This is a Pre-Proposal Meeting presentation for the Indian Health Service (IHS) Whiteriver Hospital Project scheduled for April 8, 2026.
The project involves construction of a new hospital facility and associated infrastructure at Whiteriver, Arizona, serving the White Mountain Apache Tribe. The scope encompasses new hospital construction, demolition of existing buildings, temporary parking facilities, new roadways, utilities, and three wastewater treatment plants (Hospital WWTP, Surface Water Treatment Plant, and Hon-Dah WWTP). Key construction challenges include managing ongoing hospital operations during construction, traffic and highway access constraints, parking limitations, staging area logistics, construction phasing complexity, water availability during drought conditions, and road capacity limitations for heavy equipment delivery. The project team includes IHS Division of Engineering Services personnel (Project Manager Scott Fillerup, CORs Bruce Kemme and Matt Mergenthaler), Contracting Officers Jenny Scroggins and Erik Lundstrom, SmithGroup as architect, and Jacobs as commissioning agent. The general contractor and quality assurance manager positions are to be determined. The solicitation uses a format organized in Sections A through M with proposal preparation instructions in Section L.8-L.10 and evaluation factors in Section M.3. Evaluation is based on technical experience, technical approach with draft schedule, key personnel resumes and organizational chart, and past performance. The estimated contract award date is end of fiscal year. Construction wage rates apply and may update before award. White Mountain Apache Tribe TERO (Tribal Employment Rights Office) requirements mandate compliance plans submitted two weeks prior to start date, with fees including $2,000 permit application, $125 routing slip, and $15 per person crew fees. Contractors may utilize tribal resources including equipment, water, and facilities available through various WMAT departments.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Indian Health Service
Supporting Title or Info if Needed
Whiteriver Hospital Project
Pre-Proposal Meeting April 8, 2026
Outline
• Contracting Information
• Brief Overview of the Project
• Construction Challenges
• Architect Presentation
• Tribal Representative
• TERO Office Information
• Site Walk
• Hospital Campus
• New Construction Area
• New Entrances to the Site
• Potential Laydown Area Across the Hwy
• Existing Buildings and Phase 1 Continued Operating Conditions
• Temporary Parking Lot
• Hospital Utility Campus (Wastewater Treatment Plant, Water Tanks, and Road Improvements)
• Surface Water Treatment Plant (tribally owned and operated)
• Hon-Dah Wastewater Treatment Plant (Conclude site walk here)
Logistics
• Emergency Exit and Rally Point: Primary Exit is through the patio to the east. Rally Point is the parking lot to the north
• Restroom Locations
• Rules of Engagement
• Questions
• Please hold broad questions for the end
• Please ask pointed questions about the presentation during the presentation
• Disclaimer: This Pre-Proposal Meeting is for informational purposes only.
• None of the information shared at this Pre-Proposal Meeting should be considered final. Attendance, in person or virtual, is not mandatory. Any remarks or explanations given during this Pre-Proposal Meeting (or in the Pre-Proposal Meeting notes) will not change the terms and conditions of the solicitation. Offerors are cautioned to carefully read the requirements of the solicitation and comply accordingly. Oral exchanges between offerors and the Government will not be binding unless changes are incorporated by a written amendment. For official response, provide an RFI in accordance with the instructions in the solicitation. The Government is not responsible for any costs incurred by attendees at the Pre-Proposal Meeting.
Purpose for today
• IHS
• Share information about the solicitation
• Encourage response to the solicitation through the following
• Increased clarity
• Early Communication
• Building Relationships
• Contractors
• Obtain information about the sites associated with this project
• Obtain information to allow you to provide a more competitive proposal
• Ask IHS questions about the solicitation
• Meet potential partners and/or subcontractors
Project Team
• Indian Health Service (IHS)
• Division of Engineering Services
• Project Manager / COR (AE) – Scott Fillerup
• Contracting Officer's Representative (Construction and QA) – Bruce Kemmet
• Contracting Officer's Representative (Commissioning) – Matt Mergenthaler
• Alternate COR – Frank Chua
• Contracting Officer – Jenny Scroggins
• Contracting Officer – Erik Lundstrom
• Phoenix Area Office
• Project Manager – Derrick Buck
• Planner – Deswood Etsitty
• Whiteriver Indian Hospital
• Brian Campbell - Deputy CEO
• Shawn Gant - Facility Manager
Project Team - continued
• White Mountain Apache Tribe
• Tribal Council
• Tribal Engineer
• Colbert Burnette
• Tribal Employment Rights Office (TERO)
• Gary Hill – TERO Director
• Architect - SmithGroup
• Craig Passey – Vice President
• Lyle Steely – Senior Principal Design Architect
• Mark Koechling – Senior Principal Healthcare Studio
• Brandy Koch – Senior Project Manager
• Matt Hess – Project Architect
• Commissioning Agent - Jacobs
• General Contractor - TBD
• FFE – Multiple - TBD
• Quality Assurance Manager - TBD
• DO NOT directly contact the COR or other personnel listed, direct all questions to CO emails
Contracting Information
• Key Solicitation Info:
• Format
• Section A thru M and Attachments
• Section L – L.8 Proposal Prep Instructions, L.9 General Instructions (Factor Submissions)
• Section M – M.3 Basis of Evaluation (Factor Evaluations)
• Key Dates
• Proposal Due Date – SAM.gov posting and SF1442
• Estimated Contract Award Date – End of FY
• Process for RFIs
• Pre-proposal RFIs and RFI cut-off date, reference L.10 Inquiries
• Post-award RFIs, reference H.14 Document Management
• Amendment(s) will be issued with copies of all solicitation Request for Information (RFI) / questions
& answers.
• Construction Wage Rates apply & may update before award
• Key Solicitation Info (Continued):
• Proposal Bid Guarantee, reference L.9 (2) Volume II 2. (c), Post-award Payment and Performance
Bonds, and Insurance Requirements in accordance with contract requirements
• Refer to L.8 Proposal Prep Instructions, and L.9 General Instructions
• Questions about the Solicitation Information to include Evaluation Factors
• Evaluation Factors -
• FACTOR 1: TECHNICAL EXPERIENCE
• FACTOR 2: TECHNICAL APPROACH, & DRAFT SCHEDULE & CONSTRUCTION
• FACTOR 3: KEY PERSONNEL RESUMES & ORGANIZATIONAL CHART
• FACTOR 4: PAST PERFORMANCE
• Questions about the Evaluation Factors
Hon-Dah WWTP
WR Hospital
& WWTP
SWTP
Hospital Site
• Existing Buildings to be
Demolished
• Existing Building to Remain
• Housing Area Not In Scope
• New Construction Hospital and
Temp Parking
• New & Expanded Intersections, Traffic Lights
• Optional Staging Area – Arrange
Separately with WMAT
• New Construction Road, Utilities, WWTP, Booster
Pump Station and Water
Storage Tanks
Hospital WWTP Site and Storage Tanks
SWTP Site
• Install an additional treatment train in the existing building
Hon-Dah WWTP
Site
• Existing Dirt Road
• New Construction Road, Utilities, and WWTP
• Campus Logistics Issues
• Existing Hospital Operations
• Traffic Flow and Highway access Challenges
• Parking Challenges
• Staging Areas and proposed temporary construction facilities
• Construction Phasing
• Mobilization Challenges
• Construction Water during drought
• Fire department access to Utility Campus and South Entrance
• Road to Hospital WWTP may not accommodate a ‘Low-Boy’ trailer
Construction Challenges
• Upcoming Addendum – Radon Mitigation System
• DIV 01 General Conditions
• Web-based construction management program ( Procore) for a construction administration requirements
• Quality Control and Quality Assurance Expectations – 3 phase inspection process
• 3rd Party Construction Quality Assurance contractor (QAC) on-site for the IHS
• CONTINUOUS COMMUNICATION: Contractor, COR, Facility Manager, QAC personnel highly encouraged
Construction Challenges
Special Design Features – AE
WMAT Tribal Employment Right Ordinance or Office (TERO) Requirements
WMAT TERO Information
Complete and Submit
• Prime Contractor Compliance Plan
• Subcontractor Compliance Plan
• Minimum 2 weeks prior to start date
Projects Greater than $22K
• Permit Application: $2,000.00
• Routing Slip: $125.00
• Core/Crew/Individual: $15.00 per person
• If additional crew are added after initial there will be an Addendum charge of $20 and added crew are $20 per person (instead of the $15)
• % of Contract Value: 5%
Contact Information
• Gary Hill, TERO Director
• Email: garyhill@wmat.us
• Phone: (928) 338-1012
Tribal Resources
• Importance to the Community
• Tribally Operated Resources:
• Public Works – 928-338-1504
• Roll-Offs and Trucks
• Repair Truck and Heavy Equipment Tires
• Land Operations – 928-338-1404
• Heavy Equipment for Hauling
• Tribal Transportation – 928-338-5155
• Dump Trucks
• Forestry – 928-338-1650
• Green House
• WMATCO LLC – 928-594-8046
• Lumber Mill - Some Lumber Capacity
(Cutting to Size)
• Utility – 928-338-4825
• Porta-Johns, Water Buffalos, Water Trucks
• Water Resources Program – 928-338-4267 &
WMAT Rural Water System – 928-338-4267
• Permit for surface water from stream
• Fire Department – 928-338-1701
• Apache Enterprise – 928-338-1414
• Repair Truck and Heavy Equipment Tires
• Hon-Dah Casino – 928-369-0299
• Bleachers and Tents for Ground Breaking, Grand
Opening, Other Events
• Hotel and RV Park
• WMAT - Contact Info:
http://wmat.us/contact.html
These are additional resources and for information only
Site Walk
Special Instructions
Answers provided during the Pre-Proposal Meeting are not official. Official answers will only be provided to questions submitted through the RFI process described in the solicitation.
We are starting at the Hospital Campus
QR Codes for future locations:
Hospital WWTP SWTP Hon-Dah WWTP
We will conclude from the Hon-Dah WWTP site
4. Hon-Dah WWTP
2. Hospital
WWTP
3. SWTP
1. WR
Hospital
File details come from the government source that posted it. Updated .