Attachment J-04 TERP Form WOI_6-25-20.pdf

PDF 2 MB Posted

Attached to
TEAMS-Next Warfighter Operational Integration Federal contract opportunity
Solicitation number
HQ0858-20-R-011
Issued by
DOD Missile Defense Agency

About this file

This document contains a template for a TERP (Task Execution and Reporting Procedure) form and instructions for its completion under the TEAMS-Next contract. The TERP form is used to request additional work under the contract through the end of the period of performance. It requires identification of the contract and TERP number, agency and contractor details, period of performance which can be either through the end of the contract or a shorter specified term, a description of the additional work being requested and any associated deliverables, and whether additional travel or other direct costs are required. The contractor must provide a cost summary and approval signature. Final approval is given by the contracting officer. The instructions provide guidance on populating each field of the form, including how to specify the period of performance, describe the additional work and any deliverables, identify additional travel or other direct costs needed to support the work, and develop the required cost summary using an attached pricing model.

View the file

Other files for this federal contract opportunity

Other files attached to TEAMS-Next Warfighter Operational Integration, newest first.
File Type Posted
Amd 01-Section M - Warfighter Operational Integration_Updated_Track Changes_R1.pdf PDF
Amd 01-Attachment L-05 Warfighter EPW 10-07-20 Updates.xlsx XLSX spreadsheet
Amd 01-HQ0858-20-R-0011 - TN-WOI Questions_Consolidated_Final.xlsx XLSX spreadsheet
Amd 01-Section L - Warfighter Operational Integration Final R1.pdf PDF
WOI Amend 01 Conf.pdf PDF
WOI Amend 01.pdf PDF
Amd 01-Attachment L-01 WOI - PPI Form V6_Track Changes.docx DOCX document
Amd 01-Attachment L-02 WOI - PPQ Form V3 Track Changes.docx DOCX document
Amd 01-Attachment L 07 OCI Disclosure Form_Track Changes.docx DOCX document
Attachment J-17 WOI IMCP Supplier Compliance Supplement 6-30-20.pdf PDF
HQ0858-20-R-0011 TN-WOI RFP Industry Comment Matrix.xlsx XLSX spreadsheet
Attachment L-01 WOI - PPI Form V5.docx DOCX document
Attachment J-18 WOI - MEFs 6.22.2020.pdf PDF
Attachment J-01 WOI - SOW v13_09032020.pdf PDF
Attachment J-13 Monthly Manpower Report template 06092020_.xlsx XLSX spreadsheet
Attachment L-07 OCI Disclosure Form 30 Jun 20.rtf RTF text file
Section L - Warfighter Operational Integration Final 09.10.2020.pdf PDF
Exhibit A Final CDRLs Combined.pdf PDF
Attachment J-05 WOI TERP Pricing Model 7-1-20.xlsx XLSX spreadsheet
Attachment L-06 WOI Accounting System Checklist 20 Aug 20.doc DOC document
Attachment J-02 G-06 Allotment of Funds HQ0858-20-R-0011 6.11.20.xlsx XLSX spreadsheet
Attachment L-02 WOI - PPQ Form V2 8-26-20.docx DOCX document
Section M - Warfighter Operational Integration Final 09.02.2020.pdf PDF
Attachment J-06 WOI Individual Contractor NDA 9 Jan 20.pdf PDF
Attachment L-04 Client Authorization Letter 8-24-20.docx DOCX document
Attachment J-12 WOI Travel and ODC Report 021820.xlsx XLSX spreadsheet
Attachment J-15 WOI SOFA Travel Clauses.pdf PDF
TN-WOI Final Solicitation 09.17.2020.pdf PDF
Attachment J-08 REDACTED-WOI Signed - DD 254.pdf PDF
Attachment L-03 Sample Consent Letter 8-24-20.docx DOCX document
Attachment J-11 WOI Cost Report Template_03092020.xlsx XLSX spreadsheet
Attachment J-14 WOIQuarterly Accomplishments Reporting Format_03092020.pdf PDF
Attachment J-03 WOI TERP Procedures 6-25-2020.pdf PDF
Attachment J-09 WOI ODC Travel by CLIN.xlsx XLSX spreadsheet
Attachment L-05 Warfighter EPW 8-31-20 Updates.xlsx XLSX spreadsheet
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HQ0858-20-R-0011

Section J, Attachment 4

TEAMS-Next Solicitation HQ0858-20-R-0011

Section J, Attachment 4

TEAMS-Next Emergent Requirements

Package (TERP) Form

25 June 2020

Approved for Public Release 20-MDA-10566 (9 Sep 20)

TERP Form

TEAMS-Next Emergent Requirements Package (TERP) This TERP is prepared pursuant to Section J, Attachment 3 “TERP Procedures”.

1. Contract Number: 2. TERP Number: (sequential record # assigned by MDA)

HQ0858-21-C-xxxx TBD

3. Agency Name/Program: 4. Contractor Name:

Missile Defense Agency (MDA) Consolidated Support Directorate

TBD

5. Period of Performance (see prescription below): Choose an item.

If PoP selection is short-term (e.g. not through end of contract (inclusive of options)), identify start and end dates below:

START: Click or tap to enter a date. END: Click or tap to enter a date.

6. Description of Effort (see prescription below); use Continuation Page if required):

7. Deliverables: (see prescription below): Choose an item.

Description of Deliverable(s):

8. Additional Travel or ODC: (see prescription below): Choose an item.

Identify affected CLINs, whether increase is for Travel, ODC, or both. If ODC is anticipated, describe what’s required herein:

9. Cost Summary (see prescription below):

Total Hours (LOE): Total Labor Cost (all Labor CLINs):

Total Travel:

Total ODC:

Subtotal Estimated Cost:

Total Fixed Fee:

Total Est. Cost Plus Fixed Fee (CPFF):

10. Contractor Approval

Signature:

Printed Name:

Date: Click or tap to enter a date.

11. Government Approval (Contracting Officer)

Signature:

Printed Name:

Date: Click or tap to enter a date.

TERP Form

The following provides an explanation for each block in the above template and directions for its completion:

Block 1: Contract Number. MDA/CSK will complete.

Block 2: TERP Number. MDA/CSK will designate a sequential record number for the effort (TERP-001, TERP-002, etc.)

Block 3: Agency/Program. MDA/CSK will complete.

Block 4: Contractor Name. MDA/CSK will complete.

Block 5: Period of Performance. MDA stakeholder will select from the orange drop-down menu, designating whether the duration of the effort is to be through the entire contract PoP (including all Option

Periods) – OR – shorter term (e.g. completion date prior to the end of the contract expiration, inclusive of option periods). If shorter term is selected, use the orange PoP calendar fields to identify the Start and End dates, regardless of whether the dates cross between Base and Option periods. If PoP selection is through end of contract, you are not required to enter dates in the PoP calendar fields.

Block 6: Description of Effort. MDA stakeholder will complete. Directly cite the overarching SOW paragraph(s), applicable subparagraph number(s), and specific SOW language for which additional LOE is being added.

Block 7: Deliverables. MDA stakeholder shall select from orange drop-down menu whether the additional effort will also drive an additional CDRL deliverable or a modification to an existing CDRL. If either applies, click “Yes” and describe in general terms the additional CDRL or the modification to an existing CDRL, whether the CDRL submission requires Govt approval, and the delivery date and frequency of the deliverable. Example: “CDRL A000X is modified to add stakeholder GMB to the distribution list; frequency is unchanged; is not an “approval” CDRL”; or “CDRL A000Y is added to incorporate Data Item Description #XXX; frequency is monthly; deliverable submissions require Govt approval”. Include the approved CDRL (DD1423) as part of the TERP package.

Block 8: Additional Travel and/or ODC. MDA stakeholder shall select from orange drop-down menu whether the additional effort will also entail an increase to the estimated cost for the corresponding

Travel/ODC CLIN for purposes of additional Travel and/or ODC. If adding both, identify in this field how much is for Travel and how much is for ODC. When adding a significant amount of labor (e.g. 10 FTE or more), consideration should be given to whether commensurate Travel should be added as well. NOTE:

the travel increase is only for contract ceiling purposes; actual travel approval would still be handled through the Form 110 process. If ODC is being added, describe in Block 8 what ODC will be required and why; if possible, go ahead and complete the Form 70 process as part of the TERP approval.

Block 9: Cost Summary. Contractor will utilize Section J, Attachment 5, “TERP Pricing Model” to develop its TERP proposal; total summary values from the TERP Pricing Model will be added to Block 9.

The contractor shall not modify the competitively-established rates set forth in Section J, Attachment 5.

TERP Form

The TERP Pricing Model shall be completed as set forth in Section J Attachment 3 TERP Procedures.

NOTE: If increasing ODC/Travel, the associated increase shall NOT be deducted from CLIN 0001; rather, the ODC/Travel adjustment will be a net increase in overall contract value. Additionally, increases in

ODC/Travel are cost-only and carry not additional fixed fee.

Block 10: Contractor Approval: This field is for the contractor’s approval. This field shall be signed by a person given the authority to commit the contractor. The individual’s name and title shall also be printed and the date of approval shall be provided.

Block 11: Government/Contracting Officer Approval: The TERP is not authorized until approved by the Contracting Officer.