B01 Attachment J02d Specs (Vol 4).pdf

PDF 10 MB Posted

Attached to
Whiteriver Hospital Construction
Solicitation number
75H70126R00016
Issued by

About this file

This is a comprehensive set of electrical system construction specifications for the Whiteriver Hospital Construction project prepared by SmithGroup on behalf of the Indian Health Service (IHS). The 407,000 square-foot hospital facility is located on the Fort Apache Indian Reservation in Whiteriver, Arizona, and will serve a projected primary service area population of 19,088 by 2030. The specifications encompass Division 26 (Electrical) through Division 46 (Water and Wastewater Equipment) and detail all electrical infrastructure, power distribution, lighting controls, communications systems, grounding and bonding, cable trays, raceways, surge protection, electrical monitoring and control systems, and wastewater treatment plant (WWTP) electrical requirements.

The construction specifications require the contractor to furnish all materials, equipment, and labor necessary to install complete operational electrical systems including main and backup power distribution, emergency lighting controls, fire suppression and alarm systems, HVAC controls, data communications networks, security and access control systems, medical gas systems, and sophisticated electrical power monitoring and control (SCADA) systems. Key technical requirements include compliance with the National Electrical Code (NFPA 70), IEEE standards, and ASHRAE guidelines; installation of multifunction energy meters and power monitoring equipment with web-based monitoring capabilities; network lighting controls with daylight harvesting and occupancy sensors; grounding systems designed for the 6,600-foot altitude location with specific resistance requirements; cable specifications for both power and communications with extensive identification and labeling protocols; and comprehensive testing, commissioning, and operator training. The contractor must demonstrate system integration across multiple disciplines, coordinate with HVAC building automation systems, and provide maintenance support including 12 months of full maintenance service beginning at substantial completion, plus two years of software technical support and upgrades. All electrical work must maintain compliance with LEED certification standards and include detailed documentation of as-built conditions, testing reports, relay settings, protective device coordination studies, arc-flash hazard analyses, and complete operation and maintenance manuals.

View the file

Other files

File Type Posted
A10-1a 0_MEM2026-0618_IHS-Whiteriver-Hospital_BID-Addendum-H.pdf PDF
A10-1b 0_SPEC2026-0618_Specifications_IHS-Whiteriver-Hospital_BID-ADD-H.pdf PDF
A10-3a Attachment J12a AZ FORM 5000HC_TPT HEALTHCARE EXEMPTION CERTIFICATE.pdf PDF
A10-1j BP3_DWG2026-0618_05_CIVIL_IHS-Hon-Dah-UC_BID-ADD-H.pdf PDF
A10-2 Section B.pdf PDF
Amend9 - WR Construction - 17 Jun 2026.pdf PDF
A9-1b BP1_DWG2026-0612_15_ELECTRICAL_IHS-Whiteriver-Hospital_BID-ADD-G.pdf PDF
A9-2 WR Pre-Proposal_RFIs 001 - 163.xlsx XLSX spreadsheet
A8-1e BP1_DWG2026-0609_16_ICT_IHS-Whiteriver-Hospital_BID-ADD-F.pdf PDF
A8-1c BP1_DWG2026-0609_06_LANDSCAPE_IHS-Whiteriver-Hospital_BID-ADD-F.pdf PDF
A8-3 WR Pre-Proposal_RFIs 001 - 132.xlsx XLSX spreadsheet
A7-1a 0_MEM2026-0528_IHS-Whiteriver-Hospital_BID-Addendum-E.pdf PDF
A7-1d BP1_DWG2026-0528_15_ELECTRICAL_IHS-Whiteriver-Hospital_BID-ADD-E.pdf PDF
Amend7 - WR Construction - 29 May 2026.pdf PDF
A7-1b 00_SPEC2026-0528_Specifications_IHS-Whiteriver-Hospital_BID-ADD-E.pdf PDF
A7-1c BP1_DWG2026-0528_08_ARCHITECTURAL_IHS-Whiteriver-Hospital_BID-ADD-E.pdf PDF
A7-2a WR Pre-Proposal_RFIs 001 - 121.xlsx XLSX spreadsheet
A6-1d BP1_DWG2026-0521_06_LANDSCAPE_IHS-Whiteriver-Hospital_BID-ADD-D.pdf PDF
A6-3a Attachment J06a - Building AZ20260027 rev-0518.pdf PDF
A6-3c Attachment J06c - Heavy AZ20260054 rev-0518.pdf PDF
Amend6 - WR Construction - 22 May 2026.pdf PDF
A6-1f BP1_DWG2026-0520_16_ICT_IHS-Whiteriver-Hospital_BID-ADD-D.pdf PDF
A5-3 WR Standard Form 1442.pdf PDF
Amend5 - WR Construction - 15 May 2026.pdf PDF
A5-1a 0_MEM2026-0514_IHS-Whiteriver-Hospital_BID-Addendum-C.pdf PDF
A5-1c BP1_DWG2026-0514_05_CIVIL_IHS-Whiteriver-ADOT-PLANS_BID-ADD-C.pdf PDF
Amend4 - WR Construction - 7 May 2026.pdf PDF
A4-1b SPEC2026-0430_Specifications_IHS-Whiteriver-Hospital_BID-ADD-B.pdf PDF
A4-1c SPEC2026-0430_Specifications_IHS-Whiteriver-WTTP_BID-ADD-B.pdf PDF
A4-1d BP1_DWG2026-0430_05_CIVIL_IHS-Whiteriver-HOSPITAL-PLANS_BID-ADD-B.pdf PDF
Amend2 - WR Construction - 24 April 2026.pdf PDF
A2-1d BP1_DWG2026-0416_06_LANDSCAPE_IHS-Whiteriver-Hospital_BID-ADD-A.pdf PDF
A2-2 WR Pre-Proposal_RFIs 001 - 050.xlsx XLSX spreadsheet
A1-1a WR Pre-Proposal Mtg IHS Presentation.pdf PDF
A1-3 WR Pre-Proposal_RFIs 001 - 008.xlsx XLSX spreadsheet
Amend1 - WR Construction - 14 April 2026.pdf PDF
B01 RFP Whiteriver Hospital Construction 75H70126R00016.pdf PDF
B01 Attachment J01 BP3_01_GENERAL_IHS-HonDah-WWTP_FINAL-CD.pdf PDF
B01 Attachment J02b Specs (Vol 2).pdf PDF
B01 Attachment J02c Specs (Vol 3).pdf PDF
B01 Attachment J02f SWTP Specs (Vol 6).pdf PDF
Attachment J06a - Building AZ20260027.pdf PDF
Attachment J10 Subcontracting Plan (Large Business).docx DOCX document
B01 Attachment J01 BP5_SWTP_Whiteriver_Final_CD.pdf PDF
B01 Attachment J02e Specs (Vol 5).pdf PDF
Attachment J09 Past Performance Questionnaire.docx DOCX document
B01 Attachment J01 BP4_01_GENERAL_IHS-Whiteriver-Pump-House_FINAL-CD.pdf PDF
Attachment J06b - Highway AZ20260033.pdf PDF
Attachment J07 Company Technical Experience Construction Sheet.docx DOCX document
Attachment J08 - Key Personnel Resume Form.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared for: INDIAN HEALTH SERVICE

100% CONSTRUCTION DOCUMENTS

Project No: 14904.000

5 MARCH 2026

VOLUME 4

Prepared by:

SMITHGROUP 14904.000 INDIAN HEALTH SERVICE

WHITERIVER HOSPITAL

FINAL CONSTRUCTION DOCUMENTS

23 JANUARY 2026

SEALS PAGE 000107 - 1

DOCUMENT 000107 - SEALS PAGE

Include on this Seals Page Document the seals of the design professionals of record required by statute to affix their seal to the documents. Where required, include a description of the Specification Sections prepared under the direction of each design professions *EDIT FOR YOUR PROJECT-USE DIVISION AND/OR SECTION NUMBERS*.

If such listing is required, you may alternatively use the MasterSpec seals page instead of this SmithGroup seals page.

Architect SmithGroup, Inc.

Phoenix, AZ Matthew Hess, AIA, NCARB

Responsible for Divisions 01-49 Sections except where indicated as prepared by other design professionals of record.

Structural Engineer PK Associates and Pimara Paul Koehler Scottsdale, Arizona Christa Chau, PE, SE Responsible for: Division 03, Sections 030000 and 032000; Division 04, Section 042000; Division 05, Sections 051200 and 053100; and Division 31, Section 316329

Civil Engineer Dibble & Associates Consulting Engineers, Inc.

Phoenix, Arizona

Christina Shannon Mauck, PE

Responsible for: Division 01, Section 015713, Division 02, Section 024100, Division 09, Section 099713, Division 31, Sections 312213, 312300, 312316.16, 312323.13, 312333, 312500, Division 32, Sections 321123, 321216, 321313, 321315, Division 33, Sections 331000, 331623, 333000, 333213, 333723, 334213

Fire Protection Engineer

Phoenix, AZ Andrew Ochsankehl, PE Responsible for: Division 13, Section 131200*; Division 21, Sections 211300, 213000, 210533; Division 27, Section 273226; Division 28, Section 283111

*Fire Protection Related Requirements Only

SEALS PAGE 000107 - 2

Electrical Engineer

Phoenix, AZ Daniel L. Peterson, PE Responsible for: Division 26, except for those Sections labeled with “WWTP”

Communications (AV, IT, Security) Designer

Washington, DC David K. Glenn, RCDD Responsible for: Division 27, Sections 270413, 270526, 270528, 270536, 270544, 270553, 271100, 271300, 271500, 272100, 273226, 274116, 275113, 275119, 275123, 275223, 275313, 275316 and 275319; and Division 28, Sections 280413, 280513, 280526, 280528, 281300, 281600, 282300 and 285000

Landscape Architect

Phoenix, AZ Richard P. Jones, PLA Responsible for: Division 32, Sections 321316, 321373, 321716, 321723, 323113, 323119, 323213, 324020, 328000, 329100, 329220, 329300

Civil Engineer Dibble & Associates Consulting Engineers, Inc.

Phoenix, Arizona

Ian B. Mowry, PE

Responsible for: Division 31, Sections 312213, 312300, 312316, 312323, 312500; Division 32, Sections 321123, 321216, 321315; Division 33, Section 4213; Division 34, Sections 340114, 347113, 347116

SEALS PAGE 000107 - 3

Structural Engineer Morrison-Maierle Phoenix, Arizona

Michael Brennan, PE Responsible for structural specifications for the WWTPs:

Division 03: 033000; Division 05: 051400, 055000, 055200, 055300; Division 13: 133419; Division 41:

413313, 413313.01

Electrical Engineer

Phoenix, Arizona Michael Brandt, PE

Responsible for electrical specifications for the WWTPs:

Division 26: 260400, 260519, 260523, 260526, 260529, 260533, 260536, 260543, 260544, 260548.16, 260553, 260573.13, 260573.16, 260573.19, 260913, 260923, 262213, 262413, 262416, 262419, 262713, 262726, 262813, 262816, 262923, 263213, 263353, 263600, 264313, 265100, 265600

Plumbing Engineer

Phoenix, Arizona Jody Waverek, PE

Responsible for plumbing specifications for the WWTPs:

Division 22: 220517, 220518, 220519, 220523.12, 220523.14, 220529, 220548, 220553, 220719, 221116, 221119, 221123, 221123.13, 221316, 221429, 223300, 224213.13, 224213.16, 224216.13, 224216.16, 224223, 224500

Mechanical Engineer

Phoenix, Arizona Jody Waverek, PE Responsible for mechanical specifications for the WWTPs: Division 23: 230513, 230529, 230548, 230553, 230593, 230713, 230716, 230900, 233113, 233300, 233423, 233713, 237416.11, 238126, 238239

SEALS PAGE 000107 - 4

Environmental Engineer

Phoenix, Arizona Ulrike Lashley, PE

Responsible for the following specifications for the WWTPs: Division 09: 099600; Division 10: 101400.01, 104352; Division 40: 400205, 400510, 400510.03, 400510.04, 400510.09, 400510.12, 400510.13, 400510.30, 400553, 400555, 400557, 406110, 406115, 406116, 406120, 406120.01, 406120.02, 406120.03, 406120.04, 406121, 406124, 406127, 406128, 406140, 406160, 406171, 406176, 406177, 406180, 406181, 406182, 406191; Division 41: 413313.17; Division 43:

431030, 431111, 432256, 432321, 432331, 432331.01, 432358, 433230, 433269, 434010; Division 46: 460754, 460754.01, 460754.02, 460754.03, 460754.04, 460754.05, 460754.06, 460754.07, 460754.08, 460754.09, 460754.10, 461155, 461155.01, 461155.02, 461155.03, 461155.04, 462113, 462113.01, 462113.02, 462113.03, 465035, 465035.01, 465035.02, 465131, 465131.01, 465131.02

Hazardous Building Materials

Mabbett & Associates, Inc.

Stoneham, Massachusetts

Michael Delaney, Asbestos Designer

Responsible for: 028200, 028313

END OF DOCUMENT 000107

TABLE OF CONTENTS TOC - 1

TABLE OF CONTENTS

Volume 1

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 001000 - SOLICITATION, CONTRACT LINE-ITEM NUMBER (CLIN) SCHEDULE

SECTION 002000 - INSTRUCTIONS FOR PROCUREMENT

SECTION 002100 - INSTRUCTIONS

SECTION 002113 - INSTRUCTIONS TO BIDDERS

SECTION 002116 - INSTRUCTIONS TO PROPOSERS

SECTION 002200 - SUPPLEMENTARY INSTRUCTIONS

SECTION 002216 - SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS

SECTION 003000 - AVAILABLE INFORMATION

SECTION 004000 - PROCUREMENT FORMS AND SUPPLEMENTS

SECTION 004300 - BID BOND FORM

SECTION 004373 - PROPOSED CONSTRUCTION SCHEDULE FORM

SECTION 004500 - REPRESENTATIONS AND CERTIFICATIONS

SECTION 005000 - CONTRACTING FORMS AND SUPPLEMENTS

SECTION 005100 - NOTICE OF AWARD

SECTION 005200 - AGREEMENT FORMS

SECTION 006000 - PROJECT FORMS

SECTION 006100 - BOND FORMS

SECTION 006200 - CERTIFICATES

SECTION 007000 - CONDITIONS OF THE CONTRACT

SECTION 007100 - CONTRACTING DEFINITIONS

SECTION 007200 - GENERAL CONDITIONS

SECTION 007300 - SUPPLEMENTAL CONDITIONS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 011000 - SUMMARY

SECTION 012300 - OPTIONS

SECTION 012500 - SUBSTITUTION PROCEDURES

SECTION 012510 - SUBSTITUTION REQUEST FORM

SECTION 012600 - CONTRACT MODIFICATION PROCEDURES

SECTION 012614 - REQUESTS FOR INFORMATION

SECTION 012900 - PAYMENT PROCEDURES

SECTION 012973 - SCHEDULE OF VALUES

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

TABLE OF CONTENTS TOC - 2

SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 013233 - PHOTOGRAPHIC DOCUMENTATION

SECTION 013300 - SUBMITTAL PROCEDURES

SECTION 013330 - SUBMITTAL COMPLIANCE FORM

SECTION 013526 - GOVERNMENT SAFETY REQUIREMENTS

SECTION 013573 - DELEGATED DESIGN REQUIREMENTS AND PROCEDURES

SECTION 014200 - REFERENCES

SECTION 014339 - EXTERIOR WALLS MOCKUPS

SECTION 014500.00 10 - QUALITY CONTROL

SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS

SECTION 015713 - TEMPORARY EROSION AND SEDIMENT CONTROL

SECTION 015731 - INDOOR AIR QUALITY (IAQ) MANAGEMENT

SECTION 016000 - PRODUCT REQUIREMENTS

SECTION 017300 - EXECUTION

SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

SECTION 017700 - CLOSEOUT PROCEDURES

SECTION 017823 - OPERATION AND MAINTENANCE DATA

SECTION 017839 - PROJECT RECORD DOCUMENTS

SECTION 017900 - DEMONSTRATION AND TRAINING

SECTION 018113 - SUSTAINABLE DESIGN REQUIREMENTS

SECTION 018900 - SITE CONSTRUCTION PERFORMANCE REQUIREMENTS

SECTION 019113 - GENERAL COMMISSIONING REQUIREMENTS

SECTION 019119 - BUILDING ENCLOSURE COMMISSIONING

SECTION 019200 - FACILITY OPERATION, MAINTENANCE, AND TROUBLESHOOTING

MOBILE GRAPHICAL INFORMATION MANAGEMENT PLATFORM

DIVISION 02 - EXISTING CONDITIONS

SECTION 024100 - SITE DEMOLITION

SECTION 028200 - ASBESTOS ABATEMENT

SECTION 028313 - LEAD HAZARD CONTROL

TABLE OF CONTENTS TOC - 3

DIVISION 03 – CONCRETE

SECTION 032000 - CONCRETE REINFORCEMENT

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE - WWTP

SECTION 033543 - POLISHED CONCRETE FINISHING

SECTION 035400 - CAST UNERLAYMENT

DIVISION 04 – MASONRY

SECTION 042000 - UNIT MASONRY ASSEMBLIES

SECTION 042500 - TERRA COTTA RAINSCREEN SYSTEM

SECTION 042505 - STABILIZED RAMMED EARTH

SECTION 042613 - MASONRY VENEER

DIVISION 05 – METALS

SECTION 051200 - STRUCTURAL STEEL FRAMING

SECTION 051400 - STRUCTURAL ALUMINUM

SECTION 053100 - STEEL DECKING

SECTION 054000 - COLD FORMED METAL FRAMING

SECTION 054300 - SLOTTED CHANNEL FRAMING

SECTION 055000 - METAL FABRICATIONS

SECTION 055000 - METAL FABRICATIONS-WWTP

SECTION 055113 - METAL PAN STAIRS

SECTION 055119 - METAL GRATING STAIRS

SECTION 055200 - HANDRAILS AND RAILIINGS

SECTION 055300 - FABRICATED GRATING

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

SECTION 061053 - MISCELLANEOUS ROUGH CARPENTRY

SECTION 061600 - SHEATHING

SECTION 064116 - PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

SECTION 066119 - QUARTZ SURFACING FABRICATIONS

SECTION 066400 - PLASTIC PANELING

SECTION 068300 - COMPOSITE PANELING

TABLE OF CONTENTS TOC - 4

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 071113 - BITUMINOUS DAMPPROOFING

SECTION 071326 - SELF-ADHERING SHEET WATERPROOFING

SECTION 071413 - HOT FLUID-APPLIED RUBBERIZED ASPHALT WATERPROOFING

SECTION 071900 - WATER REPELLENTS

SECTION 072100 - THERMAL INSULATION

SECTION 072600 - VAPOR RETARDERS

SECTION 072726 - FLUID-APPLIED MEMBRANE AIR BARRIERS

SECTION 074213.13 - FORMED METAL WALL PANELS

SECTION 074213.23 - METAL COMPOSITE MATERIAL WALL PANELS

SECTION 074213.33 - FORMED METAL SCREENWALL PANELS

SECTION 074293 - SOFFIT PANELS

SECTION 075419 - POLYVINYL-CHLORIDE (PVC) ROOFING

SECTION 076200 - SHEET METAL FLASHING AND TRIM

SECTION 077129 - MANUFACTURED ROOF EXPANSION JOINTS

SECTION 077200 - ROOF ACCESSORIES

SECTION 077273 - VEGETATED ROOF SYSTEMS

SECTION 078100 - APPLIED FIREPROOFING

SECTION 078123 - INTUMESCENT FIREPROOFING

SECTION 078413 - PENETRATION FIRESTOPPING

SECTION 078443 - JOINT FIRESTOPPING

SECTION 079200 - JOINT SEALANTS

SECTION 079219 - ACOUSTICAL JOINT SEALANTS

SECTION 079513.13 - INTERIOR EXPANSION JOINT COVER ASSEMBLIES

SECTION 079513.16 - EXTERIOR EXPANSION JOINT COVER ASSEMBLIES

Volume 2

DIVISION 08 – OPENINGS

SECTION 081113 - HOLLOW METAL DOORS AND FRAMES

SECTION 081216 - ALUMINUM FRAMES

SECTION 081416 - FLUSH WOOD DOORS

SECTION 081473 - SLIDING WOOD DOORS

SECTION 083113 - ACCESS DOORS AND FRAMES

SECTION 083313 - COILING COUNTER DOORS

SECTION 083323 - OVERHEAD COILING DOORS

SECTION 083343 - OVERHEAD COILING SMOKE CURTAINS

TABLE OF CONTENTS TOC - 5

SECTION 083516 - SIDE-FOLDING SECURITY GRILLES

SECTION 084123 - INTERIOR ALUMINUM-FRAMES ENTRANCES AND STOREFRONTS

SECTION 084126 - ALL-GLASS ENTRANCES

SECTION 084229.23 - SLIDING AUTOMATIC ENTRANCES

SECTION 084243 - INTENSIVE CARE UNIT/CRITICAL CARE UNIT (ICU/CCU)

ENTRANCES

SECTION 084313 - ALUMINUM-FRAMED STOREFRONTS

SECTION 084413 - GLAZED ALUMINUM CURTAIN WALLS

SECTION 085619 - PASS WINDOWS

SECTION 086200 - UNIT SKYLIGHTS

SECTION 087100 - DOOR HARDWARE

SECTION 088000 - GLAZING

SECTION 088113 - DECORATIVE GLASS GLAZING

SECTION 088300 - MIRRORS

SECTION 088813 - FIRE-RATED GLAZING

DIVISION 09 – FINISHES

SECTION 090561.13 - MOISTURE VAPOR EMISSION CONTROL

SECTION 092116.23 - GYPSUM BOARD SHAFT WALL ASSEMBLIES

SECTION 092216 - NON-STRUCTURAL METAL FRAMING

SECTION 092900 - GYPSUM BOARD

SECTION 093013 - CERAMIC TILING

SECTION 095113 - ACOUSTICAL PANEL CEILINGS

SECTION 095423 - LINEAR METAL CEILINGS

SECTION 095446 - ACOUSTICAL BAFFLE SYSTEM

SECTION 096513 - RESILIENT BASE AND ACCESSORIES

SECTION 096516 - RESILIENT SHEET FLOORING

SECTION 096519 - RESILIENT TILE FLOORING

SECTION 096566 - RESILIENT ATHLETIC FLOORING

SECTION 096623 - RESINOUS MATRIX TERRAZZO FLOORING

SECTION 096723 - RESINOUS FLOORING

SECTION 096813 - TILE CARPETING

SECTION 097200 - WALL COVERINGS

SECTION 097723 - FABRIC-WRAPPED PANELS

SECTION 098316 - ACOUSTICAL CEILING INSULATION

SECTION 098433 - SOUND ABSORBING WALL UNITS

SECTION 099113 - EXTERIOR PAINTING

TABLE OF CONTENTS TOC - 6

SECTION 099123 - INTERIOR PAINTING

SECTION 099600 - HIGH-PERFORMANCE COATINGS

SECTION 099600 - HIGH-PERFORMANCE COATINGS - WWTP

SECTION 099713 - COATINGS FOR WELDED STEEL WATER STORAGE TANK

DIVISION 10 – SPECIALTIES

SECTION 101100 - VISUAL DISPLAY UNITS

SECTION 101400 - SIGNAGE

SECTION 101400.01 - IDENTIFYING DEVICES

SECTION 102113.14 - STAINLESS-STEEL TOILET COMPARTMENTS

SECTION 102123 - CUBICLE CURTAINS AND TRACK

SECTION 102239 - FOLDING PANEL PARTITIONS

SECTION 102600 - WALL AND DOOR PROTECTION

SECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES

SECTION 103100 - MANUFACTURED FIREPLACES

SECTION 104352 - FIRST AID AND SAFETY EQUIPMENT

SECTION 104413 - FIRE PROTECTION CABINETS

SECTION 104416 - FIRE EXTINGUISHERS

SECTION 105113 - METAL LOCKERS

SECTION 107516 - GROUND-SET FLAGPOLES

SECTION 108219 - EXTERIOR SOUND PANELS

DIVISION 11 – EQUIPMENT

SECTION 110800 - EQUIPMENT COMMISSIONING

SECTION 111313 - LOADING DOCK BUMPERS

SECTION 111316 - LOADING DOCK SEALS

SECTION 111319 - STATIONARY LOADING DOCK EQUIPMENT

SECTION 111326 - LOADING DOCK LIGHTS

SECTION 114000 - FOODSERVICE EQUIPMENT

SECTION 117000 - HEALTHCARE EQUIPMENT

SECTION 117100 - MEDICAL STERILIZING EQUIPMENT

SECTION 117311 - PATIENT LIFTS

SECTION 118129 - FACILITY FALL PROTECTION

SECTION 118201 - HYDRAULIC CART TIPPER

SECTION 118226 - FACILITY WASTE COMPACTORS

TABLE OF CONTENTS TOC - 7

DIVISION 12 – FURNISHINGS

SECTION 122413 - ROLLER WINDOW SHADES

SECTION 123553 - GENERAL REQUIREMENTS FOR LABORATORY CASEWORK AND

FUME HOODS

SECTION 123553.03 - ADAPTABLE LABORATORY CASEWORK SYSTEMS

SECTION 123553.19 - WOOD LABORATORY CASEWORK

SECTION 123570 - HEALTHCARE CASEWORK

SECTION 123623.13 - PLASTIC-LAMINATE-CLAD COUNTERTOPS

SECTION 123661.16 - SOLID SURFACING COUNTERTOPS

SECTION 123661.19 - QUARTZ AGGLOMERATE COUNTERTOPS

SECTION 124816 - ENTRANCE FLOOR GRILLES

SECTION 126100 - FIXED UPHOLSTERED SEATING

DIVISION 13 - SPECIAL CONSTRUCTION

SECTION 131200 - ALUMINUM ROOFTOP HELISTOPS

SECTION 131224 - EXTERIOR WATER FEATURE

SECTION 133419 - METAL BUILDING SYSTEMS

SECTION 134900 - RADIATION PROTECTION

SECTION 134920 - RFI/EMI SHIELDING

DIVISION 14 - CONVEYING EQUIPMENT

SECTION 142100 - ELECTRIC TRACTION ELEVATORS

SECTION 149200 - PNEUMATIC TUBE SYSTEM – 6 INCH

Volume 3

DIVISION 21 - FIRE SUPPRESSION

SECTION 210533 - HEAT TRACING FOR FIRE-SUPPRESSION PIPING

SECTION 210800 - FIRE SUPPRESSION SYSTEMS COMMISSIONING

SECTION 211300 - FIRE SPRINKLER AND STANDPIPE SYSTEMS

SECTION 213000 - FIRE PUMPS, PUMP CONTROLLERS, AND

OTHER APPURTENANCES

TABLE OF CONTENTS TOC - 8

DIVISION 22 – PLUMBING

SECTION 220513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

SECTION 220516 - EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING

SECTION 220517 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

SECTION 220517 - SLEEVES AND SLEEVE SEALS PLUMBING PIPING-WWTP

SECTION 220518 - ESCUTCHEONS FOR PLUMBING PIPING

SECTION 220518 - ESCUTCHEONS FOR PLUMBING PIPING - WWTP

SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING

SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING - WWTP

SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING

SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING - WWTP

SECTION 220523.13 - BUTTERFLY VALVES FOR PLUMBING PIPING

SECTION 220523.14 - CHECK VALVES FOR PLUMBING PIPING

SECTION 220523.14 - CHECK VALVES FOR PLUMBING PIPING - WWTP

SECTION 220523.15 - GATE VALVES FOR PLUMBING PIPING

SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND

EQUIPMENT

SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND

EQUIPMENT - WWTP

SECTION 220533 - HEAT TRACING FOR PLUMBING PIPING

SECTION 220548 - VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND

EQUIPMENT

SECTION 220548 - VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND

EQUIPMENT - WWTP

SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT–

SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT - WWTP

SECTION 220716 - PLUMBING EQUIPMENT INSULATION

SECTION 220719 - PLUMBING PIPING INSULATION

SECTION 220719 - PLUMBING PIPING INSULATION - WWTP

SECTION 220800 - PLUMBING SYSTEMS COMMISSIONING

SECTION 221113 - FACILITY WATER DISTRIBUTION PIPING

SECTION 221116 - DOMESTIC WATER PIPING

SECTION 221116 - DOMESTIC WATER PIPING - WWTP

SECTION 221117 - RECLAIMED-WATER PIPING

SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES

SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES - WWTP

SECTION 221123 - DOMESTIC WATER PUMPS

SECTION 221123 - DOMESTIC WATER PUMPS - WWTP

SECTION 221123.13 - DOMESTIC-WATER PACKAGED BOOSTER PUMPS

TABLE OF CONTENTS TOC - 9

SECTION 221123.13 - DOMESTIC-WATER PACKAGED BOOSTER PUMPS - WWTP

SECTION 221316 - SANITARY WASTE AND VENT PIPING

SECTION 221316 - SANITARY WASTE AND VENT PIPING - WWTP

SECTION 221323 - SANITARY WASTE INTERCEPTORS

SECTION 221413 - FACILITY STORM DRAINAGE PIPING

SECTION 221423 - STORM DRAINAGE PIPING SPECIALTIES

SECTION 221429 - SUMP PUMPS

SECTION 221429 - SUMP PUMPS - WWTP

SECTION 223100 - DOMESTIC WATER SOFTENERS

SECTION 223200 - DOMESTIC WATER FILTRATION EQUIPMENT

SECTION 223300 - ELECTRIC, DOMESTIC-WATER HEATERS

SECTION 223300 - ELECTRIC, DOMESTIC-WATER HEATERS - WWTP

SECTION 224213.13 - COMMERCIAL WATER CLOSETS

SECTION 224213.13 - COMMERCIAL WATER CLOSETS - WWTP

SECTION 224213.16 - COMMERCIAL URINALS

SECTION 224213.16 - COMMERCIAL URINALS - WWTP

SECTION 224216.13 - COMMERCIAL LAVATORIES

SECTION 224216.13 - COMMERCIAL LAVATORIES - WWTP

SECTION 224216.16 - COMMERCIAL SINKS

SECTION 224216.16 - COMMERCIAL SINKS - WWTP

SECTION 224223 - COMMERCIAL SHOWER

SECTION 224223 - COMMERCIAL SHOWER - WWTP

SECTION 224300 - HEALTHCARE PLUMBING FIXTURES

SECTION 224500 - EMERGENCY PLUMBING FIXTURES

SECTION 224500 - EMERGENCY PLUMBING FIXTURES - WWTP

SECTION 224700 - DRINKING FOUNTAINS AND WATER COOLERS

SECTION 226113 - COMPRESSED-AIR PIPING FOR LABORATORY AND HEALTHCARE

FACILITIES

SECTION 226119 - COMPRESSED-AIR EQUIPMENT FOR LABORATORY AND

HEALTHCARE FACILITIES

SECTION 226213 - VACUUM PIPING FOR LABORATORY AND HEALTHCARE

FACILITIES

SECTION 226219 - VACUUM EQUIPMENT FOR LABORATORY AND HEALTHCARE

FACILITIES

SECTION 226313 - GAS PIPING FOR LABORATORY AND HEALTHCARE FACILITIES

TABLE OF CONTENTS TOC - 10

SECTION 226400 - MEDICAL GAS ALARMS

SECTION 226713 - PROCESSED WATER PIPING FOR LABORATORY AND

HEALTHCARE FACILITIES

SECTION 226719 - PROCESSED WATER EQUIPMENT FOR LABORATORY AND

HEALTHCARE FACILITIES

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

SECTION 230130.51 - HVAC AIR-DISTRIBUTION SYSTEM CLEANING

SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC AND PLUMBING

EQUIPMENT

SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC AND PLUMBING

EQUIPMENT - WWTP

SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

SECTION 230517 - SLEEVES AND SLEEVE SEALS FOR HVAC AND PLUMBING PIPING

SECTION 230518 - ESCUTCHEONS FOR HVAC PIPING

SECTION 230519 - METERS AND GAGES FOR HVAC PIPING

SECTION 230523 - GENERAL-DUTY VALVES FOR HVAC PIPING

SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT -

WWTP

SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC

SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC - WWTP

SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT - WWTP

SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC - WWTP

SECTION 230713 - DUCT INSULATION

SECTION 230713 - DUCT INSULATION - WWTP

SECTION 230716 - HVAC EQUIPMENT INSULATION

SECTION 230716 - HVAC EQUIPMENT INSULATION - WWTP

SECTION 230719 - HVAC PIPING INSULATION

SECTION 230800 - HVAC SYSTEMS COMMISSIONING

SECTION 230900 - INSTRUMENTATION AND CONTROL FOR HVAC

SECTION 231113 - FACILITY FUEL-OIL PIPING

SECTION 231126 - FACILITY LIQUEFIED-PETROLEUM GAS PIPING

SECTION 232113 - HYDRONIC PIPING

SECTION 232116 - HYDRONIC PIPING SPECIALTIES

SECTION 232123 - HYDRONIC PUMPS

SECTION 2323000 - REFRIGERANT PIPING

TABLE OF CONTENTS TOC - 11

SECTION 232513 - WATER TREATMENT FOR CLOSED-LOOP HYDRONIC SYSTEMS

SECTION 233113 - METAL DUCTS

SECTION 233113 - METAL DUCTS - WWTP

SECTION 233300 - AIR DUCT ACCESSORIES

SECTION 233300 - AIR DUCT ACCESSORIES - WWTP

SECTION 233416 - CENTRIFUGAL HVAC FANS

SECTION 233423 - HVAC POWER VENTILATORS

SECTION 233423 - HVAC POWER VENTILATORS - WWTP

SECTION 233433 - AIR CURTAINS

SECTION 233600 - AIR TERMINAL UNITS

SECTION 233713 - DIFFUSERS, REGISTERS, AND GRILLES

SECTION 233713 - DIFFUSERS, REGISTERS, AND GRILLES - WWTP

SECTION 233723 - HVAC GRAVITY VENTILATORS

SECTION 234100 - PARTICULATE AIR FILTRATION

SECTION 234200 - GAS-PHASE AIR FILTRATION

SECTION 235213 - ELECTRIC BOILERS

SECTION 235700 - HEAT EXCHANGERS FOR HVAC

SECTION 236423.13 - AIR-COOLED, SCROLL WATER CHILLERS

SECTION 236423.14 - AIR SOURCE CHILLER-HEATER

SECTION 236426 - AIR-COOLED CENTRIFUGAL WATER CHILLERS

SECTION 237200 - AIR-TO-AIR ENERGY RECOVERY EQUIPMENT

SECTION 237323 - CUSTOM OUTDOOR CENTRAL-STATION AIR-HANDLING UNITS

SECTION 237416.11 - PACKAGED, SMALL-CAPACITY, ROOFTOP AIR-CONDITIONING

UNITS

SECTION 237416.11 - PACKAGED, SMALL-CAPACITY, ROOFTOP AIR-CONDITIONING

UNITS - WWTP

SECTION 238123.12 - LARGE CAPACITY (7 TONS (25 KW AND LARGER), COMPUTER-

ROOM AIR-CONDITIONERS

SECTION 238123.13 - COMPUTER-ROOM AIR-CONDITIONERS

SECTION 238126 - SPLIT-SYSTEM AIR-CONDITIONERS

SECTION 238126 - SPLIT-SYSTEM AIR-CONDITIONERS - WWTP

SECTION 238214 - CHILLED BEAMS

SECTION 238216 - AIR COILS

SECTION 238219 - FAN COIL UNITS

SECTION 238239 - UNIT HEATERS

SECTION 238239 - UNIT HEATERS - WWTP

SECTION 238316 - RADIANT-HEATING HYDRONIC PIPING

SECTION 238413 - HUMIDIFIERS

SECTION 238610 - BI-POLAR IONIZATION AIR PURIFICATION SYSTEM

TABLE OF CONTENTS TOC - 12

DIVISION 25 - INTEGRATED AUTOMATION

NOT APPLICABLE

Volume 4

DIVISION 26 – ELECTRICAL

SECTION 260400 - COMMON WORK RESULTS FOR ELECTRICAL

SECTION 260400 - COMMON WORK RESULTS FOR ELECTRICAL - WWTP

SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

– WWTP

SECTION 260523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLES

SECTION 260523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLES - WWTP

SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS - WWTP

SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS - WWTP

SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS - WWTP

SECTION 260536 - CABLE TRAYS FOR ELECTRICAL SYSTEMS - WWTP

SECTION 260539 - UNDERFLOOR RACEWAYS FOR ELECTRICAL SYSTEMS

SECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL

SYSTEMS - WWTP

SECTION 260543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL

SYSTEMS-WWTP - M-M

SECTION 260544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND

CABLING

SECTION 260544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND

CABLING - WWTP

SECTION 260548.16 - SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION 260548.16 - SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS - WWTP

SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS - WWTP

SECTION 260573.13 - OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY

SECTION 260573.13 - OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY -

WWTP

SECTION 260573.16 - OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

TABLE OF CONTENTS TOC - 13

SECTION 260573.16 - OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY -

WWTP

SECTION 260573.19 - OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY

SECTION 260573.19 - OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY –

WWTP

SECTION 260800 - ELECTRICAL SYSTEMS COMMISSIONING

SECTION 260913 - ELECTRICAL POWER MONITORING AND CONTROL

SECTION 260913 - ELECTRICAL POWER MONITORING AND CONTROL - WWTP

SECTION 260923 - LIGHTING CONTROL DEVICES

SECTION 260923 - LIGHTING CONTROL DEVICES - WWTP

SECTION 260943 - NETWORK LIGHTING CONTROLS

SECTION 260943.23 - RELAY-BASED LIGHTING CONTROLS

SECTION 262213 - LOW-VOLTAGE DISTRIBUTION TRANSFORMERS

SECTION 262213 - LOW-VOLTAGE DISTRIBUTION TRANSFORMERS - WWTP

SECTION 262300 - LOW-VOLTAGE SWITCHGEAR

SECTION 262313 - PARALLELING LOW-VOLTAGE SWITCHGEAR

SECTION 262413 - SWITCHBOARDS

SECTION 262413 - SWITCHBOARDS - WWTP

SECTION 262416 - PANELBOARDS

SECTION 262416 - PANELBOARDS - WWTP

SECTION 262419 - MOTOR CONTROL CENTERS - WWTP

SECTION 262713 - ELECTRICITY METERING

SECTION 262713 - ELECTRICITY METERING - WWTP

SECTION 262726 - WIRING DEVICES

SECTION 262726 - WIRING DEVICES - WWTP

SECTION 262743 - ELECTRIC-VEHICLE SERVICE EQUIPMENT - AC LEVEL 1 AND

LEVEL 2

SECTION 262813 - FUSES

SECTION 262813 - FUSES - WWTP

SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS - WWTP

SECTION 262923 - VARIABLE-FREQUENCY MOTOR CONTROLLERS

SECTION 262923 - VARIABLE-FREQUENCY MOTOR CONTROLLERS - WWTP

SECTION 263100 - PHOTOVOLTAIC COLLECTORS

SECTION 263213 - ENGINE GENERATORS

SECTION 263213 - ENGINE GENERATORS - WWTP

SECTION 263233 - ROTARY UNINTERRUPTIBLE POWER UNITS

SECTION 263353 - STATIC UNINTERRUPTIBLE POWER SUPPLY

SECTION 263353 - STATIC UNINTERRUPTIBLE POWER SUPPLY - WWTP

TABLE OF CONTENTS TOC - 14

SECTION 263600 - TRANSFER SWITCHES

SECTION 263600 - TRANSFER SWITCHES - WWTP

SECTION 263650 - GENERATOR DOCKING STATIONS

SECTION 264113 - LIGHTNING PROTECTION FOR STRUCTURES

SECTION 264313 - SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER

CIRCUITS - WWTP

SECTION 264313 - SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER

CIRCUITS-WWTP

SECTION 265100 - INTERIOR LIGHTING

SECTION 265100 - INTERIOR LIGHTING - WWTP

SECTION 265600 - EXTERIOR LIGHTING

SECTION 265600 - EXTERIOR LIGHTING - WWTP

DIVISION 27 – COMMUNICATIONS

SECTION 270413 - COMMON SUBMITTAL REQUIREMENTS FOR COMMUNICATIONS

SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

SECTION 270528 - PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION 270544 - SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS

PATHWAYS AND CABLING

SECTION 270553 - IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

SECTION 270800 - COMMUNICATIONS SYTEMS COMMISSIONING

SECTION 271100 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS

SECTION 271300 - COMMUNICATIONS BACKBONE CABLING

SECTION 271500 - COMMUNICATIONS HORIZONTAL CABLING

SECTION 272100 - DATA COMMUNICATIONS NETWORK EQUIPMENT

SECTION 273226 - TWO-WAY COMMUNICATIONS SYSTEM

SECTION 274116 - INTEGRATED AUDIOVISUAL SYSTEMS AND EQUIPMENT

SECTION 275113 - PAGING SYSTEMS

SECTION 275119 - SOUND MASKING SYSTEMS

SECTION 275123 - EMERGENCY HELP POINTS AND CALL BOXES

SECTION 275223 - NURSE CALL AND CODE BLUE SYSTEMS

SECTION 275313 - SYNCHRONIZED CLOCK SYSTEM

SECTION 275316 - PATIENT, INFANT, AND EQUIPMENT RFID TRACKING SYSTEMS

SECTION 275319 - DISTRIBUTED ANTENNA STSYTEMS

TABLE OF CONTENTS TOC - 15

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

SECTION 280413 - COMMON SUBMITTAL REQUIREMENTS FOR ELECTRONIC SAFETY

AND SECURITY

SECTION 280513 - CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND

SECURITY

SECTION 280526 - GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND

SECURITY

SECTION 280528 - PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY

SECTION 280544 - SLEEVES AND SLEEVE SEALS FOR ELECTRONIC SAFETY AND

SECURITY PATHWAYS AND CABLING

SECTION 280800 - ELECTRONIC SAFETY AND SECURITY SYSTEMS COMMISSIONING

SECTION 281300 – ACCESS CONTROL

SECTION 281600 - INTRUSION DETECTION SYSTEM

SECTION 282300 - VIDEO SURVEILLANCE

SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION 285000 - SECURITY CONTROL SYSTEM

Volume 5

DIVISION 31 – EARTHWORK

SECTION 312213 - ROUGH GRADING

SECTION 312300 - EXCAVATION AND FILL

SECTION 312316.16 - STRUCTURAL EXCAVATION FOR MINOR STRUCTURES

SECTION 312323.13 - BACKFILL

SECTION 312333 - TRENCHING AND BACKFILL

SECTION 312500 - EROSION AND SEDIMENTATION CONTROLS

SECTION 313116 - TERMITE CONTROL

SECTION 316329 - DRILLED CONCRETE PIERS AND SHAFTS

TABLE OF CONTENTS TOC - 16

DIVISION 32 - EXTERIOR IMPROVEMENTS

SECTION 321123 - AGGREGATE BASE COURSES

SECTION 321216 - ASPHALT PAVING

SECTION 321223 - IMPRINTED ASPHALT

SECTION 321313 - CONCRETE PAVING

SECTION 321315 - CONCRETE WALKS, CURBS AND GUTTERS

SECTION 321316 - DECORATIVE CONCRETE PAVING

SECTION 321373 - CONCRETE PAVING JOINT SEALANTS

SECTION 321716 - MANUFACTURED TRAFFIC-CALMING DEVICES

SECTION 321723 - PAVEMENT MARKINGS

SECTION 323113 - CHAIN LINK FENCES AND GATES

SECTION 323119 - DECORATIVE METAL FENCES AND GATES

SECTION 323213 - CAST-IN-PLACE CONCRETE RETAINING WALLS

SECTION 324020 - PIPE AND TUBE RAILINGS

SECTION 328000 - IRRIGATION SYSTEM

SECTION 329100 - SOIL PREPARATION (TOPSOIL)

SECTION 329220 - NATIVE SEEDING

SECTION 329300 - EXTERIOR PLANTINGS

DIVISION 33 - UTILITIES

SECTION 331000 - WATER UTILITIES

SECTION 331623 - WELDED STEEL WATER STORAGE TANK AND FOUNDATION

SECTION 333000 - SANITARY SEWERAGE UTILITIES

SECTION 333213 - PACKAGE LIFT STATION

SECTION 333723 - SLIDE GATE

SECTION 334213 - STORMWATER CULVERTS AND DRAINAGE FACILITIES

DIVISION 34 - TRANSPORTATION

SECTION 340114 - SIGNING AND MARKING

SECTION 344113 - TRAFFIC SIGNALS

SECTION 347100 - ADOT REQUIREMENTS

SECTION 347113 - VEHICLE BARRIERS

SECTION 347116 - IMPACT ATTENUATING DEVICES

TABLE OF CONTENTS TOC - 17

DIVISION 40 - PROCESS INTERCONNECTIONS

SECTION 400205 - PIPING SCHEDULE

SECTION 400510 - PIPING - GENERAL

SECTION 400510.03 - DPS - EPOXY LINED DUCTILE IRON PIPE AND FITTINGS

SECTION 400510.04 - DPS - MILL TYPE STEEL PIPE AND FITTINGS (GENRAL SERVICE)

SECTION 400510.09 - DPS STAINLESS STEEL PIPE AND FITTINGS

SECTION 400510.12 - DPS - POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS

SECTION 400510.13 - DPS - CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPE

AND FITTINGS

SECTION 400510.30 - DPS HIGH DENSITY POLYETHYLENE (HDPE) PIPE

AND TUBING

SECTION 400533 - MANUAL VALVES

SECTION 400555 - SELF CONTAINED AUTOMATIC VALVES

SECTION 400557 - POWER OPERATED GATE AND VALVE ASSEMBLIES

SECTION 406110 - PROCESS INSTRUMENTATION AND CONTROLS SYSTEM (PICS)

GENERAL

SECTION 406115 - PICS SCOPE OF WORK

SECTION 406116 - PICS ENCLOSURES

SECTION 406120 - PROCESS CONTROL NARRATIVES (PCNs)

SECTION 406120.01- PCN-INFLUENT PUMP STATION

SECTION 406120.02 - PCN-EQ BASIN TRANSFER PUMP STATION

SECTION 406120.03 - PCN-AEORBIC SLUDGE DIGESTER

SECTION 406120.04 - PCN-EFFLUENT PUMPING SYSTEM

SECTION 406121 - PICS PROCESS TAPS AND PRIMARY ELEMENTS

SECTION 406124 - PICS INSTRUMENTATION CABLE

SECTION 406127 - PICS INDUSTRIAL ETHERNET NETWORK

SECTION 406128 - PICS MISCELLANEOUS EQUIPMENT

SECTION 406140 - PICS INSTRUMENTATION REQUIREMENTS

SECTION 406160 - PICS PLC I-O INDEX

SECTION 406171 - INSTRUMENT SPECIFICATIONS

SECTION 406176 - PLANT CONTROL SYSTEM (PCS) SOFTWARE REQUIREMENTS

SECTION 406177 - PLANT CONTROL SYSTEM (PCS) HARDWARE AND SOFTWARE

SECTION 406180 - PICS TESTING, CALIBRATION, AND INSTALLATION VERIFICATION

SECTION 406181 - PICS COMMISSIONING AND START-UP

SECTION 406182 - PICS PERSONNEL TRAINING

SECTION 406191- PICS SPARE PARTS

TABLE OF CONTENTS TOC - 18

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

SECTION 412213.17 - DAVIT AND GANTRY CRANES

SECTION 413313 - OVERHEAD TRAVELING CRANES

SECTION 413313.01 - DETAIL SPECIFICATION - TREATMENT PLANT BRIDGE CRANE

DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE

EQUIPMENT

SECTION 431030 - SUBMERSIBLE NON-CLOG CENTIFUGAL PUMPS

SECTION 431111 - BLOWERS

SECTION 432256 - SUBMERSIBLE MIXERS

SECTION 432321 - RECLAIMED EFFLUENT PUMPING SYSTEMS

SECTION 432331 - NPW PUMPING SYSTEMS

SECTION 432331.01 - PCN NON-POTABLE WATER SYSTEM

SECTION 432332 - RECLAIMED WATER PUMPING SYSTEM

SECTION 432358 - POSITIVE DISPLACEMENT ROTARY LOBE PUMPS

SECTION 433230 - ODOR CONTROL BIOTRICKLING SYSTEM

SECTION 433269 - CHEMICAL FEED SKID – PERISTALTIC PUMPS

SECTION 434010 - CHEMICAL STORAGE AND CONTAINMENT

DIVISION 46 – WATER AND WASTEWATER EQUIPMENT

SECTION 460754 - MEMBRANE BIOREACTOR PACKAGE PLANT SYSTEM

SECTION 460754.01 - DES-SKID COMPONENTS

SECTION 460754.02 - DES-SUBMERSIBLE MIXERS

SECTION 460754.03 - DES-FLEXIBLE MEMBRANE DIFFUSERS

SECTION 460754.04 - DES-SUBMERSIBLE PUMPS

SECTION 460754.05 - DES SELF-PRIMING CENTRIFUGAL PUMPS

SECTION 460754.06 - DES-REGENERATIVE BLOWERS

SECTION 460754.07 - DES-PROCESS INSTRUMENTATION

SECTION 460754.08 - PACKAGE MBR SYSTEM - LAYOUT DRAWINGS

SECTION 460754.09 - PACKAGE MBR SYSTEM - P&ID DDRAWINGS

SECTION 460754.10 - DES-CHEMICAL FEED SKIDS

SECTION 461155 - SLUDGE DEWATERING SYSTEM - GENERAL

SECTION 461155.01 - DES VOLUTE PRESS

SECTION 461155.02 - DES POLYMER BLENDING SYSTEM

SECTION 461155.03 - DES SCREW CONVEYOR

SECTION 461155.04 - PCN-SLUDGE DEWATERING SYSTEM

SECTION 462113 - SCREENING AND GRIT REMOVAL SYSTEM - GENERAL

TABLE OF CONTENTS TOC - 19

SECTION 462113.1 - DES - COARSE SCREENING AND GRIT REMOVAL PACKAGE

SYSTEM

SECTION 462113.2 - DES - FINE SCREENING

SECTION 462113.3 - DES - MANUAL BAR SCREEN

SECTION 465035 - WASTEWATER ULTRAVIOLET DISINFECTION SYSTEM

SECTION 465035.01 - DES-HOSPITAL WASTEWATER ULTRAVIOLET DISINFECTION

SYSTEM

SECTION 465035.02 - DES HON-DAH WASTEWATER ULTRAVIOLET DISINFECTION

SYSTEM

SECTION 465131 - AERATION EQUIPMENT – GENERAL

SECTION 465131.01 - DES-FINE BUBBLE AERATION

SECTION 465131.02 - DES-COARSE BUBBLE AERATION

END OF TABLE OF CONTENTS

FINAL CONSTRUCTION DOCUMENTS

23 JANUARY 2026

SECTION 260400 - COMMON WORK RESULTS FOR ELECTRICAL

PART 1 - GENERAL

1.1 SUMMARY

A. Design Intent:

1. The Contract Documents indicate and specify the electrical design intent. The

Contract Drawings are schematic and diagrammatic and are not intended to indicate construction details and routing unless specifically indicated. The specifications establish minimum performance, product and installation requirements.

2. In addition to the specified and indicated performance and quality requirements, furnish products and perform installation work consistent with the design intent, industry standards and as necessary to the provision of complete operating electrical systems.

3. Install electrical work in accordance with the National Electrical Code and all applicable local codes in a neat and workmanlike manner.

4. This Section specifies basic electrical requirements applicable to all Divisions unless explicitly excepted.

5. If there is a conflict between applicable documents, then the more stringent requirement shall apply. All documents listed are believed to be the most current releases of the documents. The Contractor has the responsibility to determine and adhere to the most recent release when developing the proposal for installation.

6. Contractor shall thoroughly review entire set of Contract Documents, including all discipline drawings and specifications prior to bidding and include all required electrical work in bid, even if not explicitly shown on electrical Drawings and Specifications.

7. The project is pursuing LEED certification. Contractor shall provide requirements in compliance with LEED standards as identified in the Contract Documents.

1.2 REFERENCES

A. Codes and Standards indicated in General Sheets.

B. American National Standards Institute (ANSI) C2 - National Electrical Safety Code.

C. National Electrical Contractors Association (NECA).

1. 1 - Standard for Good Workmanship in Electrical Construction.

2. 500 - Recommended Practice for Installing Indoor Commercial Lighting Systems.

D. National Fire Protection Association (NFPA).

1. 70 - National Electrical Code (NEC).

2. 70E - Standard for Electrical Safety in the Workplace.

3. 72 - National Fire Alarm and Signaling Code.

4. 99 - Healthcare Facilities Code

5. 101 - Life Safety Code.

6. 111 - Standard for Stored Electrical Energy Emergency and Standby Power

Systems.

E. Leadership in Energy and Environmental Design (LEED).

1. Interior Design and Construction (ID+C) v4 - Commercial Interiors.

COMMON WORK RESULTS FOR ELECTRICAL 260400 - 1

FINAL CONSTRUCTION DOCUMENTS

23 JANUARY 2026

1.3 Submittals

A. General

1. Submit Shop Drawings, Product Data, Samples and other specified submittals on a "system" basis. Retain, and assemble drawings and data from manufacturer or component manufacturers such that each submittal is for a complete system.

2. Refer to Section 013300, "Shop Drawings, Product Data and Samples", for basic definitions and requirements for submittals.

3. Refer to Section 013330 for submittal compliance form.

B. Contract Closeout Submittals

1. Refer to Division 01, "Record Documents", for basic definitions and requirements for record documents.

1.4 Quality Assurance

A. Owner Construction Design Standards

1. Provide an electrical installation in accordance with the Owner's construction design standards and specifications, unless specific written waivers are provided by the Owner.

B. Regulatory Requirements

1. Comply with the applicable requirements of ANSI C2 and the latest NFPA 70.

2. Comply with applicable requirements of city, county, and state laws, ordinances and regulations including modifications and supplements to ANSI C2 and NFPA 70.

3. Comply with the applicable requirements of U.S.Department of Labor, Occupational Safety and Health Administration Standards (OSHA).

4. All materials shall conform with the standards of the Underwriter¢¢s Laboratories in every case where such standards have been established for the particular type of material or assembly .

5. All material and equipment shall be UL listed and bear the UL label where such listing and labeling exists.

6. In the case where two or more Codes conflict or contradict each other, comply with the more stringent Code or standard.

C. Contractor Qualifications and Character of Work

1. Contractor personnel must be knowledgeable in local, state and national codes and regulations. Contractor shall have been in the business of installing electrical systems for a minimum of ten (10) years.

2. Contractor must possess and maintain current liability insurance certificates.

3. Contractor shall obtain and pay for all permits and inspections required by laws, local ordinances, rules, and regulations having jurisdiction for the work. Permits shall be readily available and posted in a prominent place at building site and protected from weather and physical damage.

4. The installation shall be executed in a workmanlike manner and shall present a neat physical appearance when completed.

1.5 PROJECT/SITE CONDITIONS

A. Environmental Requirements

1. Provide products suitable for operation under the following environmental conditions:

COMMON WORK RESULTS FOR ELECTRICAL 260400 - 2

FINAL CONSTRUCTION DOCUMENTS

23 JANUARY 2026

a. Temperature: -18 to 38 degrees C (0 to 100 degrees F).

b. Humidity: 0 to 95 relative percent, non-condensing.

c. Altitude: 2010 meters (6600 feet) above sea level.

d. Outdoor: Products that are UL listed for wet locations.

1.6 WARRANTIES

A. Refer to the Conditions of the Contract for provisions concerning Contract general warranty, Statements of Compliance, correction of Work period, and form of Special Warranty.

B. All electrical systems, equipment and installations shall be provided with a one-year minimum Warranty starting from the date of substantial completion.

C. During the warranty period, and for non-conformities the contractor shall take all necessary and appropriate action; free of charge, to correct any non-conformity with the warranties contained in the manufacturer agreement. During the warranty period, contractor shall provide to Owner, free of costs and charges, all support necessary to ensure that the installation meets the requirements specified in the Contract Documents and performance guarantees provided by the contractors. During the warranty period, contractors shall furnish, or cause to be furnished, all maintenance, service, parts and replacements necessary to maintain the installation in good working condition, at no cost to Owner.

1.7 CONDUCTOR SIZING

A. Feeder and Branch Circuit Sizing

1. Provide feeder and branch circuits per the circuit sizing schedules indicated on

Drawings. Where schedules are not indicated, provide conductors which are sized as required per the NEC for the indicated overcurrent protective device rating. Circuit sizing and installation shall consider the field routing and anticipated voltage drop. Upsize wire, as necessary, to compensate for voltage drop and/or other forms of derating required in accordance with the NEC.

2. Derate conductor ampacities per the NEC for field conditions including but not limited to conduits exposed to sunlight, elevated ambient temperature, and/or more than 3 current carrying conductors in a raceway.

1.8 SYSTEMS INTEGRATION

A. Coordinate with equipment suppliers and ensure integration of systems comprised of disparate equipment which work together to form a complete system.

B. Provide all miscellaneous components, wiring, hardware, etc. required for complete and operational equipment and systems whether or not these items are explicitly shown in the Contract Documents.

C. Provide systems which maintain the UL rating of the individual pieces of equipment.

D. Submit system integration wiring diagrams, control diagrams and sequence of operation, as needed.

1.9 COORDINATION

A. Contractor shall participate in the project scheduling, coordination meetings and coordination drawing/modeling activities as specified in Division 01.

COMMON WORK RESULTS FOR ELECTRICAL 260400 - 3

FINAL CONSTRUCTION DOCUMENTS

23 JANUARY 2026

B. All potential coordination issues shall be brought to the attention of the Construction Manager immediately before proceeding with the installation.

C. Contractor shall be responsible for all cross connecting and coordination with vendors and other trade contractors to provide complete operational systems.

D. For purpose of clarify and legibility, drawings are diagrammatic. Locate equipment as close as practical to the locations shown on the drawings. Should field conditions prevent the installation of equipment or materials as indicated on the drawings, make deviations only with the prior approval of the Owner's representative.

E. Coordinate arrangement, mounting, and support of electrical equipment:

1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated.

2. To provide for ease of disconnecting the equipment with minimum interference to other installations.

3. To allow right of way for piping at required slope.

4. To allow connecting raceways, cables, wireways, cable trays, and busways to be clear of obstructions and of the working and access space of other equipment.

F. Coordinate work with other trades to ensure completion is consistent with the project schedule. Ensure the NEC-required working space and dedicated electrical space about electrical equipment is provided. Foreign systems shall not be located within these dedicated zones. Any work that encroaches on the working space or dedicated electrical space shall be relocated at the Contractor's expense.

G. Equipment and device mounting heights and alignment shall adhere to architectural drawings, rules and requirements. Devices of all trades within the same general area shall be coordinated prior to construction. Care shall be taken to align devices horizontally and vertically. Devices that are not aligned properly shall be relocated at the Contractor's expense.

H. Coordinate exact conduit routing in the field with other trades and with building elements such as structural steel members. Conduit and raceways are not explicitly shown. Conduit routing where shown on drawings shall be considered approximate.

Contractor shall be responsible for final routing in the field and shall be responsible for complete coordination with all other trades.

I. Coordinate installation of required supporting devices and set sleeves in cast-in-place concrete, masonry walls, and other structural components as they are constructed.

J. Coordinate location of access panels and doors for electrical items that are behind finished surfaces or otherwise concealed. Access doors and panels are specified in Division 8.

K. Coordinate sleeve selection and application with selection and application of firestopping specified in Division 07.

PART 2 - PRODUCTS

2.1 Manufacturers

A. General

COMMON WORK RESULTS FOR ELECTRICAL 260400 - 4

FINAL CONSTRUCTION DOCUMENTS

23 JANUARY 2026

1. Furnish products by one of the equipment manufacturers listed under the heading "Manufacturers" within the applicable sections. When given, furnish the specified product model or brand for the selected manufacturer.

2. Provide products, for which quantities of two or more are to be furnished, from the same manufacturer and of the same product or model series.

3. Furnish product components designed to be used together and which are physically and electrically compatible.

B. Comparable Products

1. Comparable products may be proposed when the "or as approved" clause is specified under the heading "Manufacturers". Submit such products substitutions for approval per Division 01, "Product Requirements.••

C. Product Substitutions

1. Product substitutions may be requested under the conditions specified in Division

01 'Substitution Procedures'.•• Submit product substitutions for consideration per Division 01, "Substitution Procedures".

2.2 Products

A. Product Listing and Labeling

1. Provide listed and labeled product for which listings and labels exist by

Underwriters Laboratories Inc. (UL), Factory Mutual (FM), or similar independent testing organizations recognized by the authorities having jurisdiction. For products for which there are no such listings and labels, provide listed and labeled components of those products, for which component listing and labels exist.

B. PCB Content Prohibited

1. Provide products which do not contain any amounts of polychlorinated biphenyl

(PCB) compounds.

C. Lead Limits

1. Electrical wire and cable to have lead content less than 300 parts per million.

D. Asbestos Content Prohibited

1. Provide products which do not contain any amounts of asbestos.

E. Access Doors

1. Provide access doors necessary to access devices, whether for control or maintenance, governed by these Basic Electrical Materials and Methods.

Comply with access door requirements specified in Division 08. Access doors are not explicitly shown on the Drawings.

2. Access doors shall be coordinated with other trades and final locations shall be approved by Architect. Access doors not approved by Architect shall be removed or relocated at the Contractors expense.

3. Access doors installed in fire rated floors, walls or ceilings shall be sufficiently rated to maintain the rating of the surface where installed.

2.3 Source Quality Control

A. Factory Tests

1. Permit Architect and Owner to observe factory tests. Provide minimum five working 14 days notice of factory tests.

2. Schedule no more than one equipment or system factory test per week.

COMMON WORK RESULTS FOR ELECTRICAL 260400 - 5

FINAL CONSTRUCTION DOCUMENTS

23 JANUARY 2026

PART 3 - EXECUTION

3.1 CONSTRUCTION PHASING

A. The project will utilize phased construction. Contractor shall account for any and all costs associated with a phased construction schedule in bid.

3.2 SHUTDOWNS

A. Interruption of Existing Service: Do not interrupt electric, communications or fire alarm service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electric service according to requirements indicated:

1. Notify Architect, Construction Manager and Owner no fewer than seven days in advance of proposed interruption of service.

2. Indicate method of providing temporary service.

3. Do not proceed with interruption of service without Architect's, Construction

Manager's and Owner’s written permission.

4. Comply with NFPA 70E.

B. Coordinate all service interruptions with other disciplines and Owner's representative.

Shutdowns shall be performed during off hours, which may include weekends or holidays. This premium time cost shall be included in the Contractor's base bid.

C. Maintain Owner communications and network services operations during construction.

Coordinate all service interruptions with other disciplines and Owner's representative.

D. Maintain Owner fire alarm systems and services operations during construction.

Coordinate all service interruptions with other disciplines and Owner's representative.

3.3 DEMOLITION

A. Protect adjacent building services and materials indicated to remain. Install and maintain barriers to keep dirt, dust, and noise from being transmitted to adjacent areas.

Remove protection and barriers after demolition is complete.

B. “Carefully remove, clean and restore and reinstall items that are relocated during construction to a "like new" condition.

C. Building elements such as walls, partitions, floors and ceilings affected by electrical construction such as conduit penetrations shall be repaired, patched, painted and otherwise restored to a "like new" condition.

D. Lamp and Ballast Recycling.

1. Recycle lamps, ballasts and drivers containing hazardous materials such as mercury during construction. These shall include tubular fluorescent, compact fluorescent, HID, LED, induction and cold cathode lamps. These lamp types, ballasts and drivers associated with these lamps shall not be disposed of as solid municipal waste.

E. Equipment Protection and Cleanup.

1. Protect equipment and materials during shipment, storage and construction against damage, dust and contamination. Items that become damaged, dirty or contaminated during construction shall be restored to a "like new" condition or replaced at the Contractor's expense.

COMMON WORK RESULTS FOR ELECTRICAL 260400 - 6

FINAL CONSTRUCTION DOCUMENTS

23 JANUARY 2026

2. Remove and legally dispose of demolished items, rubbish, debris and construction waste from the construction site daily, and at the completion of the work. The contractor shall maintain a "clean" work site. Failure to do so may result in the cleanup being performed by others and all costs thereof being deducted from the Contractor’s final payment.

3.4 TEMPORARY SERVICE

A. The facility will remain operational during construction. Provide equipment, hardware, wiring, etc. to maintain systems scheduled to remain operational during construction.

Coordinate detailed work phasing plans with the Construction Manager, Architect and Owner prior to commencing work.

B. Provide, maintain and remove all temporary lighting, power and communications required to complete the project.

1. Coordinate temporary service installation with the local utility companies and building landlord prior to construction.

C. In addition to NEC ground fault protection requirements, provide ground fault protection on temporary feeders 200 amps and greater.

D. Temporary…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .