B08_Attach_09_Solit_PSP_Vol_I_Exp_REQD.pdf

PDF 122 KB Posted

Attached to
MEVE 317500, Replace Morefield Waterlines, Mesa Ve
Solicitation number
140P2026R0020
Issued by

About this file

This document is a Project Experience Questionnaire for Solicitation 140P2025R0087, designed to capture detailed information about a contractor's previous project experience. The form requires contractors to provide comprehensive details about a referenced project, including project title, location, description, and project owner information. The questionnaire includes a contractor list section where Sparky's Electrical Company (prime contractor) and ABC Plumbing & Heating, Co (subcontractor) are listed, with their respective roles, trades, pricing, and performance periods.

The questionnaire contains seven substantive questions that demand in-depth responses about the project work, addressing specific evaluation criteria from section L of the solicitation. These questions seek information on project work performed, experience elements, price and schedule changes, problem resolution, successful means and methods, and any additional relevant project information. Contractors must provide detailed responses that demonstrate their capability and past performance, which will likely be used to assess their qualifications for the proposed project.

View the file

Other files

File Type Posted
Attach_23_Answers_to_Questions_Amendment_02_2_12_26_0002.pdf PDF
Sol_140P2026R0020_Amd_0002.pdf PDF
Attach_20_Answers_to_Questions_Amendment_01_2_5_26_0001.pdf PDF
Attach_22_MEVE_317500_Attendance_from_Site_Visit_0001.pdf PDF
Attach_21_Boring_Profiles_0001.pdf PDF
Sol_140P2026R0020_Amd_0001.pdf PDF
B08_Attach_12_Solit_PSP_Vol_II_Equals_RELEASED_v1_25Feb25.pdf PDF
B08_Attach_06_Solit_PSP_Cover.pdf PDF
B08_Attach_02_MEVE_317500_Geotechnical_Investigation_Report_092123.pdf PDF
B08_Attach_16_MEVE_-_31750_Morefield_Plan_C9_No_Arc.pdf PDF
B08_Attach_13_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Soliciation_140P2026R0020_revision_January_9_2026.pdf PDF
B08_Attach_03_MEVE-317500_Morefield_Plans.pdf PDF
B08_Attach_07_Solit_Construction_SF1442_REQD_RELEASED_v2_Jan2025.pdf PDF
B08_Attach_08_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_05_MEVE_317500_Price_Schedule_041224_BLANK.xlsx XLSX spreadsheet
B08_Attach_19_MEVE_-_317500-Morefiled_Pland_C16.pdf PDF
B08_Attach_04_-_Wage_Determination.pdf PDF
B08_Attach_18_MEVE_-_317500-Morefiled_Pland_C14.pdf PDF
B08_Attach_10_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_17_MEVE_-_31750_Morefield_Plan_C30_No_Arc.pdf PDF
B08_Attach_11_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf PDF
B08_Attach_14_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.xlsx XLSX spreadsheet
Sol_140P2026R0020.pdf PDF
B08_Attach_01_MEVE_317500___Specifications.pdf PDF
B08_Attach_15_MEVE_-_31750_Morefield_Plan_C8_No_Arc.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Experience Questionnaire Solicitation: 140P2025R0087

Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in solicitation section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror Company Name

REFERENCED PROJECT INFORMATION

Project Title Title Project Location City, State Brief Project Description Description

Project Owner Company Name POC: First & Last Name Phone: (XXX) XXX-XXXX

CONTRACTOR LIST

List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.

Contractor Name

Role on Referenced

Project (Prime or Sub)

Trade

Price (list for each contractor’s specific work)

Performance Period

(calendar days) (list for each contractor’s specific work) Original Final Original Final

Sparky’s Electrical Company Prime Prime $XXX,XXX $X,XXX,XXX XX XX

ABC Plumbing & Heating, Co Subcontractor Plumbing & Mechanical $X,XXX,XXX $X,XXX,XXX XXX XXX

Subcontractor

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by all contractors listed above.

Response

2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.

Response

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

Response

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

Response

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

Response

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

Response

7. Provide any other additional project information you believe should be presented.

Response