B01 Attachment J01 BP5_SWTP_Whiteriver_Final_CD.pdf

PDF 37 MB Posted

Attached to
Whiteriver Hospital Construction
Solicitation number
75H70126R00016
Issued by

About this file

This is a Final Construction Documents set for the IHS Surface Water Treatment Plant (SWTP) at Whiteriver, Arizona, consisting of comprehensive engineering drawings and specifications for a water treatment facility serving the Fort Apache Indian Reservation. The documents include 31 sheets organized into civil/mechanical drawings (CW1.00-CW1.20) and electrical drawings (E-1 through E-11), prepared by Smith Group and Dibble Corporation with a final issue date of March 9, 2026. The civil drawings detail the treatment plant layout, influent and effluent piping systems, chemical feed systems, blower equipment, and associated mechanical components through plan views, process flow diagrams, and detailed schematics. The electrical drawings encompass site plans, single-line electrical diagrams, control schematics, conduit block diagrams, and multiple P&ID (Piping and Instrumentation Diagram) sheets covering the plant's instrumentation and control systems.

The construction documents are as-built certified and include standard abbreviations, legends, and general notes applicable to surface water treatment operations. Key systems documented include chemical feed, blower operations, sludge blowdown, and maintenance-of-plant-operations specifications. The drawings reference Arizona 811 notification requirements for excavation work and contain multiple seals and signatures from reviewing engineers and approving officials including project managers, deputy directors, and area facility program directors. These final construction documents establish the technical specifications and design requirements for constructing the water treatment infrastructure that will support the Whiteriver Hospital construction project and provide potable water service to the facility and surrounding community.

View the file

Other files

File Type Posted
A10-1j BP3_DWG2026-0618_05_CIVIL_IHS-Hon-Dah-UC_BID-ADD-H.pdf PDF
A10-2 Section B.pdf PDF
A9-2 WR Pre-Proposal_RFIs 001 - 163.xlsx XLSX spreadsheet
A8-1c BP1_DWG2026-0609_06_LANDSCAPE_IHS-Whiteriver-Hospital_BID-ADD-F.pdf PDF
A8-3 WR Pre-Proposal_RFIs 001 - 132.xlsx XLSX spreadsheet
Amend7 - WR Construction - 29 May 2026.pdf PDF
A7-1b 00_SPEC2026-0528_Specifications_IHS-Whiteriver-Hospital_BID-ADD-E.pdf PDF
A7-1c BP1_DWG2026-0528_08_ARCHITECTURAL_IHS-Whiteriver-Hospital_BID-ADD-E.pdf PDF
A7-2a WR Pre-Proposal_RFIs 001 - 121.xlsx XLSX spreadsheet
A7-1e BP1_DWG2026-0528_16_ICT_IHS-Whiteriver-Hospital_BID-ADD-E.pdf PDF
A7-1h BP4_DWG2026-0528_16_ICT_IHS-Whiteriver-Pump-House_BID-ADD-E.pdf PDF
A7-2b Contact list Service Unit - RFI 109.xlsx XLSX spreadsheet
Amend6 - WR Construction - 22 May 2026.pdf PDF
A6-1f BP1_DWG2026-0520_16_ICT_IHS-Whiteriver-Hospital_BID-ADD-D.pdf PDF
A6-1a 0_MEM2026-0520_IHS-Whiteriver-Hospital_BID-Addendum-D.pdf PDF
A6-1b SPEC2026-0520_Specifications_IHS-Whiteriver-Hospital_BID-ADD-D.pdf PDF
A6-1c BP1_DWG2026-0520_05_CIVIL_IHS-Whiteriver-ADOT-PLANS_BID-ADD-D.pdf PDF
A6-1e BP1_DWG2026-0520_08_ARCHITECTURAL_IHS-Whiteriver-Hospital_BID-ADD-D.pdf PDF
A6-2 WR Pre-Proposal_RFIs 001 - 121.xlsx XLSX spreadsheet
Amend5 - WR Construction - 15 May 2026.pdf PDF
A5-1a 0_MEM2026-0514_IHS-Whiteriver-Hospital_BID-Addendum-C.pdf PDF
A5-1c BP1_DWG2026-0514_05_CIVIL_IHS-Whiteriver-ADOT-PLANS_BID-ADD-C.pdf PDF
A5-1b SPEC2026-0514_Specifications_IHS-Whiteriver-Hospital_BID-ADD-C.pdf PDF
A5-1d BP1_DWG2026-0514_06_LANDSCAPE_IHS-Whiteriver-Hospital_BID-ADD-C.pdf PDF
A5-2 WR Pre-Proposal_RFIs 001 - 069.xlsx XLSX spreadsheet
A4-1c SPEC2026-0430_Specifications_IHS-Whiteriver-WTTP_BID-ADD-B.pdf PDF
A4-1d BP1_DWG2026-0430_05_CIVIL_IHS-Whiteriver-HOSPITAL-PLANS_BID-ADD-B.pdf PDF
A4-1a 0_MEM2026-0430_IHS-Whiteriver-Hospital_BID-Addendum-B.pdf PDF
A4-1f BP1_DWG2026-0430_15_ELECTRICAL_IHS-Whiteriver-Hospital_BID-ADD-B.pdf PDF
A3-1 Section B.pdf PDF
A3-2 Attachment J11 EPA Schedule.xlsx XLSX spreadsheet
A3-3 WR Pre-Proposal_RFIs 001 - 050.xlsx XLSX spreadsheet
A2-1d BP1_DWG2026-0416_06_LANDSCAPE_IHS-Whiteriver-Hospital_BID-ADD-A.pdf PDF
A2-2 WR Pre-Proposal_RFIs 001 - 050.xlsx XLSX spreadsheet
A2-1a MEM2026-0416_IHS-Whiteriver-Hospital_BID-Addendum-A.pdf PDF
A2-1b SPEC2026-0416_Specifications_IHS-Whiteriver-Hospital_BID-ADD-A.pdf PDF
A2-1e BP1_DWG2026-0416_08_ARCHITECTURAL_IHS-Whiteriver-Hospital_BID-ADD-A.pdf PDF
A2-1f BP1_DWG2026-0416_15_ELECTRICAL_IHS-Whiteriver-Hospital_BID-ADD-A.pdf PDF
A2-1h BP3_DWG2026-0416_05_CIVIL_IHS-Hon-Dah-UC_BID-ADD-A.pdf PDF
A1-1a WR Pre-Proposal Mtg IHS Presentation.pdf PDF
A1-3 WR Pre-Proposal_RFIs 001 - 008.xlsx XLSX spreadsheet
Amend1 - WR Construction - 14 April 2026.pdf PDF
A1-2a WR Pre-Proposal Mtg Attendee List - Original Written.pdf PDF
B01 Attachment J02e Specs (Vol 5).pdf PDF
Attachment J09 Past Performance Questionnaire.docx DOCX document
B01 Attachment J01 BP4_01_GENERAL_IHS-Whiteriver-Pump-House_FINAL-CD.pdf PDF
B01 Attachment J02d Specs (Vol 4).pdf PDF
Attachment J06b - Highway AZ20260033.pdf PDF
Attachment J07 Company Technical Experience Construction Sheet.docx DOCX document
Attachment J08 - Key Personnel Resume Form.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER

VICINITY MAP

IHS SURFACE WATER TREATMENT PLANT

BENCHMARK

CONTACT INFORMATION

A PORTION OF SECTIONS 19 AND 30, TOWNSHIP 6 NORTH,

RANGE 23 EAST OF THE GILA AND SALT RIVER MERIDIAN,

NAVAJO COUNTY, ARIZONA

AS-BUILT CERTIFICATION

Call 811 or click Arizona811.com

Contact Arizona 811 at least two full working days before you begin excavation

131445

SHEET INDEX

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:09 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\C

OV

ER

.D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.00

KEY MAP

IHS REVIEW AND APPROVAL

REVIEWED BY DATE

CIVIL

MECHANICAL

APPROVED DATE

DES PROJECT MANAGER

CONCURRENCE DATE

DES DEPUTY DIRECTOR

AREA FACILITY PROGRAM DIRECTOR

AREA OEHE DIRECTOR

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:09 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\G

EN

ER

AL

N

OT

ES

A

BB

RE

VI

AT

IO

NS

LE

GE

ND

.D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.01

ABBREVIATIONS &

LEGEND

131445

NEWEXISTING

STANDARD ABBREVIATIONS & LEGEND

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:09 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\G

EN

ER

AL

N

OT

ES

A

BB

RE

VI

AT

IO

NS

LE

GE

ND

.D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.01

MECHANICAL LEGEND

ENGINEER'S GENERAL NOTES

START-UP SPECIFICATIONS

MAINTENANCE OF PLANT OPERATIONS (MOPO) SPECIFICATIONS

ABBREVIATIONS

Call 811 or click Arizona811.com

Contact Arizona 811 at least two full working days before you begin excavation

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:11 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

P&

ID

.D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.02

EXISTING SIMPLIFIED

PROCESS FLOW

DIAGRAM

NOTES:

CONSTRUCTION NOTES

Contact Arizona 811 at least two full working days before you begin excavation

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:10 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

PL

AN

.D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.03

PLAN VIEW SWTP

NOTE:

working days before you begin excavation

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:10 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

IN

FL

UE

NT

F P.

DW

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.04

INFLUENT PIPING

AA

B B

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:10 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

EF

FL

UE

NT

F P.

DW

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.05

EFFLUENT PIPING

NOTES:

B1.06 B1.06

F 1.07

E 1.07

D 1.07

A 1.05

F 1.07

E 1.07

D 1.07

A 1.05

C1.06 C1.06

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:10 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

EF

FL

UE

NT

F P.

DW

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.06

EFFLUENT PIPING

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:11 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

EF

FL

UE

NT

F P.

DW

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.07

EFFLUENT PIPING

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:11 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

ME

CH

.D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.08

PW & SLUDGE

BLOWDOWN

AA

AA

working days before you begin excavation

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:11 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

CH

EM

F

EE

D.

DW

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.09

CHEMICAL FEED SYSTEMS

B 1.11

B 1.11

A 1.10

A 1.10 working days before you begin excavation

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:09 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

CH

EM

F

EE

D.

DW

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.10

CHEMICAL FEED SYSTEMS

working days before you begin excavation

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:46 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

CH

EM

F

EE

D.

DW

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.11

CHEMICAL FEED SYSTEMS

NOTES:

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:10 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

BL

OW

ER

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.12

BLOWER

A A

B B

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.13

SHOP DRAWINGS

131445

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.13

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.14

SHOP DRAWINGS

131445

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

CW1.14

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.15

SHOP DRAWINGS

131445

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

CW1.15

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.16

SHOP DRAWINGS

131445

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

CW1.16

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.17

SHOP DRAWINGS

131445

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

CW1.17

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.18

SHOP DRAWINGS

131445

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

CW1.18

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.19

SHOP DRAWINGS

131445

PHASE

PROJECT NUMBER

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/4 /20

3:

P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

SH

OP

D

RA

W

IN

GS

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

CW1.19

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

2/2 6/2

6 4

:14 P

M Pl ot Da te:

G:

\20

\10

4_

IH

S_

W

HI

TE

RI

VE

R\

CA

D\

SU

RF

AC

E

W

AT

ER

T

RE

AT

ME

NT

P

LA

NT

\24

4-

DE

T.

DW

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 WEST PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: KCR CHECKED BY: MJL

24034

CW1.20

DETAILS

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/2 /20

:38 A

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

1 (

EL

EC

TR

IC

AL

C

OV

ER

S

HE

ET

).D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-1

ELECTRICAL

COVER SHEET

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/2 /20

:44 A

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

2 (

OV

ER

AL

L S

IT

E

PL

AN

).D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-2

ELECTRICAL SITE PLAN

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/2 /20

:44 A

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

3 (

SI

NG

LE

LI

NE

D

IA

GR

AM

).D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-3

SINGLE LINE DIAGRAM

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/3 /20

2:

P

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

4 (

CO

NT

RO

L S

CH

EM

AT

IC

S)

.D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-4

CONTROL SCHEMATICS

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/3 /20

2:

P

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

5 (

CO

ND

UI

T

BL

OC

K

DI

AG

RA

M)

.D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-5

CONDUIT BLOCK DIAGRAM

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/2 /20

:46 A

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

6 ( P&

ID

C

OV

ER

S

HE

ET

).D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-6

P&ID SYMBOLS & LEGEND

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/2 /20

:46 A

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

7 ( P&

ID

I).

DW

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-7

P&ID - I

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/3 /20

2:

P

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

8 ( P&

ID

II)

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-8

P&ID - II

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/2 /20

:47 A

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

9 ( P&

ID

III)

.D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-9

P&ID - III

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/2 /20

:48 A

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

(P

&I D

- I V)

.D W

G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-10

P&ID - IV

SHEET TITLE

SEALS AND SIGNATURES

ISSUED FOR DATE

3/2 /20

:48 A

M Pl ot Da te:

Z:

\20

\24

4- D

IB

BL

E (W

HI

TE

RI

VE

R

IN

DI

AN

H

OS

PI

TA

L W

AT

ER

S

YS

TE

M

IM

PR

OV

EM

EN

TS

)\D

RA

W

IN

GS

\24

4 - E

(P

&I D

- V ).D

W G

455 NORTH THIRD STREET

SUITE 250

PHOENIX, AZ 85004

602.265.2200 smithgroup.com

15150 W. PARK PLACE

SUITE 317

GOODYEAR, AZ 85395

623.935.2258 dibblecorp.com

SWTP FINAL CONSTRUCTION DOCUMENTS 09MAR26

SHEET NUMBER

100%

DRAWN BY: VC CHECKED BY: JLG

24034

E-11

P&ID - V

Sheets and Views
CW1.00 COVER
CW1.01 GENERAL NOTES & ABBREVIATIONS & LEGEND
CW1.02 EXISTING SIMPLIFIED PROCESS FLOW DIAGRAM
CW1.03 PLAN VIEW SWTP
CW1.04 INFLUENT PIPING
CW1.05 EFFLUENT PIPING
CW1.06 EFFLUENT PIPING
CW1.07 EFFLUENT PIPING
CW1.08 PW & SLUDGE BLOWDOWN
CW1.09 CHEMICAL FEED SYSTEMS
CW1.10 CHEMICAL FEED SYSTEMS
CW1.11 CHEMICAL FEED SYSTEMS
CW1.12 BLOWER
CW1.13 SHOP DRAWINGS
CW1.14 SHOP DRAWINGS
CW1.15 SHOP DRAWINGS
CW1.16 SHOP DRAWINGS
CW1.17 SHOP DRAWINGS
CW1.18 SHOP DRAWINGS
CW1.19 SHOP DRAWINGS
CW1.20 DETAILS
E-1 ELECTRICAL COVER SHEET
E-2 ELECTRICAL SITE PLAN
E-3 SINGLE LINE DIAGRAM
E-4 CONTROL SCHEMATICS
E-5 CONDUIT BLOCK DIAGRAM
E-6 P&ID SYMBOLS & LEGEND
E-7 P&ID - I
E-8 P&ID - II
E-9 P&ID - III
E-10 P&ID - IV
E-11 P&ID - V
2026-03-11T11:46:51-0700
Scott P. Fillerup -S
2026-03-11T12:25:50-0700
Denman K. Ondelacy -S
2026-03-11T15:02:15-0500
Thomas Armitage -S
2026-03-11T15:32:30-0500
Hung M. Nguyen -S
2026-03-11T19:15:22-0700
Kenny R. Hicks -S
2026-03-12T08:23:31-0700
Roger N. Dahozy -S

File details come from the government source that posted it. Updated .