Attachment PPQ.pdf

PDF 658 KB Posted

Attached to
Design-Build services for IRS Fire Alarm Modernization Project
Solicitation number
47PB5126R0029
Issued by
Not on record

About this file

This is a Past Performance Questionnaire template used by the General Services Administration (GSA) for the PBS (Public Buildings Service) program to evaluate contractor performance on previous projects.

The questionnaire is divided into two main sections: contractor-provided information and client-provided evaluation. In the contractor section (Blocks 1-4), the contractor or offeror completes fields documenting firm information, work role (prime contractor, subcontractor, joint venture), contract details (number, type, title, location, award and completion dates), contract pricing (original and final amounts), and project description including complexity level and relevance to the current submission. The client evaluation section requires the contracting officer or project manager to rate contractor performance across seven major categories using a six-point rating scale: (E) Exceptional, (VG) Very Good, (S) Satisfactory, (M) Marginal, (U) Unsatisfactory, and (N) Not Applicable. Performance areas assessed include Quality, Schedule/Timeliness, Customer Satisfaction, Management/Personnel/Labor, Cost/Financial Management, Safety/Security, and General performance. Additional evaluation items address sustainability methods, overall contract compliance, and whether the client would rehire the contractor. The questionnaire includes a comments section for detailed narrative feedback on contractor strengths, weaknesses, and performance risk factors. For private sector references, the completed questionnaire must be sent directly to the contracting officer via email; for public sector references, a CPARS printout must be submitted digitally with the quote. Submission instructions require digital email delivery only to three GSA officials.

View the file

Other files

File Type Posted
SF 30 Amendment 1.pdf PDF
Fire Alarm Modernization Project Walkthrough _Virtual List - Walkthrough _ Virtual List.pdf PDF
Pre-Proposal Site Visit Agenda 07 21 2026.pdf PDF
SOW Attachment 3 _ IRS FAS Replacement CD Waste Mgmt Plan Reporting Template v2.xlsx XLSX spreadsheet
SOW Attachment 12 _ Child Care Center Design Guide.pdf PDF
SOW Attachment 4 _ C and D Waste Monthly Report.pdf PDF
Individual Model_Subcontracting_Plan - Dec 2025 - 508 Compliant.docx DOCX document
DRAFT IRS Fire Alarm Replacement Agreement.pdf PDF
SOW Attachment 11 _ IRS Feasibility - Program Study Fire Life Safety Replacement.pdf PDF
SOW Attachment 8 _ DC0022 IRS Building Annual Asbestos Inspection _ Survey Report-FINAL.pdf PDF
SOW Attachment 1 _ 283176 - FIRE ALARM AND VOICE EVACUATION SYSTEM.pdf PDF
SOW Attachment 10 _ 02085-Asbestos-April 2013.pdf PDF
SOW Attachment 2 _ 284800 EMERGENCY RADIO COMMUNICATION ENHANCEMENT SYSTEM.pdf PDF
Contractors Qualifications and Financial GSA527-21a.pdf PDF
Davis Bacon Wage Rates Washington DC.pdf PDF
SOW Attachment 7 _ HISTORIC STRUCTURES REPORT MARCH 1981.pdf PDF
SOW Attachment 6 _ NDA Document Security.pdf PDF
SF1442-22.pdf PDF
IRS Fire Alarm Replacement Solicitation.pdf PDF
SOW Attachment 5 _ GSA Affiliated Customer Accounts (GACA).pdf PDF
SOW Attachment 9 _ 01546-Safety and Health.pdf PDF
SOW FINAL IRS FA Replacement SOW Design-Build Services April 2026.pdf PDF
Bid Bond form SF24-23a.pdf PDF
GSA Cost Bid Form IRS HQ Fire Alarm Project.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PBS Past Performance Questionnaire

PBS PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)

1. CONTRACTOR/OFFEROR INFORMATION

Firm Name:

Address:

Phone Number: DUNs Number:

Contact Name

Email Address: : Contact Phone Number:

2. GENERAL WORK INFORMATION

Work performed as: Prime Contractor Sub Contractor Joint Venture Other (Please explain):

Percent (%) of project work performed:

If a subcontractor, who was the prime (Name/Phone #):

3. CONTRACT INFORMATION

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please explain)

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. PROJECT DESCRIPTION

Complexity of Work: High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

INSTRUCTIONS FOR CLIENTS COMPLETING THIS QUESTIONNAIRE: If a private sector reference is to be used the contractor shall have the reference send this Past Performance Questionnaire directly to the Contracting Officer and Contract Specialists via email upon completing sections below. The government reserves the right to verify any and all information on this form. Send to Stephany Johnson, Stephany.johnson@gsa.gov, Erin Miller, erin.miller@gsa.gov, and Douglas Tumbrello, douglas.tumbrello@gsa.gov.

INSTRUCTIONS FOR CLIENTS PROVIDING A CPARS: If a public sector reference is to be used the CPARS print out should be submitted with the quote. Only digitally emailed submissions of completed CPARS printout will be accepted for this acquisition. Please do not mail any copies by postal mail, CPARS printout should be submitted with quote. Send to Stephany Johnson, Stephany.johnson@gsa.gov, Erin Miller, erin.miller@gsa.gov, and Douglas Tumbrello, douglas.tumbrello@gsa.gov.

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

CLIENT INFORMATION

Client Point of Contact Information

Name:

Title:

Phone Number:

Email Address:

Project Information

Contract Type:

Contract Title:

Contract Location:

Describe your role in the project:

Date Questionnaire was completed (mm/dd/yy):

Client’s Signature:

Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.

1. QUALITY: E VG S M U N

(a) Quality of technical data/report preparation efforts.

(b) Ability to meet quality standards specified for technical performance.

(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).

2. SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N

(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)

(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract.

3. CUSTOMER SATISFACTION: E VG S M U N

(a) To what extent were the end users satisfied with the project?

(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication).

(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

(d) Overall customer satisfaction.

4. MANAGEMENT/ PERSONNEL/LABOR E VG S M U N

(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

(b) Ability to hire, apply, and retain a qualified workforce to this effort.

4. MANAGEMENT/ PERSONNEL/LABOR - Continued E VG S M U N

(c) Government Property Control.

(d) Knowledge/expertise demonstrated by contractor personnel.

(e) Utilization of Small Business concerns.

(f) Ability to simultaneously manage multiple projects with multiple disciplines.

(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.

(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program).

5. COST/FINANCIAL MANAGEMENT E VG S M U N

(a) Ability to meet the terms and conditions within the contractually agreed price(s)?

(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.

(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).

(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.)

Yes No

(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)

Yes No

(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)

Yes No

6. SAFETY/SECURITY E VG S M U N

(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).

(b) Contractor complied with all security requirements for the project and personnel security requirements.

7. GENERAL E VG S M U N

(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below

(c) In summary, provide an overall rating for the work performed by this contractor.

8. SUSTAINABILITY

Did this project include sustainable methods, materials, processes or certifications? (See Whole Building Design Guide for acceptable requirements. Link to guide WBDG Green Building Standards and Certification Systems.) (If yes, please explain in the comments section below.)

Yes No

9. SUMMARY

Would you hire or work with this firm again? (If no, please explain in the comments section below.)

Yes No

COMMENTS SECTION

Please provide additional information below, and attach additional pages if necessary.

Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):