B09_Amend_0001_B08_Attach_1_SOW_EX_6_Draft_SWPPP_Vol_2_0001.docx
DOCX document 33 KB Posted
- Attached to
- Susanville/Doyle Interagency Fire Station Construc Federal contract opportunity
- Solicitation number
- 140L1223B0001
About this file
This document is a Stormwater Pollution Prevention Plan (SWPPP) Volume 2 of 4 for the proposed Susanville/Doyle Interagency Fire Station construction project. The SWPPP was prepared for the Bureau of Land Management by S&B Christ Consulting and includes best management practice fact sheets for soil stabilization, sediment control, non-stormwater management, waste management, and materials management to be implemented during project construction activities from May 1, 2023 to February 1, 2024. BMPs addressed include scheduling, soil binders, silt fences, street sweeping, vehicle washing, stockpile management, and concrete waste handling. The financially responsible party is listed as the Bureau of Land Management located in Reno, Nevada.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORMWATER POLLUTION PREVENTION PLAN
VOLUME 2 OF 4: BMP FACT SHEETS
SUSANVILLE/DOYLE FIRE STATION
SE CORNER OF US-395 AND DOYLE GRADE ROAD
DOYLE, CALIFORNIA 96109
530-827-2681
RISK LEVEL: 1
WDID NUMBER: X
LEGALLY RESPONSIBLE PERSON:
BUREAU OF LAND MANAGEMENT
FINANCIAL BLVD
RENO, NV 89502
DERECK WILSON
DISTRICT MANAGER
530-224-2100
PREPARED FOR:
BUREAU OF LAND MANAGEMENT
PREPARED BY:
S&B CHRIST CONSULTING, LLC
9555 HILLWOOD DRIVE, SUITE 160
LAS VEGAS, NV 89134
LAURELI WAGNER, QSD
PREPARATION DATE:
JULY 27, 2022
ESTIMATED PROJECT DATES:
| START OF CONSTRUCTION: |
| COMPLETION OF CONSTRUCTION: |
| MAY 1, 2023 |
| FEBRUARY 1, 2024 |
THIS PAGE INTENTIONALLY LEFT BLANK
SWPPP│ SUSANVILLE/DOYLE FIRE STATION
TABLE OF CONTENTS 23
TABLE OF CONTENTS
BMP FACT SHEETS
| EC-1 | Scheduling |
| EC-2 | Preservation of Existing Vegetation |
| EC-5 | Soil Binders |
| EC-7 | Geotextiles and Mats |
| EC-16 | Non-Vegetated Stabilization |
| SE-1 | Silt Fence |
| SE-3 | Sediment Trap |
| SE-5 | Fiber Rolls |
| SE-6 | Gravel Bag Berm |
| SE-7 | Street Sweeping |
| SE-12 | Manufactured Linear Sediment Controls |
| SE-13 | Compost Sock and Berm |
| TC-1 | Stabilized Construction Entrance and Exit |
| NS-1 | Water Conservation Practices |
| NS-3 | Paving and Grinding Operation |
| NS-6 | Illicit Connection/Discharge |
| NS-7 | Potable Water/Irrigation |
| NS-8 | Vehicle and Equipment Cleaning |
| NS-9 | Vehicle and Equipment Fueling |
| NS-10 | Vehicle and Equipment Maintenance |
| NS-12 | Concrete Curing |
WM-01 Material Delivery and Storage WM-02 Material Use WM-03 Stockpile Management WM-04 Spill Prevention and Control WM-05 Solid Waste Management WM-06 Hazardous Waste Management WM-07 Contaminated Soil Management WM-08 Concrete Waste Management WM-09 Sanitary-Septic Waste Management WM-10 Liquid Waste Management
THIS PAGE INTENTIONALLY LEFT BLANK
File details come from the government source that posted it. Updated .