This document contains inspection guidelines for fire and flood systems on inactive vessels in Pearl Harbor. The guidelines include four attachments outlining inspection procedures for checking continuity of alarm circuits, activating flooding sensors to ensure proper operation, and testing heat and smoke detectors. Inspections are to be conducted quarterly using specification code NSTM 50. Discrepancies are to be documented with location, discovery date, and correction date.

The related federal contract opportunity is solicitation number N00024-21-R-4204 for operation and maintenance of the inactive vessels in Pearl Harbor. Proposals must be received by 3:00 PM on 7 April 2022. The solicitation is released by the Department of the Navy Naval Sea Systems Command.

View the file

Other files

File Type Posted
Attachment J-1 Pre-Proposal Information Form 4.21.22.pdf PDF
Exhbt C - Past Performance Questionnaire Rev 1.docx DOCX document
Attachment J-1 Rev 1 19Apr22.pdf PDF
ATTACHMENT J-4 - Tank Soundings Template.xls XLS spreadsheet
N00024-21-R-4204 Amendment 4.pdf PDF
N00024-21-R-4204 RFP Amendment 3.pdf PDF
ATTACHMENT J15 Arrival Inspection.docx DOCX document
Pearl_RFP_3.4.2022_Solicitation_Amendment_1.pdf PDF
ATTACHMENT J14 Integrity Inspection (1).docx DOCX document
Pearl_RFP_3.7.2022_Solicitation_Amendment_2.pdf PDF
Exhbt C - Past Performance Questionnaire.docx DOCX document
Attachment J-1 Pre-Proposal Information Form.xlsx XLSX spreadsheet
ATTACHMENT J20 QUALITY ASSURANCE PLAN.pdf PDF
Attachment J-2 Cost Element Summary Spreadsheets Pearl Harbor.xlsx XLSX spreadsheet
CDRL53-54 Pearl Harbor.pdf PDF
ATTACHMENT J21 DD254 (PEARL HARBOR).pdf PDF
CDRL05_08.pdf PDF
Pearl_Harbor_RFP_3.4.2022_Base_Solicitation.pdf PDF
CDRL37_40 Pearl Harbor.pdf PDF
ATTACHMENT J17 Fire Extinguisher Log.docx DOCX document
ATTACHMENT 12 Dehumidification.docx DOCX document
ATTACHMENT J9 VEHICLES.xls.xlsx XLSX spreadsheet
CDRL13-16 Pearl Harbor.pdf PDF
CDRL25-28 Pearl Harbor.pdf PDF
ATTACHMENT J16 Security Report.doc DOC document
ATTACHMENT J4 SAFE STOWAGE CHECK OFF LISTS.doc DOC document
ATTACHMENT 10 Tools and Materials Pearl Harbor (1).xlsx XLSX spreadsheet
ATTACHMENT J8 GFE from Navy ERP.xls.xlsx XLSX spreadsheet
CDRL09_12 Pearl Harbor.pdf PDF
CDRL41_44 Pearl Harbor.pdf PDF
ATTACHMENT J6 History Folder Index (1).docx DOCX document
ATTACHMENT J11 Cathodic Protection.docx DOCX document
CDRL45-48 Pearl Harbor.pdf PDF
ATTACHMENT J7 Janitorial Task and Frequency Chart.xlsx.xlsx XLSX spreadsheet
ATTACHMENT J22 INACTSHIPMAINTO Pearl Harbor Organizational Chart.docx DOCX document
CDRL33_36 Pearl Harbor.pdf PDF
CDRL01_04 Pearl Harbor.pdf PDF
ATTACHMENT J5 RRWO.docx DOCX document
CDRL21-24 Pearl Harbor.pdf PDF
CDRL49-52 Pearl Harbor.pdf PDF
ATTACHMENT J19 PCB Inventory.doc DOC document
Exhbt B - Past Performance Data.docx DOCX document
ATTACHMENT J3 VESSELS.xls.xls XLS spreadsheet
CDRL29-32 Pearl Harbor.pdf PDF
ATTACHMENT J18 Mooring_Security.xlsx XLSX spreadsheet
CDRL17-20 Pearl Harbor.pdf PDF
ATTACHMENT J-23 List of Key Personnel.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Periodicity:

Spec Code:

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

FF1

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item Check continuity of each heat, smoke and flood alarm circuit at the control panel. Record results below. Are all readings satisfactory?

Have all other discrepancies been reported? If not report them here.

F/F Continuity FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager Circuit Continuity Test Results SW No.

Cir Type K Ohm Test Location Sat Unsat SW No.

Cir Type K Ohm Test Location Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat

Attachment 12 NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing Spec Code:

Line Item # Location Discrepancy Discovery Dt Correction Dt

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

FF2

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item Audible alarm and alarm light are activated by the test switch?

Is the power available light energized at all times except during continuity testing ?

Does test switch indicate proper vessel and alarm on remote monitoring computer; can alarm be silenced from remote monitoring computer?

Have all other discrepancies been reported? If not report them here.

Fire Panel FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager

Line Item # Location Discrepancy

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

FF3

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item Activate all flooding sensors by tipping floats or shorting probes to check for proper operation.

Are sensor cutout switches numbered and chart present? Do cutouts isolate alarms circuit as indicated on chart?

All sensors operated mannually indicate proper vessel and location on remote monitoring systems.

Are Fire/Flood sensors correctly located in respect to electrical power and water tight sub-division of a ship?

Visual and audible alarms activate when the sensor is actuated.

Each fire wire heat sensor is activated.

Each smoke detector is activated using canned smoke to ensure its proper operation.

Have all other discrepancies been reported? If not report them here.

Flood Tip Float (MOB B) FWD Draft:

AFT Draft:

List:

Comments:

Inspector

Line Item # Location Discrepancy

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

FF4

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item Visual and audible alarms activate when the sensor is actuated.

Activate all flooding sensors by tipping floats or shorting probes to check for proper operation.

Are sensor cutout switches numbered and chart present? Do cutouts isolate alarms circuit as indicated on chart?

All sensors operated mannually indicate proper vessel and location on remote monitoring systems.

Are Fire/Flood sensors correctly located in respect to electrical power and water tight sub-division of a ship?

Each heat sensor is activated using a hot air gun to ensure its proper operation. (exercise extreme caution to prevent damage to heat dectecting element due to overheating) Each smoke detector is activated using canned smoke to ensure its proper operation.

Have all other discrepancies been reported? If not report them here.

Flood Tip Float (Non MOB B) FWD Draft:

AFT Draft:

List:

Comments:

Inspector

Line Item # Location Discrepancy