B09_Amd_04_02-C108_ALIGNMENT_CONTROL_PLAN-61_0004.pdf
PDF 240 KB Posted
- Solicitation number
- 140P2023R0028
About this file
This document contains an alignment control plan drawing and details for a federal contract opportunity to demolish and replace disaster damaged facilities and realign roads at Hawaii Volcanoes National Park. The alignment control plan drawing depicts the existing and proposed road alignments, including stationing and coordinates. The related federal opportunity is solicited by the National Park Service National Office within the Department of the Interior. The opportunity is for contract award to demolish and replace facilities damaged by volcanic disaster at Uekahuna Bluff and Jaggar Museum, and to realign Crater Rim Drive and expand the entrance station to improve visitor safety.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text M
AutoCAD SHX Text
BYPASS LANE N EOP
AutoCAD SHX Text
N BRANCH CL
AutoCAD SHX Text
E BRANCH CL
AutoCAD SHX Text
NEW RD ALIGNMENT
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
AutoCAD SHX Text 175449
AutoCAD SHX Text
AutoCAD SHX Text
DP, EM, MS
AutoCAD SHX Text
KK
AutoCAD SHX Text 04/26/23
AutoCAD SHX Text
HAWAII VOLCANOES NATIONAL PARK
AutoCAD SHX Text
UEKAHUNA / ENTRANCE
AutoCAD SHX Text 305150/318523 250523/315026 254676
AutoCAD SHX Text
IN FEET
AutoCAD SHX Text
SCALE
AutoCAD SHX Text 80'
AutoCAD SHX Text 0'
AutoCAD SHX Text 40'
AutoCAD SHX Text 40'
AutoCAD SHX Text
ALIGNMENT CONTROL PLAN
AutoCAD SHX Text
AutoCAD SHX Text 02- C108 kevin.kraxberger Cloud
| Sheets and Views |
| 61 |
File details come from the government source that posted it. Updated .