This document is an amendment to an invitation for bid for the Susanville/Doyle Interagency Fire Station construction project. The amendment revises the response to question 17 regarding the removal of an existing office trailer and associated deck, stairs, and ramp. The contractor is now required to remove the 12 foot by 60 foot trailer and connected structures, and has the option to relocate the trailer onsite for temporary use during construction, pending agency approval. Utilities will need to be disconnected and the site cleared prior to project completion. The Bureau of Land Management California Region issued the solicitation.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0002 Susanville/Doyle Interagency Fire Station Construction Invitation for Bid (IFB) No. 140L1223B0001 Revised Response to Question 17
-------------------------------------------------------------------------------------------------------------------------------Question 17: The (E) trailer to be removed by the Gov. includes a deck, stairs, and ramp will the Gov. remove these as well?
BLM Response (REVISED): The Drawings and SOW are amended to require the Contractor to remove the existing office trailer and the connected deck, stairs, and ramp. The trailer is 12 feet wide x 60 feet long. Attachment 4 is added to include the markup changes for Drawing C-100 and photos of the existing trailer, which includes the manufacturer nameplate.
The following note was added to Drawing C-100 (Attachment 4 – Office Trailer Information):
CONTRACTOR TO REMOVE EXISTING 12'X60' USFS TRAILER OFFICE AND ASSOCIATED DECK AND RAMP. THE CONTRACTOR IS RESPONSIBLE TO DISCONNECT AND REMOVE ALL UTILITIES. THE GOVERNMENT WILL TRANSFER OWNERSHIP OF THE TRAILER TO THE CONTRACTOR. THE CONTRACTOR WILL REMOVE THE TRAILER FROM THE SITE PRIOR TO THE END OF THE PROJECT. AT THE CONTRACTOR'S OPTION, THE CONTRACTOR CAN RELOCATE THE TRAILER ONSITE FOR USE AS A TEMPORARY OFFICE DURING CONSTRUCTION. THE LOCATION MUST BE APPROVED BY THE COR. CONTRACTOR IS RESPONSIBLE TO ARRANGE FOR TEMPORARY UTILITIES, IN ACCORDANCE WITH SECTION 01 50 00.