B08_Attach_1_SOW_EX_3_Supplemental_Specifications_Doyle_Fitness_Center.pdf
PDF 601 KB Posted
- Attached to
- Susanville/Doyle Interagency Fire Station Construc Federal contract opportunity
- Solicitation number
- 140L1223B0001
About this file
This project specification outlines requirements for construction of the Doyle Interagency Fire Station in Susanville, California. The Bureau of Land Management seeks to convert an existing fire station building into a new fitness center and winter storage facility. Work includes demolishing enclosed rooms and an existing mezzanine to open the west end for the new fitness center. Additional requirements include installing new perimeter walls, dividing walls, and an electrical service closet. Mechanical, electrical, and plumbing specifications are also provided for related renovations and upgrades.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOYLE FIRE FACILITIES
FITNESS CENTER
NORTHERN CALIFORNIA DISTRICT
DOYLE, CA
PROJECT
SPECIFICATIONS
BUREAU OF LAND MANAGEMENT
NATIONAL OPERATIONS CENTER
March 1, 2023
This page intentional left almost blank.
TABLE OF CONTENTS
Division Section Title
SPECIFICATIONS GROUP
General Requirements Subgroup
DIVISION 01 - GENERAL REQUIREMENTS
011000 Summary
Facility Construction Subgroup
DIVISION 02 - EXISTING CONDITIONS
024119 Selective Demolition
DIVISION 05 - METALS
054000 Cold-formed Metal Framing
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 Rough Carpentry 061600 Sheathing 062023 Interior Finish Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
072100 Thermal Insulation 078413 Penetration Firestopping 079200 Joint Sealants
DIVISION 08 - OPENINGS
081113 Hollow Metal Doors and Frames
DIVISION 09 - FINISHES
092900 Gypsum Board 096513 Resilient Base and Accessories 099113 Exterior Painting 099123 Interior Painting
Facility Services Subgroup
DIVISION 21 - FIRE SUPPRESSION
211313 Wet-pipe Sprinkler Systems
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230130.52 Existing HVAC Air Distribution System Cleaning
DIVISION 26 - ELECTRICAL
260519 Low-voltage Electrical Power Conductors and Cables 260529 Hangers And Supports for Electrical Systems
260533.13 Conduits For Electrical Systems
260533.16 Boxes And Covers for Electrical Systems
260553 Identification for Electrical Systems 260800 Commissioning of Electrical Systems 260923 Lighting Control Devices 262726 Wiring Devices 265119 Led Interior Lighting 265213 Emergency and Exit Lighting 265619 LED Exterior Lighting
END OF TABLE OF CONTENTS
Doyle Fitness Building Doyle Fire Station Doyle, CA
SECTION 011000 – SUMMARY 1
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Phased construction.
4. Work under Owner's separate contracts.
5. Owner-furnished/Contractor-installed (OFCI) products.
6. Contractor's use of site and premises.
7. Coordination with occupants.
8. Work restrictions.
9. Specification and Drawing conventions.
B. Related Requirements:
1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
1.2 PROJECT INFORMATION
A. Project Identification: Doyle Fitness Center
1. Project Location: Doyle Fire Facilities, Doyle, California
B. Owner: Bureau of Land Management, Northern California District
1. Owner's Representative: Kelina Wong, kmwong@blm.gov
C. Designers: BLM National Operation Center, Denver, Colorado
1. Architect: Eric G. Harris, EGHarris@blm.gov
2. Structural Engineer: Robert H. Welton, BWelton@blm.gov
3. Mechanical Engineer: Kimberly A. Paulson, KAPaulson@blm.gov
4. Electrical Engineer: Adam L. Burt, ALBurt@blm.gov
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
SECTION 011000 – SUMMARY 2
1. Conversion of the existing Doyle Fire Station building into the site’s Fitness Center: The existing Doyle Fire Station Building is to be converted to a Fitness Center and Winter Storage building. The existing building consists of a 4-bay fire truck building with a 5th “bay” housing office space, a small workout area and capped with a storage mezzanine.
The enclosed rooms and mezzanine structure within the building is to be demolished and the entire west end of the building opened up for use as the Fitness Center. The electric panel for the building is located within an existing demising wall with conduit and electrical service lines feeding up from below. This section of wall is to be retained and a new electrical service closet constructed to enclose the panel (as well as other equipment).
2. New walls along the exterior perimeter are to be constructed to protect the pre-engineered metal building walls and building insulation. A new dividing wall is to be constructed between the west-most bay with an overhead door and the next bay to the east. The demising wall will define the Fitness Center space from the Winter Storage space in the existing building. This work and other work are indicated in these specification and the accompanying design drawings.
B. Type of Contract:
1. Project will be constructed under a single prime contract concurrent with the construction of the new Fire Station to the west on the same site.
1.4 PHASED CONSTRUCTION
A. The work to convert the existing building into the new Fitness Center is to occur after the completion of the new Fire Station. The contractor is to complete the new Fire Station, the BLM will move into the new building vacating the existing building, then the contractor may commence the work to convert the existing. Scheduling is somewhat flexible, but the existing building is to remain in operation until the new building is operational. The Contractor is to work with the local staff to determine final construction scheduling.
1.5 OWNER-FURNISHED/CONTRACTOR-INSTALLED (OFCI) PRODUCTS
A. Owner's Responsibilities: Owner will furnish products indicated and perform the following, as applicable:
1. Provide to Contractor Owner-reviewed Product Data and as-built drawings as/if available.
2. Provide for delivery of Owner-furnished products to Project site.
3. Provide fitness equipment both existing and any new equipment which is to be installed into the space once the space is ready to accept the items.
4. Upon delivery, inspect, with Contractor present, delivered items.
a. If Owner-furnished products are damaged, defective, or missing, arrange for replacement.
5. Obtain manufacturer's inspections, service, and warranties.
SECTION 011000 – SUMMARY 3
6. Inform Contractor of earliest available delivery date for Owner-furnished products.
B. Contractor's Responsibilities: The Work includes the following, as applicable:
1. Designate delivery dates of Owner-furnished products in Contractor's construction schedule, utilizing Owner-furnished earliest available delivery dates.
2. Review Owner-reviewed Product Data, Shop Drawings, and Samples, noting discrepancies and other issues in providing for Owner-furnished products in the Work.
3. Receive, unload, handle, store, protect, and install Owner-furnished products.
4. Make building services connections for Owner-furnished products.
5. Protect Owner-furnished products from damage during storage, handling, and installation and prior to Substantial Completion.
6. Repair or replace Owner-furnished products damaged following receipt.
C. Owner-Furnished/Contractor-Installed (OFCI) Products:
1. Exiting fitness equipment installed in the existing fitness space.
a. Coordinate removal and storage of existing fitness equipment and other items in and around the mezzanine and engine bays to make space for construction. Fitness equipment is to be stored on site while the construction of the new Fitness Center space is being completed. The fitness equipment is then to be reinstalled for use in the new space.
2. Televisions, monitors, and telecommunication equipment.
1.6 CONTRACTOR'S USE OF SITE AND PREMISES
A. Restricted Use of Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
B. Limits on Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits on Use of Site: Confine construction operations to the west-most portion of the existing building. Once the demising wall is put in place and finishes applied, the eastern portion of the building is to be turned over to the owner for their use.
2. Driveways, Walkways, and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times.
Do not use these areas for parking or for storage of materials.
C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.
D. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.
SECTION 011000 – SUMMARY 4
1.7 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: Owner will occupy site and existing adjacent buildings during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.
B. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.
C. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.
1.8 WORK RESTRICTIONS
A. Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 6:00 p.m., Monday through Friday, unless otherwise indicated.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify Owner not less than two days in advance of proposed utility interruptions.
2. Obtain Owner's written permission before proceeding with utility interruptions.
D. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.
1. Notify Owner not less than two days in advance of proposed disruptive operations.
2. Obtain Owner's written permission before proceeding with disruptive operations.
E. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances within the existing building, on Project site or on Owner's property is not permitted.
F. Employee Identification: Provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.
SECTION 011000 – SUMMARY 5
G. Employee Screening: Comply with Owner's requirements for drug and background screening of Contractor personnel working on Project site.
1. Maintain list of approved screened personnel with Owner's representative.
1.9 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Text Color: Text used in the Specifications, including units of measure, manufacturer and product names, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics.
3. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 00 Contracting Requirements: General provisions of the Contract, including General and Supplementary Conditions, apply to all Sections of the Specifications.
C. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
SECTION 024119 - SELECTIVE DEMOLITION 1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.3 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at the project site.
1.4 INFORMATIONAL SUBMITTALS
A. Engineering Survey: Submit engineering survey of condition of building.
B. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property and for dust control. Indicate proposed locations and construction of barriers.
C. Schedule of selective demolition activities with starting and ending dates for each activity.
D. Predemolition photographs or video.
E. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician.
1.5 CLOSEOUT SUBMITTALS
A. Inventory of items that have been removed and salvaged.
SECTION 024119 - SELECTIVE DEMOLITION 2
1.6 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
1. Before selective demolition, Owner will remove any items they wish to retain for further use. Verify with the local staff that all items to be retained have been removed and that the building is ready for turnover to the Contractor.
C. Notify the Government of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Storage or sale of removed items or materials on-site is not permitted.
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
F. Arrange selective demolition schedule so as not to interfere with Owner's operations.
1.7 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
SECTION 024119 - SELECTIVE DEMOLITION 3
B. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
C. Inventory and record the condition of items to be removed and salvaged.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Arrange to shut off utilities with utility companies.
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent space within the building to remain.
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
C. Remove temporary barricades and protections where hazards no longer exist.
SECTION 024119 - SELECTIVE DEMOLITION 4
3.4 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Maintain fire watch during and for at least 3 hours after flame-cutting operations.
5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
6. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area as designated by the Government.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by the Government, items may be removed to a suitable, protected storage location during selective demolition, cleaned and reinstalled in their original locations after selective demolition operations are complete.
SECTION 024119 - SELECTIVE DEMOLITION 5
3.5 CLEANING
A. Remove demolition waste materials from Project site and recycle or dispose of them accordingly.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Comply with requirements specified in Section 017419 "Construction Waste
Management and Disposal."
B. Burning: Do not burn demolished materials.
C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
SECTION 054000 - COLD-FORMED METAL FRAMING 1
SECTION 054000 - COLD-FORMED METAL FRAMING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Load-bearing wall framing.
2. Exterior non-load-bearing wall framing.
3. Interior non-load-bearing wall framing.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at the Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For the following:
1. Cold-formed steel framing materials.
2. Load-bearing wall framing.
3. Interior non-load-bearing wall framing.
4. Vertical deflection clips.
5. Single deflection track.
6. Double deflection track.
7. Drift clips.
8. Post-installed anchors.
9. Power-actuated anchors.
B. Shop Drawings:
1. Include layout, spacings, sizes, thicknesses, and types of cold-formed steel framing;
fabrication; and fastening and anchorage details, including mechanical fasteners.
2. Indicate reinforcing channels, opening framing, supplemental framing, strapping, bracing, bridging, splices, accessories, connection details, and attachment to adjoining work.
1.4 INFORMATIONAL SUBMITTALS
A. Welding certificates.
B. Product certificates.
C. Product test reports.
SECTION 054000 - COLD-FORMED METAL FRAMING 2
D. Research Reports:
1. For post-installed anchors and/or power-actuated fasteners, from ICC-ES or other qualified testing agency acceptable to authorities having jurisdiction.
1.5 QUALITY ASSURANCE
A. Testing Agency Qualifications: Qualified according to ASTM E329 for testing indicated.
B. Product Tests: Mill certificates or data from a qualified independent testing agency.
C. Code-Compliance Certification of Studs and Tracks: Provide documentation that framing members are certified according to the product-certification program of [the Certified Steel Stud Association] [the Steel Framing Industry Association] [the Steel Stud Manufacturers Association] [or] [the Supreme Steel Framing System Association].
D. Welding Qualifications: Qualify procedures and personnel according to the following:
1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."
2. AWS D1.3/D1.3M, "Structural Welding Code - Sheet Steel."
E. Comply with AISI S230 "Standard for Cold-Formed Steel Framing - Prescriptive Method for One and Two Family Dwellings."
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Cold-Formed Steel Framing Standards: Unless more stringent requirements are indicated, framing complies with AISI S100 and ASTM C955.
2.2 COLD-FORMED STEEL FRAMING MATERIALS
A. Framing Members, General: Comply with ASTM standards for conditions indicated.
B. Steel Sheet: ASTM A1003/A1003M, Structural Grade, Type H, metallic coated, of grade and coating designation as follows:
1. Grade: [ST33H (ST230H)] [ST50H (ST340H)] [As required by structural performance] <Insert grade>.
2. Coating: [G60 (Z180), A60 (ZF180), AZ50 (AZM150), or GF30 (ZGF90)] [G90 (Z275) or equivalent] <Insert coating designation>.
C. Steel Sheet for [Vertical Deflection] [Drift] Clips: ASTM A653/A653M, structural steel, zinc coated, of grade and coating as follows:
SECTION 054000 - COLD-FORMED METAL FRAMING 3
1. Grade: [33 (230)] [50 (340), Class 1] [As required by structural performance] <Insert grade>.
2. Coating: [G60 (Z180)] [G90 (Z275)] <Insert coating designation>.
2.3 WALL FRAMING
A. Steel Studs: Manufacturer's standard C-shaped steel studs, of web depths indicated, punched, with stiffened flanges, and as noted on the structural plans.
B. Steel Track: Manufacturer's standard U-shaped steel track, of web depths indicated, unpunched, with straight flanges, and matching minimum base-metal thickness of steel studs as indicated on the structural plans.
C. Steel accessories: Manufacturer's standards to match use and placement as indicated on the structural plans.
2.4 ANCHORS, CLIPS, AND FASTENERS
A. Steel Shapes and Clips: ASTM A36/A36M, zinc coated by hot-dip process according to
ASTM A123/A123M.
B. Anchor Bolts: ASTM F1554, Grade 36 threaded carbon-steel hex-headed bolts, carbon-steel nuts, and flat, hardened-steel washers; zinc coated by [ot-dip process according to ASTM A153/A153M, Class C.
C. Post-Installed Anchors: Fastener systems with bolts of same basic metal as fastened metal, if visible, unless otherwise indicated; with working capacity greater than or equal to the design load, according to an evaluation report acceptable to authorities having jurisdiction as appropriate for the substrate.
2.5 MISCELLANEOUS MATERIALS
A. Galvanizing Repair Paint: ASTM A780/A780M.
B. Cement Grout: Portland cement, ASTM C150/C150M, Type I; and clean, natural sand, ASTM C404. Mix at ratio of 1 part cement to 2-1/2 parts sand, by volume, with minimum water required for placement and hydration.
C. Nonmetallic, Nonshrink Grout: Factory-packaged, nonmetallic, noncorrosive, nonstaining grout, complying with ASTM C1107/C1107M, and with a fluid consistency and 30-minute working time.
D. Shims: Load-bearing, high-density, multimonomer, nonleaching plastic; or cold-formed steel of same grade and metallic coating as framing members supported by shims.
E. Sill Sealer Gasket: Closed-cell neoprene foam, 1/4 inch thick, selected from manufacturer's standard widths to match width of bottom track or rim track members as required.
SECTION 054000 - COLD-FORMED METAL FRAMING 4
PART 3 - EXECUTION
3.1 PREPARATION
A. Install load-bearing shims or grout between the underside of load-bearing wall bottom track and the top of foundation wall or slab at locations with a gap larger than 1/4 inch (6 mm) to ensure a uniform bearing surface on supporting concrete or masonry construction.
B. Install sill sealer gasket at the underside of wall bottom track or rim track and at the top of foundation wall or slab at stud or joist locations.
3.2 INSTALLATION, GENERAL
A. Cold-formed steel framing may be shop or field fabricated for installation, or it may be field assembled.
B. Install cold-formed steel framing according to AISI S200, AISI S202, and manufacturer's written instructions unless more stringent requirements are indicated.
C. Install cold-formed steel framing and accessories plumb, square, and true to line, and with connections securely fastened.
D. Install framing members in one-piece lengths unless splice connections are indicated for track or tension members.
E. Install temporary bracing and supports to secure framing and support loads equal to those for which structure was designed. Maintain braces and supports in place, undisturbed, until entire integrated supporting structure has been completed and permanent connections to framing are secured.
F. Do not bridge building expansion joints with cold-formed steel framing. Independently frame both sides of joints.
G. Install insulation, specified in Section 072100 "Thermal Insulation," in framing-assembly members, such as headers, sills, boxed joists, and multiple studs at openings, that are inaccessible on completion of framing work.
H. Fasten hole-reinforcing plate over web penetrations that exceed size of manufacturer's approved or standard punched openings.
3.3 INSTALLATION OF WALL FRAMING
A. Install continuous top and bottom tracks sized to match studs. Align tracks accurately and securely anchor at corners and ends, and at spacings as follows:
1. Anchor Spacing: as per structural drawings.
SECTION 054000 - COLD-FORMED METAL FRAMING 5
B. Squarely seat studs against top and bottom tracks, with gap not exceeding 1/8 inch between the end of wall-framing member and the web of track.
1. Fasten both flanges of studs to top and bottom tracks.
2. Space studs as follows:
a. Stud Spacing: 16 inches O.C.
C. Set studs plumb, except as needed for diagonal bracing or required for nonplumb walls or warped surfaces and similar configurations.
D. Align studs vertically where floor framing interrupts wall-framing continuity. Where studs cannot be aligned, continuously reinforce track to transfer loads.
E. Align floor and roof framing over studs according to AISI S200, Section C1. Where framing cannot be aligned, continuously reinforce track to transfer loads.
F. Anchor studs abutting structural columns or walls, including masonry walls, to supporting structure.
G. Install headers over wall openings wider than stud spacing. Locate headers above openings.
Fabricate headers of compound shapes indicated or required to transfer load to supporting studs, complete with clip-angle connectors, web stiffeners, or gusset plates.
1. Frame wall openings with not less than a double stud at each jamb of frame. Fasten jamb members together to uniformly distribute loads.
2. Install tracks and jack studs above and below wall openings. Anchor tracks to jamb studs with clip angles or by welding, and space jack studs same as full-height wall studs.
H. Install supplementary framing, blocking, and bracing in stud framing indicated to support fixtures, equipment, services, casework, heavy trim, furnishings, and similar work requiring attachment to framing.
1. If type of supplementary support is not indicated, comply with stud manufacturer's written recommendations and industry standards in each case, considering weight or load resulting from item supported.
I. Install horizontal bridging in stud system, spaced vertically as indicated on Drawings. Fasten at each stud intersection.
1. Channel Bridging: Cold-rolled steel channel, welded or mechanically fastened to webs of punched studs with a minimum of two screws into each flange of the clip angle for framing members up to 6 inches deep.
J. Install miscellaneous framing and connections, including supplementary framing, web stiffeners, clip angles, continuous angles, anchors, and fasteners, to provide a complete and stable wall-framing system.
SECTION 054000 - COLD-FORMED METAL FRAMING 6
3.4 INSTALLATION TOLERANCES
A. Install cold-formed steel framing level, plumb, and true to line to a maximum allowable tolerance variation of 1/8 inch in 10 feet and as follows:
1. Space individual framing members no more than plus or minus 1/8 inch from plan location. Cumulative error are not to exceed minimum fastening requirements of sheathing or other finishing materials.
3.5 REPAIRS
A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on fabricated and installed cold-formed steel framing with galvanized repair paint according to ASTM A780/A780M and manufacturer's written instructions.
3.6 FIELD QUALITY CONTROL
A. Testing: If deemed necessary, the Owner will engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports.
B. Field and shop welds will be subject to testing and inspecting.
C. Testing agency will report test results promptly and in writing to Contractor and the Owner.
D. Cold-formed steel framing will be considered defective if it does not pass tests and inspections.
E. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
END OF SECTION 054000
SECTION 061000 - ROUGH CARPENTRY 1
SECTION 061000 - ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Framing with dimension lumber.
2. Shear wall panels.
3. Wood blocking and nailers.
4. Wood furring and grounds.
5. Plywood backing panels.
1.2 ACTION SUBMITTALS
A. Product Data:
1. For each type of process and factory-fabricated product.
2. For preservative-treated wood products.
1.3 INFORMATIONAL SUBMITTALS
A. Material Certificates:
1. For dimension lumber specified to comply with minimum allowable unit stresses.
Indicate species and grade selected for each use and design values approved by the ALSC Board of Review.
2. For preservative-treated wood products. Indicate type of preservative used and net amount of preservative retained.
B. Evaluation Reports: For the following, from ICC-ES:
1. Power-driven fasteners.
2. Post-installed anchors.
3. Metal framing anchors.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. Lumber: Comply with DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, comply with the applicable rules of any rules-writing agency
SECTION 061000 - ROUGH CARPENTRY 2
certified by the ALSC Board of Review. Grade lumber by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated.
1. Factory mark each piece of lumber with grade stamp of grading agency.
2. Dress lumber, S4S, unless otherwise indicated.
B. Maximum Moisture Content:
1. Boards: 19 percent.
2. Dimension Lumber: 19 percent 2-inch nominal thickness or less; 19 percent for more than 2-inch nominal unless otherwise indicated.
C. Engineered Wood Products: Acceptable to authorities having jurisdiction and for which current model code research or evaluation reports exist that show compliance with building code in effect for Project.
1. Allowable design stresses, as published by manufacturer, are to meet or exceed those indicated. Manufacturer's published values are to be determined from empirical data or by rational engineering analysis and demonstrated by comprehensive testing performed by a qualified independent testing agency.
2.2 DIMENSION LUMBER FRAMING
A. Non-Load-Bearing Interior Partitions by Grade: Construction, Stud, or No. 3.
1. Application: Interior partitions not indicated as load bearing.
2. Species:
a. Southern pine or mixed southern pine; SPIB.
b. Northern species; NLGA.
c. Eastern softwoods; NeLMA.
d. Western woods; WCLIB or WWPA.
B. Framing Other Than Non-Load-Bearing Partitions by Grade: Construction, Stud, or No. 3 grade.
1. Application: Framing other than interior partitions.
2. Species:
a. Hem-fir (north); NLGA.
b. Southern pine; SPIB.
c. Douglas fir-larch; WCLIB or WWPA.
d. Spruce-pine-fir; NLGA.
e. Douglas fir-south; WWPA.
f. Hem-fir; WCLIB or WWPA.
g. Douglas fir-larch (north); NLGA.
h. Spruce-pine-fir (south); NeLMA, WCLIB, or WWPA.
SECTION 061000 - ROUGH CARPENTRY 3
C. Framing Other Than Non-Load-Bearing Partitions by Performance: Any species and grade with a modulus of elasticity of at least 1,500,000 psi and an extreme fiber stress in bending of at least 850 psi thickness and 12-inch nominal width for single-member use.
1. Application: Framing other than interior partitions.
2.3 MISCELLANEOUS LUMBER
A. Provide miscellaneous lumber indicated and lumber for support or attachment of other construction, including the following:
1. Blocking.
2. Nailers.
3. Furring.
B. Dimension Lumber Items: Standard, Stud, or No. 3 grade lumber of any species.
C. Concealed Boards: 19 percent maximum moisture content and any of the following species and grades:
1. Mixed southern pine or southern pine; No. 3 grade; SPIB.
2. Eastern softwoods; No. 3 Common grade; NeLMA.
3. Northern species; No. 3 Common grade; NLGA.
4. Western woods; Standard or No. 3 Common grade; WCLIB or WWPA.
2.4 PLYWOOD BACKING PANELS
A. Equipment Backing Panels: Plywood, DOC PS 1, Exterior, A-C in thickness indicated or, if not indicated, not less than 5/8” nominal thickness.
2.5 FASTENERS
A. General: Fasteners are to be of size and type indicated and comply with requirements specified in this article for material and manufacture. Provide nails or screws, in sufficient length, to penetrate not less than 1-1/2 inches into wood substrate.
1. Where rough carpentry is exposed to weather, in ground contact, pressure-preservative treated, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A153/A153M.
B. Power-Driven Fasteners: Fastener systems with an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES AC70.
C. Post-Installed Anchors: Fastener systems with an evaluation report acceptable to authorities having jurisdiction as appropriate for the substrate.
SECTION 061000 - ROUGH CARPENTRY 4
2.6 METAL FRAMING ANCHORS
A. Allowable design loads, as published by manufacturer, are to meet or exceed those indicated.
Manufacturer's published values are to be determined from empirical data or by rational engineering analysis and demonstrated by comprehensive testing performed by a qualified independent testing agency. Framing anchors are to be punched for fasteners adequate to withstand same loads as framing anchors.
B. Galvanized-Steel Sheet: Hot-dip, zinc-coated steel sheet complying with ASTM A653/A653M, G60 coating designation.
1. Use for interior locations unless otherwise indicated.
C. Hot-Dip, Heavy-Galvanized Steel Sheet: ASTM A653/A653M; structural steel (SS), high-strength low-alloy steel Type A (HSLAS Type A), or high-strength low-alloy steel Type B (HSLAS Type B); G185 coating designation; and not less than 0.036 inch thick.
1. Use for wood-preservative-treated lumber and where indicated.
2.7 MISCELLANEOUS MATERIALS
A. Sill-Sealer Gaskets:
1. Closed-cell neoprene foam, 1/4 inch thick, selected from manufacturer's standard widths to suit width of sill members indicated.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame Construction," unless otherwise indicated.
B. Framing with Engineered Wood Products: Install engineered wood products to comply with manufacturer's written instructions.
C. Set work to required levels and lines, with members plumb, true to line, cut, and fitted. Fit rough carpentry accurately to other construction. Locate furring, nailers, blocking, grounds, and similar supports to comply with requirements for attaching other construction.
D. Install shear wall panels to comply with manufacturer's written instructions.
E. Install metal framing anchors to comply with manufacturer's written instructions. Install fasteners through each fastener hole.
F. Do not splice structural members between supports unless otherwise indicated.
G. Comply with AWPA M4 for applying field treatment to cut surfaces of preservative-treated lumber.
SECTION 061000 - ROUGH CARPENTRY 5
H. Where wood-preservative-treated lumber is installed adjacent to metal decking, install continuous flexible flashing separator between wood and metal decking.
I. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following:
1. Table 2304.9.1, "Fastening Schedule," in ICC's International Building Code (IBC).
2. ICC-ES evaluation report for fastener.
END OF SECTION 061000
SECTION 061600 – SHEATHING 1
SECTION 061600 - SHEATHING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Wall sheathing.
2. Subflooring.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product.
PART 2 - PRODUCTS
2.1 WALL SHEATHING
A. Plywood Sheathing, Walls: Exposure 1, Structural I sheathing.
2.2 SUBFLOORING AND UNDERLAYMENT
A. Plywood Subflooring: Exposure 1, Structural I single-floor panels or sheathing.
2.3 FASTENERS
A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacture.
1. For wall sheathing, provide fasteners with hot-dip zinc coating complying with
ASTM A153/A153M.
2.4 MISCELLANEOUS MATERIALS
A. Adhesives for Field Gluing Panels to Wood Framing: Formulation complying with APA AFG- 01 or ASTM D3498 that is approved for use with type of construction panel indicated by manufacturers of both adhesives and panels.
SECTION 061600 – SHEATHING 2
3.1 INSTALLATION, GENERAL
A. Do not use materials with defects that impair quality of sheathing or pieces that are too small to use with minimum number of joints or optimum joint arrangement. Arrange joints so that pieces do not span between fewer than three support members.
B. Cut panels at penetrations, edges, and other obstructions of work; fit tightly against abutting construction unless otherwise indicated.
C. Securely attach to substrate by fastening as indicated, complying with the following:
1. Table 2304.10.1, "Fastening Schedule," in the ICC's International Building Code.
2. ICC-ES evaluation report for fastener.
D. Coordinate wall sheathing installation with flashing and joint-sealant installation so these materials are installed in sequence and manner that prevent exterior moisture from passing through completed assembly.
E. Do not bridge building expansion joints; cut and space edges of panels to match spacing of structural support elements.
3.2 WOOD STRUCTURAL PANEL INSTALLATION
A. General: Comply with applicable recommendations in APA Form No. E30, "Engineered Wood Construction Guide," for types of structural-use panels and applications indicated.
B. Fastening Methods: Fasten panels as indicated below:
1. Subflooring:
a. Glue and nail to wood framing.
b. Screw to cold-formed metal framing.
c. Space panels 1/8 inch apart at edges and ends.
d. Space panels 1/8 inch apart at edges and ends.
END OF SECTION 061600
SECTION 072100 - THERMAL INSULATION 1
SECTION 072100 - THERMAL INSULATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Glass-fiber blanket insulation.
1.2 ACTION SUBMITTALS
A. Product Data: For the following:
1. Glass-fiber blanket insulation.
1.3 INFORMATIONAL SUBMITTALS
A. Installer's Certification: Listing type, manufacturer, and R-value of insulation installed in each element of the building thermal envelope.
1. Sign, date, and post the certification in a conspicuous location on Project site.
B. Product test reports.
C. Research reports.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Surface-Burning Characteristics: Maximum flame-spread and smoke-developed indexes less than 200 and 450 when tested in accordance with ASTM E84.
B. Fire Propagation Characteristics: Passes NFPA 285 testing as part of an approved assembly.
C. Labeling: Provide identification of mark indicating R-value of each piece of insulation 12 inches and wider in width.
D. Thermal-Resistance Value (R-Value): R-13 in accordance with ASTM C518, in the new demising wall between the Fitness Center and the winter storage bays of the building.
SECTION 072100 - THERMAL INSULATION 2
2.2 GLASS-FIBER BLANKET INSULATION
A. Glass-Fiber Blanket Insulation, Kraft Faced: ASTM C665, Type II (nonreflective faced), Class C (faced surface not rated for flame propagation); Category 1 (membrane is a vapor barrier).
2.3 ACCESSORIES
A. Insulation for Miscellaneous Voids:
1. Glass-Fiber Insulation: ASTM C764, Type II, loose fill; with maximum flame-spread and smoke-developed indexes of 5, per ASTM E84.
B. Insulation Anchors, Spindles, and Standoffs: As recommended by manufacturer.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Comply with insulation manufacturer's written instructions applicable to products and applications.
B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.
C. Install insulation with manufacturer's R-value label exposed after insulation is installed.
D. Extend insulation to envelop entire area to be insulated. Fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.
E. Provide sizes to fit applications and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units unless multiple layers are otherwise shown or required to make up total thickness or to achieve R-value.
3.2 INSTALLATION OF INSULATION IN FRAMED CONSTRUCTION
A. Blanket Insulation: Install in cavities formed by framing members according to the following requirements:
1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends.
2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.
3. Maintain 3-inch clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation.
SECTION 072100 - THERMAL INSULATION 3
4. For metal-framed wall cavities where cavity heights exceed 96 inches, support unfaced blankets mechanically and support faced blankets by taping flanges of insulation to flanges of metal studs.
5. For wood-framed construction, install blankets according to ASTM C1320 and as follows:
a. With faced blankets having stapling flanges, lap blanket flange over flange of adjacent blanket to maintain continuity of vapor retarder once finish material is installed over it.
b. Exterior Walls: Set units with facing placed toward interior of construction.
c. Interior Walls: Set units with facing placed toward the new Fitness Room area.
B. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to prevent gaps in insulation using the following materials:
1. Glass-Fiber Insulation: Compact to approximately 40 percent of normal maximum volume equaling a density of approximately 2.5 lb/cu. ft.
END OF SECTION 072100
SECTION 078413 - PENETRATION FIRESTOPPING 1
SECTION 078413 - PENETRATION FIRESTOPPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Penetrations in fire-resistance-rated walls.
2. Penetrations in horizontal assemblies.
3. Penetrations in smoke barriers.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at the project site.
1.3 ACTION SUBMITTALS
A. Product data.
B. Product Schedule: For each penetration firestopping system. Include location, illustration of firestopping system, and design designation of qualified testing and inspecting agency.
1. Engineering Judgments: Where Project conditions require modification to a qualified testing and inspecting agency's illustration for a particular penetration firestopping system, submit illustration, with modifications marked, approved by penetration firestopping system manufacturer's fire-protection engineer as an engineering judgment or equivalent fire-resistance-rated assembly developed in accordance with current International Firestop Council (IFC) guidelines. Obtain approval of authorities having jurisdiction prior to submittal.
1.4 INFORMATIONAL SUBMITTALS
A. Listed system designs.
1.5 CLOSEOUT SUBMITTALS
A. Installer Certificates: From Installer indicating that penetration firestopping systems have been installed in compliance with requirements and manufacturer's written instructions.
SECTION 078413 - PENETRATION FIRESTOPPING 2
1.6 QUALITY ASSURANCE
A. Installer Qualifications: A firm that has been approved by FM Approvals according to FM Approvals 4991, "Approval of Firestop Contractors," or been evaluated by UL and found to comply with its "Qualified Firestop Contractor Program Requirements."
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Fire-Test-Response Characteristics:
1. Perform penetration firestopping system tests by a qualified testing agency acceptable to authorities having jurisdiction.
2. Test per testing standards referenced in "Penetration Firestopping Systems" Article.
Provide rated systems complying with the following requirements:
a. Penetration firestop systems installed with products bearing the classification marking of a qualified product certification agency in accordance with listed system designs published by a qualified testing agency.
1) UL in its online directory "Product iQ."
2.2 PENETRATION FIRESTOPPING SYSTEMS
A. Description: Systems that resist spread of fire, passage of smoke and other gases, and maintain original fire-resistance rating of construction penetrated. Penetration firestopping systems are to be compatible with one another, with the substrates forming openings, and with penetrating items if any.
B. Penetrations in Fire-Resistance-Rated Walls: Penetration firestopping systems with ratings determined per ASTM E814 or UL 1479.
1. F-Rating: Not less than the fire-resistance rating of the wall penetrated or 1-hour minimum.
C. Penetrations in Horizontal Assemblies: Penetration firestopping systems with ratings determined per ASTM E814 or UL 1479.
PART 3 - EXECUTION
3.1 INSTALLATION OF PENETRATION FIRESTOPPING SYSTEMS
A. Examine substrates and conditions, with Installer present, for compliance with requirements for opening configurations, penetrating items, substrates, and other conditions affecting performance of the Work.
SECTION 078413 - PENETRATION FIRESTOPPING 3
B. General: Install penetration firestopping systems to comply with manufacturer's written installation instructions and published drawings for products and applications.
C. Install forming materials and other accessories of types required to support fill materials during their application and in the position needed to produce cross-sectional shapes and depths required to achieve fire ratings.
1. After installing fill…