Attachment J09 - Price Breakdown.docx
DOCX document 20 KB Posted
- Solicitation number
- 75H70122R00005
About this file
This document contains a price breakdown template and details for the Fort Duchesne PHS Indian Health Clinic Renovation solicitation. The price breakdown template requires offerors to provide lump sum pricing for various construction categories including concrete, masonry, metals, woods and plastics, finishes, equipment, furnishings, earthwork, exterior improvements, utilities, general conditions, overhead and profit. The solicitation is for the renovation of the Fort Duchesne PHS Indian Health Clinic issued by the Department of Health and Human Services Indian Health Service on November 10, 2021. It is a total small business set-aside with an estimated construction magnitude over $10,000,000 and a 365 calendar day performance period from notice to proceed. A site visit is scheduled and offerors should refer to provision L.8 for details.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J09. Price Breakdown Solicitation 75H701-22-R-00005
PRICE BREAKDOWN
All offerors shall fill out and submit a completed Pricing Sheet with their proposal. The pricing sheet is not contractually binding; however it will assist in the price reasonableness analysis and verification that the offeror understands the scope of the project.
Prices below shall be inclusive of all applicable Federal, State, and local taxes (except tribal fees which are listed separate).
| Labor |
| Materials |
| Total |
| Concrete |
| $ |
| $ |
| $ |
| Masonry |
| $ |
| $ |
| $ |
| Metals |
| $ |
| $ |
| $ |
| Woods & Plastics |
| $ |
| $ |
| $ |
| Thermal and Moisture Protection |
| $ |
| $ |
| $ |
| Doors & Windows |
| $ |
| $ |
| $ |
| Finishes |
| $ |
| $ |
| $ |
| Specialties |
| $ |
| $ |
| $ |
| Equipment |
| $ |
| $ |
| $ |
| Furnishings |
| $ |
| $ |
| $ |
| Special Construction |
| $ |
| $ |
| $ |
| Conveying Systems |
| $ |
| $ |
| $ |
| Fire Suppression |
| $ |
| $ |
| $ |
| Plumbing |
| $ |
| $ |
| $ |
| HVAC |
| $ |
| $ |
| $ |
| Electrical |
| $ |
| $ |
| $ |
| Communication |
| $ |
| $ |
| $ |
| Electronic Safety & Security |
| $ |
| $ |
| $ |
| Earthwork |
| $ |
| $ |
| $ |
| Exterior Improvements |
| $ |
| $ |
| $ |
| Utilities |
| $ |
| $ |
| $ |
| Construction Subtotal |
| $ |
| $ |
| $ |
General Conditions
Existing Conditions
Bonds & Insurance
OVERHEAD/PROFIT _______%
TERO TAXES/FEES _______%
Base Bid Lump Sum $_________________
END OF DOCUMENT
File details come from the government source that posted it. Updated .