B08_Attach_12_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf

PDF 97 KB Posted

Attached to
MEVE 317500, Replace Morefield Waterlines, Mesa Ve
Solicitation number
140P2026R0020
Issued by

About this file

This document is a Proposed Equals form for a federal solicitation (B08 Solicitation PSP Vol II), specifically related to product substitutions. The form provides a template for contractors to propose alternative products to those originally specified in the solicitation, with specific certification requirements. Contractors must certify that proposed equal products:

  1. Are equal or superior to specified salient characteristics
  2. Provide equivalent warranties
  3. Are compatible with interfacing items
  4. Will coordinate installation and required changes
  5. Waive claims for additional expenses from substitution

The document also encourages contractors to submit products that exceed accessibility standards, are sustainable, or made from recycled/environmentally responsible materials, with an indication that every effort will be made to approve such submissions. The form includes a blank table for listing specific section numbers, paragraph numbers, original product/model numbers, and proposed product/model numbers for substitution.

View the file

Other files

File Type Posted
Attach_23_Answers_to_Questions_Amendment_02_2_12_26_0002.pdf PDF
Sol_140P2026R0020_Amd_0002.pdf PDF
Attach_20_Answers_to_Questions_Amendment_01_2_5_26_0001.pdf PDF
Attach_22_MEVE_317500_Attendance_from_Site_Visit_0001.pdf PDF
Attach_21_Boring_Profiles_0001.pdf PDF
Sol_140P2026R0020_Amd_0001.pdf PDF
B08_Attach_06_Solit_PSP_Cover.pdf PDF
B08_Attach_02_MEVE_317500_Geotechnical_Investigation_Report_092123.pdf PDF
B08_Attach_16_MEVE_-_31750_Morefield_Plan_C9_No_Arc.pdf PDF
B08_Attach_13_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Soliciation_140P2026R0020_revision_January_9_2026.pdf PDF
B08_Attach_03_MEVE-317500_Morefield_Plans.pdf PDF
B08_Attach_07_Solit_Construction_SF1442_REQD_RELEASED_v2_Jan2025.pdf PDF
B08_Attach_08_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_05_MEVE_317500_Price_Schedule_041224_BLANK.xlsx XLSX spreadsheet
B08_Attach_19_MEVE_-_317500-Morefiled_Pland_C16.pdf PDF
B08_Attach_04_-_Wage_Determination.pdf PDF
B08_Attach_18_MEVE_-_317500-Morefiled_Pland_C14.pdf PDF
B08_Attach_10_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_17_MEVE_-_31750_Morefield_Plan_C30_No_Arc.pdf PDF
B08_Attach_11_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf PDF
B08_Attach_14_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
Sol_140P2026R0020.pdf PDF
B08_Attach_01_MEVE_317500___Specifications.pdf PDF
B08_Attach_09_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attach_15_MEVE_-_31750_Morefield_Plan_C8_No_Arc.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B08 Solicitation PSP Vol II Equals v1 2025Feb

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.

Section No. Paragraph No.

Product/Model No. Proposed Product/Model No.

A. By submitting the proposed equal, the Contractor certifies that it:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to the specified Salient Characteristics;

2. Will provide, as a minimum, the same warranties for the proposed item as for the item specified;

3. Has determined that the proposed item is compatible with interfacing items;

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution; and

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

B. The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.

File details come from the government source that posted it. Updated .