.2. MIN. 3' FROM ADJACENT LANES MIN. 3' FROM ADJACENT LANES 5.3. MIN. 6' DISTANCE FROM OTHER LOOPS MIN. 6' DISTANCE FROM OTHER LOOPS 5.4. MIN. 4' DISTANCE FROM ROAD CLOSURE GATES MIN. 4' DISTANCE FROM ROAD CLOSURE GATES 6. SEE SHEET 02-C501 FOR EARTH CRACK - VOID SEE SHEET 02-C501 FOR EARTH CRACK - VOID 02-C501 FOR EARTH CRACK - VOID FOR EARTH CRACK - VOID FILL DETAILS. 7. SEE SHEETS 02-C104 TO 02-C107 FOR LAYOUT SEE SHEETS 02-C104 TO 02-C107 FOR LAYOUT 02-C104 TO 02-C107 FOR LAYOUT TO 02-C107 FOR LAYOUT 02-C107 FOR LAYOUT FOR LAYOUT POINTS. 8. NEW WATER AND FIBER OPTIC LINES FOR THE PARK NEW WATER AND FIBER OPTIC LINES FOR THE PARK SHALL BE LOCATED ALONG THE ROADWAY. REFER TO SEPARATE DRAWINGS: 8.1. PMIS 196582/CLIN 7: REPLACE WATER PMIS 196582/CLIN 7: REPLACE WATER DISTRIBUTION SYSTEM, REFER TO DRAWING SET NO. 124-145330 8.2. PMIS 258076/CLIN 8: REPLACE FIBER OPTIC PMIS 258076/CLIN 8: REPLACE FIBER OPTIC LINES, REFER TO DRAWING SET N0. 124-175265 9. EXISTING OVERHEAD HAWAIIAN TELCOM & SPECTRUM EXISTING OVERHEAD HAWAIIAN TELCOM & SPECTRUM LINES SHALL BE RELOCATED. SEE SHEET 02-C117.02-C117..

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

AutoCAD SHX Text 175449

AutoCAD SHX Text

AutoCAD SHX Text

DP, EM, MS

AutoCAD SHX Text

KK

AutoCAD SHX Text 04/26/23

AutoCAD SHX Text

HAWAII VOLCANOES NATIONAL PARK

AutoCAD SHX Text

UEKAHUNA / ENTRANCE

AutoCAD SHX Text 305150/318523 250523/315026 254676

AutoCAD SHX Text

IN FEET

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 20'

AutoCAD SHX Text 20'

AutoCAD SHX Text 0'

AutoCAD SHX Text 40'

AutoCAD SHX Text

AutoCAD SHX Text

MATCH LINE SHEET 02-C10102-C101

AutoCAD SHX Text

SEE SHEET 02-C103 FOR CONTINUATION02-C103 FOR CONTINUATION FOR CONTINUATION

AutoCAD SHX Text

SITE PLAN (ENTR) II

AutoCAD SHX Text

KEY MAP

AutoCAD SHX Text 02- C102 kevin.kraxberger Cloud kevin.kraxberger Cloud

Sheets and Views
55

File details come from the government source that posted it. Updated .