ATTACHMENT J15 Arrival Inspection.docx

DOCX document 232 KB Posted

Attached to
Operation and Maintenance of Pearl Harbor Inactive Vessels
Solicitation number
N00024-21-R-4204
Issued by

About this file

This document contains an arrival inspection checklist for inactive vessels berthed at Pearl Harbor, along with details of a related federal contract opportunity. The inspection checklist outlines 50 items to be reviewed including the condition of mooring lines, flood markers, watertight doors and hatches, emergency exits, classified material storage, bilges and voids, mechanical safety devices, hazardous materials, ship's records, draft readings and other structural elements. The related solicitation seeks proposals for the operation and maintenance of the inactive vessels, with proposals due by April 7, 2022. The Naval Sea Systems Command is the contracting agency. The opportunity description does not provide additional details on required services, pricing terms, set asides or incumbents.

View the file

Other files

File Type Posted
Attachment J-1 Pre-Proposal Information Form 4.21.22.pdf PDF
Exhbt C - Past Performance Questionnaire Rev 1.docx DOCX document
Attachment J-1 Rev 1 19Apr22.pdf PDF
ATTACHMENT J-4 - Tank Soundings Template.xls XLS spreadsheet
N00024-21-R-4204 Amendment 4.pdf PDF
N00024-21-R-4204 RFP Amendment 3.pdf PDF
Pearl_RFP_3.4.2022_Solicitation_Amendment_1.pdf PDF
ATTACHMENT J14 Integrity Inspection (1).docx DOCX document
Pearl_RFP_3.7.2022_Solicitation_Amendment_2.pdf PDF
Exhbt C - Past Performance Questionnaire.docx DOCX document
Attachment J-1 Pre-Proposal Information Form.xlsx XLSX spreadsheet
ATTACHMENT J20 QUALITY ASSURANCE PLAN.pdf PDF
Attachment J-2 Cost Element Summary Spreadsheets Pearl Harbor.xlsx XLSX spreadsheet
CDRL53-54 Pearl Harbor.pdf PDF
ATTACHMENT J21 DD254 (PEARL HARBOR).pdf PDF
CDRL05_08.pdf PDF
Pearl_Harbor_RFP_3.4.2022_Base_Solicitation.pdf PDF
CDRL37_40 Pearl Harbor.pdf PDF
ATTACHMENT J17 Fire Extinguisher Log.docx DOCX document
ATTACHMENT 12 Dehumidification.docx DOCX document
ATTACHMENT J9 VEHICLES.xls.xlsx XLSX spreadsheet
CDRL13-16 Pearl Harbor.pdf PDF
CDRL25-28 Pearl Harbor.pdf PDF
ATTACHMENT J16 Security Report.doc DOC document
ATTACHMENT J4 SAFE STOWAGE CHECK OFF LISTS.doc DOC document
ATTACHMENT 10 Tools and Materials Pearl Harbor (1).xlsx XLSX spreadsheet
ATTACHMENT J8 GFE from Navy ERP.xls.xlsx XLSX spreadsheet
CDRL09_12 Pearl Harbor.pdf PDF
CDRL41_44 Pearl Harbor.pdf PDF
ATTACHMENT J6 History Folder Index (1).docx DOCX document
ATTACHMENT J11 Cathodic Protection.docx DOCX document
CDRL45-48 Pearl Harbor.pdf PDF
ATTACHMENT J7 Janitorial Task and Frequency Chart.xlsx.xlsx XLSX spreadsheet
ATTACHMENT J22 INACTSHIPMAINTO Pearl Harbor Organizational Chart.docx DOCX document
CDRL33_36 Pearl Harbor.pdf PDF
CDRL01_04 Pearl Harbor.pdf PDF
ATTACHMENT J5 RRWO.docx DOCX document
CDRL21-24 Pearl Harbor.pdf PDF
CDRL49-52 Pearl Harbor.pdf PDF
ATTACHMENT J19 PCB Inventory.doc DOC document
Exhbt B - Past Performance Data.docx DOCX document
ATTACHMENT J3 VESSELS.xls.xls XLS spreadsheet
CDRL29-32 Pearl Harbor.pdf PDF
ATTACHMENT J18 Mooring_Security.xlsx XLSX spreadsheet
CDRL17-20 Pearl Harbor.pdf PDF
ATTACHMENT J13 FIRE FLOOD INS.docx DOCX document
ATTACHMENT J-23 List of Key Personnel.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Periodicity:

Spec Code:

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item Mooring lines, chains, wire ropes, and camels are adequate and properly secured? Check for signs of wear, damage and preservation.

Flood markers are at the waterline on the bow and stern and visible from a distance to detect a change in draft.

Brow is properly placed, secure and safe.

Topside Watertight doors, hatches and scuttles are secured from the inside or padlocked from the outside? (All doors and hatches shall be secured to allow opening from the inside in case of emergency) Emergency exit(s) to vessels weather decks other than Main Access can only be opened from the inside of the ship and the route and hatch are plainly marked.

Classified material storage is secure?

Storerooms are locked and secured Pilferable gear locker is locked or welded shut?

Ships records are properly secured?

Bilges, voids and open tanks are free of oil, water and trash?

Internal above waterline spaces are weather-tight and dry.

Fire hazards are removed. (Flammable materials, trash, etc.)

Mechanical safety devices: lifelines, safety chains at ladders, hatches and scuttles are installed and in good working order.

Is vessel electrically safe? Wiring safe and adequate, rubber matting properly placed in front of all energized equipment.

Items on PCB inventory (transformers and capacitors) inspected for leaks. No leakage observed?

Hazardous Material/Waste has been removed.

Ships exterior preservation is in good condition. Update COF as required.

Main Access has fire bulletin posted, fire bottles are in place and a Sign-In Log available and being utilized?

Is Lighting in compartments at a minimum of 50%?

Have all safety hazards been reported? If not list compartment / location and nature of hazard.

Verify condition of mooring lines and chaffing gear. Water is free of obstructions which may jeopardize the hull?

Air condition and refrigeration units are pumped down and isolated. Where refrigerant has been evacuated from equipment and charged with nitrogen is pressure holding? (3-5 psig) All insulating material has been sealed to prevent possible spread of asbestos?

All sea valves are blank flanged with valves shut tight and seizing wire is adequate to prevent opening at valve.

ARRIVAL INSPECTION

Attachment 14 All Emergency Beacons have been removed from the ship?

Manhole screens and deck plates in place and secured properly.

All weather deck openings; stacks, ventilation intakes and exhaust, hatches, port holes, stuffing tubes; sealed?

COF items checked and updates made to the MR?

Record FWD, AFT Draft and ships List. Changes identified since last inspection?

Ships Records are properly secured in History Folders in Building 545?

TAG-OUT log updated? List / Identify any unterminated cables.

Shaft and Rudder Locks are in place and properly mounted? Locks are undamaged?

Stern tube(s) packing glands are watertight and dry (adequate packing gland available for additional adjustments)?

Have all other discrepancies been reported? If not report them here.

FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager

NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing Spec Code:

Line Item # Location Discrepancy Discovery Dt Correction Dt

File details come from the government source that posted it. Updated .