Attachment C2 -Pricing Sheet_MRC OM.xlsx
XLSX spreadsheet 52 KB Posted
- Solicitation number
- FDA-2026-129160-PreSOL
About this file
This file is a detailed Pricing Sheet (Attachment C2) for an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for MRC Operations and Maintenance Support Services at the FDA's Laurel, MD facility. The comprehensive pricing model includes multiple tabs covering labor categories, routine operations and maintenance, snow and ice services, and various supporting documentation. The labor catalog features 25+ distinct labor categories ranging from Project Manager and Quality Control Manager to specialized technicians like Electricians, HVAC Technicians, and Water Treatment Technicians, with each category requiring Service Contract Labor Standards (SCLS) compliance and specific wage determinations.
The pricing structure is complex, involving transition, base, and four option periods, with pricing required for monthly services across program management, utilities operations, preventive maintenance, compliance testing, and specialized environmental support. The document includes detailed instructions for completing the pricing sheet, emphasizing that only yellow cells should be filled, with blue cells as optional and gray cells being calculated. The Total Evaluated Price (TEP) will be calculated by combining IDIQ evaluated labor, routine operations and maintenance costs, snow and ice service costs, and potential non-standard repair expenses. The presolicitation is for informational purposes only, with the final solicitation to be released later on SAM.gov, and no submissions are currently being requested.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE MODEL — INSTRUCTIONS (SCLS-compliant) | |||
| How to complete | Fill only the yellow cells. Blue cells are optional inputs. Gray cells are calculated and locked. Complete tabs in order: Summary, Tab B (Labor Catalog & Rates), Tab C (TO: Routine O&M FFP), Tab D (TO: Snow & Ice), Tab E (Assumptions), Tab F (TO: NSR Transformer), Tab G (Basis of Estimate), EQs/Scenario (locked for Government use). | ||
| SCLS (formerly 'SCA') compliance | Where Service Contract Labor Standards (SCLS) apply, the WD base wage and H&W are MINIMUMS, not caps. You may propose higher wages/benefits. If duties do not match a WD classification, indicate 'Conformance Needed (SF-1444)'. Enter SCLS code/title and rates on Tab B. | ||
| TEP formula | TEP = (Sum over Ordering Periods & Labor Categories of Ceiling Rate × EQ Hours) + TO-Routine FFP + Snow Evaluated Total + NSR (Transformer) FFP. EQ Hours and Snow Scenario are Government-provided and locked. | ||
| Submission checklist | • All tabs complete; • No protected cells altered; • All Ordering Periods priced on Tab B; • Snow unit prices entered on Tab D; • BOE filled on Tab G; • PDF printout of all tabs included. | ||
| Color legend | Yellow = required input | Blue = optional input | Gray = calculated / do not edit | ||
| Legend: | Yellow = required input | Blue = optional input | Gray = calculated / do not edit |
Summary
| SUMMARY & CERTIFICATIONS | |
| Offeror Name (input) | — |
Model: Enter value UEI (input) — Model: Enter value CAGE (input) — Model: Enter value
| Certification | By submitting this workbook, the Offeror certifies that prices are current, accurate, and complete for this submission. | ||
| Status Indicators | |||
| Readiness Status | |||
| TEP (auto) | 0 | ||
| TEP (auto) | |||
| IDIQ Evaluated Labor (auto) | 0 | ||
| IDIQ Evaluated Labor (auto) | |||
| TO-Routine FFP (auto) | 0 | ||
| TO-Routine FFP (auto) | |||
| Snow Evaluated Total (auto) | 0 | ||
| Snow Evaluated Total (auto) | |||
| NSR (Transformer) FFP (auto) | 0 | ||
| NSR (Transformer) FFP (auto) | |||
| Legend: | Yellow = required input | Blue = optional input | Gray = calculated / do not edit |
B_LaborCatalog
| TAB B — LABOR CATALOG & RATES (Ordering Periods) — SCLS mapping included | |||||||||||||||||||||||||
| Internal Labor Category | SCLS Applicable? (Yes/No/Exempt-541/Exempt-Computer) | SCLS Occupation Code | SCLS Occupation Title | WD Number (locked) | WD Revision (locked) | WD Revision Date (locked) | WD Area | SCLS Base Wage ($/hr) | Health & Welfare ($/hr) | Vacation Tier | Holidays (count) | EO Min-Wage Applies? (Yes/No) | EO Floor ($/hr, locked) | Conformance Needed (SF-1444)? | SF-1444 Status | Mapping Notes (duties match) | Base Hourly Rate ($/hr) | Fringe/Indirects ($/hr) | Fully Burdened Rate ($/hr, auto) | Overtime Multiplier | Holiday Multiplier | WD Floor Check ($/hr, auto) | H&W Compliance Flag | Completeness Flag | Conformance Flag |
| Project Manager (Key) |
Model: Select SCLS applicability Model: Enter SCLS Occupation Code from WD Model: Enter SCLS Occupation Title from WD 2015-4281 34 2025-07-08 Model: Select county/area covered by WD
| Model: Enter WD base wage (you may propose higher) | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | |||
| Alternate Project Manager | 2015-4281 | 34 | 2025-07-08 |
Model: Select county/area covered by WD
| Model: Enter H&W rate; must be ≥ WD H&W | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||
| Quality Control Manager (Key) | 2015-4281 | 34 | 2025-07-08 | |||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||
| Safety Manager (Key) | 2015-4281 | 34 | 2025-07-08 | |||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||
| CMMS Planner/Scheduler / Work Control Dispatcher | 2015-4281 | 34 | 2025-07-08 | |||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||
| Chief Engineer / Operations Supervisor | 2015-4281 | 34 | 2025-07-08 | |||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||
| Stationary/Boiler Operator (licensed) | 2015-4281 | 34 | 2025-07-08 | |||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||
| Chiller Plant Operator (seasonal/shift) | 2015-4281 | 34 | 2025-07-08 | |||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||
| BAS Operator | 2015-4281 | 34 | 2025-07-08 | |||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||
| Electrician (Licensed) | 2015-4281 | 34 | 2025-07-08 |
Model: Select county/area covered by WD
| Model: Proposed Base Hourly Rate (may exceed WD) | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | |||
| Plumber (Licensed) | 2015-4281 | 34 | 2025-07-08 |
Model: Select county/area covered by WD
| Model: Fringe/Indirects per hour | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| HVAC Technician (EPA 608) | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| General Maintenance Technician (Multi-trade) | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Controls Technician (incl. Phoenix/Aircuity) | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Water Treatment Technician | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Wastewater Pre-Treatment Operator | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Laboratory Support Technician (hoods/gases/env controls) | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| NETA-Certified Electrical Testing Technician | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| TAB Technician / Balancer | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Fire Alarm / Life Safety Systems Technician | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Snow Supervisor / Dispatcher | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Equipment Operator (plow/loader) | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Truck Driver (CDL, spreader) | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Sidewalk Crew / Laborer | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Mechanic (snow equipment readiness) | 2015-4281 | 34 | 2025-07-08 | |||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| 2015-4281 | 34 | 2025-07-08 | ||||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| 2015-4281 | 34 | 2025-07-08 | ||||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| 2015-4281 | 34 | 2025-07-08 | ||||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| 2015-4281 | 34 | 2025-07-08 | ||||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| 2015-4281 | 34 | 2025-07-08 | ||||||||||||||
| Model: Select county/area covered by WD | 11 | 17.75 | 1.5 | 1 | 17.75 | ⚠ Below $5.55 | ⚠ Missing required SCLS/Rate fields | OK | ||||||||
| Legend: | Yellow = required input | Blue = optional input | Gray = calculated / do not edit |
C_TORoutine
| TAB C — TO: ROUTINE O&M (FFP by Period: Transition, 10-month Base, OP1–OP4) | ||||||||||||||||||
| Helper: | FFP Grand Total (auto) | For monthly items, use Qty = 10 for BASE (10 mo) and Qty = 12 for each Option Period (OP1–OP4). Transition Qty as applicable. | ||||||||||||||||
| Category | 0 | CLIN / Description | Unit | |||||||||||||||
| Model: Choose a standard unit: MO (month), EA (each), LOT, LS (lump sum), HR (hour). | TRANS Qty | |||||||||||||||||
| Model: TRANS Qty: enter count for transition period only (0 if not applicable). | TRANS Unit Price ($) | |||||||||||||||||
| Model: Enter unit price for the specified period. | TRANS Extended ($, auto) | BASE (10 mo) Qty | ||||||||||||||||
| Model: BASE Qty: for monthly items, enter 10 (10-month base). | BASE Unit Price ($) | |||||||||||||||||
| Model: Enter unit price for the specified period. | BASE Extended ($, auto) | OP1 Qty | ||||||||||||||||
| Model: OP1 Qty: for monthly items, enter 12. | OP1 Unit Price ($) | |||||||||||||||||
| Model: Enter unit price for the specified period. | OP1 Extended ($, auto) | OP2 Qty | ||||||||||||||||
| Model: OP2 Qty: for monthly items, enter 12. | OP2 Unit Price ($) | |||||||||||||||||
| Model: Enter unit price for the specified period. | OP2 Extended ($, auto) | OP3 Qty | ||||||||||||||||
| Model: OP3 Qty: for monthly items, enter 12. | OP3 Unit Price ($) | |||||||||||||||||
| Model: Enter unit price for the specified period. | OP3 Extended ($, auto) | OP4 Qty | ||||||||||||||||
| Model: OP4 Qty: for monthly items, enter 12. | OP4 Unit Price ($) | |||||||||||||||||
| Model: Enter unit price for the specified period. | OP4 Extended ($, auto) | Line Total ($, auto) | ||||||||||||||||
| Transition | PWS §Phase-In / Transition | Transition / Phase-In (mobilization, onboarding, coordination) | LS | 1 | 0 | |||||||||||||
| Program Mgmt & Admin | PWS §Program Admin | Project Management (monthly) | MO | 0 | ||||||||||||||
| Program Mgmt & Admin | PWS §Work Control | Work Control / Planner-Dispatcher (monthly) | MO | 0 | ||||||||||||||
| Operations — Utilities Plants | PWS §Boiler Plant | Boiler Plant Operations & Monitoring (monthly) | MO | 0 | ||||||||||||||
| Operations — Utilities Plants | PWS §Chiller Plant | Chiller & Cooling Tower Operations (seasonal/monthly) | MO | 0 | ||||||||||||||
| Operations — Utilities Plants | PWS §Water Plant | Water Plant Operations (monthly) | MO | 0 | ||||||||||||||
| Operations — Electrical/EP | PWS §Emergency Power | Emergency Power Systems Readiness (monthly) | MO | 0 | ||||||||||||||
| Preventive Maintenance | PWS §HVAC PM | HVAC Systems PM Program (monthly) | MO | 0 | ||||||||||||||
| Preventive Maintenance | PWS §Electrical PM | Electrical Distribution PM (monthly) | MO | 0 | ||||||||||||||
| Preventive Maintenance | PWS §Plumbing PM | Plumbing/RO/DI PM (monthly) | MO | 0 | ||||||||||||||
| Preventive Maintenance | PWS §Controls PM | BAS/Controls PM (monthly) | MO | 0 | ||||||||||||||
| Compliance & Testing | PWS §Lab Devices | Lab Safety Devices Certification/Support (per cycle) | EA | 0 | ||||||||||||||
| Compliance & Testing | PWS §Life Safety | Fire/Life Safety Testing & Inspection (per cycle) | EA | 0 | ||||||||||||||
| Special Environments/Processes | PWS §Sewage Pre-Treat | Sewage Pre-Treatment Ops & Sampling (monthly) | MO | 0 | ||||||||||||||
| Special Environments/Processes | PWS §Aquaculture | H-Bldg Aquaculture Checks & Chemistry (monthly) | MO | 0 | ||||||||||||||
| Special Environments/Processes | PWS §BSL-3/Vivarium | BSL-3 & Vivarium Environmental Support (monthly) | MO | 0 | ||||||||||||||
| PM/PdM Program Support | PWS §PM Matrix | PdM to Corrective Workflow (per finding) | EA | 0 | ||||||||||||||
| Reporting & KPIs | PWS §Reporting/KPI | Performance Reporting & KPI Administration (monthly) | MO | 0 | ||||||||||||||
| TO-Routine FFP Totals by Period: | TRANS Total | 0 | BASE (10 mo) Total | 0 | OP1 Total | 0 | OP2 Total | 0 | OP3 Total | 0 | OP4 Total | Grand Total | 0 | |||||
| TO-Routine FFP Totals by Period: | TRANS Total | 0 | BASE (10 mo) Total | 0 | OP1 Total | 0 | OP2 Total | 0 | OP3 Total | 0 | OP4 Total | Grand Total | 0 |
D_Snow
| TAB D — TO: SNOW & ICE (Units × Prices; Scenario S provides EQs) | |||||
| Unit Item (e.g., lane-mile plowed) | |||||
| Model: Describe the unit item (e.g., lane-mile plowed, lot push, sidewalk segment). | 0 | ||||
| Model: Enter the weather band / temperature range (e.g., 0–15°F, 16–25°F, 26–32°F). | Your Unit Price ($) | ||||
| Model: Enter your unit price. Scenario units come from the locked ScenarioS tab. | Scenario Units (auto) | Extended ($, auto) | |||
| ROADS & LOTS — PLOWING (priced per snowfall band) | 0 | ||||
| Lane-mile plowed (roads) | Trace–2" | 0 | |||
| Lane-mile plowed (roads) | >2–6" | 0 | |||
| Lane-mile plowed (roads) | >6–12" | 0 | |||
| Lane-mile plowed (roads) | >12" | 0 | |||
| Subtotal — Roads/Lots Plowing | 0 | 0 | |||
| 0 | |||||
| ROADS & LOTS — PRE-TREATMENT (anti-icing; per lane-mile application) | 0 | ||||
| Pre-treatment brine application (lane-mile) | ≤15°F | 0 | |||
| Pre-treatment brine application (lane-mile) | 16–25°F | 0 | |||
| Pre-treatment brine application (lane-mile) | 26–32°F | 0 | |||
| Subtotal — Roads/Lots Pre-Treatment | 0 | 0 | |||
| 0 | |||||
| ROADS & LOTS — POST-TREATMENT (de-icer; per ton applied) | 0 | ||||
| De-icer application (per ton applied) | ≤15°F | 0 | |||
| De-icer application (per ton applied) | 16–25°F | 0 | |||
| De-icer application (per ton applied) | 26–32°F | 0 | |||
| Subtotal — Roads/Lots Post-Treatment | 0 | 0 | |||
| 0 | |||||
| SIDEWALKS & ENTRIES — CLEARING | 0 | ||||
| Sidewalk segment cleared (per 100 LF) | ≤15°F | 0 | |||
| Sidewalk segment cleared (per 100 LF) | 16–25°F | 0 | |||
| Sidewalk segment cleared (per 100 LF) | 26–32°F | 0 | |||
| Entry/landing cleared (each) | All bands | 0 | |||
| Subtotal — Sidewalks/Entries Clearing | Yellow = required input | Blue = optional input | Gray = calculated / do not edit | 0 | |
| SIDEWALKS & ENTRIES — PRE/POST-TREATMENT | |||||
| Sidewalk pre-treatment (per 100 LF) | ≤15°F | 0 | |||
| Sidewalk pre-treatment (per 100 LF) | 16–25°F | 0 | |||
| Sidewalk pre-treatment (per 100 LF) | 26–32°F | 0 | |||
| Sidewalk de-icer application (per 100 LF) | ≤15°F | 0 | |||
| Sidewalk de-icer application (per 100 LF) | 16–25°F | 0 | |||
| Sidewalk de-icer application (per 100 LF) | 26–32°F | 0 | |||
| Subtotal — Sidewalks/Entries Treatment | 0 | ||||
| SUPPORT / READINESS | |||||
| Mobilization per event (each) | All bands | 0 | |||
| Loader stack/relocate snow (hour) | All bands | 0 | |||
| Hauling & disposal (truckload) | All bands | 0 | |||
| Refreeze treatment within 24 hrs (per application) | All bands | 0 | |||
| Subtotal — Support/Readiness | 0 | ||||
| Snow Evaluated Total: | (auto) | 0 |
E_Assumptions
| TAB E — ASSUMPTIONS (1 page max) |
| Assumptions / Clarifications |
| Enter concise assumptions that do not change requirements. |
Legend: Yellow = required input Blue = optional input Gray = calculated / do not edit
F_NSR
| TAB F — TO: NON-STANDARD REPAIR — Transformer (FFP) | ||||
| CLIN / Description | 0 | Unit | Unit Price ($) | Extended ($, auto) |
| NSR (Transformer) FFP Total: | 0 | ||
| Legend: | Yellow = required input | Blue = optional input | Gray = calculated / do not edit |
G_BOE
| TAB G — BASIS OF ESTIMATE (BOE) & Cross-Volume Consistency |
| Coverage/shift model (tie to Factor 3 Team Structure & Staffing) |
PM scope basis (tie to Factor 4 PM matrix excerpt)
Method-driven durations/assumptions (tie to Factor 4 methods)
Snow scenario interpretation notes (if any)
Major cost drivers / references (drawings counts, sidewalk segments, etc.)
Legend: Yellow = required input Blue = optional input Gray = calculated / do not edit
EQs
| LOCKED — Evaluation Quantities (EQ) for Tab B | ||||
| Internal Labor Category (match Tab B) | Ordering Period | EQ Hours | OT % | Holiday % |
ScenarioS
| LOCKED — Snow Scenario S (units per band/type) | |
| Unit Item / Band | Scenario Units (auto to D_Snow) |
| ITEM1 | 0 |
| ITEM2 | 0 |
| ITEM3 | 0 |
| ITEM4 | 0 |
| ITEM5 | 0 |
| ITEM6 | 0 |
| ITEM7 | 0 |
| ITEM8 | 0 |
| ITEM9 | 0 |
| ITEM10 | 0 |
| ITEM11 | 0 |
| ITEM12 | 0 |
| ITEM13 | 0 |
| ITEM14 | 0 |
| ITEM15 | 0 |
| ITEM16 | 0 |
| ITEM17 | 0 |
| ITEM18 | 0 |
| ITEM19 | 0 |
| ITEM20 | 0 |
TEP
| TEP DASHBOARD (auto) | |||
| IDIQ Evaluated Labor (from Tab B × EQs) | 0 | ||
| NOTE: | Government will populate EQ mapping; this cell will auto-calc. | ||
| TO-Routine FFP (Tab C) | 0 | ||
| Snow Evaluated Total (Tab D) | 0 | ||
| NSR (Transformer) FFP (Tab F) | 0 | ||
| TOTAL EVALUATED PRICE (TEP) | 0 | ||
| Legend: | Yellow = required input | Blue = optional input | Gray = calculated / do not edit |
Lists
| Units | PWS Refs |
| MO | PWS §Program Admin |
| EA | PWS §Work Control |
| LOT | PWS §Boiler Plant |
| LS | PWS §Chiller Plant |
| HR | PWS §Water Plant |
| PWS §Emergency Power | |
| PWS §HVAC PM | |
| PWS §Electrical PM | |
| PWS §Plumbing PM | |
| PWS §Controls PM | |
| PWS §Lab Devices | |
| PWS §Life Safety | |
| PWS §Sewage Pre-Treat | |
| PWS §Aquaculture | |
| PWS §BSL-3/Vivarium | |
| PWS §PM Matrix | |
| PWS §Reporting/KPI |
File details come from the government source that posted it. Updated .