ATTACHMENT B - PHASE 1 FACTOR 3 - Past Performance Questionnaire.docx

DOCX document 34 KB Posted

Attached to
Z2LZ--Design Build to Install Parking Shades and Parking Lot Reconfiguration Project 593-26-306
Solicitation number
36C26126R0055_2
Issued by

About this file

This is a Past Performance Questionnaire for evaluating contractor performance on federal contracts, specifically designed for the VA Southern Nevada Healthcare System (VASNHS) Design-Build Services project for parking lot shades and parking lot reconfiguration (Project No. 593-26-306, RFP 36C26126R0055). The questionnaire is to be completed by references or past clients who have worked with offerors submitting proposals for this opportunity.

The questionnaire requires respondents to provide detailed ratings and comments across seven performance categories: Quality (technical data preparation, quality standards compliance, problem resolution, and quality control programs); Schedule/Timeliness (delivery compliance and resource utilization); Customer Satisfaction (end-user satisfaction, contractor cooperation, and overall satisfaction); Management/Personnel/Labor (on-site management, workforce qualifications, property control, personnel expertise, multi-project management, change management, and overall effectiveness); Cost/Financial Management (price compliance, cost-saving innovations, invoice accuracy for cost-type contracts, and financial stability); Safety/Security (safety environment maintenance and security compliance); and General (emergency response capability, contractual compliance, and overall work rating). Each element uses a standardized five-point rating scale (Exceptional, Good, Satisfactory, Marginal, Unsatisfactory, or Neutral/Not Applicable). Respondents must complete all sections including contractor name, point of contact information, contract details, project title, and their organizational information. Completed questionnaires must be returned by October 15, 2026 at 2:00 pm PDT to Christopher Whipple, Contracting Officer at christopher.whipple@va.gov.

View the file

Other files

File Type Posted
RFP AMENDMENT 36C26126R0055 0003.docx DOCX document
ATTACHMENT A - PHASE 1 FACTOR 2 - EXPERIENCE-SPECIAL EXPERIENCE 10-5-2026.xlsx XLSX spreadsheet
Instruction to Offerors DESIGN BUILD 10-5-2026.docx DOCX document
Commercial Construction Clause 52.212-4 10-5-2026.docx DOCX document
RFP AMENDMENT 36C26126R0055 0002.docx DOCX document
RFP AMENDMENT 36C26126R0055 0001.docx DOCX document
Attachment SOW 07-24-2026.pdf PDF
Site Visit Attendee List 09-17-2026.pdf PDF
RFP Amendment_36C26126R0055 0001.docx DOCX document
Attachment Specifications 08-17-2026.pdf PDF
Attachment Assignment 21 - Draft Schematic Design and Report.pdf PDF
DB-ATTACH ATTACHMENT I - RELEASE OF CLAIMS.docx DOCX document
RFP 36C26126R0055_2 FINAL.docx DOCX document
Attachment Existing Carport Design.pdf PDF
Attachment Price Breakdown Form.xlsx XLSX spreadsheet
Attachment VAAR 852.219-75 JAN 2023 DEVIATION.pdf PDF
Attachment REQUEST FOR INFORMATION FORM.docx DOCX document
ATTACHMENT A - PHASE 1 FACTOR 2 - EXPERIENCE-SPECIAL EXPERIENCE SAMPLE.xlsx XLSX spreadsheet
Attachment Assignment 44 - Parking Study.pdf PDF
Attachment ED Parking Expansion.pdf PDF
Attachment Pre-solicitation Site Visit Presentation.pptx PPTX presentation
Attachment Assignment 44 - BOD Conceptual Design for Carports.pdf PDF
Attachment Wage Determination NV20260091 07-30-2026.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS

VA SOUTHERN NEVADA HEALTHCARE SYSTEM (VASNHS)– LAS VEGAS

PROJECT NO: 593-26-306

DESIGN-BUILD SERVICES TO INSTALL PARKING LOT SHADES & PARKING LOT RECONFIGURATION

The information obtained from this questionnaire will be utilized to evaluate the past and present performance of offerors submitting proposals in response to RFP 36C26126R0055 – Project No. 593-26-306, Design Build Services to Install Parking Lot Shades & Parking Lot Reconfiguration. The information you provide will be instrumental in allowing the Government to evaluate how well the contractor performed under your contract(s).

a. Please complete all sections of the attached questionnaire. Include your name and title, organizational address, e-mail address, telephone and fax number.

b. Include the contractor’s name, your point of contact (POC,) the title and/or description of the type of work performed the award number, the value of the contract, the award and completion date of the project and the type of award.

c. Use the attached rating scale rate each performance element.

d. Comments are encouraged and would be appreciated. The last page may be used if additional space is needed for comments. Clear handwritten responses are sufficient.

e. It is important that the questionnaire be completed and returned by the date proposal is due (October 15, 2026 at 2:00 pm PDT). Please e-mail your response to the following address:

Christopher Whipple, Contracting Officer - Construction Branch II at Email: christopher.whipple@va.gov.

Thank you for your time and participation.

PAST PERFORMANCE RATING SCALE

RATING:
DEFINITION:
USAGE:
EXCEPTIONAL
Performance exceeded many contractual requirements to the Government’s benefit. The contractual performance of the element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.
An EXCEPTIONAL rating is appropriate when the contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit however could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified
GOOD
Performance exceeded some contractual requirements to the Government’s benefit. The contractual performance of the element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were effective.
A GOOD rating is appropriate when the contractor has successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
SATISFACTORY
Performance met all contractual requirements. The contractual performance of the elements being assessed were accomplished with no more than a few minor problems for which corrective actions taken by the contractor were satisfactory.
A SATISFACTORY rating is appropriate when there were only a few minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified.
MARGINAL
Performance did not meet some contractual requirements. The contractual performance of the element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully successful.
A MARGINAL rating is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
UNSATISFACTORY
Performance did not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element contains a serious problem(s) for which the contractor’s corrective actions were ineffective.
An UNSATISFACTORY rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
Neutral/Not Applicable or Unknown
No performance record identifiable within the area of evaluation
Performance was not observed or not applicable to the current effort being reported.

PAST PERFORMANCE QUESTIONNAIRE

NAME OF CONTRACTOR BEING EVALUATED:

CONTRACTOR MAIN POC

CONTRACT NUMBER:

CONTRACT VALUE:

CONTRACTOR PERFORMED WORK AS:
CONTRACT AWARD & COMPLETION DATE:

Prime Contractor Sub- Contractor Key Personnel

PROJECT TITLE AND BRIEF DESCRIPTION OF WORK:

RESPONDENT’S NAME

YOUR ORGANIZATIONAL ADDRESS

PHONE/FAX NO:

E-MAIL:

1. QUALITY:

A. Quality of technical data/report preparation efforts
RATING
E
G
S
M
U
N

Comments:

B. Ability to meet quality standards specified for technical performance
RATING
E
G
S
M
U
N

Comments:

C. Timeliness/effectiveness of contract problem resolution without extensive customer guidance
RATING
E
G
S
M
U
N

Comments:

D. Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
RATING
E
G
S
M
U
N

Comments:

FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

A. Compliance with contract delivery/completion schedules including any significant intermediate milestones
RATING
E
G
S
M
U
N

Comments:

B. Rate the contractor’s use of available resources to accomplish tasks
RATING
E
G
S
M
U
N

Comments:

3. CUSTOMER SATISFACTION:

A. To what extent were the end users satisfied with the project?
RATING
E
G
S
M
U
N

Comments:

B. Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports and business communication)
RATING
E
G
S
M
U
N

Comments:

C. To what extent was the contractor cooperative, businesslike and concerned with the interests of the customer?
RATING
E
G
S
M
U
N

Comments:

D. Overall customer satisfaction
RATING
E
G
S
M
U
N

Comments:

4. MANAGEMENT/PERSONNEL/LABOR

A. Effectiveness of on-site management, including management of subcontractors, suppliers, materials and/or labor force?
RATING
E
G
S
M
U
N

Comments:

FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED

B. Ability to hire, apply and retain a qualified workforce to the effort
RATING
E
G
S
M
U
N

Comments:

C. Government Property Control
RATING
E
G
S
M
U
N

Comments:

D. Knowledge/expertise demonstrated by contractor personnel
RATING
E
G
S
M
U
N

Comments:

E. Ability to simultaneously manage multiple projects with multiple disciplines.
RATING
E
G
S
M
U
N

Comments:

F. Ability to assimilate and incorporate changes in requirements or priority, including planning, execution and response to Government changes
RATING
E
G
S
M
U
N

Comments:

G. Effectiveness of overall management (including ability to effectively lead, manage and control the program)
RATING
E
G
S
M
U
N

Comments:

5. COST/FINANCIAL MANAGEMENT

A. Ability to meet the terms and conditions contractually agreed to price(s)?
RATING
E
G
S
M
U
N

Comments:

FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED

B. Contractor proposed innovative alternative methods/processes that reduced costs, improved maintainability or other factors that benefited the client.
RATING
E
G
S
M
U
N

Comments:

C. If this is/was a Government cost type contract, please rate the contractor’s timeliness and accuracy in submitting monthly invoices with appropriate backup documentation, monthly status reports/budget variance reports, compliance with established budges and avoidance of significant and/or unexplained variances (under runs or overruns)
RATING
E
G
S
M
U
N

Comments:

D. Have there been any indications that the contractor has had any financial problems? If yes please explain below
RATING
Yes
No

Comments:

6. SAFETY/SECURITY:

A. To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

RATING

E
G
S
M
U
N

Comments:

B. Contractor complied with all security requirements for the project and personnel security requirements.
RATING
E
G
S
M
U
N

Comments:

FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED

7. GENERAL:

A. Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM, or Contracting officer in a timely manner regarding urgent contractual issues.)
RATING
E
G
S
M
U
N

Comments:

B. Compliance with contractual terms/provisions (explain if specific issues)
RATING
E
G
S
M
U
N

Comments:

C. Would you hire or work with this firm again (if no, please explain below)

RATING

Yes
No
D. In summary, provide an overall rating for the work performed by this contractor.
RATING
E
G
S
M
U
N

Comments:

FOR OFFICIAL USE ONLY – SOURCE SELECTION SENSITIVE WHEN COMPLETED

File details come from the government source that posted it. Updated .