B09_Amend_0001_B08_Attach_1_SOW_EX_6_Draft_SWPPP_Vol_4_0001.docx
DOCX document 79 KB Posted
- Attached to
- Susanville/Doyle Interagency Fire Station Construc Federal contract opportunity
- Solicitation number
- 140L1223B0001
About this file
This document contains a Stormwater Pollution Prevention Plan (SWPPP) for the construction of the Susanville/Doyle Interagency Fire Station. The SWPPP includes four volumes, with Volume 4 containing appendices of supporting documentation such as weather reports, monitoring records, BMP inspection forms, and training materials. The SWPPP is for a Risk Level 1 construction site located at the corner of US-395 and Doyle Grade Road in Doyle, California. Construction is estimated to begin in May 2023 and be completed in February 2024. The SWPPP identifies the legally responsible party as the Bureau of Land Management and was prepared by S&B Christ Consulting for the Bureau of Land Management's Susanville/Doyle Interagency Fire Station project.
The related federal contract opportunity is a solicitation for the construction of the Susanville/Doyle Interagency Fire Station, with Solicitation Number 140L1223B0001. The solicitation was issued by the Department of the Interior Bureau of Land Management California Region.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORMWATER POLLUTION PREVENTION PLAN
VOLUME 4 OF 4: FORMS
SUSANVILLE/DOYLE FIRE STATION
SE CORNER OF US-395 AND DOYLE GRADE ROAD
DOYLE, CALIFORNIA 96109
530-827-2681
RISK LEVEL: 1
WDID NUMBER: X
LEGALLY RESPONSIBLE PERSON:
BUREAU OF LAND MANAGEMENT
FINANCIAL BLVD
RENO, NV 89502
DERECK WILSON
DISTRICT MANAGER
530-224-2100
PREPARED FOR:
BUREAU OF LAND MANAGEMENT
PREPARED BY:
S&B CHRIST CONSULTING, LLC
9555 HILLWOOD DRIVE, SUITE 160
LAS VEGAS, NV 89134
LAURELI WAGNER, QSD
PREPARATION DATE:
JULY 27, 2022
ESTIMATED PROJECT DATES:
| START OF CONSTRUCTION: |
| COMPLETION OF CONSTRUCTION: |
| MAY 1, 2023 |
| FEBRUARY 1, 2024 |
THIS PAGE INTENTIONALLY LEFT BLANK
SWPPP│ SUSANVILLE/DOYLE FIRE STATION
TABLE OF CONTENTS 23
TABLE OF CONTENTS
VOLUME 4 APPENDICES
| Appendix A | Weather Reports |
| Appendix B | Monitoring Records |
| Appendix C | BMP Inspection Form |
| Appendix D | Project Specific Rain Event Action Plan Template (Not Currently Applicable) |
| Appendix E | Training Reporting Form |
| Appendix F | Example Storm Event Monitoring Form |
| Appendix G | Field Meter Instructions |
| Appendix H | Supplemental Information |
TABLE OF CONTENTS 23
APPENDIX A – WEATHER REPORTS
Place printed NOAA weather forecasts in this Appendix.
APPENDIX B – MONITORING RECORDS
Place completed BMP Inspection Forms, Visual Monitoring, Effluent Sampling and Receiving Water Field Logs, Monitoring Exceptions, NAL Exceedance Reports, and Receiving Water Monitoring Trigger Exceptions in this Appendix.
APPENDIX C – BMP INSPECTION FORM
BMP INSPECTION REPORT
| Date and Time of Inspection: |
| Date Report Written: |
Inspection Type:
(Circle one) Weekly Complete Parts I,II,III and VII Pre-Storm Complete Parts I,II,III,IV and VII During Rain Event Complete Parts I, II, III, V, and VII Post-Storm Complete Parts I,II,III,VI and VII
Part I. General Information
Site Information
Construction Site Name:
Construction stage and completed activities:
Approximate area of site that is exposed:
Photos Taken:
(Circle one)
| Yes |
| No |
| Photo Reference IDs: |
Weather
Estimate storm beginning:
(date and time) Estimate storm duration:
(hours)
Estimate time since last storm:
(days or hours) Rain gauge reading and location:
(in)
Is a “Qualifying Event” predicted or did one occur (i.e., 0.5” rain with 48-hrs or greater between events)? (Y/N) If yes, summarize forecast:
Exemption Documentation (explanation required if inspection could not be conducted). Visual inspections are not required outside of business hours or during dangerous weather conditions such as flooding or electrical storms.
Inspector Information
| Inspector Name: |
| Inspector Title: |
| Signature: |
| Date: |
Part II. BMP Observations. Describe deficiencies in Part III.
| Minimum BMPs for Risk Level _____ Sites |
| Failures or other short comings |
(yes, no, N/A)
| Action Required (yes/no) |
| Action Implemented (Date) |
Good Housekeeping for Construction Materials
Inventory of products (excluding materials designed to be outdoors)
Stockpiled construction materials not actively in use are covered and bermed
All chemicals are stored in watertight containers with appropriate secondary containment, or in a completely enclosed storage shed
Construction materials are minimally exposed to precipitation
BMPs preventing the off-site tracking of materials are implemented and properly effective
Good Housekeeping for Waste Management
Wash/rinse water and materials are prevented from being disposed into the storm drain system
Portable toilets are contained to prevent discharges of waste
Sanitation facilities are clean and with no apparent for leaks and spills
Equipment is in place to cover waste disposal containers at the end of business day and during rain events
Discharges from waste disposal containers are prevented from discharging to the storm drain system / receiving water
Stockpiled waste material is securely protected from wind and rain if not actively in use
Procedures are in place for addressing hazardous and non-hazardous spills
Appropriate spill response personnel are assigned and trained
Equipment and materials for cleanup of spills is available onsite
Washout areas (e.g., concrete) are contained appropriately to prevent discharge or infiltration into the underlying soil
Good Housekeeping for Vehicle Storage and Maintenance
Measures are in place to prevent oil, grease, or fuel from leaking into the ground, storm drains, or surface waters
All equipment or vehicles are fueled, maintained, and stored in a designated area with appropriate BMPs
Vehicle and equipment leaks are cleaned immediately and disposed of properly
Part II. BMP Observations Continued. Describe deficiencies in Part III.
Minimum BMPs for Risk Level _____ Sites Adequately designed, implemented and effective (yes, no, N/A)
| Action Required (yes/no) |
| Action Implemented (Date) |
Good Housekeeping for Landscape Materials
Stockpiled landscape materials such as mulches and topsoil are contained and covered when not actively in use
Erodible landscape material has not been applied 2 days before a forecasted rain event or during an event
Erodible landscape materials are applied at quantities and rates in accordance with manufacturer recommendations
Bagged erodible landscape materials are stored on pallets and covered
Good Housekeeping for Air Deposition of Site Materials
Good housekeeping measures are implemented onsite to control the air deposition of site materials and from site operations
Non-Stormwater Management
Non-Stormwater discharges are properly controlled
Vehicles are washed in a manner to prevent non-stormwater discharges to surface waters or drainage systems
Streets are cleaned in a manner to prevent unauthorized non-stormwater discharges to surface waters or drainage systems.
Erosion Controls
Wind erosion controls are effectively implemented
Effective soil cover is provided for disturbed areas inactive (i.e., not scheduled to be disturbed for 14 days) as well as finished slopes, open space, utility backfill, and completed lots
The use of plastic materials is limited in cases when a more sustainable, environmentally friendly alternative exists.
Sediment Controls
Perimeter controls are established and effective at controlling erosion and sediment discharges from the site
Entrances and exits are stabilized to control erosion and sediment discharges from the site
Sediment basins are properly maintained
Linear sediment control along toe of slope, face of slope an at grade breaks (Risk Level 2 & 3 Only)
Limit construction activity to and from site to entrances and exits that employ effective controls to prevent offsite tracking (Risk Level 2 & 3 Only)
Ensure all storm, drain inlets and perimeter controls, runoff control BMPs and pollutants controls at entrances and exits are maintained and protected from activities the reduce their effectiveness (Risk Level 2 & 3 Only)
Inspect all immediate access roads daily (Risk Level 2 & 3 Only)
Run-On and Run-Off Controls
Run-on to the site is effectively managed and directed away from all disturbed areas.
Other
Are the project SWPPP and BMP plan up to date, available onsite and being properly implemented?
Part III. Descriptions of BMP Deficiencies
| Deficiency |
| Repairs Implemented: |
Note - Repairs must begin within 72 hours of identification and, complete repairs as soon as possible.
| Start Date |
| Action |
1.
2.
3.
4.
Part IV. Additional Pre-Storm Observations. Note the presence or absence of floating and suspended materials, sheen, discoloration, turbidity, odors, and source(s) of pollutants(s).
Yes, No, N/A
Do stormwater storage and containment areas have adequate freeboard? If no, complete Part III.
Are drainage areas free of spills, leaks, or uncontrolled pollutant sources? If no, complete Part VII and describe below.
Notes:
Are stormwater storage and containment areas free of leaks? If no, complete Parts III and/or VII and describe below.
Notes:
Part V. Additional During Storm Observations. If BMPs cannot be inspected during inclement weather, list the results of visual inspections at all relevant outfalls, discharge points, and downstream locations. Note odors or visible sheen on the surface of discharges. Complete Part VII (Corrective Actions) as needed.
Outfall, Discharge Point, or Other Downstream Location
| Location |
| Description |
| Location |
| Description |
| Location |
| Description |
| Location |
| Description |
| Location |
| Description |
| Location |
| Description |
| Location |
| Description |
| Location |
| Description |
Part VI. Additional Post-Storm Observations. Visually observe (inspect) stormwater discharges at all discharge locations within two business days (48 hours) after each qualifying rain event, and observe (inspect) the discharge of stored or contained stormwater that is derived from and discharged subsequent to a qualifying rain event producing precipitation of ½ inch or more at the time of discharge. Complete Part VII (Corrective Actions) as needed.
| Discharge Location, Storage or Containment Area |
| Visual Observation |
Part VII. Additional Corrective Actions Required. Identify additional corrective actions not included with BMP Deficiencies (Part III) above. Note if SWPPP change is required.
| Required Actions |
| Implementation Date |
APPENDIX D – PROJECT SPECIFIC RAIN EVENT ACTION PLAN TEMPLATE
(NOT CURRENTLY APPLICABLE)
Rain Event Action Plan (REAP)
| Date: |
| |_| NOAA Report Attached |
| WDID Number: |
Date Rain Predicted:
Predicted % chance of rain:
Site Information:
Site Name, City and Zip Code Project Risk Level:
Site Stormwater Manager Information:
Name, Company, Emergency Phone Number (24/7)
Erosion and Sediment Control Contractor (labor force contracted for the Site):
Name, Company, Emergency Phone Number (24/7)
Stormwater Sampling Agent:
Name, Company, Emergency Phone Number (24/7)
| Current Phase of Construction (Check ALL the boxes below that apply to the site). |
| |_| Grading and Land Development |
| |_|Vertical Construction |
| |_|Inactive Site |
| |_| Streets and Utilities |
| |_|Final Landscaping/Site Stabilization |
| |_|Other: |
Activities Associated with Current Phase(s) Check ALL the boxes below that apply to the site (some apply to all Phases).
UGrading and Land Development:
| |_| Demolition |
| |_| Vegetation Removal |
| |_| Vegetation Salvage-Harvest |
| |_| Rough Grade |
| |_| Finish Grade |
| |_| Blasting |
| |_| Soil Amendment(s): |
| |_| Excavation (_____ ft) |
| |_| Soils Testing |
| |_| Rock Crushing |
| |_| Erosion and Sediment Control |
| |_| Surveying |
| |_| Equip. Maintenance/Fueling |
| |_| Material Delivery and Storage |
| |_| Other: |
UStreets and Utilities:
| |_| Finish Grade |
| |_| Utility Install: water-sewer-gas |
| |_| Paving Operations |
| |_| Equip. Maintenance/Fueling |
| |_| Storm Drain Installation |
| |_| Material Delivery & Storage |
| |_| Curb and Gutter/Concrete Pour |
| |_| Masonry |
| |_| Other: |
UVertical Construction:
| |_| Framing |
| |_| Carpentry |
| |_| Concrete/Forms/Foundation |
| |_| Masonry |
| |_| Electrical |
| |_| Painting |
| |_| Drywall/Interior Walls |
| |_| Plumbing |
| |_| Stucco |
| |_| Equip. Maintenance/Fueling |
| |_| HVAC |
| |_| Tile |
| |_| Exterior Siding |
| |_| Insulation |
| |_| Landscaping & Irrigation |
| |_| Flooring |
| |_| Roofing |
| |_| Other: |
UFinal Landscaping & Site Stabilization:
| |_| Stabilization |
| |_| Vegetation Establishment |
| |_| E&S Control BMP Removal |
| |_| Finish Grade |
| |_| Storage Yard/ Material Removal |
| |_| Landscape Installation |
| |_| Painting and Touch-Up |
| |_| Irrigation System Testing |
| |_| Other: |
| |_| Drainage Inlet Stencils |
| |_| Inlet Filtration |
| |_| Perm. Water Quality Ponds |
| |_| Other: |
| |_| Other: |
| |_| Other: |
Inactive Construction Site:
| |_| E & S Control Installation |
| |_| Routine Site Inspection |
| |_| Trash Removal |
| |_| E & S Control Maintenance |
| |_| Street Sweeping |
| |_| Other: |
REAP (Continued)
Active on Site during Current Phase(s) (Check ALL the boxes below that apply to your site)
| |_| Storm Drain Improvement |
| |_| Grading Contractor |
| |_| Surveyor- Soil Technician |
| |_| Street Improvements |
| |_| Water Pipe Installation |
| |_| Sanitary Station Provider |
| |_| Material Delivery |
| |_| Sewer Pipe Installation |
| |_| Electrical |
| |_| Trenching |
| |_| Gas Pipe Installation |
| |_| Carpentry |
| |_| Concrete Pouring |
| |_| Electrical Installation |
| |_| Plumbing |
| |_| Foundation |
| |_| Communication Installation |
| |_| Masonry |
| |_| Demolition |
| |_| Erosion and Sediment Control |
| |_| Water, Sewer, Electric Utilities |
| |_| Material Delivery |
| |_| Equipment Fueling/Maintenance |
| |_| Rock Products |
| |_| Tile Work- Flooring |
| |_| Utilities, e.g., Sewer, Electric |
| |_| Painters |
| |_| Drywall |
| |_| Roofers |
| |_| Carpenters |
| |_| HVAC installers |
| |_| Stucco |
| |_| Pest Control: e.g., Termites |
| |_| Exterior Siding |
| |_| Masons |
| |_| Water Feature Installation |
| |_| Insulation |
| |_| Landscapers |
| |_| Utility Line Testers |
| |_| Fireproofing |
| |_| Riggers |
| |_| Irrigation System Installation |
| |_| Steel Systems |
| |_| Utility Line Testers |
| |_| Other: |
Trade Contractor Information Provided (Check ALL the boxes below that apply to the site.)
| |_| Educational Material Handout |
| |_| Tailgate Meetings |
| |_| Training Workshop |
| |_| Contractual Language |
| |_| Fines and Penalties |
| |_| Signage |
| |_| Other: |
| |_| Other: |
| |_| Other: |
Predicted Rain Event-Triggered Actions Below is a list of suggested actions and items to review for this project. Each active Trade should check all material storage areas, stockpiles, waste management areas, vehicle and equipment storage and maintenance, areas of active soil disturbance, and areas of active work to ensure the proper implementation of BMPs. Project-wide BMPs should be checked and cross-referenced to the BMP progress map.
| Trade or Activity |
| Suggested action(s) to perform / item(s) to review prior to rain event |
| |_| Information & Scheduling |
| |_| Inform trade supervisors of predicted rain |
|_| Check scheduled activities and reschedule as needed |_| Alert erosion/sediment control provider |_| Alert sample collection contractor (if applicable) |_| Schedule staff for extended rain inspections |_| Check Erosion and Sediment Control (ESC) material stock |_| Review BMP progress map |_| Hours of operation verified for upcoming storm event |_| Other:
|_| Material storage areas
|_| Material under cover or in sheds (e.g., treated woods and metals) |_| Perimeter control around stockpiles |_| Stockpiles covered (as applicable) |_| Other:
|_| Waste management areas
|_| Dumpsters closed and drain holes plugged |_| Recycling bins covered |_| Portable restrooms have secondary containment and protected from tipping over
REAP (Continued)
| Trade or Activity, Continued |
| Suggested action(s) to perform / item(s) to review prior to rain event |
|_| Trade operations
|_| Exterior operations shut down for event (e.g., no concrete pours or paving) |_| Soil treatments (e.g., fertilizer, soil binder) ceased within 24 hours of event |_| Materials and equipment (e.g., tools) properly stored and covered |_| Waste and debris disposed in covered dumpsters or removed from site |_| Trenches and excavations protected |_| Perimeter controls around disturbed areas |_| Fueling and repair areas covered and bermed |_| Other:
|_| Erosion and Sediment Control
|_| Adequate capacity in sediment basins and traps |_| Site perimeter and slope controls in place |_| Catch basin and drop inlet protection in place and cleaned |_| Temporary erosion controls deployed |_| Roads swept; site ingress and egress points stabilized |_| Temporary perimeter controls deployed around disturbed areas and stockpiles |_| Other:
| |_| Concrete washout |
| |_| Adequate capacity for rain or covered |
|_| Other:
|_| Spill and drips
|_| All incident spills and drips cleaned, including paint, stucco, fuel, and oil |_| Drip pans emptied |_| Other:
|_| Other / Discussion / Diagrams
I certify under penalty of law that this Rain Event Action Plan (REAP) will be performed in accordance with the General Permit by me or under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
________________________________ Date: _______________________ Qualified SWPPP Practitioner
APPENDIX E – TRAINING REPORTING FORM
Trained Contractor Personnel Log Stormwater Management Training Log and Documentation
Project Name:
WDID #: __________________________________________________________
Stormwater Management Topic: (check as appropriate)
| |_| Erosion Control | |_| Sediment Control | ||
| |_| Wind Erosion Control | |_| Tracking Control | ||
| |_| Non-Stormwater Management | |_| Waste Management and Materials Pollution Control |
|_| Stormwater Sampling
Specific Training Objective:
Location: Date: _
Instructor: Telephone:
Course Length (hours):
Attendee Roster (Attach additional forms if necessary)
| Name |
| Company |
| Phone |
As needed, add proof of external training (e.g., course completion certificates, credentials for QSP, QSD).
APPENDIX F – EXAMPLE STORM EVENT MONITORING FORMS
Rain Gauge Log Sheet
Construction Site Name:
WDID #:
Date (mm/dd/yy) Time (24-hr)
| Initials |
| Rainfall Depth |
(Inches) Notes:
Risk Level 1, 2, 3 Visual Inspection Field Log Sheet
| Date and Time of Inspection: |
| Report Date: |
| Inspection Type: |
| □ Weekly |
| □ Before predicted rain |
| □ During rain event |
| □ Following qualifying rain event |
| □ Contained stormwater release |
| □ Quarterly non-stormwater |
Site Information
Construction Site Name:
Construction stage and completed activities:
Approximate area of exposed site:
Weather and Observations
| Date Rain Predicted to Occur: |
| Predicted % chance of rain: |
Estimate storm beginning:
(date and time) Estimate storm duration:_________ (hours) Estimate time since last storm: ________ (days or hours) Rain gauge reading: _______ (inches)
Observations: If yes identify location
Odors Yes □ No □
Floating material Yes □ No □
Suspended Material Yes □ No □
Sheen Yes □ No □
Discolorations Yes □ No □
Turbidity Yes □ No □
Site Inspections
| Outfalls or BMPs Evaluated |
| Deficiencies Noted |
(add additional sheets or attached detailed BMP Inspection Checklists)
| Photos Taken: |
| Yes □ |
| No □ |
| Photo Reference IDs: |
Corrective Actions Identified (note if SWPPP/REAP change is needed)
Inspector Information
| Inspector Name: |
| Inspector Title: |
| Signature: |
| Date: |
NAL Exceedance Evaluation Summary Report Page __ of __
Project Name
Project WDID
Project Location
Date of Exceedance
| Type of Exceedance | ||
| NAL Daily Average | |_| pH | |_| Turbidity |
|_| Other (specify)
| Measurement or Analytical Method | |
| |_| Field meter | |
| (Sensitivity: | ) |
|_| Lab method (specify)
| (Reporting Limit: | ) |
| (MDL: | ) |
| Calculated Daily Average | ||
| |_| pH | pH units | |
| |_| Turbidity | NTU |
| Rain Gauge Measurement | |
| inches |
| Compliance Storm Event | |
| inches (5-year, 24-hour event) |
Visual Observations on Day of Exceedance
Description of BMPs in Place at Time of Event
Initial Assessment of Cause
Corrective Actions Taken (deployed after exceedance)
Additional Corrective Actions Proposed
Report Completed By
(Print Name, Title)
Signature
CHAIN-OF-CUSTODY
DATE:
Lab ID:
DESTINATION LAB:
| REQUESTED ANALYSIS |
| Notes: |
ATTN:
ADDRESS:
Office Phone:
Cell Phone:
SAMPLED BY:
Contact:
Project Name
| Client Sample ID |
| Sample |
| Sample |
| Sample |
| Container |
| Date |
| Time |
| Matrix |
| # |
| Type |
| Pres. |
SENDER COMMENTS:
RELINQUISHED BY
Signature:
Print:
Company:
Date:
TIME:
LABORATORY COMMENTS:
RECEIVED BY
Signature:
Print:
Company:
Date:
TIME:
APPENDIX G – FIELD METER INSTRUCTIONS
Place instructions for field meters that will be used by contractor personnel in this Appendix.
APPENDIX H – SUPPLEMENTAL INFORMATION
Place documents related to Regional Board required monitoring, watershed monitoring option approval, and bioassessment exception approval in this Appendix, as applicable.
File details come from the government source that posted it. Updated .