This Stormwater Pollution Prevention Plan (SWPPP) Volume 3 of 4 outlines requirements for a construction project to build the Susanville/Doyle Interagency Fire Station located at the southeast corner of US-395 and Doyle Grade Road in Doyle, California. The Bureau of Land Management is the legally responsible entity overseeing the project, which will be constructed by S&B Christ Consulting, LLC between May 1, 2023 and February 1, 2024. The SWPPP was prepared by Laureli Wagner of S&B Christ Consulting and identifies the site as a Risk Level 1 project requiring a Construction General Permit from the California Regional Water Quality Control Board with a WDID number to be determined. It also provides stormwater pollution prevention measures during construction activities to control soil erosion and sediment and prevent impacts to surface waters.

View the file

Other files for this federal contract opportunity

Other files attached to Susanville/Doyle Interagency Fire Station Construc, newest first.
File Type Posted
B09_Amend_02_Section_J_-_Attachment_4_-_Office_Trailer_Information_0002.pdf PDF
B09_Amend_02_Revised_Section_J_0002.pdf PDF
Sol_140L1223B0001_Amd_0002.pdf PDF
B09_Amend_0002_Revised_Response_to_Question_17_0002.docx DOCX document
B09_Amend_0001_Questions_and_Answers_0001.docx DOCX document
B09_Amend_0001_Revised_Pages_0001.pdf PDF
B09_Amend_0001_B08_Attach_1_SOW_EX_6_Draft_SWPPP_Vol_2_0001.docx DOCX document
B09_Amend_0001_B08_Attach_1_SOW_EX_6_Draft_SWPPP_Vol_1_0001.docx DOCX document
B09_Amend_0001_B08_Attach_1_SOW_EX_6_Draft_SWPPP_Vol_4_0001.docx DOCX document
B09_Amend_0001_Site_Visit_Sign_in_Sheet_0001.pdf PDF
B03_Attach_2_Wage_Determination_CA20230007_Rev_15_30_June_2023_0001.pdf PDF
Sol_140L1223B0001_Amd_0001.pdf PDF
B09_Amend_0001_B08_Attach_1_Statement_of_Work_Revised_19_Jul_2023_0001.docx DOCX document
B08_Attach_1_SOW_EX_3_Supplemental_Specifications_Doyle_Fitness_Center.pdf PDF
B08_Attach_1_SOW_EX_5__As-Builts_Drawings.pdf PDF
B03_Attach_2_Wage_Determination_CA20230007_Rev_12_5_May_2023.pdf PDF
B08_Attach_3_Pricing_Schedule.xlsx XLSX spreadsheet
B08_Attach_1_Statement_of_Work.pdf PDF
B08_Attach_1_SOW_EX_4_Supplemental_Drawings_Doyle_Fitness_Center.pdf PDF
B08_Attach_1_SOW_EX_2_Project_Drawings_Doyle_Fire_Station.pdf PDF
Sol_140L1223B0001.pdf PDF
B08_Attach_1_SOW_EX_1_Project_Specifications_Doyle_Fire_Station.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORMWATER POLLUTION PREVENTION PLAN

VOLUME 3 OF 4: CGP PERMIT

SUSANVILLE/DOYLE FIRE STATION

SE CORNER OF US-395 AND DOYLE GRADE ROAD

DOYLE, CALIFORNIA 96109

530-827-2681

RISK LEVEL: 1

WDID NUMBER: X

LEGALLY RESPONSIBLE PERSON:

BUREAU OF LAND MANAGEMENT

FINANCIAL BLVD

RENO, NV 89502

DERECK WILSON

DISTRICT MANAGER

530-224-2100

PREPARED FOR:

BUREAU OF LAND MANAGEMENT

PREPARED BY:

S&B CHRIST CONSULTING, LLC

9555 HILLWOOD DRIVE, SUITE 160

LAS VEGAS, NV 89134

LAURELI WAGNER, QSD

PREPARATION DATE:

JULY 27, 2022

ESTIMATED PROJECT DATES:

START OF CONSTRUCTION:
COMPLETION OF CONSTRUCTION:
MAY 1, 2023
FEBRUARY 1, 2024

THIS PAGE INTENTIONALLY LEFT BLANK

SWPPP│ SUSANVILLE/DOYLE FIRE STATION

CGP Permit 23