Attachment L-3 Sample Excel Prevailing Wage for all RFB.xlsx
XLSX spreadsheet 57 KB Posted
- Solicitation number
- 240757
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This is a prevailing wage data collection form for a project at Wayne County, Michigan, specifically related to the Detroit Metropolitan Wayne County Airport. The document is a detailed Excel spreadsheet (Attachment L-3) that provides a comprehensive template for contractors to report certified payroll information, including labor classifications, wage rates, and fringe benefits for various construction trades. The form is designed for use with the contract number MI20240001, and it includes an extensive list of labor classifications such as carpenters, electricians, engineers, ironworkers, laborers, painters, plumbers, and truck drivers, with specific wage rates and fringe benefits for each classification.
The prevailing wage document covers multiple labor groups and provides precise hourly rates and fringe benefits for each classification, with rates varying by group and specific job type. The wage rates range from as low as $10.00 for a flag person to $56.42 for certain power equipment operators. The form includes detailed instructions for data entry, emphasizing compliance requirements such as not using full social security numbers, accurately reporting hours worked, and distinguishing between straight time and overtime rates. The document appears to be part of a standardized process for tracking and verifying labor compliance on construction projects, with specific focus on ensuring proper compensation and benefits for workers across different trades and skill levels.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PW_Data
| COLOR KEY | Prime Contractor Name | Subcontractor Name | Contract # | Contract Name | |
| Employee Information | Missing Required Information | ||||
| Pay Rates and Times | For WCAA Use Only - DO NOT USE | Week Ending | Payroll # | ||
| Fringe Rates | For WCAA Use Only - DO NOT USE |
| DO NOT USE - FOR WCAA USE ONLY | FOR WCAA USE ONLY | Straight Time Worked (Hours) | FOR WCAA USE ONLY | Over Time Worked (Hours) | FOR WCAA USE ONLY | FOR WCAA USE ONLY | |
| Contract # |
Mishler, Christopher: Mishler, Christopher:
Fill in above Gen_Dec_No Pub_Date Region Subcontractor Mishler, Christopher: Mishler, Christopher:
Fill in Subcontractor name in I2 Payroll # Mishler, Christopher: Mishler, Christopher:
Fill in Payroll # in I4 Week Ending Mishler, Christopher: Mishler, Christopher:
Fill in Week Ending date in H4. Employee Name Employee ID # Labor Class Code Work Classification Wage Rate Percent Audrey Jones: Audrey Jones:
If non-apprentice, enter 100. If apprentice rate, enter as needed. Entering as a formula (=100%) will auto-fill subsequent additional rows. Fringe Rate Percent Mishler, Christopher: Mishler, Christopher:
| Percent of Fringes paid; may be less than 100% if agreed in approved apprentice/trainee prgm | Fringe Fund | |
| Rate ST | Cash Fringe Rate ST | Rate |
ST
Mishler, Christopher: Mishler, Christopher:
Actual pay rate - Straight Time Mishler, Christopher: Mishler, Christopher:
Fill in above Mishler, Christopher: Mishler, Christopher:
Fill in Subcontractor name in I2 Mishler, Christopher: Mishler, Christopher:
Fill in Payroll # in I4 Mishler, Christopher: Mishler, Christopher:
| Fill in Week Ending date in H4. | Day1 | |||||||||||||
| ST | Day2 | |||||||||||||
| ST | Day3 | |||||||||||||
| ST | Day4 | |||||||||||||
| ST | Day5 | |||||||||||||
| ST | Day6 | |||||||||||||
| ST | Day7 | |||||||||||||
| ST | Total ST Hours | Total ST Pay | Fringe Fund | |||||||||||
| Rate OT | Cash Fringe Rate OT | Rate | ||||||||||||
| OT | Day1 | |||||||||||||
| OT | Day2 | |||||||||||||
| OT | Day3 | |||||||||||||
| OT | Day4 | |||||||||||||
| OT | Day5 | |||||||||||||
| OT | Day6 | |||||||||||||
| OT | Day7 | |||||||||||||
| OT | Total OT Hours | Total OT Pay | Gross Project Pay | Gross Wkly Pay (all projects) | Total | |||||||||
| Deductions | Net Wages Paid | |||||||||||||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| 0 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0 | 0 | 12/31/99 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
Gen_Dec
| Gen_Dec_No. | Pub_Date | LaborClass | Mod_Date | Description | Rates | Fringes | Region |
| MI20240001 | 12/6/24 | CARP0004-005 | 6/1/18 | Carpenter (Piledriver) | 30.50 | 27.28 | Wayne |
| MI20240001 | 12/6/24 | ELEC0017-005 Groundman/Driver | 6/1/24 | Line Construction | 32.00 | 17.87 | Wayne |
| MI20240001 | 12/6/24 | ELEC0017-005 Signal Tech | 6/1/24 | Line Construction | 47.35 | 22.94 | Wayne |
| MI20240001 | 12/6/24 | ELEC0017-005 Specialist | 6/1/24 | Line Construction | 54.45 | 25.28 | Wayne |
| MI20240001 | 12/6/24 | ELEC0017-005 Operator A | 6/1/24 | Line Construction | 40.09 | 20.54 | Wayne |
| MI20240001 | 12/6/24 | ELEC0017-005 Operator B | 6/1/24 | Line Construction | 37.46 | 19.67 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 1 | 6/1/24 | Operator - Power Equipment (Steel) | 55.42 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 2 | 6/1/24 | Operator - Power Equipment (Steel) | 56.42 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 3 | 6/1/24 | Operator - Power Equipment (Steel) | 53.92 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 4 | 6/1/24 | Operator - Power Equipment (Steel) | 54.92 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 5 | 6/1/24 | Operator - Power Equipment (Steel) | 52.42 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 6 | 6/1/24 | Operator - Power Equipment (Steel) | 53.42 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 7 | 6/1/24 | Operator - Power Equipment (Steel) | 52.15 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 8 | 6/1/24 | Operator - Power Equipment (Steel) | 53.15 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 9 | 6/1/24 | Operator - Power Equipment (Steel) | 51.70 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 10 | 6/1/24 | Operator - Power Equipment (Steel) | 52.70 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 11 | 6/1/24 | Operator - Power Equipment (Steel) | 50.97 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 12 | 6/1/24 | Operator - Power Equipment (Steel) | 51.97 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 13 | 6/1/24 | Operator - Power Equipment (Steel) | 50.61 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 14 | 6/1/24 | Operator - Power Equipment (Steel) | 51.61 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 15 | 6/1/24 | Operator - Power Equipment (Steel) | 49.97 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 16 | 6/1/24 | Operator - Power Equipment (Steel) | 46.77 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 17 | 6/1/24 | Operator - Power Equipment (Steel) | 32.29 | 12.40 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-003 GRP 18 | 6/1/24 | Operator - Power Equipment (Steel) | 35.78 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-005 GRP 1 | 9/1/24 | Operator - Power Equipment (Underground) | 43.48 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-005 GRP 2 | 9/1/24 | Operator - Power Equipment (Underground) | 38.75 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-005 GRP 3 | 9/1/24 | Operator - Power Equipment (Underground) | 38.02 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-005 GRP 4 | 9/1/24 | Operator - Power Equipment (Underground) | 37.45 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-005 GRP 5 | 9/1/24 | Operator - Power Equipment (Underground) | 27.85 | 12.10 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-006 GRP 1 | 6/1/24 | Operator - Power Equipment (airport/bridge/highway) | 43.71 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-006 GRP 2 | 6/1/24 | Operator - Power Equipment (airport/bridge/highway) | 42.56 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-006 GRP 3 | 6/1/24 | Operator - Power Equipment (airport/bridge/highway) | 35.83 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-006 GRP 4 | 6/1/24 | Operator - Power Equipment (airport/bridge/highway) | 35.27 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-008 GRP 1 | 10/1/23 | Operator - Power Equipment (Sewer Relining) | 37.37 | 15.44 | Wayne |
| MI20240001 | 12/6/24 | ENGI0324-008 GRP 2 | 10/1/23 | Operator - Power Equipment (Sewer Relining) | 35.33 | 15.44 | Wayne |
| MI20240001 | 12/6/24 | ENGI0325-012 GRP 1 | 5/1/24 | Operator - Power Equipment (Gas/duct install) | 37.98 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | ENGI0325-012 GRP 2 | 5/1/24 | Operator - Power Equipment (Gas/duct install) | 34.75 | 25.25 | Wayne |
| MI20240001 | 12/6/24 | IRON0025-002 Pre-Engineered Metal Building | 6/1/24 | Ironworker | 25.81 | 26.43 | Wayne |
| MI20240001 | 12/6/24 | IRON0025-002 Ornamental and Structural | 6/1/24 | ironworker | 34.50 | 38.44 | Wayne |
| MI20240001 | 12/6/24 | IRON0025-002 Reinforcing | 6/1/24 | Ironworker | 33.43 | 37.15 | Wayne |
| MI20240001 | 12/6/24 | LABO0005-006 Levels A, B or C | 10/1/22 | Laborers - hazardous waste | 29.93 | 16.90 | Wayne |
| MI20240001 | 12/6/24 | LABO0005-006 Level D | 10/1/22 | Laborers - hazardous waste | 28.93 | 16.90 | Wayne |
| MI20240001 | 12/6/24 | LABO0259-001 GRP 1 | 9/1/24 | Laborers - Tunnel/Shaft/Caisson | 27.86 | 22.11 | Wayne |
| MI20240001 | 12/6/24 | LABO0259-001 GRP 2 | 9/1/24 | Laborers - Tunnel/Shaft/Caisson | 29.86 | 22.11 | Wayne |
| MI20240001 | 12/6/24 | LABO0259-001 GRP 3 | 9/1/24 | Laborers - Tunnel/Shaft/Caisson | 25.86 | 22.11 | Wayne |
| MI20240001 | 12/6/24 | LABO0259-001 GRP 4 | 9/1/24 | Laborers - Tunnel/Shaft/Caisson | 23.97 | 16.93 | Wayne |
| MI20240001 | 12/6/24 | LABO0259-001 GRP 5 | 9/1/24 | Laborers - Tunnel/Shaft/Caisson | 24.22 | 16.93 | Wayne |
| MI20240001 | 12/6/24 | LABO0259-001 GRP 6 | 9/1/24 | Laborers - Tunnel/Shaft/Caisson | 24.55 | 16.93 | Wayne |
| MI20240001 | 12/6/24 | LABO0259-001 GRP 7 | 9/1/24 | Laborers - Tunnel/Shaft/Caisson | 17.83 | 16.93 | Wayne |
| MI20240001 | 12/6/24 | LABO0334-001 GRP 1 | 9/1/24 | Laborers - Open Cut | 27.71 | 22.11 | Wayne |
| MI20240001 | 12/6/24 | LABO0334-001 GRP 2 | 9/1/24 | Laborers - Open Cut | 29.71 | 22.11 | Wayne |
| MI20240001 | 12/6/24 | LABO0334-001 GRP 3 | 9/1/24 | Laborers - Open Cut | 25.87 | 22.11 | Wayne |
| MI20240001 | 12/6/24 | LABO0334-001 GRP 4 | 9/1/24 | Laborers - Open Cut | 23.71 | 16.72 | Wayne |
| MI20240001 | 12/6/24 | LABO0334-001 GRP 5 | 9/1/24 | Laborers - Open Cut | 24.17 | 16.72 | Wayne |
| MI20240001 | 12/6/24 | LABO0334-001 GRP 6 | 9/1/24 | Laborers - Open Cut | 22.00 | 16.72 | Wayne |
| MI20240001 | 12/6/24 | LABO0334-001 GRP 7 | 9/1/24 | Laborers - Open Cut | 17.84 | 16.72 | Wayne |
| MI20240001 | 12/6/24 | LABO0465-001 GRP 1 | 6/1/24 | Laborer - Highway/Bridge/Airport | 34.01 | 14.45 | Wayne |
| MI20240001 | 12/6/24 | LABO0465-001 GRP 2 | 6/1/24 | Laborer - Highway/Bridge/Airport | 34.14 | 14.45 | Wayne |
| MI20240001 | 12/6/24 | LABO0465-001 GRP 3 | 6/1/24 | Laborer - Highway/Bridge/Airport | 34.32 | 14.45 | Wayne |
| MI20240001 | 12/6/24 | LABO0465-001 GRP 4 | 6/1/24 | Laborer - Highway/Bridge/Airport | 34.40 | 14.45 | Wayne |
| MI20240001 | 12/6/24 | LABO0465-001 GRP 5 | 6/1/24 | Laborer - Highway/Bridge/Airport | 34.61 | 14.45 | Wayne |
| MI20240001 | 12/6/24 | LABO0465-001 GRP 6 | 6/1/24 | Laborer - Highway/Bridge/Airport | 34.91 | 14.45 | Wayne |
| MI20240001 | 12/6/24 | LABO1076-005 | 4/1/24 | Laborer (Distribution)- zone 1 | 27.16 | 13.45 | Wayne |
| MI20240001 | 12/6/24 | PAIN0022-002 | 7/1/08 | Painter | 25.06 | 14.75 | Wayne |
| MI20240001 | 12/6/24 | PLAS0514-001 | 6/1/23 | Cement Mason/Concrete Finisher | 33.00 | 18.51 | Wayne |
| MI20240001 | 12/6/24 | PLUM0190-003 Welding | 5/1/15 | Plumber/Pipefitter - Gas Distribution | 33.03 | 20.19 | Wayne |
| MI20240001 | 12/6/24 | PLUM0190-003 All other | 5/1/15 | Plumber/Pipefitter - Gas Distribution | 24.19 | 12.28 | Wayne |
| MI20240001 | 12/6/24 | SUMI2002-001 Flag | 5/1/02 | Flag Person | 10.00 | - 0 | Wayne |
| MI20240001 | 12/6/24 | SUMI2002-001 Line | 5/1/02 | Line Protector | 22.89 | 13.45 | Wayne |
| MI20240001 | 12/6/24 | SUMI2002-001 GRP 1 | 5/1/02 | Pavement Marker | 30.52 | 13.45 | Wayne |
| MI20240001 | 12/6/24 | SUMI2002-001 GRP 2 | 5/1/02 | Pavement Marker | 27.47 | 13.45 | Wayne |
| MI20240001 | 12/6/24 | TEAM0007-004 Euclids, double bottoms and lowboys | 6/1/24 | Truck Driver | 32.65 | ** | Wayne |
| MI20240001 | 12/6/24 | TEAM0007-004 Trucks under 8 cu. yds | 6/1/24 | Truck Driver | 32.40 | ** | Wayne |
| MI20240001 | 12/6/24 | TEAM0007-004 Trucs 8 cu. yds. And over | 6/1/24 | Truck Driver | 32.50 | ** | Wayne |
| MI20240001 | 12/6/24 | TEAM0247-004 GRP 1 | 4/1/13 | Sign Installer | 22.03 | 11.83 | Wayne |
| MI20240001 | 12/6/24 | TEAM0247-004 GRP 2 | 4/1/13 | Sign Installer | 25.02 | 11.84 | Wayne |
| MI20240001 | 12/6/24 | TEAM0247-010 GRP 1 | 4/1/18 | Truck Driver (Underground construction) | 24.12 | 19.04 | Wayne |
| MI20240001 | 12/6/24 | TEAM0247-010 GRP 2 | 4/1/18 | Truck Driver (Underground construction) | 24.26 | 19.04 | Wayne |
| MI20240001 | 12/6/24 | TEAM0247-010 GRP 3 | 4/1/18 | Truck Driver (Underground construction) | 24.45 | 19.04 | Wayne |
** .75 + $470.70 per week + $68.70 daily
Assumptions
| Contract Information | |||||
| Contract | Prime | Description | Gen_Dec_No | Gen. Dec. Publication Date | Region |
| Sample Contract # 1 | Sample Prime Contractor | Sample Contract Description | MI20240001 | 12/6/24 | Wayne |
| MUNIS SubContractors | Labor Class & Group | |
| Allowable SubContractor Names | Allowable Labor classifications | |
| Vendor | Code | Description |
| Sample Prime Contractor | CARP0004-005 | Carpenter (Piledriver) |
| Sample Sub Contractor - Drywall | ELEC0017-005 Groundman/Driver | Line Construction |
| Sample Electric Sub Contractor | ELEC0017-005 Signal Tech | Line Construction |
| Sample Electric Sub Asphalt | ELEC0017-005 Specialist | Line Construction |
| ELEC0017-005 Operator A | Line Construction | |
| ELEC0017-005 Operator B | Line Construction | |
| ENGI0324-003 GRP 1 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 2 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 3 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 4 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 5 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 6 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 7 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 8 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 9 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 10 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 11 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 12 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 13 | Operator - Power Equipment (Steel) | |
| Subcontractors cannot be added or replaced after bid submittal without the prior written approval of the Airport Authority | ENGI0324-003 GRP 14 | Operator - Power Equipment (Steel) |
| ENGI0324-003 GRP 15 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 16 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 17 | Operator - Power Equipment (Steel) | |
| ENGI0324-003 GRP 18 | Operator - Power Equipment (Steel) | |
| ENGI0324-005 GRP 1 | Operator - Power Equipment (Underground) | |
| ENGI0324-005 GRP 2 | Operator - Power Equipment (Underground) | |
| ENGI0324-005 GRP 3 | Operator - Power Equipment (Underground) | |
| ENGI0324-005 GRP 4 | Operator - Power Equipment (Underground) | |
| ENGI0324-005 GRP 5 | Operator - Power Equipment (Underground) | |
| ENGI0324-006 GRP 1 | Operator - Power Equipment (airport/bridge/highway) | |
| ENGI0324-006 GRP 2 | Operator - Power Equipment (airport/bridge/highway) | |
| ENGI0324-006 GRP 3 | Operator - Power Equipment (airport/bridge/highway) | |
| ENGI0324-006 GRP 4 | Operator - Power Equipment (airport/bridge/highway) | |
| ENGI0324-008 GRP 1 | Operator - Power Equipment (Sewer Relining) | |
| ENGI0324-008 GRP 2 | Operator - Power Equipment (Sewer Relining) | |
| ENGI0325-012 GRP 1 | Operator - Power Equipment (Gas/duct install) | |
| ENGI0325-012 GRP 2 | Operator - Power Equipment (Gas/duct install) | |
| IRON0025-002 Pre-Engineered Metal Building | Ironworker | |
| IRON0025-002 Ornamental and Structural | ironworker (E of us 23) | |
| IRON0025-002 Reinforcing | Ironworker | |
| LABO0005-006 Levels A, B or C | Laborers - hazardous waste | |
| LABO0005-006 Level D | Laborers - hazardous waste | |
| LABO0259-001 GRP 1 | Laborers - Tunnel/Shaft/Caisson | |
| LABO0259-001 GRP 2 | Laborers - Tunnel/Shaft/Caisson | |
| LABO0259-001 GRP 3 | Laborers - Tunnel/Shaft/Caisson | |
| LABO0259-001 GRP 4 | Laborers - Tunnel/Shaft/Caisson | |
| LABO0259-001 GRP 5 | Laborers - Tunnel/Shaft/Caisson | |
| LABO0259-001 GRP 6 | Laborers - Tunnel/Shaft/Caisson | |
| LABO0259-001 GRP 7 | Laborers - Tunnel/Shaft/Caisson | |
| LABO0334-001 GRP 1 | Laborers - Open Cut | |
| LABO0334-001 GRP 2 | Laborers - Open Cut | |
| LABO0334-001 GRP 3 | Laborers - Open Cut | |
| LABO0334-001 GRP 4 | Laborers - Open Cut | |
| LABO0334-001 GRP 5 | Laborers - Open Cut | |
| LABO0334-001 GRP 6 | Laborers - Open Cut | |
| LABO0334-001 GRP 7 | Laborers - Open Cut | |
| LABO0465-001 GRP 1 | Laborer - Highway/Bridge/Airport | |
| LABO0465-001 GRP 2 | Laborer - Highway/Bridge/Airport | |
| LABO0465-001 GRP 3 | Laborer - Highway/Bridge/Airport | |
| LABO0465-001 GRP 4 | Laborer - Highway/Bridge/Airport | |
| LABO0465-001 GRP 5 | Laborer - Highway/Bridge/Airport | |
| LABO0465-001 GRP 6 | Laborer - Highway/Bridge/Airport | |
| LABO1076-005 | Laborer (Distribution)- zone 1 | |
| PAIN0022-002 | Painter | |
| PLAS0514-001 | Cement Mason/Concrete Finisher | |
| PLUM0190-003 Welding | Plumber/Pipefitter - Gas Distribution | |
| PLUM0190-003 All other | Plumber/Pipefitter - Gas Distribution | |
| SUMI2002-001 Flag | Flag Person | |
| SUMI2002-001 Line | Line Protector | |
| SUMI2002-001 GRP 1 | Pavement Marker | |
| SUMI2002-001 GRP 2 | Pavement Marker | |
| TEAM0007-004 Euclids, double bottoms and lowboys | Truck Driver | |
| TEAM0007-004 Trucks under 8 cu. yds | Truck Driver | |
| TEAM0007-004 Trucs 8 cu. yds. And over | Truck Driver | |
| TEAM0247-004 GRP 1 | Sign Installer | |
| TEAM0247-004 GRP 2 | Sign Installer | |
| TEAM0247-010 GRP 1 | Truck Driver (Underground construction) | |
| TEAM0247-010 GRP 2 | Truck Driver (Underground construction) | |
| TEAM0247-010 GRP 3 | Truck Driver (Underground construction) |
Data Entry Instructions
| WCAA - Certified Payroll Data Collection Form Instructions | |
| Step # | |
| 1 | Form submitted to Prime Contractor |
| Naming convention: |
Contract#_Prime Contractor _Sub Contractor_Weekending (Example: "123456_ContractorB_ SubCon Inc_070216") Tabs Included:
"PW_Data" - Certified payroll data entry "Gen_Dec" - General Decision and prevailing wages applicable to specific contract "Assumptions" - List of applicable job classifications, contract information and approved subcontractors (hidden) 2 Data Entry into "PW_Data" tab:
DO NOT enter data into grey cells - these cells include formulas that automatically calculate once necessary information is entered.
Items marked with an asterisks MUST be entered prior to submittal, other items are dependent on actual work completed.
*Cell H2: Use drop down to enter prime contractor name *Cell I2/J2: Use drop down to enter subcontractor name (if prime is completing the work, enter prime again) *Cell K2: Use drop down to enter contract number *Cell H4: Enter certified payroll weekending date *Cell I3/J3: Enter payroll # or check number The information entered above is auto populated into columns A-G for each employee row. DO NOT enter data into columns A-G
Beginning in Row 8, enter the following for each employee:
*Column H: Employee Name *Column I: Employee ID # (DO NOT enter employee's full SS#) *Column J: Use drop down to enter employee's labor classification descriptive of work actually performed. Note that If employee worked in more than one classification, report using one line per labor class.
*Column L: Default percentage is 100%, however, If employee is part of an approved apprentice program, enter percentage rate of pay and attach proof of enrollment in approved apprentice program and pay level in the submittal to WCAA. Note that rates do not need to be submitted to the Authority on a weekly basis if it has already been submitted, unless it is needed to prove change in percentage rate *Column M: Employee's fringe rate percentage (default is 100%) Column N: Employee's straight time fringe rate paid to a fund/program Column O: Employee's straight time cash in lieu of fringe benefits rate *Coumn P: Employee's straight time rate Columns Q-W: Employee's daily straight time hours worked on project Column Z: Employee's overtime fringe rate paid to a fund/program Column AA: Employee's overtime cash in lieu of fringe benefits rate Column AB: Employee's overtime rate Columns AC-AI: Employee's daily overtime hours worked on project *Column AM: Employee's gross weekly pay on ALL projects *Column AN: Employee's total deductions from weekly gross wage (all projects)
| 3 | Add 1 or more lines to enter new employee data: |
| In the bottom right corner of the last cell in column AO, click and drag the cursor down the number of rows needed. | |
| Form Information | Blue Column Categories - Entry of employee information, hours worked and hourly rates, and gross pay |
Green Column Categories - Entry of Fringe benefits (cash ST, cash OT, and fund) Purple Column Category - Entry of payroll deductions Grey Column Categories - Automatic formulas which included totals calculated using entries from blue, green and purple categories Common Errors Attempting to enter contractor/subcontractor name or contract number without using drop down: An error prompt will pop-up to alert that the name typed is not included as an approved entry.
Employee ID #s containing 6 or more digits [column I] - These cells will be filled in orange as a reminder that full social security numbers should not be submitted with the certified payroll.
Total straight time hours over 40 [column X] - These cells will be filled in red as a reminder that all hours worked in excess of 40 hours a week are paid at an overtime rate.
Missing required information - These cells will be filled in yellow as a reminder that information is missing (see items with asterisks in step 2 above for required entries)
File details come from the government source that posted it. Updated .