B08-Attach_13_-_307127_YELL_Rehab_Ft_Yellowstone_Final_Paint_Schemes.pdf

PDF 10 MB Posted

Attached to
YELL 307127 - Yellowstone National Park - Rehabili
Solicitation number
140P2023R0170
Issued by

About this file

This federal contract opportunity solicitation seeks proposals for rehabilitation work at Yellowstone National Park. The solicitation number is 140P2023R0170 and was issued by the Department of the Interior National Park Service National Office. Under this opportunity, the selected contractor will be responsible for completing final paint schemes as part of the YELL 307127 rehabilitation project at Yellowstone National Park. Proposals are due by the date listed in the attached PDF file, which provides 10MB of additional specifications, drawings, or other requirements for the final paint schemes. The anticipated award date is also provided in the attached file. Pricing should be quoted as a firm fixed price with payment terms of net 30. This opportunity is unrestricted and open to all responsible sources.

View the file

Other files

File Type Posted
Sol_140P2023R0170_Amd_0004.pdf PDF
Sol_140P2023R0170_Amd_0003.pdf PDF
YELL_307127_Solicitation_RFI_responses_10_NOV_2023_0003.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD_0002.doc DOC document
Sol_140P2023R0170_Amd_0002.pdf PDF
YELL_307127_Solicitation_RFI_responses_10_NOV_2023_0002.pdf PDF
Mammoth_Monthly_Total_Precip-11-13-23_0002.pdf PDF
YELL_307127_updated_Storm_Sash_design_bldgs_4-33_0002.pdf PDF
YELL_307127_updated_Storm_Sash_Basis_of_Design_bldgs_4-33_0002.pdf PDF
standards-guidelines-archeology-historic-preservation_0001.pdf PDF
YELL_307127_-_Mortar_Sample_Log_0001.pdf PDF
Sign_In_Sheet_0001.jpg JPG image
Sol_140P2023R0170_Amd_0001.pdf PDF
140P2023R0170_0001.pdf PDF
YELL_307127_Ft_Yell_Preproposal_Conference_2023_11-01_0001.pptx PPTX presentation
307127_YELL_Rehab_Exteriors_Ft_Yellowstone_Construction_Specifications_Revised_071223_0001.pdf PDF
Mitigation_List_-_YELL_307127_0001.pdf PDF
Q_A_(1)_0001.pdf PDF
B08-307127_YELL_Rehab_Exteriors_Ft_Yellowstone_Construction_Specifications.pdf PDF
B08-Attach_11-307127_YELL_Rehab_Ft_Yellowstone_Exteriors_Final_CD_Product_File.pdf PDF
b08-Attach_14-307127_YELL_Rehab_Ft_Yellowstone_Submittal_List_Final_CD.pdf PDF
Sol_140P2023R0170.pdf PDF
B08-aTTACH_12_-_307127_YELL_Rehab_Ft_Yellowstone_Closeout_O_M_Requirements_Final_CD.pdf PDF
B08-Attach_17-307127_YELL_StatementOfStructuralTestsSpecialInspections.pdf PDF
B08-Attach_19-YELL_307127_Condition_Assessment_FINAL.pdf PDF
B08-307127_YELL_Rehab_Exteriors_Ft_Yellowstone_Final_CD_Drawings.pdf PDF
B08-Attach_16-307127_YELL_Radon_Assessment_Report_011923.pdf PDF
B08-Attach_18-Treatment_Guidelines_-_Fort_Yellowstone_-_Final_-_Full_Document.pdf PDF
B08-230327_XRF_Yellowstone_Fort_FINAL_BOOKMARKS.pdf PDF
B08-Attach_15-307127_YELL_Hazardous_Materials_Report.pdf PDF
B08-140P2023R0170-Complete_Solicitation_Packagev1.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Park Service

Yellowstone National Park

307127 YELL Rehabilitate Exteriors of

Historic Fort Yellowstone Buildings

Paint Color Schemes

(Buildings 2, 3, 4, 6, 10, 32)

17 March 2023

DOUBLE CAPTAIN’S QUARTERS, BUILDING #02, FMSS 2815 (1909)

Building Color Charts

FIELD OFFICER’S QUARTERS, BUILDING #03, FMSS 3851 (1909)

RAFTER TAIL

SW 2833

PORCH DECK

PORCH POST

RAFTER TAIL

SW 2832

WINDOW TRIM

SW 2833

SW 2833

WINDOW JAMB

SW 6258SW 2833

WINDOW

SASH

SW 2816SW 2833

*based on sample from sister building

FRONT DOOR

WINDOW TRIM

SW 2833

SW 2833

WINDOW JAMB

SW 6258

WINDOW

SASH

*based on sample from sister building

PORCH DECK

PORCH RAIL

SW 2832

SW 2816SW 2833

FRONT DOOR

*based on sample from sister building

*based on sample from sister building

GUTTER SHINGLE SIDING SW 2816SW 2833

SW 0024

PORCH POST & RAIL

SW 2816

WINDOW TRIM

GUTTER SHINGLE SIDING SW 2816SW 2833

DOUBLE CAPTAIN’S QUARTERS, BUILDING #02, FMSS 2815 (1909)

Building Color Charts

FIELD OFFICER’S QUARTERS, BUILDING #03, FMSS 3851 (1909)

RAFTER TAIL

SW 2833

PORCH DECK

PORCH POST

RAFTER TAIL

SW 2832

WINDOW TRIM

SW 2833

SW 2833

WINDOW JAMB

SW 6258SW 2833

WINDOW

SASH

SW 2816SW 2833

*based on sample from sister building

FRONT DOOR

WINDOW TRIM

SW 2833

SW 2833

WINDOW JAMB

SW 6258

WINDOW

SASH

*based on sample from sister building

PORCH DECK

PORCH RAIL

SW 2832

SW 2816SW 2833

FRONT DOOR

*based on sample from sister building

*based on sample from sister building

SW 0024

PORCH POST & RAIL

SW 2816

WINDOW TRIM

10 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021

DOUBLE OFFICER’S QUARTERS, BUILDING #04, FMSS 5944 (1897)

WINDOW

SASH

FRONT GABLE SHINGLE SIDING

SW 2833

PORCH POST

DOUBLE OFFICER’S QUARTERS, BUILDING #05, FMSS 5947 (1897)

RAFTER

BRACKET

SW 2816

SW 2816

SW 6258

FRONT GABLE SHINGLE SIDING

SW 2833

PORCH POST PORCH RAIL

SW 0024

SW 2816

SW 6258

*based on sample from sister building

*based on sample from sister building

WINDOW

SASH

CHIMNEY

CHIMNEY

WINDOW TRIM

SW 2816

WINDOW TRIM

SW 2816

SW 2816

DOOR TRIM

SW 2816

DOOR TRIM

*based on sample from sister building

*based on sample from sister building

*based on sample from sister building

SW 2833

SIDING

SW 2833

SIDING

10 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021

DOUBLE OFFICER’S QUARTERS, BUILDING #04, FMSS 5944 (1897)

WINDOW

SASH

FRONT GABLE SHINGLE SIDING

SW 2833

PORCH POST

DOUBLE OFFICER’S QUARTERS, BUILDING #05, FMSS 5947 (1897)

RAFTER

BRACKET

SW 2816

SW 2816

SW 6258

FRONT GABLE SHINGLE SIDING

SW 2833

PORCH POST PORCH RAIL

SW 0024

SW 2816

SW 6258

*based on sample from sister building

*based on sample from sister building

WINDOW

SASH

CHIMNEY

CHIMNEY

WINDOW TRIM

SW 2816

WINDOW TRIM

SW 2816

SW 2816

DOOR TRIM

SW 2816

DOOR TRIM

*based on sample from sister building

*based on sample from sister building

*based on sample from sister building

SW 2833

SIDING

SW 2833

SIDING

SW 2833SW 2816

SIDING &

GUTTER

FRONT DOOR

SW 0024 SW 0024

PORCH POST & RAIL RAFTER

BRACKET

WINDOW, FASCIA,

& VENT TRIM SW 2816

SHINGLE SIDING & LOUVER

DOUBLE OFFICER’S QUARTERS, BUILDING #06, FMSS 5954 (1891)

DOUBLE OFFICER’S QUARTERS, BUILDING #07, FMSS 5956 (1891)

TRIM

SW 0024

SIDING

SW 0024

WINDOW TRIM

SW 0042

SW 6347

WINDOW

SASH

EYEBROW

WINDOW

PORCH

BRACKET

LATTICE

SW 0024SW 0024

SW 6258

TRIM

SW 0024

SIDING

SW 2816

WINDOW TRIM

SW 0042

SW 6347

WINDOW

SASH

LATTICE

SW 6258

SW 0042

SW 0042

CHIMNEY

CHIMNEY

SW 2816

WINDOW JAMB

SW 2816

WINDOW JAMB

*based on sample from sister building

*based on sample from sister building

EYEBROW

WINDOW

PORCH

BRACKET

SW 0024SW 0042

*based on sample from sister building

*based on sample from sister building

Note: Original layer of linseed oil paint present on all building components except window sash.

Note: Original layer of linseed oil paint present on all building components except window sash, jamb, and porch bracket.

10 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021

DOUBLE OFFICER’S QUARTERS, BUILDING #04, FMSS 5944 (1897)

WINDOW

SASH

FRONT GABLE SHINGLE SIDING

SW 2833

PORCH POST

DOUBLE OFFICER’S QUARTERS, BUILDING #05, FMSS 5947 (1897)

RAFTER

BRACKET

SW 2816

SW 2816

SW 6258

FRONT GABLE SHINGLE SIDING

SW 2833

PORCH POST PORCH RAIL

SW 0024

SW 2816

SW 6258

*based on sample from sister building

*based on sample from sister building

WINDOW

SASH

CHIMNEY

CHIMNEY

WINDOW TRIM

SW 2816

WINDOW TRIM

SW 2816

SW 2816

DOOR TRIM

SW 2816

DOOR TRIM

*based on sample from sister building

*based on sample from sister building

*based on sample from sister building

SW 2833

SIDING

SW 2833

SIDING

SW 2833SW 2816

SIDING &

GUTTER

FRONT DOOR

SW 0024 SW 0024

PORCH POST & RAIL RAFTER

BRACKET

WINDOW, FASCIA,

QUARTERMASTER STOREHOUSE, BUILDING #10, FMSS 6022 (1891/1909/1926)

COMMISSARY, BUILDING #11, FMSS 6023 (1891/1909/1926)

WINDOW

SASH

SW 6258

WINDOW

SASH

FASCIA TRIM

SW 6258SW 2816

SHINGLE

SIDING

*based on sample from sister building

SW 2816

SHINGLE

SIDING

*based on sample from sister building

SW 0024

VENT TRIM/

LOUVERS

PORCH

POST

SW 2816SW 0024

FRONT

DOOR

*based on sample from sister building

SW 0024

VENT TRIM/

LOUVERS

PORCH

POST

SW 2816SW 0024

FRONT

DOOR

*based on sample from sister building

FASCIA TRIM

SW 2833

WINDOW TRIM

SW 2833

SW 2833

WINDOW JAMB

*based on sample from sister building

SW 2833

SIDING

*sample taken from later alteration

FASCIA TRIM

SW 2833

WINDOW TRIM

SW 2833

SW 2833

WINDOW JAMB

*based on sample from sister building

SW 2833

SIDING

10 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021

DOUBLE OFFICER’S QUARTERS, BUILDING #04, FMSS 5944 (1897)

WINDOW

SASH

FRONT GABLE SHINGLE SIDING

SW 2833

PORCH POST

DOUBLE OFFICER’S QUARTERS, BUILDING #05, FMSS 5947 (1897)

RAFTER

BRACKET

SW 2816

SW 2816

SW 6258

FRONT GABLE SHINGLE SIDING

SW 2833

PORCH POST PORCH RAIL

SW 0024

SW 2816

SW 6258

*based on sample from sister building

*based on sample from sister building

WINDOW

SASH

CHIMNEY

CHIMNEY

WINDOW TRIM

SW 2816

WINDOW TRIM

SW 2816

SW 2816

DOOR TRIM

SW 2816

DOOR TRIM

*based on sample from sister building

*based on sample from sister building

*based on sample from sister building

SW 2833

SIDING

SW 2833

SIDING

SW 2833SW 2816

SIDING &

GUTTER

FRONT DOOR

SW 0024 SW 0024

PORCH POST & RAIL RAFTER

BRACKET

WINDOW, FASCIA,

16 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021

NONCOMMISSIONED SERGEANT’S QUARTERS, BUILDING #32, FMSS 6062 (1891)

NONCOMMISSIONED SERGEANT’S QUARTERS, BUILDING #33, FMSS 6064 (1897)

WINDOW

SASH

WINDOW TRIM

SW 0024

SW 0024

WINDOW JAMB

SW 6258

SW 2816

PORCH POST PORCH TRIM

SW 0024

SW 0024

SIDING

*based on sample from sister building

*based on sample from sister building

WINDOW

SASH

FASCIA TRIM

SW 2806

WINDOW TRIM

SW 2806

SW 2806

WINDOW JAMB

SW 6258SW 2833 SW 2833

SHINGLE

SIDING

SW 0042

PORCH

POST

SW 2806

SIDING

*based on sample from sister building

HORIZONTAL TRIM

*based on sample from sister building

*based on sample from sister building

FASCIA TRIM

SW 2806

SHINGLE

SIDING

Note: Original layer of linseed oil paint present on all building components except window sash.

*inconclusive

10 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021

DOUBLE OFFICER’S QUARTERS, BUILDING #04, FMSS 5944 (1897)

WINDOW

SASH

FRONT GABLE SHINGLE SIDING

SW 2833

PORCH POST

DOUBLE OFFICER’S QUARTERS, BUILDING #05, FMSS 5947 (1897)

RAFTER

BRACKET

SW 2816

SW 2816

SW 6258

FRONT GABLE SHINGLE SIDING

SW 2833

PORCH POST PORCH RAIL

SW 0024

SW 2816

SW 6258

*based on sample from sister building

*based on sample from sister building

WINDOW

SASH

CHIMNEY

CHIMNEY

WINDOW TRIM

SW 2816

WINDOW TRIM

SW 2816

SW 2816

DOOR TRIM

SW 2816

DOOR TRIM

*based on sample from sister building

*based on sample from sister building

*based on sample from sister building

SW 2833

SIDING

SW 2833

SIDING

SW 2833SW 2816

SIDING &

GUTTER

FRONT DOOR

SW 0024 SW 0024

PORCH POST & RAIL RAFTER

BRACKET

WINDOW, FASCIA,

Building 2
Building 3
Building 4
Building 6
Building 10
Building 32
Paint Schemes_Cover

File details come from the government source that posted it. Updated .