Attachment R1 MRC OM Routine TO PWS 251102.pdf
PDF 2 MB Posted
- Solicitation number
- FDA-2026-129160-PreSOL
About this file
This document is a comprehensive Statement of Work (SOW) for Operations and Maintenance (O&M) support services at the U.S. Food and Drug Administration's (FDA) Muirkirk Road Complex (MRC) in Laurel, Maryland. The contract requires a contractor to provide comprehensive maintenance services for three facilities totaling 432,000 square feet of research laboratory space, including Module I (246,853 sq ft), Module II (100,406 sq ft), and the Beltsville Research Facility (35,061 sq ft), which support critical research programs for human foods, veterinary medicine, and scientific investigations.
The SOW covers a 60-month period with a 60-day transition period and subsequent base and option periods, requiring 24/7 operations and maintenance across multiple technical disciplines. Key service requirements include preventive and reactive maintenance, operations monitoring, technical services for architectural, mechanical, electrical, plumbing, and laboratory support systems, emergency response, safety compliance, environmental management, and specialized support for sensitive research environments like animal care facilities. The contractor must maintain complex building systems, meet strict environmental control standards, comply with multiple regulatory requirements, and support ongoing FDA research missions while ensuring continuous, safe facility operations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
OPERATIONS AND MAINTENANCE SERVICES
FDA Muirkirk Road Complex (MRC)
The U.S. Food and Drug Administration’s (FDA) laboratory research and animal testing facilities located at: - 8301 Muirkirk Road (Module I) - 8401 Muirkirk Road (Module II) -
8501 Muirkirk Road (Beltsville Research Facility)
Laurel, Maryland 20708
U.S. Food and Drug Administration
November 2, 2025
75F40126R000006
PLACEHOLDER IDENTIFICATION GUIDE
This document contains placeholders that must be filled in before use. All placeholders are shown in [RED BOLD TEXT IN BRACKETS] throughout the document.
Required Placeholders to Complete:
Placeholder Description / Location
[INSERT DATE] Cover page - Document issue date
[INSERT CONTRACT NUMBER] Cover page and throughout - Actual contract number
[Contracting Officer Name] Multiple sections - CO name
[Contracting Officer Contact] Multiple sections - CO contact
[COR Name] Multiple sections - COR name
[COR Contact] Multiple sections - COR contact
[Contract Start Date] Section 2 - Contract start date
[Contract End Date] Section 2 - Contract end date
[Contract Value] Section 1 - Estimated contract value
[Number of Buildings] Section 1 - Building count (3: Module I, II, BRF)
[Square Footage] Section 1 - Total square footage
[Contractor Name] Forms - After award
NOTE: Use Find (Ctrl+F) to search for “[” to locate all placeholders.
APPENDIX D – PERFORMANCE REQUIREMENTS SUMMARY (PRS)
Contract/Order No.: [Insert] • Appendix D PRS • Page 2
Statement of Work - Operations and Maintenance Services
FDA Muirkirk Road Complex (MRC)
Table of Contents
PLACEHOLDER IDENTIFICATION GUIDE
Required Placeholders to Complete:
SECTION 1 - EXECUTIVE SUMMARY & PROJECT IDENTIFICATION
1.0 INTRODUCTION
1.1 BACKGROUND
1.1.1 Site Overview
1.1.2 Module I (Mod I)
1.1.3 Module II (Mod II)
1.1.4 Beltsville Research Facility (BRF)
1.2 CONTRACT OBJECTIVE
1.2.1 Primary Objective
1.2.2 Facility Performance Requirements
1.2.3 Research Mission Support
1.2.4 Safety and Compliance
1.3 SCOPE SUMMARY
1.3.1 Operations and Monitoring Services
1.3.2 Preventive Maintenance Services
1.3.3 Reactive Maintenance Services
1.3.4 Technical Services by Discipline
1.3.5 Specialized Support Services
1.3.6 Service Delivery Coverage
1.3.7 Contractor-Furnished Resources
1.3.8 Compliance Requirements
1.4 PERIOD OF PERFORMANCE
1.4.1 Contract Periods
1.4.2 Transition Period Requirements
1.5 SITE INFORMATION AND ACCESS
Contract/Order No.: [Insert] • Appendix D PRS • Page 3
1.5.1 Site Location
1.5.2 Pre-Proposal Site Visit
1.5.3 Contractor Site Familiarization Requirement
1.5.4 Security and Access Requirements
SECTION 2 - SCOPE & PLACE/HOURS OF PERFORMANCE
2.0 OVERVIEW
2.1 SCOPE OF WORK
2.1.1 General Requirements
2.1.2 Standards and Code Compliance
2.1.3 Site Familiarity Requirement
2.1.4 Standard Work Orders and Day-to-Day Operations
2.2 PLACE OF PERFORMANCE
2.2.1 Primary Location
2.2.2 Facility Components
2.2.3 Site Infrastructure
2.2.4 Off-Site Work
2.3 HOURS OF OPERATION AND COVERAGE REQUIREMENTS
2.3.1 Service Coverage
2.3.2 Normal Duty Hours
2.3.3 After Hours, Weekends, and Holidays
2.3.4 Federal Holidays
2.3.5 Staffing Flexibility and Coverage
2.4 WORK ORDER RECEPTION AND MANAGEMENT
2.4.1 Single Point of Contact
2.4.2 Work Request Review and Analysis
2.4.3 Work Request Sources
2.4.4 Work Order Documentation
2.5 SCOPE LIMITATIONS AND EXCLUSIONS
2.5.1 Work Not Included
2.5.2 Government Responsibilities
2.6 CHANGES TO SCOPE
2.6.1 Scope Modifications
2.6.2 Changed Conditions
2.6.3 Additional Services
Contract/Order No.: [Insert] • Appendix D PRS • Page 4
SECTION 3 - APPLICABLE LAWS/STANDARDS & OPERATING CONSTRAINTS
3.0 OVERVIEW
3.1 FEDERAL LAWS AND REGULATIONS
3.1.1 Occupational Safety and Health Act (OSHA)
3.1.2 Environmental Protection Agency (EPA) Regulations
3.1.3 Americans with Disabilities Act (ADA)
3.1.4 Animal Welfare Act
3.2 NATIONAL CODES AND STANDARDS
3.2.1 National Electrical Code (NEC)
3.2.2 National Fire Protection Association (NFPA) Standards
3.2.3 American Society of Mechanical Engineers (ASME) Standards
3.2.4 American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Standards
3.2.5 American Society for Testing and Materials (ASTM) Standards
3.2.6 International Building Code (IBC)
3.2.7 International Mechanical Code (IMC)
3.2.8 International Plumbing Code (IPC)
3.3 STATE AND LOCAL REQUIREMENTS
3.3.1 Maryland State Requirements
3.3.2 Prince George’s County Requirements
3.3.3 Permits and Licenses
3.3.4 Inspections
3.4 MANUFACTURER REQUIREMENTS
3.4.1 Manufacturer Instructions
3.4.2 Warranty Preservation
3.4.3 Factory-Authorized Service
3.5 OPERATING CONSTRAINTS
3.5.1 Research Operations
3.5.2 Animal Care Facilities
3.5.3 Good Laboratory Practices
3.5.4 Security Requirements
3.6 ORDER OF PRECEDENCE FOR CONFLICTING REQUIREMENTS
3.6.1 Hierarchy of Requirements
3.6.2 Most Stringent Requirement
Contract/Order No.: [Insert] • Appendix D PRS • Page 5
3.6.3 Conflict Resolution
3.7 CHANGES TO APPLICABLE REQUIREMENTS
3.7.1 Monitoring Changes
3.7.2 Notification of Changes
3.7.3 Implementation of Changes
SECTION 4 - GOVERNMENT-FURNISHED RESOURCES
4.0 OVERVIEW
4.1 GOVERNMENT FURNISHED PROPERTY (GFP)
4.1.1 Definition and Scope
4.1.2 Tools and Test Equipment
4.1.3 Office Equipment and Furniture
4.1.4 Computers and Information Technology Equipment
4.1.5 Safety Equipment
4.1.6 Vehicles
4.1.7 Property Accountability
4.2 GOVERNMENT FURNISHED EQUIPMENT (GFE)
4.2.1 Definition and Scope
4.2.2 Equipment Categories
4.2.3 Equipment List
4.2.4 Equipment Additions and Deletions
4.2.5 Contractor Maintenance Responsibility
4.2.6 Equipment Manuals and Documentation
4.3 GOVERNMENT FURNISHED FACILITIES (GFF)
4.3.1 Definition and Scope
4.3.2 Buildings and Structures
4.3.3 Site Infrastructure
4.3.4 Contractor Work Space
4.4 GOVERNMENT FURNISHED SERVICES (GFS)
4.4.1 Definition and Scope
4.4.2 Utilities
4.4.3 Information Technology Support
4.4.4 Badging and Access Control
4.4.5 Waste Disposal Services
4.5 LIMITATIONS AND CONTRACTOR RESPONSIBILITIES
Contract/Order No.: [Insert] • Appendix D PRS • Page 6
4.5.1 Government Liability Limitations
4.5.2 Service Interruptions
4.5.3 Proper Use Requirements
4.5.4 Security and Protection
4.5.5 Return at Contract End
SECTION 5 - CONTRACTOR-FURNISHED ITEMS & STAFFING
5.0 OVERVIEW
5.1 CONTRACTOR-FURNISHED MATERIALS AND SUPPLIES
5.1.1 General Requirements
5.1.2 Material Quality Standards
5.1.3 Spare Parts Inventory
5.1.4 Hazardous Materials
5.1.5 Refrigerants
5.1.6 Water Treatment Chemicals
5.2 CONTRACTOR-FURNISHED TOOLS AND EQUIPMENT
5.2.1 General Tools
5.2.2 Specialized Equipment
5.2.3 Test and Measurement Equipment
5.2.4 Safety Equipment
5.2.5 Vehicles
5.2.6 Communication Equipment
5.3 KEY PERSONNEL
5.3.1 Definition and Requirements
5.3.2 Project Manager
5.3.3 Alternate Project Manager
5.3.4 Safety Manager
5.3.5 Quality Control Manager
5.3.6 Key Personnel Changes
5.4 STAFFING REQUIREMENTS
5.4.1 General Staffing Requirements
5.4.2 Required Positions and Coverage
5.4.3 Qualifications and Certifications
5.4.4 Staffing Summary Table
5.5 PERSONNEL REQUIREMENTS
Contract/Order No.: [Insert] • Appendix D PRS • Page 7
5.5.1 Background Checks and Badging
5.5.2 Conduct and Performance Standards
5.5.3 Subcontractor Personnel
5.6 CONTINUITY OF OPERATIONS
5.6.1 Coverage During Absences
5.6.2 Succession Planning
5.6.3 Knowledge Transfer
SECTION 6 - MANAGEMENT & WORK CONTROL
6.0 OVERVIEW
6.1 MANAGEMENT STRUCTURE
6.1.1 Contractor Organization
6.1.2 Management Responsibilities
6.1.3 Government Interface
6.2 WORK CONTROL SYSTEM
6.2.1 System Requirements
6.2.2 Work Order Types
6.2.3 Work Order Processing
6.2.4 Work Order Documentation
6.2.5 Equipment History
6.3 SCHEDULING AND COORDINATION
6.3.1 Master Schedule
6.3.2 Preventive Maintenance Scheduling
6.3.3 Outage Coordination
6.3.4 Access Coordination
6.4 EMERGENCY RESPONSE
6.4.1 Emergency Response Plan
6.4.2 Emergency Notification
6.4.3 Emergency Response Requirements
6.4.4 After-Hours Response
6.5 MEETINGS AND COMMUNICATION
6.5.1 Progress Meetings
6.5.2 Coordination Meetings
6.5.3 Safety Meetings
6.5.4 Daily Communication
Contract/Order No.: [Insert] • Appendix D PRS • Page 8
6.6 SUBCONTRACTOR MANAGEMENT
6.6.1 Subcontractor Use
6.6.2 Subcontractor Approval
6.6.3 Subcontractor Supervision
6.6.4 Subcontractor Coordination
6.7 CHANGE MANAGEMENT
6.7.1 Contract Changes
6.7.2 Change Requests
6.7.3 Out-of-Scope Work
SECTION 7 - PROGRAMS & PLANS
7.0 OVERVIEW
7.1 TRANSITION PLAN
7.1.1 Purpose and Scope
7.1.2 Transition Plan Contents
7.1.3 Transition Activities
7.1.4 Assumption of Full Responsibility
7.2 PREVENTIVE MAINTENANCE PROGRAM
7.2.1 Program Objectives
7.2.2 PM Program Plan
7.2.3 PM Scheduling and Execution
7.2.4 PM Compliance
7.3 TRAINING PROGRAM
7.3.1 Training Requirements
7.3.2 Training Program Plan
7.3.3 New Employee Orientation
7.3.4 Job-Specific Training
7.3.5 Safety Training
7.3.6 Certification and License Maintenance
7.4 SAFETY PROGRAM
7.4.1 Safety Program Requirements
7.4.2 Safety Program Plan
7.4.3 Safety Program Implementation
7.5 QUALITY CONTROL PROGRAM
7.5.1 Quality Control Requirements
Contract/Order No.: [Insert] • Appendix D PRS • Page 9
7.5.2 Quality Control Plan
7.5.3 Quality Control Implementation
7.6 ENVIRONMENTAL MANAGEMENT PROGRAM
7.6.1 Environmental Compliance Requirements
7.6.2 Environmental Management Plan
7.6.3 Waste Management
7.6.4 Spill Prevention and Response
7.7 ENERGY MANAGEMENT PROGRAM
7.7.1 Energy Management Objectives
7.7.2 Energy Management Activities
7.7.3 Energy Reporting
7.8 WATER MANAGEMENT PROGRAM
7.8.1 Water Management Requirements
7.8.2 Water Management Plan
7.8.3 Water System Monitoring
7.9 EMERGENCY PREPAREDNESS PROGRAM
7.9.1 Emergency Preparedness Requirements
7.9.2 Emergency Response Plan
7.9.3 Business Continuity
7.10 RECORDS MANAGEMENT PROGRAM
7.10.1 Records Management Requirements
7.10.2 Record Retention
7.10.3 Records Access
7.10.4 Records Turnover
7.11 CONTINUOUS IMPROVEMENT PROGRAM
7.11.1 Continuous Improvement Philosophy
7.11.2 Improvement Identification
7.11.3 Improvement Implementation
SECTION 8 - TECHNICAL REQUIREMENTS BY SYSTEM/DISCIPLINE
8.0 OVERVIEW
8.1 ARCHITECTURAL AND STRUCTURAL SYSTEMS
8.1.1 General Requirements
8.1.2 Roofing Systems
8.1.3 Exterior Walls and Building Envelope
Contract/Order No.: [Insert] • Appendix D PRS • Page 10
8.1.4 Doors and Hardware
8.1.5 Windows
8.1.6 Interior Finishes
8.1.7 Painting
8.2 HEATING, VENTILATION, AIR CONDITIONING AND REFRIGERATION
(HVACR)
8.2.1 General Requirements
8.2.2 Environmental Control Standards
8.2.3 Air Handling Units and Distribution Systems
8.2.4 Exhaust Systems
8.2.5 Terminal Units and Local Equipment
8.2.6 Refrigeration Equipment
8.2.7 Controls and Instrumentation
8.2.8 Testing, Adjusting, and Balancing
8.2.9 Lubrication
8.2.10 Compressors
8.3 BOILER PLANT OPERATIONS AND MAINTENANCE
8.3.1 General Requirements
8.3.2 Operational Requirements
8.3.3 Water Treatment
8.3.4 Daily Maintenance Requirements
8.3.5 Periodic Maintenance
8.3.6 Annual Boiler Inspections
8.3.7 Steam Distribution Systems
8.4 CHILLER PLANT AND COOLING SYSTEMS
8.4.1 General Requirements
8.4.2 Chiller Operations
8.4.3 Chiller Maintenance
8.4.4 Cooling Towers and Condensers
8.4.5 Chilled Water Distribution
8.4.6 Condenser Water Systems
8.5 ELECTRICAL SYSTEMS
8.5.1 General Requirements
8.5.2 Electrical Distribution Equipment
Contract/Order No.: [Insert] • Appendix D PRS • Page 11
8.5.3 Lighting Systems
8.5.4 Emergency Lighting and Exit Signs
8.6 EMERGENCY POWER SYSTEMS
8.6.1 General Requirements
8.6.2 Emergency Generator Maintenance
8.6.3 Transfer Switch Maintenance
8.6.4 UPS Systems
8.7 PLUMBING SYSTEMS
8.7.1 General Requirements
8.7.2 Domestic Water Systems
8.7.3 Sanitary Sewer Systems
8.7.4 Specialized Water Systems
8.7.5 Wastewater Pretreatment
8.8 FIRE PROTECTION SYSTEMS
8.8.1 General Requirements
8.8.2 Fire Sprinkler Systems
8.8.3 Fire Alarm Systems
8.8.4 Fire Extinguishers
8.8.5 Special Suppression Systems
8.9 BUILDING AUTOMATION AND CONTROL SYSTEMS
8.9.1 General Requirements
8.9.2 BAS Monitoring and Operation
8.9.3 BAS Maintenance
8.9.4 Controls Programming
8.10 ELEVATOR SYSTEMS
8.10.1 General Requirements
8.10.2 Elevator Maintenance
8.10.3 Elevator Testing
8.10.4 Emergency Service
8.11 LABORATORY SUPPORT SYSTEMS
8.11.1 Laboratory Gas Systems
8.11.2 Laboratory Vacuum Systems
8.11.3 Biological Safety Cabinets
8.11.4 Vivarium Equipment
Contract/Order No.: [Insert] • Appendix D PRS • Page 12
8.12 SITE INFRASTRUCTURE
8.12.1 Grounds and Exterior
8.12.2 Exterior Lighting
8.12.3 Site Utilities
SECTION 9 - ITP MATRIX (INSPECTION, TESTING, AND PREVENTIVE
MAINTENANCE)
9.0 OVERVIEW
9.1 ITP MATRIX ORGANIZATION
9.1.1 Matrix Structure
9.1.2 Frequency Definitions
9.1.3 Task Scheduling
9.1.4 Task Documentation
9.2 ITP MATRIX BY SYSTEM
9.2.1 ARCHITECTURAL AND STRUCTURAL SYSTEMS
Roofing Systems
Building Envelope
Doors and Hardware
9.2.2 HVACR SYSTEMS
Air Handling Units
Exhaust Systems
Terminal Units
Refrigeration Equipment
9.2.3 BOILER SYSTEMS
Boiler Operations
Steam Distribution
9.2.4 CHILLER AND COOLING SYSTEMS
Chillers
Cooling Towers
Pumps (Chilled Water and Condenser Water)
9.2.5 ELECTRICAL SYSTEMS
Electrical Distribution
Lighting Systems
9.2.6 EMERGENCY POWER SYSTEMS
Emergency Generators
Contract/Order No.: [Insert] • Appendix D PRS • Page 13
UPS Systems
9.2.7 PLUMBING SYSTEMS
Domestic Water Systems
Sanitary and Storm Systems
Specialized Water Systems
9.2.8 FIRE PROTECTION SYSTEMS
Fire Sprinkler Systems
Fire Alarm Systems
Fire Extinguishers
9.2.9 BUILDING AUTOMATION SYSTEMS
9.2.10 ELEVATOR SYSTEMS
9.2.11 LABORATORY SUPPORT SYSTEMS
Laboratory Gases
Laboratory Vacuum
Biological Safety Cabinets
9.3 SCHEDULE MANAGEMENT AND COMPLIANCE
9.3.1 PM Schedule Development
9.3.2 PM Schedule Balancing
9.3.3 PM Completion Tracking
9.3.4 PM Schedule Adjustments
9.4 EQUIPMENT ADDITIONS AND DELETIONS
9.4.1 New Equipment
9.4.2 Equipment Removal
9.4.3 ITP Matrix Updates
SECTION 10 - SAFETY, HEALTH, AND ENVIRONMENTAL REQUIREMENTS
10.0 OVERVIEW
10.1 SAFETY PROGRAM REQUIREMENTS
10.1.1 Written Safety Program
10.1.2 Safety Responsibility
10.1.3 Safety Meetings
10.1.4 Safety Performance Monitoring
10.2 OSHA COMPLIANCE
10.2.1 General OSHA Requirements
10.2.2 Hazard Communication (OSHA 1910.1200)
Contract/Order No.: [Insert] • Appendix D PRS • Page 14
10.2.3 Lockout/Tagout (OSHA 1910.147)
10.2.4 Personal Protective Equipment (OSHA 1910 Subpart I)
10.2.5 Confined Space Entry (OSHA 1910.146)
10.2.6 Fall Protection (OSHA 1910.28 and 1926 Subpart M)
10.2.7 Respiratory Protection (OSHA 1910.134)
10.2.8 Electrical Safety (OSHA 1910 Subpart S and NFPA 70E)
10.2.9 Ladder Safety
10.2.10 Machine Guarding
10.3 ACCIDENT AND INCIDENT RESPONSE
10.3.1 Accident Notification
10.3.2 Accident Investigation
10.3.3 Emergency Medical Response
10.3.4 Corrective Actions
10.4 SPECIFIC HAZARD CONTROLS
10.4.1 Asbestos
10.4.2 Lead Paint
10.4.3 Biological Hazards
10.4.4 Chemical Hazards
10.4.5 Hot Work
10.4.6 Overhead Work and Falling Objects
10.5 SAFETY TRAINING REQUIREMENTS
10.5.1 General Safety Training
10.5.2 Task-Specific Training
10.5.3 Refresher Training
10.5.4 Training Documentation
10.6 ENVIRONMENTAL REQUIREMENTS
10.6.1 Environmental Compliance
10.6.2 Pollution Prevention
10.6.3 Waste Management
10.6.4 Spill Prevention and Response
10.6.5 Air Quality Protection
10.6.6 Water Quality Protection
10.6.7 Noise Control
Contract/Order No.: [Insert] • Appendix D PRS • Page 15
10.7 COORDINATION WITH GOVERNMENT SAFETY AND ENVIRONMENTAL
PERSONNEL
10.7.1 Government Safety Personnel
10.7.2 Government Environmental Personnel
10.7.3 Facility Emergency Response
SECTION 11 - PERFORMANCE MANAGEMENT
11.0 OVERVIEW
11.1 PERFORMANCE REQUIREMENTS SUMMARY (PRS)
11.1.1 PRS Organization
11.1.2 Performance Objectives
11.1.3 Acceptable Quality Levels
11.2 RESPONSE TIME REQUIREMENTS
11.2.1 Emergency Response
11.2.2 Urgent Service Calls
11.2.3 Routine Service Calls
11.2.4 Preventive Maintenance Completion
11.2.5 Callback Response
11.3 PERFORMANCE MONITORING AND SURVEILLANCE
11.3.1 Surveillance Methods
11.3.2 Performance Metrics
11.3.3 Performance Trending
11.4 QUALITY ASSURANCE
11.4.1 Contractor Quality Control
11.4.2 Government Quality Assurance
11.4.3 Deficiency Correction
11.4.4 Acceptance of Work
11.5 PERFORMANCE ISSUES AND REMEDIES
11.5.1 Performance Deficiencies
11.5.2 Corrective Action Plans
11.5.3 Performance Improvement Plans
11.5.4 Remedies
11.6 PERFORMANCE EXCELLENCE
11.6.1 Recognition of Excellence
11.6.2 Continuous Improvement
Contract/Order No.: [Insert] • Appendix D PRS • Page 16
11.6.3 Innovation
11.7 PERFORMANCE EVALUATION
11.7.1 Ongoing Performance Assessment
11.7.2 Formal Performance Evaluations
11.7.3 Contractor Input
11.8 PERFORMANCE REPORTING
11.8.1 Monthly Performance Reports
11.8.2 Performance Reviews
11.8.3 Annual Performance Summary
SECTION 12 - DELIVERABLES AND REPORTING
12.0 OVERVIEW
12.1 DELIVERABLE SUMMARY TABLE
12.2 INITIAL DELIVERABLES
12.2.1 Transition Plan
12.2.2 Organizational Chart
12.2.3 Subcontractor List
12.2.4 Preventive Maintenance Program Plan
12.2.5 Training Program Plan
12.2.6 Safety Program Plan
12.2.7 Quality Control Plan
12.2.8 Environmental Management Plan
12.2.9 Emergency Response Plan
12.2.10 Water Management Plan
12.3 MONTHLY REPORTS
12.3.1 Monthly Performance Report
12.3.2 Monthly Energy Report
12.3.3 Work Order Status Report
12.3.4 Safety Report
12.4 PERIODIC REPORTS
12.4.1 Quarterly Equipment Inventory Updates
12.4.2 Annual Property Inventory Report
12.4.3 Annual Performance Summary
12.5 EVENT-DRIVEN REPORTS
12.5.1 Emergency Notifications
Contract/Order No.: [Insert] • Appendix D PRS • Page 17
12.5.2 Accident and Incident Reports
12.5.3 Spill Reports
12.5.4 Out-of-Spec Conditions
12.6 REPORT FORMAT AND SUBMISSION
12.6.1 Format Requirements
12.6.2 Electronic Submission
12.6.3 Data Format
12.6.4 Timeliness
12.7 RECORD RETENTION AND AVAILABILITY
12.7.1 Retention Requirements
12.7.2 Government Access
12.7.3 Contract Closeout
SECTION 13 - QUALITY CONTROL AND RECORDKEEPING
13.0 OVERVIEW
13.1 QUALITY CONTROL PROGRAM
13.1.1 Quality Control Organization
13.1.2 Quality Control Inspection Plan
13.1.3 Three-Phase Inspection Process
13.2 INSPECTION REQUIREMENTS BY WORK TYPE
13.2.1 Preventive Maintenance Inspections
13.2.2 Corrective Maintenance Inspections
13.2.3 Critical System Inspections
13.2.4 New Installation Inspections
13.3 DEFICIENCY MANAGEMENT
13.3.1 Deficiency Identification
13.3.2 Deficiency Tracking
13.3.3 Deficiency Correction
13.3.4 Deficiency Trending
13.4 WORK ORDER DOCUMENTATION
13.4.1 Work Order Completion Requirements
13.4.2 Required Work Order Information
13.4.3 Photographs and Attachments
13.4.4 Work Order Quality Review
13.5 EQUIPMENT HISTORY RECORDS
Contract/Order No.: [Insert] • Appendix D PRS • Page 18
13.5.1 Equipment History Purpose
13.5.2 Equipment History Contents
13.5.3 Equipment History Maintenance
13.5.4 Equipment History Analysis
13.6 RECORD TYPES AND REQUIREMENTS
13.6.1 Maintenance Records
13.6.2 Safety Records
13.6.3 Environmental Records
13.6.4 Training Records
13.6.5 Quality Control Records
13.6.6 Property Records
13.6.7 Administrative Records
13.7 RECORDKEEPING SYSTEM
13.7.1 Electronic Records
13.7.2 Hard Copy Records
13.7.3 Record Organization
13.7.4 Record Protection
13.8 GOVERNMENT ACCESS TO RECORDS
13.8.1 Right of Access
13.8.2 Record Copies
13.8.3 On-Site Review
13.9 AUDITS AND INSPECTIONS
13.9.1 Internal Audits
13.9.2 Government Audits
13.9.3 Regulatory Inspections
APPENDIX A - DEFINITIONS & ACRONYMS
APPENDIX B – EQUIPMENT LISTING
See IDIQ PWS Attachment B
APPENDIX C - FACILITY DRAWINGS AND MAPS
APPENDIX D - REQUIRED STAFFING TABLE
APPENDIX E - STANDARDS AND CODES REGISTER
APPENDIX F - PERFORMANCE REQUIREMENTS SUMMARY (PRS)
Contract/Order No.: [Insert] • Appendix D PRS • Page 19
SECTION 1 - EXECUTIVE SUMMARY & PROJECT IDENTIFICATION
1.0 INTRODUCTION
This Statement of Work (SOW) establishes the requirements for comprehensive operations and maintenance (O&M) support services at the U.S. Food and Drug Administration’s (FDA) Muirkirk Road Complex (MRC) located in Laurel, Maryland.
The contractor shall provide all necessary labor, materials, equipment, and management to ensure the continuous, safe, and efficient operation of all buildings and facilities on a 24 hours per day, 7 days per week basis throughout the period of performance.
The contract title is Standard Work Orders Operations & Support Services, Muirkirk Road Complex (MRC). The FDA Project Number will be assigned by the issuing office, which is the U.S. Food and Drug Administration (FDA) Office of Facilities Engineering and Property Management.
Definitions of key terms and acronyms used in this SOW are provided in Appendix A.
1.1 BACKGROUND
1.1.1 Site Overview
The FDA Muirkirk Road Complex (MRC) is a 198-acre FDA-owned site located in Laurel, Maryland between U.S. Route 1 and the Baltimore Washington Parkway (I- 295). The complex consists of 432,000 square feet of research laboratory space supporting mission-critical research for the U.S. Food and Drug Administration and its program research offices. The site comprises 195 acres of land with three principal facilities located at 8301, 8401, and 8501 Muirkirk Road.
1.1.2 Module I (Mod I)
1.1.2.1 Facility Characteristics
Module I is located at 8301 Muirkirk Road, Laurel, Maryland 20708. The facility was constructed in 1984 and dedicated in August 1990, consisting of 246,853 gross square feet. Module I houses research programs for the Human Foods Program (HFP) and Office of Inspections and Investigations (OII).
1.1.2.2 Research Mission
Research conducted at Module I is designed to provide credible scientific information upon which informed decisions can be based. These facilities permit the Agency to improve its science base and prepare for the challenges of the 21st century. Animal studies are conducted according to contemporary scientific standards and in accordance with the Animal Welfare Act and the Guide for the Care and Use of Laboratory Animals, with the flexibility to keep pace with technological developments.
Contract/Order No.: [Insert] • Appendix D PRS • Page 20
1.1.2.3 Research Areas
Research is directed to assess significant health questions in areas that include pharmaceuticals, drug interaction, toxicology, drug chemistry, and food nutrition.
The facility is accredited by the American Association for the Accreditation of Laboratory Animal Care (AAALAC).
1.1.3 Module II (Mod II)
1.1.3.1 Facility Characteristics
Module II is located at 8401 Muirkirk Road, Laurel, Maryland 20708. The facility consists of 18 buildings totaling approximately 100,406 gross square feet and is designed with the most modern equipment available to facilitate the research mission. Module II houses the Center for Veterinary Medicine (CVM).
1.1.3.2 Mission and Responsibilities
CVM is responsible for assuring the safety and efficiency of food, drugs, and food additives that will be given to animals. These include animals from which human foods are derived, as well as companion animals. This component of the regulatory testing group performs bioassays using animals. CVM is presently AAALAC accredited.
1.1.4 Beltsville Research Facility (BRF)
1.1.4.1 Facility Characteristics
The Beltsville Research Facility is located at 8501 Muirkirk Road, Laurel, Maryland 20708. Operational since 1964, the facility consists of 35,061 gross square feet. The facility houses research programs for CVM.
1.1.4.2 Facility Components
The BRF includes the main research building which was renovated in 2014, a mechanical equipment building, a small block storage building, a maintenance building, three Hazmat containment units used for processing hazardous waste, one machine shop/fitness center building, and one steel storage building.
1.1.4.3 Special Considerations
Certain systems at the Beltsville Research Facility (BRF), including abandoned piping and heating distribution systems, contain asbestos. The Contractor shall immediately notify the COR upon discovery of any friable suspect material. The COR and CO may direct asbestos abatement through a work order.
Contract/Order No.: [Insert] • Appendix D PRS • Page 21
1.2 CONTRACT OBJECTIVE
1.2.1 Primary Objective
The objective of this contract is to ensure the continuous, safe, and efficient operation of all buildings and facilities located at the U.S. Food and Drug Administration’s Muirkirk Road Complex (MRC). The Contractor shall provide comprehensive operations and maintenance (O&M) support services on a 24 hours per day, 7 days per week basis to maintain optimal facility performance and readiness throughout the period of performance.
1.2.2 Facility Performance Requirements
The Contractor shall maintain optimal facility performance throughout the period of performance, ensure facility readiness to support mission-critical research, and maintain all systems in safe and operational condition.
1.2.3 Research Mission Support
The Contractor shall support ongoing laboratory research activities, maintain environmental conditions required for animal care and use, ensure compliance with good laboratory practices, and maintain AAALAC accreditation standards.
1.2.4 Safety and Compliance
The Contractor shall maintain compliance with all applicable codes and regulations, ensure safe working conditions for government and contractor personnel, maintain life safety systems in operational readiness, and protect the environment and prevent pollution.
1.3 SCOPE SUMMARY
1.3.1 Operations and Monitoring Services
The Contractor shall provide 24/7 operation and monitoring of building automation systems, boiler plant operations and monitoring, chiller plant operations and monitoring, emergency generator operations and testing, utilities monitoring and energy management, water treatment operations, and wastewater pretreatment operations.
1.3.2 Preventive Maintenance Services
The Contractor shall provide a comprehensive preventive maintenance (PM) program for all equipment, building and structures preventive maintenance, mechanical systems preventive maintenance, electrical systems preventive maintenance, specialized systems preventive maintenance, and PM documentation and recordkeeping.
Contract/Order No.: [Insert] • Appendix D PRS • Page 22
1.3.3 Reactive Maintenance Services
The Contractor shall provide service calls and work order response, emergency repairs and callbacks, routine repairs and maintenance, and equipment troubleshooting and repair.
1.3.4 Technical Services by Discipline
The Contractor shall provide architectural and structural maintenance, site and exterior maintenance, mechanical systems including HVAC, steam, boilers, chillers, and compressed air, electrical systems including distribution, emergency power, and lighting, building automation and control systems, fire protection and life safety systems, vertical transportation including elevators, and plumbing and water systems.
1.3.5 Specialized Support Services
The Contractor shall provide laboratory support equipment maintenance, animal facility environmental controls, laboratory gas systems, specialized water systems including reverse osmosis, de-ionized, and distilled water systems, and wastewater pretreatment operations.
1.3.6 Service Delivery Coverage
The Contractor shall provide 24 hours per day, 7 days per week service coverage, holiday and weekend coverage as required, and emergency callback capability.
1.3.7 Contractor-Furnished Resources
The Contractor shall provide all labor including skilled trades, technicians, operators, and management staff, all materials and supplies, all tools and equipment, all vehicles and transportation, all permits and licenses, all certifications and training, and all supervision and management necessary to perform the services required by this SOW.
1.3.8 Compliance Requirements
All work shall comply with local, county, state, and federal codes and regulations, ASTM standards, OSHA requirements, National Electrical Code (NEC), ASME standards, manufacturer recommendations, and industry best practices. In the event of conflicting requirements, the more stringent code or standard shall apply.
1.4 PERIOD OF PERFORMANCE
1.4.1 Contract Periods
The period of performance consists of a Transition Period from date of award through sixty (60) days, a Base Period after the transition period of sixty (60) days continuing for ten (10) months thereafter, Option Period 1 from Month 13 through
Contract/Order No.: [Insert] • Appendix D PRS • Page 23
Month 24, Option Period 2 from Month 25 through Month 36, Option Period 3 from Month 37 through Month 48, and Option Period 4 from Month 49 through Month 60.
1.4.2 Transition Period Requirements
During the sixty (60) day transition period, the Contractor shall mobilize personnel and resources, complete required training and badging, conduct facility and equipment walkdowns with incumbent contractor if applicable, develop and submit required plans and procedures, establish work management systems and processes, and assume full operational responsibility by day 60. Detailed transition requirements are specified in Section 7 (Programs & Plans).
1.5 SITE INFORMATION AND ACCESS
1.5.1 Site Location
The primary address is FDA Muirkirk Road Complex, 8301-8501 Muirkirk Road, Laurel, Maryland 20708. The site is located between U.S. Route 1 and the Baltimore Washington Parkway (I-295), approximately 15 miles northeast of Washington, DC and approximately 20 miles south of Baltimore, MD.
1.5.2 Pre-Proposal Site Visit
A pre-proposal site visit will be scheduled for all potential offerors. Details regarding date, time, and registration requirements will be provided in the solicitation. Offerors are strongly encouraged to attend the site visit to familiarize themselves with the facility layout and conditions, observe existing equipment and systems, understand access requirements and restrictions, and ask questions about the facility and requirements.
1.5.3 Contractor Site Familiarization Requirement
The Contractor acknowledges that they have visited the site or have had the opportunity to visit the site and are aware of all aspects of the existing conditions, needs, and requirements stated in this SOW. The Contractor shall be responsible for determining all requirements including materials, tools, and equipment needs, supply requirements, regulatory compliance requirements, required certifications and licenses, vehicle and transportation needs, workforce requirements including engineers, technicians, tradesmen, and support personnel, subcontractor needs, and management staff requirements.
1.5.4 Security and Access Requirements
1.5.4.1 Badging Requirements
All contractor personnel require FDA-issued identification badges for facility access.
Badge requirements and processes are detailed in Section 5 (Contractor-Furnished Items & Staffing).
Contract/Order No.: [Insert] • Appendix D PRS • Page 24
1.5.4.2 Restricted Areas
Certain areas of the facility have restricted access due to ongoing research activities, animal care facilities subject to AAALAC requirements, secure storage areas, and sensitive research equipment. The Contractor shall coordinate with the COR and Center Managers before accessing restricted areas.
Contract/Order No.: [Insert] • Appendix D PRS • Page 25
SECTION 2 - SCOPE & PLACE/HOURS OF PERFORMANCE
2.0 OVERVIEW
This section defines the complete scope of work, place of performance, hours of operation, and coverage requirements for operations and maintenance services at the Muirkirk Road Complex. The Contractor shall provide all necessary materials, labor, permits, hauling, equipment, shipping, delivery, and supervision for protecting existing equipment and all other Government property.
2.1 SCOPE OF WORK
2.1.1 General Requirements
The Contractor shall provide comprehensive operations and maintenance support services to ensure the continuous, safe, and efficient operation of all buildings and facilities at the MRC. The scope encompasses all systems, equipment, and infrastructure necessary to support the mission-critical research activities conducted at the facility.
2.1.2 Standards and Code Compliance
The Contractor shall be certified and ensure all work adheres to local, county, ASTM, OSHA, NEC, ASME, and other applicable codes and specifications as listed and identified in Section 3 (Applicable Laws/Standards & Operating Constraints) or the overall contract Statement of Work. In the event a conflict arises over workmanship, the more stringent code shall be adhered to.
2.1.3 Site Familiarity Requirement
The Contractor has visited the site and is aware of all aspects of the existing conditions, needs, and requirements stated in this SOW. The Contractor shall be responsible for all requirements in the SOW to determine materials, tools, equipment, supplies, regulatory compliance, certifications, licenses, vehicles, and a fully trained workforce of engineers, technicians, tradesmen, support personnel, subcontractors, and management staff to ensure continuous and satisfactory operational performance on a 24 hours per day, 7 days per week basis.
2.1.4 Standard Work Orders and Day-to-Day Operations
The Contractor shall deliver the full range of operational and maintenance services throughout the period of performance. The scope of work identifies key day-to-day operations that are standard orders to the contract in Operations and Maintenance support services. This includes preventive maintenance, operations, and support services that will be standard to the contract with detailed requirements per section as specified in Section 8 (Technical Requirements by System/Discipline).
Contract/Order No.: [Insert] • Appendix D PRS • Page 26
2.2 PLACE OF PERFORMANCE
2.2.1 Primary Location
All work under this contract shall be performed at the FDA Muirkirk Road Complex located at 8301-8501 Muirkirk Road, Laurel, Maryland 20708. The place of performance includes all buildings, structures, grounds, and infrastructure within the 198-acre site boundaries.
2.2.2 Facility Components
The place of performance encompasses the following facilities as described in Section 1.1 (Background):
2.2.2.1 Module I
8301 Muirkirk Road, Laurel, MD 20708. Total area of 246,853 gross square feet housing Human Foods Program and Office of Inspections and Investigations research programs.
2.2.2.2 Module II
8401 Muirkirk Road, Laurel, MD 20708. Consisting of 18 buildings totaling approximately 100,406 gross square feet housing the Center for Veterinary Medicine.
2.2.2.3 Beltsville Research Facility
8501 Muirkirk Road, Laurel, MD 20708. Total area of 35,061 gross square feet housing Center for Veterinary Medicine research programs.
2.2.3 Site Infrastructure
The place of performance includes all site infrastructure supporting the three facilities including but not limited to central utility plants, distribution systems for steam, chilled water, compressed air, natural gas, electricity, domestic water, wastewater collection and pretreatment, storm water management systems, roads, parking areas, exterior lighting, perimeter fencing and gates, landscaped areas, and other site improvements.
2.2.4 Off-Site Work
The Contractor may perform certain administrative, procurement, or preparatory work at off-site locations. However, all operational, maintenance, and direct support activities shall be performed at the MRC. The Contractor shall maintain an on-site presence as specified in Section 2.3 (Hours of Operation and Coverage Requirements).
Contract/Order No.: [Insert] • Appendix D PRS • Page 27
2.3 HOURS OF OPERATION AND COVERAGE REQUIREMENTS
2.3.1 Service Coverage
The Contractor shall provide operations and maintenance services on a continuous basis, 24 hours per day, 7 days per week, 365 days per year including Federal holidays. This continuous coverage is essential to support the mission-critical research activities and maintain facility safety and environmental conditions.
2.3.2 Normal Duty Hours
2.3.2.1 Definition
Normal duty hours are defined as Monday through Friday, 6:00 AM to 6:00 PM, excluding Federal holidays. During normal duty hours, the Contractor shall maintain full staffing levels to support preventive maintenance activities, reactive maintenance, routine operations, administrative functions, and coordination with Government personnel.
2.3.2.2 Staffing During Normal Duty Hours
During normal duty hours, the Contractor shall ensure that all positions identified in Section 5 (Contractor-Furnished Items & Staffing) are filled and that personnel are available to respond to service calls, emergency conditions, and routine operational needs. The Contractor’s on-site Project Manager or designee shall be available during all normal duty hours.
2.3.3 After Hours, Weekends, and Holidays
2.3.3.1 Continuous Operations Coverage
The Contractor shall provide continuous staffing for critical building systems that require 24/7 monitoring and operation. This includes but is not limited to boiler plant operations, chiller plant operations, building automation system monitoring, water treatment operations, wastewater pretreatment operations, and emergency response capability.
2.3.3.2 Callback and Emergency Response
The Contractor shall maintain callback capability 24 hours per day, 7 days per week to respond to emergency conditions outside normal duty hours. The Contractor shall provide contact information for emergency response and shall respond to emergency callbacks within the timeframes specified in Section 11 (Performance Management) and detailed in Appendix F (Performance Requirements Summary).
2.3.3.3 Preventive Maintenance Scheduling
Due to ongoing research activities, the Contractor shall be prepared to schedule preventive maintenance and other work outside normal duty hours. The Contractor
Contract/Order No.: [Insert] • Appendix D PRS • Page 28 shall coordinate with the COR and Center Managers to minimize disruption to research operations. No additional overtime compensation will be paid for routine maintenance or continuous utility operations performed outside normal Government business hours.
2.3.4 Federal Holidays
Federal holidays observed by the FDA are not considered normal duty hours.
However, the Contractor shall maintain continuous operations coverage on Federal holidays as specified in Section 2.3.3.1. The Federal holidays are New Year’s Day, Martin Luther King Jr. Day, Presidents’ Day, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. When a holiday falls on a Saturday, it is observed on the preceding Friday. When a holiday falls on a Sunday, it is observed on the following Monday.
2.3.5 Staffing Flexibility and Coverage
2.3.5.1 General Staffing Requirements
The Contractor shall ensure that all positions are fully staffed at all times. To meet this requirement, the Contractor may utilize part-time rovers, cross-trained personnel, or subcontractors to provide coverage during employee absences, extended leave, weekends, and holidays. The use of rovers or part-time staff does not relieve the Contractor of the responsibility to maintain required service levels and response times.
2.3.5.2 Building Automation System Coverage
In addition to general facility operations coverage, the Contractor shall provide a Building Automation System (BAS) operator on site three (3) days per week. The BAS operator must be employed by a company independent of the on-site contractor to ensure objective system monitoring and optimization.
2.3.5.3 Controls Contractor Coverage
The Contractor shall provide a Phoenix-authorized contractor on-site one (1) day every week to perform service calls and programming for the Phoenix control systems. This specialized coverage ensures that proprietary control systems are maintained by factory-authorized technicians.
2.4 WORK ORDER RECEPTION AND MANAGEMENT
2.4.1 Single Point of Contact
The Contractor shall maintain a single point of contact continuously during normal working hours on-site at the facility for reception of all work requests and orders. A Contractor representative shall reside in the Project Manager’s Office during normal hours to receive, process, and otherwise manage all incoming work requests
Contract/Order No.: [Insert] • Appendix D PRS • Page 29 including ones received from the FDA’s Employee Resource & Information Center (ERIC) ERIC Call Center.
2.4.2 Work Request Review and Analysis
The Contractor shall review each work request for completeness, understanding, and clarity. The Contractor shall analyze each work request thoroughly, breaking all tasks down to the simplest elements possible. This analysis shall include identification of required labor skills, materials, tools, estimated duration, and any special requirements or constraints.
2.4.3 Work Request Sources
Service calls shall be placed directly to the Contractor via telephone or email by the COR or Government Center Managers. Miscellaneous Utility Work Orders will be issued to the Contractor by the COR or designated Government Representative.
Emergency work orders may be initiated by any authorized Government personnel and shall be responded to immediately regardless of source.
2.4.4 Work Order Documentation
The Contractor shall document all work orders in accordance with the requirements specified in Section 6 (Management & Work Control) and Section 13 (D
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .