This document contains specifications for a federal construction project. The project involves demolishing and replacing facilities damaged by volcanic activity at Hawaii Volcanoes National Park, including structures at Uekahuna Bluff and the Jaggar Museum, as well as realigning Crater Rim Drive and expanding the entrance station to improve visitor safety. The specifications outline requirements for temporary facilities and controls during construction, including utilities, field offices, storage areas, sanitation facilities, security measures, and fire protection. The contractor must furnish potable water, erosion control, and adhere to environmental and resource protection restrictions.

View the file

Other files

File Type Posted
B09_Amd_06_02_41_13_-_Site_Selective_Demolition_0006.pdf PDF
B09_Amd_06_33_16_00_-_Water_Utility_Storage_Tank_0006.pdf PDF
B09_Amd_06_01-X101_SITE_TESC___DEMO_PLAN_(UB)_I_0006.pdf PDF
B09_Amd_06_Pages_from_HAVO_124_41013B__id101233__HVO_and_Renovated_Annex_Asbuilts_1988_0006.pdf PDF
B09_Amd_06_01-C105_GRADING_PLAN_(UB)_II_0006.pdf PDF
B09_Amd_06_01-X102_SITE_TESC___DEMO_PLAN_(UB)_II_0006.pdf PDF
B09_Amd_06_Solicitation_QA_HAVO_140P2023R0028_0006.xlsx XLSX spreadsheet
B09_Amd_06_SF30_140P2023R0028_0006.pdf PDF
B09_Amd_06_01-X103_BUILDING_DEMO_PLAN_(GENERAL)_0006.pdf PDF
B09_Amd_06_01-C104_GRADING_PLAN_(UB)_I_0006.pdf PDF
Sol_140P2023R0028_Amd_0006.pdf PDF
Sol_140P2023R0028_Amd_0005.pdf PDF
B09_Amd_05_SF30_140P2023R0028_0005.pdf PDF
B09_Amd_05_Solicitation_QA_HAVO_140P2023R0028_0005.xlsx XLSX spreadsheet
B09_Amd_04_02-C102_SITE_PLAN_(ENTR)_II-55_0004.pdf PDF
B09_Amd_04_02-C118_COLLOCATED_UTILITY_PLAN-71_0004.pdf PDF
B09_Amd_04_02-C505_SITE_DETAILS_V-75_0004.pdf PDF
B09_Amd_04_02-C108_ALIGNMENT_CONTROL_PLAN-61_0004.pdf PDF
B09_Amd_04_02-C301_ROAD_SECTIONS_(ENTR)-70_0004.pdf PDF
B09_Amd_04_SF30_0004.pdf PDF
B09_Amd_04_Solicitation_QA_HAVO_140P2023R0028_0004.xlsx XLSX spreadsheet
Sol_140P2023R0028_Amd_0004.pdf PDF
B09_Amd_03_Site_Visit_sign_in_HAVO_305150_0003.pdf PDF
B09_Amd_03_Site_Visit_Tri_Fold_HAVO_305150_0003.pdf PDF
B09_Amd_03_SF30_HAVO_305150-315026__0003.pdf PDF
B09_Amd_03_BIL_Signage_2023_05_08_0003.pdf PDF
Sol_140P2023R0028_Amd_0003.pdf PDF
B09_Amd_03_HAVO_305150_315026__Prebid_Meeting_Notes_5-4-23_0003.docx DOCX document
B09_Amd_02_02-C101-C103_SITE_PLAN_0002.pdf PDF
B09_Amd_02_Solicitation_QA_HAVO_140P2023R0028_0002.xlsx XLSX spreadsheet
B09_Amd_02_01_27_00_DefinitionOfContractLineItems_305150-315026_0002.pdf PDF
B09_Amd_02_HAVO_305150-315026_Contract_Price_Schedule___Blank_Price_0002.xlsx XLSX spreadsheet
B09_Amd_02_HAVO_305150-315026_Contract_Price_Schedule___Blank_Price_0002.pdf PDF
B09_Amd_02_02-C117_OVERHEAD_UTILITY_RELOCATION_PLAN_0002.pdf PDF
Sol_140P2023R0028_Amd_0002.pdf PDF
B09_Amd_02_02-C118_COLLOCATED_UTILITY_PLAN_0002.pdf PDF
B09_Amd_02_01_11_00_SummaryOfWork_305150-315026_0002.pdf PDF
B09_Amd_02_SF30_HAVO_305150-315026__0002.pdf PDF
Sol_140P2023R0028_Amd_0001.pdf PDF
B08_Amd_01_Q_A_0001.pdf PDF
B08_Attach_3_258076_Fiber_Optic_Line_Package.zip ZIP file
B08_Attach 1a1_305150-315026 Uekahuna Bluff and Park Entrance Package1a1.zip ZIP file
B08_Attach_2_196582_Water_Line_Package.zip ZIP file
B08_Attach_1b1_305150-31506_Uekahuna_Bluff_and_Park_Entrance_Package.zip ZIP file
B08_Attach_5_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Attach_9_Contract_Price_Schedule___Blank.xlsx XLSX spreadsheet
Sol_140P2023R0028.pdf PDF
B08_Attach_6_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_Attach_8_revLmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Attach_7_Solit_PSP_Vol_II_GenRefs.doc DOC document
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAVO - 305150, 318523, 315026, 250523, 254676, 196582, 258076 01 50 00 - 1

012721 TEMPORARY FACILITIES AND CONTROLS

NPS DSC Division 1 Specifications National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21

HAVO - 305150, 318523, 315026, 250523, 254676, 196582, 258076

SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

1.2 DEFINITIONS

A. Permanent Enclosure: As determined by Contracting Officer (CO), permanent or temporary roofing is complete, insulated, and weathertight; exterior walls are insulated and weathertight;

and openings are closed with permanent construction or substantial temporary closures.

1.3 USE CHARGES

A. General: Cost or use charges for temporary facilities shall be included in Contract Sum as required.

B. Water Service: Limited potable water is available in the vicinity of the project sites. Contractor shall be allowed to use up to 4,000 gallons of water per day. Contractor to provide a meter and all necessary fittings. Coordinate water use through the CO.

1. In the visitor center and entrance station area, water is available from either the Rainshed at the maintenance yard (behind the Kīlauea Visitor Center) or a hydrant by the wash rack in the Maintenance Buildings area

2. At Uēkahuna, water is available from the existing water tank.

3. The available water service is from a catchment system and water use may be further limited during dry times of the year.

1.4 QUALITY ASSURANCE

A. Electric Service: Comply with National Electrical Contractors Association (NECA), National

Electrical Manufacturers Association (NEMA), and Underwriter Laboratories (UL) standards and regulations for temporary electric service. Install service to comply with National Fire Protection

Association (NFPA) 70.

B. Environmental Protection: Provide environmental protection as required by agency(ies) with jurisdiction and as indicated in Contract Documents. Coordinate with requirements of the following:

HAVO - 305150, 318523, 315026, 250523, 254676, 196582, 258076 01 50 00 - 2

1. Regulatory Requirements

2. Noise and Acoustics Management

3. Environmental Management

4. Construction Waste Management

C. Accessible Temporary Egress: Comply with applicable provisions in the United States (U.S.)

Architectural & Transportation Barriers Compliance Board’s Architectural Barriers Act

Accessibility Standard (ABAAS) Accessibility Guidelines.

1.5 PROJECT CONDITIONS

A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before NPS acceptance, regardless of previously assigned responsibilities.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Temporary materials may be new or used, but must be adequate in capacity for required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.

B. Pavement: Comply with Division 32 pavement Sections.

C. Portable Chain-Link Fencing: Minimum 2 inch (50 millimeters), 9-gage, galvanized steel, chain-link fabric fencing; minimum 6 feet (1.8 millimeters) high with galvanized steel pipe posts;

minimum 2-3/8 inch (60 millimeters) OD line posts and 2-7/8 inch (73 millimeters) OD corner and pull posts, with 1-5/8 inch (42 millimeters) OD top and bottom rails. Provide concrete bases for supporting posts.

D. Safety Barrier Fence: Orange plastic fence, minimum height, 4 feet.

E. Lumber and Plywood: Comply with requirements in Division 06 Section "Rough Carpentry."

F. Gypsum Board: Minimum 1/2 inch (12.7 millimeters) thick by 48 inches (1219 millimeters) wide by maximum available lengths; regular-type panels with tapered edges. Comply with ASTM C

36/C 36M.

G. Insulation: Unfaced mineral-fiber blanket, manufactured from glass, slag wool, or rock wool;

with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively.

H. Polyethylene Sheet: Reinforced, fire-resistive sheet, 10 mil (0.25-millimeter) minimum thickness, with flame-spread rating of 15 or less per ASTM E 84 and passing NFPA 701 Test Method 2.

I. Dust-Control Adhesive-Surface Walk-off Mats: Provide mats minimum 36 by 60 inches (914 by

1624 millimeters).

HAVO - 305150, 318523, 315026, 250523, 254676, 196582, 258076 01 50 00 - 3

J. Temporary Water Tank: Provide minimum 3,000 gallon temporary water tank for potable water to Nāmakanipaio Campground and Cabins; water tank shall meet NSF/ANSI 61 standards for drinking water system components.

2.2 TEMPORARY FACILITIES

A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and foundations adequate for normal loading.

B. Contracting Officers Field Office: Field office shall be a separate structure from Contractor's office.

1. Prefabricated, job built, or a mobile unit; excellent condition, structurally sound, non-flammable exterior construction, weather tight, minimum 300 square feet.

2. Operable windows and security screens, adjustable ventilation.

3. Restroom (minimum of lavatory and toilet, with exhaust fan if room is windowless).

4. Air conditioner and heater.

5. Interior partition with lockable door to divide office

6. Paneling or freshly painted walls, acoustical tile or painted ceilings, and resilient flooring.

7. Two exterior doors with dead bolts keyed from outside,

8. Minimum 20-square-foot landing and steps at each exterior door.

C. Storage and Fabrication Sheds: Temporary weather tight sheds or other covered facilities for storage of materials subject to weather damage. Number and size of structures shall be subject to

Contracting Officer's approval.

D. Toilets: Sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible, sturdy enclosures with privacy locks.

2.3 EQUIPMENT

A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

B. Heating, Ventilation, and Air Conditioning (HVAC) Equipment: Unless Contracting Officer authorizes use of permanent HVAC system, provide vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control.

1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited.

2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable to agency(ies) with jurisdiction, and marked for intended use.

3. Permanent HVAC System: If Owner authorizes use of permanent HVAC system for temporary use during construction, provide filter with Minimum Efficiency Reporting

Value (MERV) of 8 at each return air grille in system and remove at end of construction.

C. Direct Digital Control (DDC) Internet Connection: Furnish, install and maintain a high-speed connection (Digital Subscriber Line (DSL) or similar) between the project’s DDC system and the internet through a Contractor furnished internet service provider. Contractor is responsible for

HAVO - 305150, 318523, 315026, 250523, 254676, 196582, 258076 01 50 00 - 4

maintenance of this connection and costs associated with internet service provider through warranty period of this contract. Upon completion of warranty period, service shall be transferable to the Government at which time future costs for connection will no longer be the responsibility of Contractor.

D. Contracting Officers Field Office

1. Outlets: Minimum of two, quad outlets with surge protection.

2. Refrigerator: Under counter, 3.2-cubic-foot volume with 0.8-cubic-foot freezer with dedicated power receptacle.

3. Fire Extinguisher: UL listed and FM (Fire Pump Motors) approved, minimum rating of 2-

A:10-B:C, dry chemical.

4. First-Aid Kit: General office/light industrial kit which includes antiseptic wipes, bandages, disposable gloves, tape, instant cold pack, dressing pads, eye pads, scissors, and Tylenol tablets. Provide small size, such as manufactured by Johnson & Johnson, New Brunswick, New Jersey, or approved equal.

5. Two desks with five drawers each and two chairs with casters; two drafting tables

(minimum 40 inches wide by 5 feet long) and two stools; drawing rack; two 2-drawer and one 4-drawer legal size locking filing cabinets with keys; 8 feet of 12 inch deep shelving;

coat rack; two additional guest chairs; two desk lamps; two drafting table lamps; and a maximum/minimum thermometer.

6. Manufactured computer work station, capable of containing CPU (central processing unit), monitor, keyboard, printer; work station chair.

7. Additional tables necessary for FAX machine and copier.

8. Two 5-gallon trash cans and one 30-gallon trash can with lid.

9. Ceiling mounted general lighting fixtures.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Locate facilities where shown in the drawings. For temporary facilities not shown in the drawings locate within project limits where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

1. Locate facilities to limit site disturbance and as directed by the Contracting Officer.

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

3.2 TEMPORARY UTILITY INSTALLATION

A. General: Install temporary service or connect to existing service.

1. Arrange with utility company, NPS, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services. Acquire necessary permits.

HAVO - 305150, 318523, 315026, 250523, 254676, 196582, 258076 01 50 00 - 5

B. Non-potable water for construction is not available within the park boundaries. Contractor shall furnish non-potable water from a source outside park boundary as needed.

C. Potable water is available on site. Refer to Part 1.3 B above. Facilities must be cleaned and maintained in a condition acceptable to NPS. At Substantial Completion, restore these facilities to condition existing before initial use.

D. Sanitary Facilities: Provide temporary toilets, and wash facilities for use by construction personnel.

1. Place in approved locations secluded from public observation and convenient to work stations. Relocate as work progress requires.

2. Maintain and clean toilet facilities at least weekly.

3. Completely remove sanitary facilities on completion of work.

E. Heating and Cooling: Provide temporary heating and cooling required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of low temperatures or high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed.

1. Use of permanent heating and cooling system will not be allowed without written authorization from Contracting Officer. When the permanent heating and cooling system is approved for use as temporary heating and cooling, pay costs until final acceptance.

Permanent heating and cooling system shall be sufficiently complete, including controls, to permit safe operation

2. Provide and maintain adequate approved facilities, as required for safety and construction requirements, during the work. Provide ample clearance around stoves, heaters, chimney and vent connections to prevent ignition of combustible material

3. Install and maintain temporary filters when air handing equipment is used for temporary heating and cooling. Install new filters before final acceptance in addition to any extra sets of filters required. Clean coils as determined by Contracting Officer.

4. Warranties for equipment used for temporary heating and cooling shall start on date of

Final Acceptance.

F. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of high humidity. Select equipment that will not have a harmful effect on completed installations or elements being installed. Coordinate ventilation requirements to produce ambient condition required and minimize energy consumption.

G. Electric Power Service: Contractor to coordinate temporary electrical service with Hawaiian

Electric. Electric power service from the NPS will not be provided.

1. When temporary connections are removed, restore existing utility services to original condition.

H. Telephone Service: No telephone service is available on site for Contractor's use. Make arrangements with Telephone Company and pay costs.

HAVO - 305150, 318523, 315026, 250523, 254676, 196582, 258076 01 50 00 - 6

I. Temporary Potable Water Service: Provide potable water to Nāmakanipaio Campground and

Cabins when the Uēkahuna water tanks are offline. Anticipated maximum potable water demand at Nāmakanipaio Campgrounds and Cabins is 2,700 gallons per day.

3.3 SUPPORT FACILITIES INSTALLATION

A. General: Comply with the following:

1. Provide incombustible construction for offices, shops, and sheds located within construction area or within 50 feet of building lines. Comply with NFPA 241.

2. Maintain support facilities until near Substantial Completion. Remove structures, equipment, and furnishings, and terminate services after punch list is 100 percent completed or when directed by Contracting Officer. Personnel remaining after Substantial

Completion will be permitted to use permanent facilities, under conditions acceptable to

Contracting Officer.

B. Contracting Officers Field Office:

1. Provide Heat, lights, power, air conditioning, temporary water pressure and sewage holding tanks.

2. Provide office, furnishings, and utility connections no later than 7 days after date of Notice to Proceed. Exact location will be determined by Contracting Officer.

3. Maintain equipment, furnishings, and structures. Provide equipment replacement elements as needed. Provide weekly cleaning services and trash disposal. Maintain and service water and sewer holding tanks as required.

C. Temporary Roads and Paved Areas: Construct and maintain temporary roads and paved areas adequate for construction operations. Locate temporary roads and paved areas in same location as permanent roads and paved areas. Extend temporary roads and paved areas, within construction limits indicated, as necessary for construction operations.

1. Coordinate elevations of temporary roads and paved areas with permanent roads and paved areas.

2. Prepare subgrade and install subbase and base for temporary roads and paved areas according to Division 31 Section "Earth Moving."

3. Delay installation of final course of permanent hot-mix asphalt pavement until immediately before Substantial Completion. Repair hot-mix asphalt base-course pavement before installation of final course according to Division 32 Section "Asphalt Paving."

D. Traffic Controls: Erect and maintain barricades, lights, danger signals, and warning signs in accordance with Manual on Uniform Traffic Control Devices (MUTCD), Part IV, latest edition.

1. Protect existing site improvements to remain including curbs, pavement, and utilities.

2. Maintain access for fire-fighting equipment and access to fire hydrants.

3. Illuminate barricades and obstructions at night; keep safety lights burning from sunset to sunrise. See section 1 11 00 – 1.12 for special requirements on lighting.

4. Adequately barricade and post open cuts in or adjacent to thoroughfares.

5. Protect pedestrian traffic by guardrails or fences.

HAVO - 305150, 318523, 315026, 250523, 254676, 196582, 258076 01 50 00 - 7

6. When pedestrian traffic is detoured onto a roadway, provide temporary walkways with protection as required at ends and overhead. For walkways, use lumber running parallel to direction of traffic movement and provide ramps at changes of elevation.

7. Cover pipes, hoses, and power lines crossing sidewalks and walkways with troughs using beveled edge boards.

8. Install Barrier Tape where directed by Contracting Officer. Keep a minimum of two rolls on site.

E. Parking: Use designated areas shown on drawings for construction personnel.

F. Dewatering Facilities and Drains: Comply with requirements of the agency(ies) with jurisdiction.

Maintain Project site, excavations, and construction free of water.

1. Dispose of rainwater in lawful manner that will not result in flooding Project or adjoining properties nor endanger permanent Work or temporary facilities.

G. Project Identification and Temporary Signs: Provide Project identification and other signs. Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.

1. Provide temporary, directional signs for construction personnel and visitors.

2. Maintain and touchup signs so they are legible at all times.

3. Erect and maintain sufficient detour signs at road closures and along detour routes.

H. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of agency(ies) with jurisdiction.

3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Cleaning of Equipment: Contractor shall ensure prior to moving on to Project Area, equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure equipment has been pressure washed and is free of exotic species. Equipment shall be considered free of soil, seeds, and other debris when visual inspection does not disclose such material. Refer to Section 01-11-40 “Resource Protection Work Restrictions”.

C. Temporary Erosion and Sedimentation Control: Refer to Section 01 57 23 "Temporary Storm

Water Pollution Prevention".

D. Tree and Plant Protection: Refer to Section 01 11 00 "Summary of Work" and Section 01-11-40

“Resource Protection Work Restrictions”.

E. Pest Control: Refer to Section 01-11-40 “Resource Protection Work Restrictions” for pest control requirements related to invasive species and the protection of threatened and endangered species..

Perform control operations lawfully, using environmentally safe materials.

F. Site Enclosure Fence: Before construction operations begin, furnish and install chain link fencing to prevent people and animals from easily entering site except by entrance gates.

HAVO - 305150, 318523, 315026, 250523, 254676, 196582, 258076 01 50 00 - 8

1. Extent of Fence: As indicated on Drawings.

2. Locate vehicular gates to avoid interference with traffic on public thoroughfares.

3. Locate pedestrian entrance gates as required to provide controlled personnel entry.

4. Maintain security by limiting number of keys and restricting distribution to authorized personnel.

G. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security.

H. Barricades, Warning Signs, and Lights: Comply with requirements of Manual on Uniform

Traffic Control Devices (MUTCD), part IV, 2003 edition for erecting structurally adequate barricades, including warning signs and lighting. See section 1 11 00 – 1.12 for special requirements on lighting.

I. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities.

Provide temporary weathertight enclosure for building exterior.

1. Where heating or cooling is needed and permanent enclosure is not complete, insulate temporary enclosures.

J. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. Comply with NFPA

241.

1. Responsible Person: Capable and qualified person shall be placed in charge of fire protection. Responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.

2. Fires discovered by the contractor, or their employees must be promptly reported to

Dispatch at 808-985-6170. Contractor or their employees must take action on any and all fires within the permit areas and within a 100-foot zone adjacent to the project area.

3. Tobacco Use, Smoking, and Vaping: Smoking within buildings or temporary storage sheds is prohibited. No smoking when traveling except when traveling on a graveled, oiled or otherwise surfaced road. Equip vehicles with ashtrays. Violations of the smoking regulations (36 CFR 261.52 (a) (c) (d)) and fire requirements will result in criminal action against the violator. Advise all employees of this regulation.

4. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition according to requirements of NPS. Cutting by torch or welding (or any ‘hot work’) can only be performed when adequate fire protection is provided. If torch or welding is planned, notify NPS at least 3 business days prior to the activity.

5. Develop and supervise overall fire-prevention and -protection program for personnel at

Project Site. Review needs with local fire department and establish procedures to be followed. Instruct personnel in methods and procedures. Post warnings and information.

6. Provide temporary standpipes and hoses for fire protection. Hang hoses with warning sign stating hoses are for fire-protection purposes only and are not to be removed. Match hose size with outlet size and equip with suitable nozzles.

7. Hazard Control: Take necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing buildings. Provide adequate ventilation during use of volatile or noxious substances.

HAVO - 305150, 318523, 315026, 250523, 254676, 196582, 258076 01 50 00 - 9

8. Spark Arresters: Equip gasoline or diesel powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by United States Department of Agriculture (USDA) Forest Service.

a. Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.

9. Buildings: Furnish a minimum of one extinguisher for each 1,500 square feet of area or major fraction thereof.

a. Travel distance from any work station to nearest extinguisher shall not exceed 75 feet.

10. Vehicles and Equipment: Furnish all vehicles on this project, except fuel trucks, with an

ABC triple class, dry chemical fire extinguisher of not less than 2½-pound capacity.

11. Service and Refueling Areas: Locate areas a minimum of 50 feet from buildings. Shut down equipment before refueling.

3.5 OPERATION, TERMINATION, AND REMOVAL

A. Supervision: Enforce strict discipline in use of temporary facilities. Minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.

B. Maintenance: Maintain facilities in good operating condition until removal.

1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on 24-hour basis where required to achieve indicated results and avoid possibility of damage.

C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.

D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial

Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.

1. Materials and facilities that constitute temporary facilities are property of Contractor. NPS reserves right to take possession of Project identification signs.

2. At Substantial Completion, clean and renovate permanent facilities used during construction period.

END OF SECTION 01 50 00