Amendment 7 75H70122R00005.pdf
PDF 618 KB Posted
- Solicitation number
- 75H70122R00005
About this file
This document provides responses to pre-proposal inquiries for a Request for Proposal to renovate the Fort Duchesne PHS Indian Health Clinic. The RFP is seeking general construction services for renovations including new modular buildings to serve as temporary facilities during construction. Key details include a performance period of 365 calendar days from notice to proceed, an estimated construction magnitude over $10 million, and a total small business set-aside competition. The document addresses questions on specifications for items like BBQ equipment, picnic tables, shade structures, insulation, and security requirements. It also clarifies details for the temporary modular facilities like electrical service, permits, lighting, climate control needs, and layout of security and access control systems.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A0007
SUMMARY OF CHANGES:
The purpose of this amendment is to answer pre-proposal inquiries and to correct an error in Amendment 6.
The proposal due date in Amendment 6 incorrectly stated the date. Proposals are due Thursday February 3, 2022 at 2:00 PM pacific time.
See continuation page.
All other terms and conditions remain unchanged.
Indian Health Service – Division of Engineering Services 701 Fifth Avenue, Suite 1650 Seattle, WA 98104
SEE BLOCK 6.
75H70122R00005
1 9
01/18/2022
11/10/2021
Amendment of Solicitation Amendment A00007 under Solicitation 75H70122R00005 Fort Duchesne PHS Indian Health Clinic Renovation
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H70122R00005
PROJECT:
Fort Duchesne PHS Indian Health Clinic Renovation
LOCATION: Fort Duchesne, Utah
PROJECT NO: PH19UO01C7
DOCUMENT
OWNER: Matthew Phelps PHONE: (206) 613-2153 DOCUMENTS:
DATE: 01/06/2022 DEPARTMENT: IHS/DES
Item No.
Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response
Amendment A00007 dated 01/18/2022
Questions received after Pre‐Proposal Site Visit
14. Spec What is the BBQ built out of? Details for Design/Finishes?
Civil
RTF48‐29‐KC ‐ Universal 48” – Ready to Finish Kamado BBQ Island, RTV72‐29‐AC ‐ Universal with 72‐Inch Ready to finish BBQ Island Cabinet ‐ BOTH SIDES. Red/Brown granite top with tile finish, color to match building.
Bbqguys.com – or approved equal.
15. Spec What is the spec for the picnic tables? Civil H‐2129GR – Metal Picnic Table – 8’ Rectangle Gray uline.com ‐ or approved equal.
16. Spec What is the design/Spec for the shade over the BBQ?
Civil
AS28‐04 ‐ 28’X28’ All Steel Square Forestview Pavilion Gazebocreations.com or approved equal, Spec Section 107300
17. Spec Catwalk Details there are none? Grating spec/Structural Detail (how does it attach to building)/Design
Struct See details on A1.5. See updated details on new attachment “19103‐U&O Health Center RFI 17 Response”
18. Spec Insulation R‐49? Only ceiling/only walls/ all of the project?
R‐49 batt insulation for new roofs. R‐19 Batt Insulation in new walls with R7.5 Rigid insulation see wall types.
19. Spec Old Catwalk? Are we to demo the old catwalk?
Demo old catwalk. New catwalk as per A1.5
Fort Duchesne PHS Indian Health Clinic Renovation
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H70122R00005
PROJECT:
Fort Duchesne PHS Indian Health Clinic Renovation
LOCATION: Fort Duchesne, Utah
PROJECT NO: PH19UO01C7
DOCUMENT
OWNER: Matthew Phelps PHONE: (206) 613-2153 DOCUMENTS:
DATE: 01/06/2022 DEPARTMENT: IHS/DES
Item No.
20. Spec How long will it take the IHS staff to move from facility to temp trailers?
Per Facility Manager ‐ The clinic will likely be closed for a week to allow for staff to move. Estimate 3 days for staff physically moving locations.
21. Spec How long will it take for the staff to move back to the facility?
Per Facility Manager ‐ The clinic will likely be closed for a week to allow for staff to move. Estimate 3 days for staff physically moving locations.
Fort Duchesne PHS Indian Health Clinic Renovation
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H70122R00005
PROJECT:
Fort Duchesne PHS Indian Health Clinic Renovation
LOCATION: Fort Duchesne, Utah
PROJECT NO: PH19UO01C7
DOCUMENT
OWNER: Matthew Phelps PHONE: (206) 613-2153 DOCUMENTS:
DATE: 01/06/2022 DEPARTMENT: IHS/DES
Item No.
22. Spec Gas meter relocation? Who is the Gas Company? Where do you want it moved to?
The existing meter location is shown on sheet C‐3 The proposed new meter location is shown on sheet P‐ 1.2
Gas Company:
Moon Lake Electric: 435‐722‐5400 Meter Number: QSG27200683
Fort Duchesne PHS Indian Health Clinic Renovation
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H70122R00005
PROJECT:
Fort Duchesne PHS Indian Health Clinic Renovation
LOCATION: Fort Duchesne, Utah
PROJECT NO: PH19UO01C7
DOCUMENT
OWNER: Matthew Phelps PHONE: (206) 613-2153 DOCUMENTS:
DATE: 01/06/2022 DEPARTMENT: IHS/DES
Item No.
23. RFP
The published wage determination does not include categories for the following trades:
Flooring: Carpet and anything besides tile.
Polished Concrete Drywallers Finish Carpenters HVAC (non‐sheet metal) Roofers Painting Asphalt layers Utility pipefitters Landscapers Doors, Frames and Hardware Installers Aluminum Frame and Glazing Installers
Can you please address these omissions?
CO
Per the Wage Determination in the RFP:
Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate).
24. Spec Will the government accept in fleet buildings less than 5 years old for this project?
Yes per IHS
Fort Duchesne PHS Indian Health Clinic Renovation
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H70122R00005
PROJECT:
Fort Duchesne PHS Indian Health Clinic Renovation
LOCATION: Fort Duchesne, Utah
PROJECT NO: PH19UO01C7
DOCUMENT
OWNER: Matthew Phelps PHONE: (206) 613-2153 DOCUMENTS:
DATE: 01/06/2022 DEPARTMENT: IHS/DES
Item No.
25. Spec
Are the parking spaces in the middle being used or can they be covered by D/S/R? We will need to install multiple decks, step and HC ramps in some of this area.
Yes per IHS
26. Spec Do the temporary buildings require security cameras, sound masking, or any special door locks?
Elec
Yes, the temporary buildings will require these systems to the extent that the new building has them implemented. The contractor will need to provide a floor plan layout of the temporary buildings along with layout of these systems for architectural/engineering review and approval.
27. Spec Does the Medical Records Storage dedicated Conex need to be a climate‐controlled space?
Per Facility Manager ‐ Yes, climate controlled (temperature and humidity) for paper storage.
28. Spec Specs state that HVAC equipment LP gas or fuel oil. Is electrical HVAC equipment acceptable?
Mech RFI is too vague. Provide exact section and paragraph is specification.
29. Spec Specs state that primary and secondary 4 stage HEPA‐equipped portable units are required. Are these provided by GC? GC to provide primary and secondary 4 stage HEPA‐ equipped portable units.
30. Spec Is the GC responsible for any required permits for the temporary buildings? Yes, the GC is responsible for permits for the temporary buildings.
31. Spec Are any flood lights required on the exterior of the temporary buildings to luminate the parking area?
Per Facility Manager ‐ Yes, flood lights will be required for parking area illumination and security purposes
Fort Duchesne PHS Indian Health Clinic Renovation
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H70122R00005
PROJECT:
Fort Duchesne PHS Indian Health Clinic Renovation
LOCATION: Fort Duchesne, Utah
PROJECT NO: PH19UO01C7
DOCUMENT
OWNER: Matthew Phelps PHONE: (206) 613-2153 DOCUMENTS:
DATE: 01/06/2022 DEPARTMENT: IHS/DES
Item No.
32. Spec Is there a roller system for the files and if so, where does it go?
There is a roller system file in the completed building see information in Medical Records Storage Room 183. The existing roller file system is to be demolished.
33. Spec Is 9‐gauge metal mesh required in the pharmacy ceiling and floors for security purposes?
See information for barrier mesh requirements for Pharmacy Ceiling on A‐1.3C. For the walls on the wall types sheet G‐2.2 and floor plan A‐1.2C. The floor is an existing slab on grade. Temporary pharmacy building to be constructed to discourage security breach.
34. Spec What are the security requirements for the pharmacy dispensing rollup doors?
See requirements for doors 102 in door schedule. Both roll down doors to meet requirements of door 102. See RCP A‐1.2C. Cooling door details on A‐6.2 and spec section 083323 Overhead coiling door. The (2) pickup windows for the temporary pharmacy building to meet the same requirements for the coiling doors and the bullet proof glass at the transaction counter.
35. Spec Requesting information on where access control is required in any of the buildings. Elec
Use the main building as the template for where access control will be required in the temporary buildings. We will review the contractor’s layout for this equipment when it is available during the construction period.
36. Spec Is the temp power shown as 800 AMP/208 Volt, 3 phase?
Elec
Yes, we are using 800A, 120/208V, three phase, four wire electrical service as the temporary feed to the modular buildings. The existing 1200A service will be shared with the renovated building until the temporary buildings can be shed.
Fort Duchesne PHS Indian Health Clinic Renovation
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H70122R00005
PROJECT:
Fort Duchesne PHS Indian Health Clinic Renovation
LOCATION: Fort Duchesne, Utah
PROJECT NO: PH19UO01C7
DOCUMENT
OWNER: Matthew Phelps PHONE: (206) 613-2153 DOCUMENTS:
DATE: 01/06/2022 DEPARTMENT: IHS/DES
Item No.
37. Spec If it is determined that the 800 AMP is not sufficient, is there a secondary source of power?
Elec
Not readily available. If a larger power source were required, it would likely require a new medium voltage ground sleeve and utility transformer. This would have to be coordinated with the electrical utility.
38. Spec In regards to the electrical panel boards. The AIC ratings are blank on the panel schedules and are not shown on the one line either. Can you provide these?
Elec
MDP=42kAIC P1=22kAIC P2=22kAIC P3=10kAIC PA=10kAIC EM1=22kAIC EM2=10kAIC
UP
752 SF
AIR HANDLER ROOM
275 SF
HW HEATER ROOM
69 SF
ELECT.
35 SF
HALLWAY
A-6.2
66 7 7
TYP
A-1.5
A-1.5
A-1.5
A-1.5
8 8
8 8
88 88 8888
88 10
3 5/8" METAL STUD FRAMING 16" O.C.
SEE STRUCTURAL
8" METAL STUD HEADER,
SEE STRUCTURAL
3 5/8" METAL STUD,
SEE STRUCTURAL
EXPANDED METAL CATWALK
SHEAR WALL SHEATHING,
SEE STRCTURAL
OPEN
CATWALK
3 5/8" METAL STUD O.C.
SEE STRUCTURAL.
OPENING IN THE SHEAR WALL
SHEAR WALL; SHEATHING
AS PER STRUCTURAL
3 5/8"METAL STUD
A-1.5
CATWALK KICKPLATE
1'
- 6
2' - 6"
ROOF DECK, SEE STRUCTURAL
BRUSHED METAL PIPE HANDRAIL
CATWALK GRATING W-19-4 (3/4"x3/16")
CONTINUOUS KICKPLATE
2'
- 0
BRUSHED HSS2x2x1/4
C8x11.5
L5x5x5/16 L5x5x5/16
L6x4x5/16x0'7"
(LLV) TYP
CATWALK MUST BE FIELD LOCATED AT JOIST PANEL POINT
FIELD SPACING TO BE NO MORE THAN 3'-0" O.C.
L5x5x5/16
L3x3x1/4 BRACE AT 8'-0" O.C. MAX
(LATERAL BRACING NEED NOT BE
LOCATED AT JOIST PANEL POINT)
WHERE JOIST PANEL POINTS SPACING DOES NOT
ALLOW FOR ANGLE TO SPAN AND 'PICK UP' BOTH
CATWALK HSS SUPPORTS, PROVIDE HSS5X5X3/16
L6x4x5/16x0'-7" (LLV) LOCATE AT
JOIST PANEL POINTS, TYP
L5x5x5/16 SPANNING
BETWEEN JOIST
(AT PANEL POINTS)
L5x5x5/16 SPANNING BETWEEN ANGLE
FRAMES. ONLY REQUIRED WHERE
ATTACHING TO VERTICAL HSS
STEEL PLATE 1/2"x6"X0'-6"
(ALIGN WITH TOP OF CHANNEL)
(PARALLEL TO ROOF FRAMING)
(PERPENDICULAR TO ROOF FRAMING)
TYP
TYP
(3) SIDES
TYP
TYP
TYP
TYP
TYP
TYP
1/4
1/4
1/4
1/4
1/4 1/4
1/4
FI
EL
D
VE
RI
FY
H
EI
GH
T
C
135 EAST CENTER STREET, NORTH SALT LAKE, UTAH 84054 PHONE: (801 ) 936-1343FAX: (801 ) 936-0180
Copyright 2020 JZW Architects - The Purchaser is granted a single use license for construction only. These plans are copyrighted and are subject to copyright protection as an "architectural work" under the copyright act. The protection includes but is not limited to the overall form as well as the arrangement and composition of spaces. Under such protection, unauthorized use of these plans, work, or structure represented will result in the cessation of construction and / or monetary compensation to JZW Architects.
PROJECT NUMBER
ISSUE DATE:
REVISIONS:
CONSULTANT
19103
JULY 24, 2020
A-1.5
CATWALK ACCESS
PLAN
U& O
HE
AL
TH
C
EN
TE
R
E
S
FO
RT
D
UC
HE
SN
E, U
T
1/8" = 1'-0"A-1.5
1 UPPER CATWALK PLAN
KEYED NOTES
1 INTERIOR SHEAR WALL TO EXTEND TO DECK; SEE STRUCTURAL
2 APPROXIMATELY 6' 0" HEAD HEIGHT TO JOIST; FIELD VERIFY
3 MECHANICAL DUCTS & EQUIPMENT, SEE MECHANICAL PLANS
4 SKYLIGHT; SEE DETAILS ON A-10.3
5 NEW ROLL-DOWN DOOR; SEE DOOR SCHEDULE
6 METAL CATWALK SYSTEM WITH UNISTRUT SUPPORTS AT 12'-0" A.F.F.; GUARD
RAILS AND METAL GRATE FLOOR, SEE DETAIL 4/A-1.5
7 FRAMED OPENING IN SHEAR WALL. SEE DETAIL 3/A-1.5
8 ATTIC ACCESS THROUGH ACT FOR MECHANICAL EQUIPMENT UNACCESSIBLE
FROM CATWALK; SEE REFLECTED CEILING PLANS FOR LOCATION.
9 METAL CATWALK STAIR SYSTEM TO CONNECT TO CATWALK AT 12'-0" A.F.F.
10 30" X 30" ATTIC ACCESS HATCH
11 APPROXIMATELY 4-6" HEAD HEIGHT TO JOIST; FIELD VERIFY
12 RAILING TO BE INSTALLED AS PER DETAIL 4/A-1.5
13 COORDINATE CATWALK WITH DOOR OPENING IN BOTH WIDTH AND HEIGHT
1/2" = 1'-0"A-1.5
FRAMED OPENING IN SHEAR WALL
DETAIL
1/2" = 1'-0"A-1.5
3 FRAMED OPENING DETAIL 1" = 1'-0"A-1.5
4 CATWALK DETAIL
No. Date
3 1/17/2022
NOTE: COORDINATE CATWALK INSTALLATION WITH MECHANICAL DUCTWORK
PLANS. DUCTS SHALL BE RUN BELOW THE CATWALK SYSTEM WHERE POSSIBLE. IF
IT IS REQUIRED TO RUN THE DUCTS ABOVE THE CATWALK THEY ARE TO BE
MINIMUM 6' 6" ABOVE THE WALKING SURFACE. LOCATIONS WHERE THIS CANNOT
BE DONE ARE TO HAVE THE DUCTWORK RUNNING BELOW THE STAIR SURFACE
WITH A STAIR SYSTEM RUNNING OVER IT.
| B05 SF30 Amendment 7 |
| B04 Pre-Proposal Inquiries FD Clinic - 75H70122R00005 Responses 14-38 |
| B05 19103-U&O Health Center RFI 17 Response |
| Sheets |
| A-1.5 - CATWALK ACCESS PLAN |