The file's text, extracted by GovTribe without its formatting.
BY (~FY26)
Follow-On Product Family Support Contract - Level of Effort Table (BASE Year)
| | N55236-25-R-3000 Section J Attachment J-8 | | | |
| | SWRMC PF / CODE | SUPPORT POSITION TITLE | SOW SECTION | LOCATION/BLDG |
| (DEFAULT IS NBSD) | REQUIREMENTS HOLDER | DOL SCA WD CATEGORY | # OF POSITIONS | ST HOURS | |
| (FORMULA) | OT HOURS TOTAL (FORMULA) | CLEARANCE OR BACKGROUND INVESTIGATION | CAC | | |
| ("YES" OR "NO") | ON-SITE OR OFF-SITE | | | | |
ON-SITE SUPPORT
| Corrosion Control PF 910 | | | | | | | | | | | |
| 912 | Lead/Senior Corrosion Control Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Lead | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 5 | 9800 | 125 | N/A | No | On-Site |
| 912 | Welder Lead | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Welder | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 4 | 7840 | 100 | N/A | No | On-Site |
| 922 | WTD Technician | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 927 | Life Raft Repair Technician | 3.3.4 | 3338 | Larry Kennedy/Michael Ringleman | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 929 | RSL Technician | 3.3.6 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 957 | Painter Lead | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 957 | Painter | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 957 | Painter | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 957 | Electronics Mechanic | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Engine PF 930 | | | | | | | | | | | |
| 911 | Rigger | 3.4.6 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 9 | 17640 | 225 | Tier 3 | Yes | On-Site |
| 913 | AC&R Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 913 | Electrician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 913 | Lead/Senior Engineering Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 913 | Engineering Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 925 | Welder | 3.4.5 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 9 | 17640 | 225 | Tier 3 | Yes | On-Site |
| 931 | Lead/Senior Diesel Technician | 3.4.1 | 3418 | Kelvin Vaden/Arturo Santos | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 931 | Diesel Technician | 3.4.1 | 3418 | Kelvin Vaden/Art Santos | Engineering Tech 4 | 8 | 15680 | 200 | Tier 3 | Yes | On-Site |
| 932 | Gas Turbine Technician | 3.4.2 | 3418 | Kelvin Vaden/Francis Genilo | Engineering Tech 4 | 5 | 9800 | 125 | Tier 3 | Yes | On-Site |
| 946 | Flex Hose Mechanic | 3.4.3 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Machine PF 940 | | | | | | | | | | | |
| 941 | Lead/Senior Inside Machinist | 3.5.2 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 941 | Inside Machinist | 3.5.3 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-site |
| 941 | Inside Machinist | 3.5.4 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-site |
| 941 | Additive Manufacturing Technician | 3.5.2 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | Lead/Senior Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 942 | Lead/Senior ESU Technician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | ESU Mechanic | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | ESU Mechanic | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 942 | ESU Electrician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 942 | ESU Electrician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 943 | Pump Technician | 3.5.6 | 61 | Tom Thomas/Antonio Jones | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 944 | Valve Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 944 | Deluge Valve Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 928 | SCBA Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 945 | Compressor Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 945 | Compressor Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 945 | AC&R Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 945 | AC&R Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 949 | Optical Equipment Technician | 3.5.5 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Combat Systems PF 950 | | | | | | | | | | | |
| 952 | Gun Systems Technician | 3.6.3 | 3278 | Jerry Ring/Ashley Collins | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 953 | 2M / FO Technician | 3.6.5 | 3338 | Jerry Ring/Raul Munoz | Electronics Technician Maint. 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 954 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 954 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 955 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 955 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 957A | External Communications Technician | 3.6.2 | 3339 | Jerry Ring/Raul Munoz | Telecommunications Mechanic 2 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 958A | Electric Motor Rewind Technician | 3.6.6 | 3278 | Jerry Ring/Raul Munoz | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 958 | Outside Electrical Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 4 | 3 | 5880 | 75 | Secret | Yes | On-Site |
| 959B | Metrology Technician | 3.6.6 | NASNI 463 | Jerry Ring/Jerome Lawrence | Metrology Tech 2 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 959B | Metrology Technician | 3.6.6 | 116 | Jerry Ring/Jerome Lawrence | Metrology Tech 1 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 959 | Lead/Senior Interior Communication Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 5 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 959 | Interior Communication Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 4 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| Process Improvement 900PI | | | | | | | |
| 900PI | Lean Six Sigma Black Belt | 3.8 | 3418 | Ashley Sparks | Non-DOL SCA WD Labor Cat (~$95/hr) | 1 | 1176 |
tc={A1D29A67-E9BA-4416-9601-B4D3560C7570}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Part-time position, approximately 24 hours per week. | 25 | Tier 3 | Yes | On-Site | | | | | | | | | |
| | 900PI | Engineer (Industrial, Chemical, or Mechanical) | 3.8 | 3418 | Ashley Sparks | Engineering Tech 5 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Millwright Support | | | | | | | | | | | |
| 900 | Millwright | 3.7 | 3418 | Technical Director (TBD)/Tom Thomas | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Production Control Div 960 | | | | | | | | | | | |
| 963 | Maintenance Coordinator | 3.9.1 | 3116,77,36,94,3278 | Ron Bible | Engineering Tech 4 | 23 | 45080 | 575 | Secret | Yes | On-Site |
| 963 | Maintenance Coordinator | 3.9.1 | 3116,77,36,94,3278 | Ron Bible | Engineering Tech 3 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 964 | Material Coordinator | 3.9.2 | 3418,61,3339,3278 | Ron Bible/Felicia Lara | Supply Technician | 12 | 23520 | 300 | Tier 3 | Yes | On-Site |
| 964 | Material Coordinator | 3.9.2 | 3418,61,3339,3279 | Ron Bible/Felicia Lara | Material Coordinator | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| I-Level Planning Div 962 | | | | | | | | | | | |
| 962 | Structural/Piping Planner | 3.10 | 77 | Benjamin Aller | Engineering Tech 5 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Diesel/Gas Turbine Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Machinery Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Electrical Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 3 | 5880 | 75 | Secret | Yes | On-Site |
| 962 | Electronics Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 962 | Services Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| Dry Dock Div 980 | | | | | | | | | | | |
| 980 | Industrial Mechanic | 3.11.2, 3.11.3 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 980 | Industrial Mechanic | 3.11.2, 3.11.3 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 8 | 15680 | 200 | Tier 3 | Yes | On-Site |
| 980 | Industrial Electrician | 3.11.2, 3.11.4 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 980 | Industrial Electrician | 3.11.2, 3.11.4 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 8 | 15680 | 200 | Tier 3 | Yes | On-Site |
| 980 | Crane Operator | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 980 | Rigger | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 980 | Crane Technician | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 980 | Shipwright | 3.11.2, 3.11.6 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 980 | Shipfitter/Pipefitter/Welder | 3.11.2, 3.11.6 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Expeditionary Maintenance 800 | | | | | | | | | | | |
| 800 | Lead Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 800 | Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 4 | 7 | 13720 | 175 | Tier 3 | No | On-Site |
| 800 | Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 3 | 6 | 11760 | 150 | Tier 3 | No | On-Site |
OFF-SITE FACILITY
| Off-Site Hoist Shop | | | | | | | | | | | |
| 900 | Lead/Senior Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 4 | 7840 | 100 | N/A | No | Off-Site |
| 900 | Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | Off-Site |
| Off-Site RIB Shop | | | | | | | | | | | |
| 900 | Lead/Senior RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 2 | 3920 | 50 | N/A | No | Off-Site |
| 900 | RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | Off-Site |
| Off-Site Antenna Preservation Shop | | | | | | | | | | | |
| 900 | Lead/Senior Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 1 | 1960 | 25 | N/A | No | Off-Site |
| 900 | Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | Off-Site |
900 Off-Site Facility Admin/Material 3.11.2-3.11.4 Off-Site Facility Technical Director (TBD)/Ron Bible Supply Technician 1 1960 25 Tier 3 Yes Off-Site
TOTALS: 238 465,696 5,950
BUSINESS SENSITIVE
&"-,Bold"&20&UFollow-On Product Family Support Contract - Level of Effort Table (BASE YEAR) 04/02/2024
Page &P of &N
OY1 (~FY27)
Follow-On Product Family Support Contract - Level of Effort Table (Option Year 1)
| | N55236-25-R-3000 Section J Attachment J-8 | | | |
| | SWRMC PF / CODE | SUPPORT POSITION TITLE | SOW SECTION | LOCATION/BLDG |
| (DEFAULT IS NBSD) | REQUIREMENTS HOLDER | DOL SCA WD CATEGORY | # OF POSITIONS | ST HOURS | |
| (FORMULA) | OT HOURS TOTAL (FORMULA) | CLEARANCE OR BACKGROUND INVESTIGATION | CAC | | |
| ("YES" OR "NO") | ON-SITE OR OFF-SITE | | | | |
ON-SITE SUPPORT
| Corrosion Control PF 910 | | | | | | | | | | | |
| 912 | Lead/Senior Corrosion Control Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Lead | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 5 | 9800 | 125 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 5 | 9800 | 125 | N/A | No | On-Site |
| 912 | Welder Lead | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Welder | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 4 | 7840 | 100 | N/A | No | On-Site |
| 922 | WTD Technician | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 927 | Life Raft Repair Technician | 3.3.4 | 3338 | Larry Kennedy/Michael Ringleman | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 929 | RSL Technician | 3.3.6 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 957 | Painter Lead | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 957 | Painter | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 957 | Painter | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 957 | Electronics Mechanic | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Engine PF 930 | | | | | | | | | | | |
| 911 | Rigger | 3.4.6 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 11 | 21560 | 275 | Tier 3 | Yes | On-Site |
| 913 | AC&R Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 913 | Electrician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 913 | Lead/Senior Engineering Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 913 | Engineering Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 925 | Welder | 3.4.5 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 11 | 21560 | 275 | Tier 3 | Yes | On-Site |
| 931 | Lead/Senior Diesel Technician | 3.4.1 | 3418 | Kelvin Vaden/Arturo Santos | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 931 | Diesel Technician | 3.4.1 | 3418 | Kelvin Vaden/Art Santos | Engineering Tech 4 | 13 | 25480 | 325 | Tier 3 | Yes | On-Site |
| 932 | Gas Turbine Technician | 3.4.2 | 3418 | Kelvin Vaden/Francis Genilo | Engineering Tech 4 | 6 | 11760 | 150 | Tier 3 | Yes | On-Site |
| 946 | Flex Hose Mechanic | 3.4.3 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Machine PF 940 | | | | | | | | | | | |
| 941 | Lead/Senior Inside Machinist | 3.5.2 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 941 | Inside Machinist | 3.5.3 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-site |
| 941 | Inside Machinist | 3.5.4 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 3 | 2 | 3920 | 50 | Tier 3 | Yes | On-site |
| 941 | Additive Manufacturing Technician | 3.5.2 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | Lead/Senior Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 942 | Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 942 | Lead/Senior ESU Technician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | ESU Mechanic | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | ESU Mechanic | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 942 | ESU Electrician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 942 | ESU Electrician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 943 | Pump Technician | 3.5.6 | 61 | Tom Thomas/Antonio Jones | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 944 | Valve Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 944 | Deluge Valve Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 928 | SCBA Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 945 | Compressor Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 945 | Compressor Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 3 | 4 | 7840 | 100 | N/A | No | On-Site |
| 945 | AC&R Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 945 | AC&R Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 3 | 4 | 7840 | 100 | N/A | No | On-Site |
| 949 | Optical Equipment Technician | 3.5.5 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Combat Systems PF 950 | | | | | | | | | | | |
| 952 | Gun Systems Technician | 3.6.3 | 3278 | Jerry Ring/Ashley Collins | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 953 | 2M / FO Technician | 3.6.5 | 3338 | Jerry Ring/Raul Munoz | Electronics Technician Maint. 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 954 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 954 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 955 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 955 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 957A | External Communications Technician | 3.6.2 | 3339 | Jerry Ring/Raul Munoz | Telecommunications Mechanic 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 958A | Electric Motor Rewind Technician | 3.6.6 | 3278 | Jerry Ring/Raul Munoz | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 958 | Outside Electrical Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 4 | 4 | 7840 | 100 | Secret | Yes | On-Site |
| 959B | Metrology Technician | 3.6.6 | NASNI 463 | Jerry Ring/Jerome Lawrence | Metrology Tech 2 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 959B | Metrology Technician | 3.6.6 | 116 | Jerry Ring/Jerome Lawrence | Metrology Tech 1 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 959 | Lead/Senior Interior Communication Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 5 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 959 | Interior Communication Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 4 | 3 | 5880 | 75 | Secret | Yes | On-Site |
| Process Improvement 900PI | | | | | | | |
| 900PI | Lean Six Sigma Black Belt | 3.8 | 3418 | Ashley Sparks | Non-DOL SCA WD Labor Cat (~$95/hr) | 1 | 1176 |
tc={249620E5-20B8-4013-AF2E-9EB4903E557C}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Part-time position, approximately 24 hours per week. | 25 | Tier 3 | Yes | On-Site | | | | | | | | | |
| | 900PI | Engineer (Industrial, Chemical, or Mechanical) | 3.8 | 3418 | Ashley Sparks | Engineering Tech 5 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Millwright Support | | | | | | | | | | | |
| 900 | Millwright | 3.7 | 3418 | Technical Director (TBD)/Tom Thomas | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Production Control Div 960 | | | | | | | | | | | |
| 963 | Maintenance Coordinator | 3.9.1 | 3116,77,36,94,3278 | Ron Bible | Engineering Tech 4 | 25 | 49000 | 625 | Secret | Yes | On-Site |
| 963 | Maintenance Coordinator | 3.9.1 | 3116,77,36,94,3278 | Ron Bible | Engineering Tech 3 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 964 | Material Coordinator | 3.9.2 | 3418,61,3339,3278 | Ron Bible/Felicia Lara | Supply Technician | 12 | 23520 | 300 | Tier 3 | Yes | On-Site |
| 964 | Material Coordinator | 3.9.2 | 3418,61,3339,3279 | Ron Bible/Felicia Lara | Material Coordinator | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| I-Level Planning Div 962 | | | | | | | | | | | |
| 962 | Structural/Piping Planner | 3.10 | 77 | Benjamin Aller | Engineering Tech 5 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Diesel/Gas Turbine Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Machinery Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Electrical Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 3 | 5880 | 75 | Secret | Yes | On-Site |
| 962 | Electronics Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 962 | Services Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| Dry Dock Div 980 | | | | | | | | | | | |
| 980 | Industrial Mechanic | 3.11.2, 3.11.3 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 980 | Industrial Mechanic | 3.11.2, 3.11.3 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 8 | 15680 | 200 | Tier 3 | Yes | On-Site |
| 980 | Industrial Electrician | 3.11.2, 3.11.4 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 980 | Industrial Electrician | 3.11.2, 3.11.4 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 8 | 15680 | 200 | Tier 3 | Yes | On-Site |
| 980 | Crane Operator | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 980 | Rigger | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 980 | Crane Technician | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 980 | Shipwright | 3.11.2, 3.11.6 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 980 | Shipfitter/Pipefitter/Welder | 3.11.2, 3.11.6 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Expeditionary Maintenance 800 | | | | | | | | | | | |
| 800 | Lead Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 800 | Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 4 | 7 | 13720 | 175 | Tier 3 | No | On-Site |
| 800 | Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 3 | 6 | 11760 | 150 | Tier 3 | No | On-Site |
OFF-SITE FACILITY
| Off-Site Hoist Shop | | | | | | | | | | | |
| 900 | Lead/Senior Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 4 | 7840 | 100 | N/A | No | Off-Site |
| 900 | Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 4 | 7840 | 100 | N/A | No | Off-Site |
| Off-Site RIB Shop | | | | | | | | | | | |
| 900 | Lead/Senior RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 2 | 3920 | 50 | N/A | No | Off-Site |
| 900 | RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | Off-Site |
| Off-Site Antenna Preservation Shop | | | | | | | | | | | |
| 900 | Lead/Senior Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 1 | 1960 | 25 | N/A | No | Off-Site |
| 900 | Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | Off-Site |
900 Off-Site Facility Admin/Material 3.11.2-3.11.4 Off-Site Facility Technical Director (TBD)/Ron Bible Supply Technician 1 1960 25 Tier 3 Yes Off-Site
TOTALS: 268 524,496 6,700
&"-,Bold"&20&UContract - Level of Effort Table (OPTION YEAR 1)
Page &P of &N
OY2 (~FY28)
Follow-On Product Family Support Contract - Level of Effort Table (Option Year 2)
| | N55236-25-R-3000 Section J Attachment J-8 | | | |
| | SWRMC PF / CODE | SUPPORT POSITION TITLE | SOW SECTION | LOCATION/BLDG |
| (DEFAULT IS NBSD) | REQUIREMENTS HOLDER | DOL SCA WD CATEGORY | # OF POSITIONS | ST HOURS | |
| (FORMULA) | OT HOURS TOTAL (FORMULA) | CLEARANCE OR BACKGROUND INVESTIGATION | CAC | | |
| ("YES" OR "NO") | ON-SITE OR OFF-SITE | | | | |
ON-SITE SUPPORT
| Corrosion Control PF 910 | | | | | | | | | | | |
| 912 | Lead/Senior Corrosion Control Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Lead | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 6 | 11760 | 150 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 6 | 11760 | 150 | N/A | No | On-Site |
| 912 | Welder Lead | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Welder | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 4 | 7840 | 100 | N/A | No | On-Site |
| 922 | WTD Technician | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 927 | Life Raft Repair Technician | 3.3.4 | 3338 | Larry Kennedy/Michael Ringleman | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 929 | RSL Technician | 3.3.6 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 957 | Painter Lead | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 957 | Painter | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 957 | Painter | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 957 | Electronics Mechanic | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Engine PF 930 | | | | | | | | | | | |
| 911 | Rigger | 3.4.6 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 12 | 23520 | 300 | Tier 3 | Yes | On-Site |
| 913 | AC&R Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 913 | Electrician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 913 | Lead/Senior Engineering Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 913 | Engineering Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 925 | Welder | 3.4.5 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 12 | 23520 | 300 | Tier 3 | Yes | On-Site |
| 931 | Lead/Senior Diesel Technician | 3.4.1 | 3418 | Kelvin Vaden/Arturo Santos | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 931 | Diesel Technician | 3.4.1 | 3418 | Kelvin Vaden/Art Santos | Engineering Tech 4 | 15 | 29400 | 375 | Tier 3 | Yes | On-Site |
| 932 | Gas Turbine Technician | 3.4.2 | 3418 | Kelvin Vaden/Francis Genilo | Engineering Tech 4 | 7 | 13720 | 175 | Tier 3 | Yes | On-Site |
| 946 | Flex Hose Mechanic | 3.4.3 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Machine PF 940 | | | | | | | | | | | |
| 941 | Lead/Senior Inside Machinist | 3.5.2 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 941 | Inside Machinist | 3.5.3 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-site |
| 941 | Inside Machinist | 3.5.4 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 3 | 3 | 5880 | 75 | Tier 3 | Yes | On-site |
| 941 | Additive Manufacturing Technician | 3.5.2 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | Lead/Senior Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 942 | Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 942 | Lead/Senior ESU Technician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | ESU Mechanic | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | ESU Mechanic | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 942 | ESU Electrician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 942 | ESU Electrician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 943 | Pump Technician | 3.5.6 | 61 | Tom Thomas/Antonio Jones | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 944 | Valve Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 944 | Deluge Valve Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 928 | SCBA Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 945 | Compressor Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 945 | Compressor Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 3 | 4 | 7840 | 100 | N/A | No | On-Site |
| 945 | AC&R Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 945 | AC&R Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 3 | 4 | 7840 | 100 | N/A | No | On-Site |
| 949 | Optical Equipment Technician | 3.5.5 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Combat Systems PF 950 | | | | | | | | | | | |
| 952 | Gun Systems Technician | 3.6.3 | 3278 | Jerry Ring/Ashley Collins | Engineering Tech 4 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 953 | 2M / FO Technician | 3.6.5 | 3338 | Jerry Ring/Raul Munoz | Electronics Technician Maint. 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 954 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 954 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 955 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 955 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 957A | External Communications Technician | 3.6.2 | 3339 | Jerry Ring/Raul Munoz | Telecommunications Mechanic 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 958A | Electric Motor Rewind Technician | 3.6.6 | 3278 | Jerry Ring/Raul Munoz | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 958 | Outside Electrical Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 4 | 4 | 7840 | 100 | Secret | Yes | On-Site |
| 959B | Metrology Technician | 3.6.6 | NASNI 463 | Jerry Ring/Jerome Lawrence | Metrology Tech 2 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 959B | Metrology Technician | 3.6.6 | 116 | Jerry Ring/Jerome Lawrence | Metrology Tech 1 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 959 | Lead/Senior Interior Communication Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 5 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 959 | Interior Communication Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 4 | 4 | 7840 | 100 | Secret | Yes | On-Site |
| Process Improvement 900PI | | | | | | | |
| 900PI | Lean Six Sigma Black Belt | 3.8 | 3418 | Ashley Sparks | Non-DOL SCA WD Labor Cat (~$95/hr) | 1 | 1176 |
tc={368AAA8D-E5AC-45F9-98BF-70BEAF2BEAE2}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Part-time position, approximately 24 hours per week. | 25 | Tier 3 | Yes | On-Site | | | | | | | | | |
| | 900PI | Engineer (Industrial, Chemical, or Mechanical) | 3.8 | 3418 | Ashley Sparks | Engineering Tech 5 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Millwright | | | | | | | | | | | |
| 900 | Millwright | 3.7 | 3418 | Technical Director (TBD)/Tom Thomas | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Production Control Div 960 | | | | | | | | | | | |
| 963 | Maintenance Coordinator | 3.9.1 | 3116,77,36,94,3278 | Ron Bible | Engineering Tech 4 | 27 | 52920 | 675 | Secret | Yes | On-Site |
| 963 | Maintenance Coordinator | 3.9.1 | 3116,77,36,94,3278 | Ron Bible | Engineering Tech 3 | 4 | 7840 | 100 | Secret | Yes | On-Site |
| 964 | Material Coordinator | 3.9.2 | 3418,61,3339,3278 | Ron Bible/Felicia Lara | Supply Technician | 13 | 25480 | 325 | Tier 3 | Yes | On-Site |
| 964 | Material Coordinator | 3.9.2 | 3418,61,3339,3279 | Ron Bible/Felicia Lara | Material Coordinator | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| I-Level Planning Div 962 | | | | | | | | | | | |
| 962 | Structural/Piping Planner | 3.10 | 77 | Benjamin Aller | Engineering Tech 5 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Diesel/Gas Turbine Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Machinery Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Electrical Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 3 | 5880 | 75 | Secret | Yes | On-Site |
| 962 | Electronics Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 962 | Services Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| Dry Dock Div 980 | | | | | | | | | | | |
| 980 | Industrial Mechanic | 3.11.2, 3.11.3 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 980 | Industrial Mechanic | 3.11.2, 3.11.3 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 8 | 15680 | 200 | Tier 3 | Yes | On-Site |
| 980 | Industrial Electrician | 3.11.2, 3.11.4 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 980 | Industrial Electrician | 3.11.2, 3.11.4 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 8 | 15680 | 200 | Tier 3 | Yes | On-Site |
| 980 | Crane Operator | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 980 | Rigger | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 980 | Crane Technician | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 980 | Shipwright | 3.11.2, 3.11.6 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 980 | Shipfitter/Pipefitter/Welder | 3.11.2, 3.11.6 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Expeditionary Maintenance 800 | | | | | | | | | | | |
| 800 | Lead Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 800 | Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 4 | 7 | 13720 | 175 | Tier 3 | No | On-Site |
| 800 | Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 3 | 6 | 11760 | 150 | Tier 3 | No | On-Site |
OFF-SITE FACILITY
| Off-Site Hoist Shop | | | | | | | | | | | |
| 900 | Lead/Senior Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 4 | 7840 | 100 | N/A | No | Off-Site |
| 900 | Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 4 | 7840 | 100 | N/A | No | Off-Site |
| Off-Site RIB Shop | | | | | | | | | | | |
| 900 | Lead/Senior RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 3 | 5880 | 75 | N/A | No | Off-Site |
| 900 | RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | Off-Site |
| Off-Site Antenna Preservation Shop | | | | | | | | | | | |
| 900 | Lead/Senior Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 1 | 1960 | 25 | N/A | No | Off-Site |
| 900 | Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | Off-Site |
900 Off-Site Facility Admin/Material 3.11.2-3.11.4 Off-Site Facility Technical Director (TBD)/Ron Bible Supply Technician 1 1960 25 Tier 3 Yes Off-Site
TOTALS: 290 567,616 7,250
&"-,Bold"&20&UContract - Level of Effort Table (OPTION YEAR 2)
Page &P of &N
OY3 (~FY29)
Follow-On Product Family Support Contract - Level of Effort Table (Option Year 3)
| | N55236-25-R-3000 Section J Attachment J-8 | | | |
| | SWRMC PF / CODE | SUPPORT POSITION TITLE | SOW SECTION | LOCATION/BLDG |
| (DEFAULT IS NBSD) | REQUIREMENTS HOLDER | DOL SCA WD CATEGORY | # OF POSITIONS | ST HOURS | |
| (FORMULA) | OT HOURS TOTAL (FORMULA) | CLEARANCE OR BACKGROUND INVESTIGATION | CAC | | |
| ("YES" OR "NO") | ON-SITE OR OFF-SITE | | | | |
ON-SITE SUPPORT
| Corrosion Control PF 910 | | | | | | | | | | | |
| 912 | Lead/Senior Corrosion Control Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Lead | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 6 | 11760 | 150 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 7 | 13720 | 175 | N/A | No | On-Site |
| 912 | Welder Lead | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Welder | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 4 | 7840 | 100 | N/A | No | On-Site |
| 922 | WTD Technician | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 927 | Life Raft Repair Technician | 3.3.4 | 3338 | Larry Kennedy/Michael Ringleman | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 929 | RSL Technician | 3.3.6 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 957 | Painter Lead | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 957 | Painter | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 957 | Painter | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 957 | Electronics Mechanic | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Engine PF 930 | | | | | | | | | | | |
| 911 | Rigger | 3.4.6 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 13 | 25480 | 325 | Tier 3 | Yes | On-Site |
| 913 | AC&R Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 913 | Electrician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 913 | Lead/Senior Engineering Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 913 | Engineering Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 925 | Welder | 3.4.5 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 13 | 25480 | 325 | Tier 3 | Yes | On-Site |
| 931 | Lead/Senior Diesel Technician | 3.4.1 | 3418 | Kelvin Vaden/Arturo Santos | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 931 | Diesel Technician | 3.4.1 | 3418 | Kelvin Vaden/Art Santos | Engineering Tech 4 | 16 | 31360 | 400 | Tier 3 | Yes | On-Site |
| 932 | Gas Turbine Technician | 3.4.2 | 3418 | Kelvin Vaden/Francis Genilo | Engineering Tech 4 | 7 | 13720 | 175 | Tier 3 | Yes | On-Site |
| 946 | Flex Hose Mechanic | 3.4.3 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Machine PF 940 | | | | | | | | | | | |
| 941 | Lead/Senior Inside Machinist | 3.5.2 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 941 | Inside Machinist | 3.5.3 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-site |
| 941 | Inside Machinist | 3.5.4 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 3 | 4 | 7840 | 100 | Tier 3 | Yes | On-site |
| 941 | Additive Manufacturing Technician | 3.5.2 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | Lead/Senior Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 942 | Outside Machinist | 3.5.1 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 942 | Lead/Senior ESU Technician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | ESU Mechanic | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 942 | ESU Mechanic | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 2 | 3920 | 50 | N/A | No | On-Site |
| 942 | ESU Electrician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 942 | ESU Electrician | 3.5.4 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 943 | Pump Technician | 3.5.6 | 61 | Tom Thomas/Antonio Jones | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 944 | Valve Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 944 | Deluge Valve Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 928 | SCBA Technician | 3.5.7 | 3278 | Tom Thomas/Mark Funk | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 945 | Compressor Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 945 | Compressor Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 3 | 5 | 9800 | 125 | N/A | No | On-Site |
| 945 | AC&R Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 945 | AC&R Technician | 3.5.3 | 61 | Tom Thomas/Bobby Jones | Engineering Tech 3 | 5 | 9800 | 125 | N/A | No | On-Site |
| 949 | Optical Equipment Technician | 3.5.5 | 61 | Tom Thomas/Bronson Fegurgur | Engineering Tech 3 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Combat Systems PF 950 | | | | | | | | | | | |
| 952 | Gun Systems Technician | 3.6.3 | 3278 | Jerry Ring/Ashley Collins | Engineering Tech 4 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 953 | 2M / FO Technician | 3.6.5 | 3338 | Jerry Ring/Raul Munoz | Electronics Technician Maint. 2 | 3 | 5880 | 75 | Secret | Yes | On-Site |
| 954 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 954 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 955 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 955 | Launcher Refurbishment Technician | 3.6.2 | 37 | Jerry Ring/Lucas Amido | Engineering Tech 4 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 957A | External Communications Technician | 3.6.2 | 3339 | Jerry Ring/Raul Munoz | Telecommunications Mechanic 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 958A | Electric Motor Rewind Technician | 3.6.6 | 3278 | Jerry Ring/Raul Munoz | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 958 | Outside Electrical Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 4 | 5 | 9800 | 125 | Secret | Yes | On-Site |
| 959B | Metrology Technician | 3.6.6 | NASNI 463 | Jerry Ring/Jerome Lawrence | Metrology Tech 2 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 959B | Metrology Technician | 3.6.6 | 116 | Jerry Ring/Jerome Lawrence | Metrology Tech 1 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 959 | Lead/Senior Interior Communication Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 5 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 959 | Interior Communication Technician | 3.6.4 | 3278 | Jerry Ring/Douglas Fitzgerald | Engineering Tech 4 | 4 | 7840 | 100 | Secret | Yes | On-Site |
| Process Improvement 900PI | | | | | | | |
| 900PI | Lean Six Sigma Black Belt | 3.8 | 3418 | Ashley Sparks | Non-DOL SCA WD Labor Cat (~$95/hr) | 1 | 1176 |
tc={301B4B45-16D9-48EA-87FB-A08C48C316DA}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Part-time position, approximately 24 hours per week. | 25 | Tier 3 | Yes | On-Site | | | | | | | | | |
| | 900PI | Engineer (Industrial, Chemical, or Mechanical) | 3.8 | 3418 | Ashley Sparks | Engineering Tech 5 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Millwright | | | | | | | | | | | |
| 900 | Millwright | 3.7 | 3418 | Technical Director (TBD)/Tom Thomas | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Production Control Div 960 | | | | | | | | | | | |
| 963 | Maintenance Coordinator | 3.9.1 | 3116,77,36,94,3278 | Ron Bible | Engineering Tech 4 | 27 | 52920 | 675 | Secret | Yes | On-Site |
| 963 | Maintenance Coordinator | 3.9.1 | 3116,77,36,94,3278 | Ron Bible | Engineering Tech 3 | 5 | 9800 | 125 | Secret | Yes | On-Site |
| 964 | Material Coordinator | 3.9.2 | 3418,61,3339,3278 | Ron Bible/Felicia Lara | Supply Technician | 13 | 25480 | 325 | Tier 3 | Yes | On-Site |
| 964 | Material Coordinator | 3.9.2 | 3418,61,3339,3279 | Ron Bible/Felicia Lara | Material Coordinator | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| I-Level Planning Div 962 | | | | | | | | | | | |
| 962 | Structural/Piping Planner | 3.10 | 77 | Benjamin Aller | Engineering Tech 5 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Diesel/Gas Turbine Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Machinery Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 2 | 3920 | 50 | Secret | Yes | On-Site |
| 962 | Electrical Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 3 | 5880 | 75 | Secret | Yes | On-Site |
| 962 | Electronics Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| 962 | Services Planner | 3.10 | 77 | Benjamin Aller | Technical Writer 2 | 1 | 1960 | 25 | Secret | Yes | On-Site |
| Dry Dock Div 980 | | | | | | | | | | | |
| 980 | Industrial Mechanic | 3.11.2, 3.11.3 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 980 | Industrial Mechanic | 3.11.2, 3.11.3 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 8 | 15680 | 200 | Tier 3 | Yes | On-Site |
| 980 | Industrial Electrician | 3.11.2, 3.11.4 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 980 | Industrial Electrician | 3.11.2, 3.11.4 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 8 | 15680 | 200 | Tier 3 | Yes | On-Site |
| 980 | Crane Operator | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 5 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 980 | Rigger | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 980 | Crane Technician | 3.11.2, 3.11.5 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 980 | Shipwright | 3.11.2, 3.11.6 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 980 | Shipfitter/Pipefitter/Welder | 3.11.2, 3.11.6 | 82, 341, 408 | Jeffrey Weber | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| Expeditionary Maintenance 800 | | | | | | | | | | | |
| 800 | Lead Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 800 | Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 4 | 7 | 13720 | 175 | Tier 3 | No | On-Site |
| 800 | Ship Maintenance Technician | 3.9.3.15 | 74/3304 | Shaun Rhinehart/Larry Jordan | Engineering Tech 3 | 6 | 11760 | 150 | Tier 3 | No | On-Site |
OFF-SITE FACILITY
| Off-Site Hoist Shop | | | | | | | | | | | |
| 900 | Lead/Senior Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 4 | 7840 | 100 | N/A | No | Off-Site |
| 900 | Hoist Technician | 3.11.2 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 5 | 9800 | 125 | N/A | No | Off-Site |
| Off-Site RIB Shop | | | | | | | | | | | |
| 900 | Lead/Senior RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 3 | 5880 | 75 | N/A | No | Off-Site |
| 900 | RIB Technician | 3.11.3 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | Off-Site |
| Off-Site Antenna Preservation Shop | | | | | | | | | | | |
| 900 | Lead/Senior Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | Off-Site |
| 900 | Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 4 | 1 | 1960 | 25 | N/A | No | Off-Site |
| 900 | Antenna Preservation Technician | 3.11.4 | Off-Site Facility | Technical Director (TBD)/Ron Bible | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | Off-Site |
900 Off-Site Facility Admin/Material 3.11.2-3.11.4 Off-Site Facility Technical Director (TBD)/Ron Bible Supply Technician 1 1960 25 Tier 3 Yes Off-Site
TOTALS: 305 597,016 7,625
&"-,Bold"&20&UContract - Level of Effort Table (OPTION YEAR 3)
Page &P of &N
OY4 (~FY30)
Follow-On Product Family Support Contract - Level of Effort Table (Option Year 4)
| | N55236-25-R-3000 Section J Attachment J-8 | | | |
| | SWRMC PF / CODE | SUPPORT POSITION TITLE | SOW SECTION | LOCATION/BLDG |
| (DEFAULT IS NBSD) | REQUIREMENTS HOLDER | DOL SCA WD CATEGORY | # OF POSITIONS | ST HOURS | |
| (FORMULA) | OT HOURS TOTAL (FORMULA) | CLEARANCE OR BACKGROUND INVESTIGATION | CAC | | |
| ("YES" OR "NO") | ON-SITE OR OFF-SITE | | | | |
ON-SITE SUPPORT
| Corrosion Control PF 910 | | | | | | | | | | | |
| 912 | Lead/Senior Corrosion Control Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Lead | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 7 | 13720 | 175 | Tier 3 | Yes | On-Site |
| 912 | Powder Coat Technician | 3.3.1 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 7 | 13720 | 175 | N/A | No | On-Site |
| 912 | Welder Lead | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 912 | Welder | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 4 | 4 | 7840 | 100 | N/A | No | On-Site |
| 922 | WTD Technician | 3.3.5 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 927 | Life Raft Repair Technician | 3.3.4 | 3338 | Larry Kennedy/Michael Ringleman | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 929 | RSL Technician | 3.3.6 | 123 | Larry Kennedy/Victor Guerrero | Engineering Tech 3 | 3 | 5880 | 75 | Tier 3 | Yes | On-Site |
| 957 | Painter Lead | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 957 | Painter | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 957 | Painter | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 3 | 3 | 5880 | 75 | N/A | No | On-Site |
| 957 | Electronics Mechanic | 3.3.3 | 3338 | Larry Kennedy/Wayne Williams | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Engine PF 930 | | | | | | | | | | | |
| 911 | Rigger | 3.4.6 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 13 | 25480 | 325 | Tier 3 | Yes | On-Site |
| 913 | AC&R Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| 913 | Electrician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 913 | Lead/Senior Engineering Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 6 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 913 | Engineering Technician (Habitability) | 3.4.4 | 3418 | Kelvin Vaden | Engineering Tech 4 | 4 | 7840 | 100 | Tier 3 | Yes | On-Site |
| 925 | Welder | 3.4.5 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 13 | 25480 | 325 | Tier 3 | Yes | On-Site |
| 931 | Lead/Senior Diesel Technician | 3.4.1 | 3418 | Kelvin Vaden/Arturo Santos | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
| 931 | Diesel Technician | 3.4.1 | 3418 | Kelvin Vaden/Art Santos | Engineering Tech 4 | 16 | 31360 | 400 | Tier 3 | Yes | On-Site |
| 932 | Gas Turbine Technician | 3.4.2 | 3418 | Kelvin Vaden/Francis Genilo | Engineering Tech 4 | 7 | 13720 | 175 | Tier 3 | Yes | On-Site |
| 946 | Flex Hose Mechanic | 3.4.3 | 3418 | Kelvin Vaden/Anson Dement | Engineering Tech 4 | 2 | 3920 | 50 | Tier 3 | Yes | On-Site |
| Machine PF 940 | | | | | | | | | | | |
| 941 | Lead/Senior Inside Machinist | 3.5.2 | 61 | Tom Thomas/Cesar Molina | Engineering Tech 5 | 1 | 1960 | 25 | Tier 3 | Yes | On-Site |
This is the start of the file's text. The full file is on GovTribe.