ATTACHMENT J17 Fire Extinguisher Log.docx

DOCX document 233 KB Posted

Attached to
Operation and Maintenance of Pearl Harbor Inactive Vessels
Solicitation number
N00024-21-R-4204
Issued by

About this file

This document contains inspection guidelines and checklists for fire extinguishers on naval vessels, as well as information on a related federal contract opportunity. The inspection guidelines provide periodicity requirements and describe items to check such as CO2 cylinders, hoses, fittings, valves, and condition assessments. The federal contract opportunity is solicitation number N00024-21-R-4204 for operation and maintenance services of inactive vessels in Pearl Harbor. Proposals are due by April 7, 2022 and the soliciting agency is the Naval Sea Systems Command within the Department of the Navy.

View the file

Other files

File Type Posted
Attachment J-1 Pre-Proposal Information Form 4.21.22.pdf PDF
Exhbt C - Past Performance Questionnaire Rev 1.docx DOCX document
Attachment J-1 Rev 1 19Apr22.pdf PDF
ATTACHMENT J-4 - Tank Soundings Template.xls XLS spreadsheet
N00024-21-R-4204 Amendment 4.pdf PDF
N00024-21-R-4204 RFP Amendment 3.pdf PDF
ATTACHMENT J15 Arrival Inspection.docx DOCX document
Pearl_RFP_3.4.2022_Solicitation_Amendment_1.pdf PDF
ATTACHMENT J14 Integrity Inspection (1).docx DOCX document
Pearl_RFP_3.7.2022_Solicitation_Amendment_2.pdf PDF
Exhbt C - Past Performance Questionnaire.docx DOCX document
Attachment J-1 Pre-Proposal Information Form.xlsx XLSX spreadsheet
ATTACHMENT J20 QUALITY ASSURANCE PLAN.pdf PDF
Attachment J-2 Cost Element Summary Spreadsheets Pearl Harbor.xlsx XLSX spreadsheet
CDRL53-54 Pearl Harbor.pdf PDF
ATTACHMENT J21 DD254 (PEARL HARBOR).pdf PDF
CDRL05_08.pdf PDF
Pearl_Harbor_RFP_3.4.2022_Base_Solicitation.pdf PDF
CDRL37_40 Pearl Harbor.pdf PDF
ATTACHMENT 12 Dehumidification.docx DOCX document
ATTACHMENT J9 VEHICLES.xls.xlsx XLSX spreadsheet
CDRL13-16 Pearl Harbor.pdf PDF
CDRL25-28 Pearl Harbor.pdf PDF
ATTACHMENT J16 Security Report.doc DOC document
ATTACHMENT J4 SAFE STOWAGE CHECK OFF LISTS.doc DOC document
ATTACHMENT 10 Tools and Materials Pearl Harbor (1).xlsx XLSX spreadsheet
ATTACHMENT J8 GFE from Navy ERP.xls.xlsx XLSX spreadsheet
CDRL09_12 Pearl Harbor.pdf PDF
CDRL41_44 Pearl Harbor.pdf PDF
ATTACHMENT J6 History Folder Index (1).docx DOCX document
ATTACHMENT J11 Cathodic Protection.docx DOCX document
CDRL45-48 Pearl Harbor.pdf PDF
ATTACHMENT J7 Janitorial Task and Frequency Chart.xlsx.xlsx XLSX spreadsheet
ATTACHMENT J22 INACTSHIPMAINTO Pearl Harbor Organizational Chart.docx DOCX document
CDRL33_36 Pearl Harbor.pdf PDF
CDRL01_04 Pearl Harbor.pdf PDF
ATTACHMENT J5 RRWO.docx DOCX document
CDRL21-24 Pearl Harbor.pdf PDF
CDRL49-52 Pearl Harbor.pdf PDF
ATTACHMENT J19 PCB Inventory.doc DOC document
Exhbt B - Past Performance Data.docx DOCX document
ATTACHMENT J3 VESSELS.xls.xls XLS spreadsheet
CDRL29-32 Pearl Harbor.pdf PDF
ATTACHMENT J18 Mooring_Security.xlsx XLSX spreadsheet
CDRL17-20 Pearl Harbor.pdf PDF
ATTACHMENT J13 FIRE FLOOD INS.docx DOCX document
ATTACHMENT J-23 List of Key Personnel.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Periodicity:

Spec Code:

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

CO1

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item CO2 cylinders are in place on board?

Check latest hydrostatic test data stamped on cylinder dome. Inspection card in place and up to date.

Hose and horn are free of deterioration and fittings are tight?

CO2 band and clamp assembly in satisfactory condition?

The extinguisher valve, handle, locking pin and D-ring are free of damage and corrosion?

Locking pin cannot be removed without breaking anti-pilferage seal? DO NOT BREAK SEAL CO2 Bottles (visual) FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager

Attachment 17 NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing Spec Code:

Line Item # Location Discrepancy Discovery Dt Correction Dt

Periodicity:

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

CO2

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item CO2 cylinders are in place on board?

Locking pin cannot be removed without breaking anti-pilferage seal? DO NOT BREAK SEAL CO2 cylinders are of proper weight?

CO2 Bottles (Weigh) FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager

NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing

Line Item # Location Discrepancy Discovery Dt Correction Dt

File details come from the government source that posted it. Updated .