A3-2 Attachment J11 EPA Schedule.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Whiteriver Hospital Construction
- Solicitation number
- 75H70126R00016
About this file
This file is an EPA Schedule pricing template for the Whiteriver Hospital Construction project (Solicitation No. 75H70126R00016). The schedule establishes unit pricing requirements for fourteen categories of materials and supplies essential to the 407,000 square-foot hospital construction project in Whiteriver, Arizona. Bidders must provide unit prices for asphalt shingles (per square), PVC pipe, CPVC pipe, and HDPE pipe (per linear foot by diameter), stainless steel pipe and fittings (per pound), ductile iron pipe (per pound), rigid foam insulation board (per square foot), copper wire and cable (per linear foot by gauge), electrical conduit PVC and GRS (per linear foot by diameter), fiberglass insulation (per square foot), aluminum sheet and extrusion (per pound), structural steel (per pound), concrete (per cubic yard), and lumber (per board foot). The template includes columns for item description, unit of measure, unit price, and estimated quantity per deliverable, with all prices to exclude indirect costs and profit.
This pricing schedule supports the Indian Health Service Division of Engineering Services' solicitation for the construction of a new hospital facility on the Fort Apache Indian Reservation. The template serves as the mechanism for contractors to submit competitive unit pricing for the specified materials, which will be used to evaluate proposals and establish pricing for the construction contract. Contractors must complete all fourteen line items with corresponding unit prices to submit a responsive bid for this federal construction opportunity.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 EPA Schedule - Whiteriver Hospital
| # | Item Description | Unit | Unit Price | Estimated Qty per Deliverable |
| 1 | Asphalt shingles (per square) | SQ | $__ | __ |
| 2 | PVC pipe (per LF, by diameter) | LF | $__ | __ |
| 3 | CPVC pipe (per LF, by diameter) | LF | $__ | __ |
| 4 | HDPE pipe (per LF, by diameter) | LF | $__ | __ |
| 5 | Stainless steel pipe and fittings (per LB) | LB | $__ | __ |
| 6 | Ductile iron pipe (per LB) | LB | $__ | __ |
| 7 | Rigid foam insulation board (per SF) | SF | $__ | __ |
| 8 | Copper wire and cable (per LF, by gauge) | LF | $__ | __ |
| 9 | Electrical conduit (PVC and GRS) (per LF, by diameter) | LF | $__ | __ |
| 10 | Fiberglass insulation (per SF) | SF | $__ | __ |
| 11 | Aluminum (sheet/extrusion, per LB) | LB | $__ | __ |
| 12 | Structural Steel (per LB) | LB | $__ | __ |
| 13 | Concrete (per CY) | CY | $__ | __ |
| 14 | Lumber (per board foot) | BF | $__ | __ |
| Unit Price (excludes indirect costs and profit) |