This is a Price Breakdown Form template for solicitation number 36C261C26R0055, Project 593-26-306, related to design-build services for installing parking lot shades and reconfiguring the parking lot at the VA Medical Center in Las Vegas. The form is structured to capture comprehensive pricing across all major construction divisions using the MasterFormat classification system, including General Requirements, Concrete, Metals, Electrical, Earthwork, Exterior Improvements, and numerous other trade categories.
The template requires offerors to provide itemized cost breakdowns separated into material and labor components for each division, with subtotals calculated at the division level. The form consolidates pricing through a hierarchical structure that captures Design Total, overhead, profit, insurance and taxes, and bonding costs, culminating in a Grand Total price. All fields are currently populated with $0.00 placeholders, indicating this is a blank template awaiting completion by prospective contractors. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 is the procuring agency, and contractors must use this standardized form to submit pricing proposals in response to the solicitation.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Breakdown Sheet
| Solicitation Number: 36C261C26R0055 | |
| Project Number and Title: 593-26-306, Design-Build to Install Parking Lot Shades and Parking Lot Reconfiguration - VA Medical Center Las Vegas | |
| Prepared Date: | |
| Offeror Name: | |
| Preparer Name: | |
| Division Total: | $0.00 |
| Design Total | $0.00 |
| Overhead: | $0.00 |
| Subtotal: | $0.00 |
| Profit: | $0.00 |
| Subtotal: | $0.00 |
| Insurance & Taxes: | $0.00 |
| Subtotal: | $0.00 |
| Bonding: | $0.00 |
| Grand Total: | $0.00 |
| Division Totals | |
| Division 01 - General Requirements | $0.00 |
| Division 02 - Existing Conditions | $0.00 |
| Division 03 - Concrete | $0.00 |
| Division 04 - Masonry | $0.00 |
| Division 05 - Metals | $0.00 |
| Division 06 - Wood and Plastic | $0.00 |
| Division 07 - Therm/Moisture Prot. | $0.00 |
| Division 08 - Doors and Windows | $0.00 |
| Division 09 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 13 - Special Construction | $0.00 |
| Division 14 - Conveying Equipment | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - HVAC | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Elect. Safety/Security | $0.00 |
| Division 31 - Earthwork | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| Division 33 - Utilities | $0.00 |
| Division 34 - Transportation | $0.00 |
| Division 48 - Electrical Power Gen. | $0.00 |
| Material | ||||||
| Division 01 - General Requirements | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | |||||
| Division 02 - Existing Conditions | Labor | $0.00 | |||
| 0 | $0.00 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | Material Sum: | $0.00 | |
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 03 - Concrete | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 04 - Masonry | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 05 - Metals | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 06 - Wood and Plastic | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||||
| $0.00 | Material Sum: | $0.00 | ||||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 07 - Therm /Moisture Prot. | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | |||
| 0 | 0 | $0.00 | $0.00 | |||
| 0 | 0 | $0.00 | $0.00 | |||
| 0 | 0 | $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 08 - Doors and Windows | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 09 - Finishes | Labor | 0 | $0.00 | $0.00 | ||
| 0 | 0 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | 0 | $0.00 | 0 | $0.00 | $0.00 | |
| 0 | 0 | $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 10 - Specialties | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | 0 | 0 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | 0 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | 0 | $0.00 | |
| 0 | $0.00 | $0.00 | 0 | 0 | $0.00 | |
| 0 | $0.00 | $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 11 - Equipment | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 12 - Furnishings | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 13 - Special Construction | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 14 - Conveying Equipment | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 21 - Fire Suppression | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 22 - Plumbing | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 23 - HVAC | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 25 - Integrated Automation | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 26 - Electrical | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 27 - Communications | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||||
| Division 28 - Elect. Safety/Security | Labor | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||||
| $0.00 | Material Sum: | $0.00 | ||||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 31 - Earthwork | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 32 - Exterior Improvements | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 33 - Utilities | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 34 - Transportation | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |
| Material | ||||
| Division 48 - Electrical Power Gen. | Labor | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | Material Sum: | $0.00 | ||
| Labor Sum: | $0.00 | Division Total: | $0.00 |