B08_Attach_18_MEVE_-_317500-Morefiled_Pland_C14.pdf

PDF 1 MB Posted

Attached to
MEVE 317500, Replace Morefield Waterlines, Mesa Ve
Solicitation number
140P2026R0020
Issued by

About this file

This document is a water line plan engineering drawing for a project located in Mesa Verde National Park, specifically covering stations 18+00 to 30+00 in Morefield Canyon. The plan details the installation of a new 6" composite water line with careful environmental considerations, including a construction fence offset to protect sensitive vegetation, specifically a rare plant area. The drawing includes a detailed legend showing water line alignment, potential construction staging areas, park boundaries, and key infrastructure elements such as hydrant plug tees (HPT), valves (V), reducers (R), and control points. The drawing is dated 1/29/23, scaled at 1" = 40', and is part of a larger set (sheet C14 of 56), indicating a comprehensive infrastructure improvement project within the national park.

View the file

Other files

File Type Posted
Attach_23_Answers_to_Questions_Amendment_02_2_12_26_0002.pdf PDF
Sol_140P2026R0020_Amd_0002.pdf PDF
Attach_20_Answers_to_Questions_Amendment_01_2_5_26_0001.pdf PDF
Attach_22_MEVE_317500_Attendance_from_Site_Visit_0001.pdf PDF
Attach_21_Boring_Profiles_0001.pdf PDF
Sol_140P2026R0020_Amd_0001.pdf PDF
B08_Attach_12_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf PDF
B08_Attach_06_Solit_PSP_Cover.pdf PDF
B08_Attach_02_MEVE_317500_Geotechnical_Investigation_Report_092123.pdf PDF
B08_Attach_16_MEVE_-_31750_Morefield_Plan_C9_No_Arc.pdf PDF
B08_Attach_13_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Soliciation_140P2026R0020_revision_January_9_2026.pdf PDF
B08_Attach_03_MEVE-317500_Morefield_Plans.pdf PDF
B08_Attach_07_Solit_Construction_SF1442_REQD_RELEASED_v2_Jan2025.pdf PDF
B08_Attach_08_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_05_MEVE_317500_Price_Schedule_041224_BLANK.xlsx XLSX spreadsheet
B08_Attach_19_MEVE_-_317500-Morefiled_Pland_C16.pdf PDF
B08_Attach_04_-_Wage_Determination.pdf PDF
B08_Attach_10_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_17_MEVE_-_31750_Morefield_Plan_C30_No_Arc.pdf PDF
B08_Attach_11_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf PDF
B08_Attach_14_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
Sol_140P2026R0020.pdf PDF
B08_Attach_01_MEVE_317500___Specifications.pdf PDF
B08_Attach_09_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attach_15_MEVE_-_31750_Morefield_Plan_C8_No_Arc.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL

EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL EWL W W W W W W W W W

M

AT

C H

LI

N

E

ST

A

+0

M

AT

C H

LI

N

E

ST

A

+0

INSTALL NEW 6" COMPOSITE

WATER LINE

INSTALL CONSTRUCTION FENCE

OFFSET NO MORE THAN 20'

OFF PROPOSED WATERLINE TO

PROTECT SENSITIVE VEGETATION

L-7 L-8 L-9 L-10

18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00

WATER LINE

PLAN

STA 18+00 TO STA 30+00

MOREFIELD CANYON

C14

SCALE OF FEET

8040040 1" = 40'

SENSITIVE RESOURCE AREA (RARE PLANT)

LEGEND

MEVE PARK BOUNDARY

NEW WATER LINE ALIGNMENT

POTENTIAL CONSTRUCTION STAGING AREA

H

P

T

HYDRANT

PLUG

TEE

CONTROL POINT

W

LIMIT OF WORK FENCING

V VALVE

R REDUCER

CONSTRUCTION LIMITS

Sheets and Views
C14

File details come from the government source that posted it. Updated .