Attachment G - Pricing Worksheet SPE60126R0310.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- SPE60126R0310
- Issued by
-
Defense Logistics Agency Energy
About this file
This is a Pricing Worksheet for solicitation SPE60126R0310, which requires contractors to provide unit and extended pricing for bulk Dinitrogen Tetroxide (N2O4) propellant and ancillary services over a ten-year period of performance. The contract is structured in three phases: a six-month phase-in period (September 15, 2026 – March 31, 2027), a 54-month base period (April 1, 2027 – September 14, 2031), and a five-year option period (September 15, 2031 – September 14, 2036).
The phase-in period includes four line items: Non-Recurring Engineering (NRE) Fee, Monthly Maintenance Facility Fee (6 months), Pre-Production Sample (6 units), and First Article Batch (6 units). The base period requires pricing for five main propellant types—MON-10, MON-15, MON-25, MON-3, and MON-3 Ultra Low—with annual quantities ranging from 100 to 7,000 pounds per year across five contract years. Supporting services include Monthly Maintenance Facility Fees (6 units in Year 1, 12 units annually thereafter), Non-Routine Lab Analysis, Reprocessing of Reclaimable Product (500 pounds), Cylinder Recertification Testing, Precision Cleaning, General Repair/Maintenance, Passivation, and Trailer Evacuation and Purge services. The option period (Years 6-10) carries identical quantities and service requirements as the base period. All pricing fields are currently blank at $0.00, indicating this is a template for offerors to complete. Prices must not exceed two decimal places, and the worksheet must remain unlocked per the solicitation instructions.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING WORKSHEET
| PRICING WORSHEET SOLICITATION SPE60126R0310 | |||||||
| 6 - Month Phase - In Period | |||||||
| CLIN# | O & G Product NSN / SVC # | Product Short Text | POP | UOM | Annual Qty | Unit Price | Extended Total |
| 0017 | SE0000189 | Miscellaneous Services - Non-Recurring Engineering (NRE) Fee |
Campbell, Tammie D CIV DLA ENERGY (USA): Campbell, Tammie D CIV DLA ENERGY (USA):
| This is the most common industry-wide term. It refers to the one-time, up-front cost to design, develop, test, and set up a new product production line before manufacturing actually begins. Specialized tooling design, manufacturing process engineering, software setup, and initial calibration. | 09/15/2026 - 03/31/2027 | EA | 1 | $0.00 | $0.00 | |||
| 0018 | SE0000173 | Monthly Maintenance Facility Fee 6-Month Phase- In | 09/15/2026 - 03/31/2027 | EA | 6 | $0.00 | $0.00 | |
| 0019 | SE0000227 | Pre-Production Sample 6-Month Phase- In | 09/15/2026 - 03/31/2027 | EA | 6 | $0.00 | $0.00 | |
| 0020 | SE0000228 | First Article Batch 6-Month Phase- In | 09/15/2026 - 03/31/2027 | EA | 6 | $0.00 | $0.00 | |
| Base 54 - Month Period | ||||||||
| CLIN# | O & G Product NSN / SVC # | Product Short Text | POP | UOM | Annual Qty | Unit Price | Extended Total | |
| 0001 | 9135016659185 | PROPELLANT, Dinitrogen Tetroxide (N2O4) MON-10 CYLINDER (Year 1) | 04/01/2027 - 09/14/2027 | LB | 200 | $0.00 | $0.00 | |
| MON -10 Year 2 | 09/15/2027 - 09/14/2028 | LB | 200 | $0.00 | $0.00 | |||
| MON -10 Year 3 | 09/15/2028 - 09/14/2029 | LB | 200 | $0.00 | $0.00 | |||
| MON -10 Year 4 | 09/15/2029 - 09/14/2030 | LB | 200 | $0.00 | $0.00 | |||
| MON -10 Year 5 | 09/15/2030 - 09/14/2031 | LB | 200 | $0.00 | $0.00 | |||
| 0002 | 9135016659189 | PROPELLANT, Dinitrogen Tetroxide (N2O4) MON-15 (Cylinder) Year 1 | 04/01/2027 - 09/14/2027 | LB | 200 | $0.00 | $0.00 | |
| MON -15 Year 2 | 09/15/2027 - 09/14/2028 | LB | 200 | $0.00 | $0.00 | |||
| MON -15 Year 3 | 09/15/2028 - 09/14/2029 | LB | 200 | $0.00 | $0.00 | |||
| MON -15 Year 4 | 09/15/2029 - 09/14/2030 | LB | 200 | $0.00 | $0.00 | |||
| MON -15 Year 5 | 09/15/2030 - 09/14/2031 | LB | 200 | $0.00 | $0.00 | |||
| 0003 | 9135016659209 | PROPELLANT, Dinitrogen Tetroxide (N2O4) MON-25 (Cylinder) Year 1 | 04/01/2027 - 09/14/2027 | LB | 100 | $0.00 | $0.00 | |
| MON -25 Year 2 | 09/15/2027 - 09/14/2028 | LB | 100 | $0.00 | $0.00 | |||
| MON -25 Year 3 | 09/15/2028 - 09/14/2029 | LB | 100 | $0.00 | $0.00 | |||
| MON -25 Year 4 | 09/15/2029 - 09/14/2030 | LB | 100 | $0.00 | $0.00 | |||
| MON -25 Year 5 | 09/15/2030 - 09/14/2031 | LB | 100 | $0.00 | $0.00 | |||
| 0004 | 9135016659301 | PROPELLANT, Dinitrogen Tetroxide (N2O4) MON-3 CYLINDER (Year 1) | 04/01/2027 - 09/14/2027 | LB | 7,000 | $0.00 | $0.00 | |
| MON - 3 Year 2 | 09/15/2027 - 09/14/2028 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Year 3 | 09/15/2028 - 09/14/2029 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Year 4 | 09/15/2029 - 09/14/2030 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Year 5 | 09/15/2030 - 09/14/2031 | LB | 7,000 | $0.00 | $0.00 | |||
| 0005 | 9135016659314 | PROPELLANT, Dinitrogen Tetroxide (N2O4) MON-3 ULTRA LOW (Year 1) | 04/01/2027 - 09/14/2027 | LB | 7,000 | $0.00 | $0.00 | |
| MON - 3 Ultra Low Year 2 | 09/15/2027 - 09/14/2028 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Ultra Low Year 3 | 09/15/2028 - 09/14/2029 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Ultra Low Year 4 | 09/15/2029 - 09/14/2030 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Ultra Low Year 5 | 09/15/2030 - 09/14/2031 | LB | 7,000 | $0.00 | $0.00 | |||
| 0006 | SE0000173 | Monthly Maintenance Facility Fee (MMFF) (Year 1) | 04/01/2027 - 09/14/2027 | EA | 6 | $0.00 | $0.00 | |
| Year 2 | 09/15/2027 - 09/14/2028 | EA | 12 | $0.00 | $0.00 | |||
| Year 3 | 09/15/2028 - 09/14/2029 | EA | 12 | $0.00 | $0.00 | |||
| Year 4 | 09/15/2029 - 09/14/2030 | EA | 12 | $0.00 | $0.00 | |||
| Year 5 | 09/15/2030 - 09/14/2031 | EA | 12 | $0.00 | $0.00 | |||
| 0007 | SE0000160 | Non-Routine Lab Analysis | 04/01/2027 - 9/14/2031 | EA | 5 | $0.00 | $0.00 | |
| 0008 | SE0000118 | Reprocessing Reclaimable Product | 04/01/2027 - 9/14/2031 | LB | 500 | $0.00 | $0.00 | |
| 0009 | SE0000159 | DOT 110A500W Cylinder Recertification Testing | 04/01/2027 - 9/14/2031 | EA | 5 | $0.00 | $0.00 | |
| 0010 | SE0000119 | DOT 110A500W Cylinder Precision Cleaning to level 100A | 04/01/2027 - 9/14/2031 | EA | 5 | $0.00 | $0.00 | |
| 0011 | SE0000159 | 4BW Cylinder Maintenance Recertification Testing | 04/01/2027 - 9/14/2031 | EA | 5 | $0.00 | $0.00 | |
| 0012 | SE0000119 | Precision Cleaning to Level 100A, 4 BW Cylinder | 04/01/2027 - 9/14/2031 | EA | 5 | $0.00 | $0.00 | |
| 0013 | SE0000188 | General Repair / Maintenance | 04/01/2027 - 9/14/2031 | EA | 5 | $0.00 | $0.00 | |
| 0014 | SE0000120 | Passivation | 04/01/2027 - 9/14/2031 | EA | 5 | $0.00 | $0.00 | |
| 0015 | SE0000185 | Trailer Evacuate and Purge | 04/01/2027 - 9/14/2031 | EA | 5 | $0.00 | $0.00 | |
| 5 Year Option Period | ||||||||
| CLIN# | O & G Product NSN / SVC # | Product Short Text | POP | UOM | Annual Qty | Unit Price | Extended Total | |
| 0021 | 9135016659185 | PROPELLANT, Dinitrogen Tetroxide (N2O4) MON-10 CYLINDER Year 6 | 09/15/2031 -09/14/2032 | LB | 200 | $0.00 | $0.00 | |
| MON -10 Year 7 | 09/15/2032 -09/14/2033 | LB | 200 | $0.00 | $0.00 | |||
| MON - 10 Year 8 | 09/15/2033 -09/14/2034 | LB | 200 | $0.00 | $0.00 | |||
| MON -10 Year 9 | 09/15/2034 -09/14/2035 | LB | 200 | $0.00 | $0.00 | |||
| MON - 10 Year 10 | 09/15/2035 -09/14/2036 | LB | 200 | $0.00 | $0.00 | |||
| 0022 | 9135016659189 | PROPELLANT, Dinitrogen Tetroxide (N2O4) MON-15 (Cylinder) Year 6 | 09/15/2031 -09/14/2032 | LB | 200 | $0.00 | $0.00 | |
| MON -15 Year 7 | 09/15/2032 -09/14/2033 | LB | 200 | $0.00 | $0.00 | |||
| MON - 15 Year 8 | 09/15/2033 -09/14/2034 | LB | 200 | $0.00 | $0.00 | |||
| MON -15 Year 9 | 09/15/2034 -09/14/2035 | LB | 200 | $0.00 | $0.00 | |||
| MON - 15 Year 10 | 09/15/2035 -09/14/2036 | LB | 200 | $0.00 | $0.00 | |||
| 0023 | 9135016659209 | PROPELLANT, Dinitrogen Tetroxide (N2O4) MON-25 (Cylinder) Year 6 | 09/15/2031 -09/14/2032 | LB | 100 | $0.00 | $0.00 | |
| MON - 25 Year 7 | 09/15/2032 -09/14/2033 | LB | 100 | $0.00 | $0.00 | |||
| MON - 25 Year 8 | 09/15/2033 -09/14/2034 | LB | 100 | $0.00 | $0.00 | |||
| MON - 25 Year 9 | 09/15/2034 -09/14/2035 | LB | 100 | $0.00 | $0.00 | |||
| MON - 25 Year 10 | 09/15/2035 -09/14/2036 | LB | 100 | $0.00 | $0.00 | |||
| 0024 | 9135016659301 | PROPELLANT, Dinitrogen Tetroxide (N2O4) MON-3 CYLINDER Year 6 | 09/15/2031 -09/14/2032 | LB | 7,000 | $0.00 | $0.00 | |
| MON - 3 Year 7 | 09/15/2032 -09/14/2033 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Year 8 | 09/15/2033 -09/14/2034 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Year 9 | 09/15/2034 -09/14/2035 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Year 10 | 09/15/2035 -09/14/2036 | LB | 7,000 | $0.00 | $0.00 | |||
| 0025 | 9135016659314 | PROPELLANT, Dinitrogen Tetroxide (N2O4) MON-3 ULTRA LOW CYLINDER Year 6 | 09/15/2031 -09/14/2032 | LB | 7,000 | $0.00 | $0.00 | |
| MON - 3 Ultra Low Year 7 | 09/15/2032 -09/14/2033 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Ultra Low Year 8 | 09/15/2033 -09/14/2034 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Ultra Low Year 9 | 09/15/2034 -09/14/2035 | LB | 7,000 | $0.00 | $0.00 | |||
| MON - 3 Ultra Low Year 10 | 09/15/2035 -09/14/2036 | LB | 7,000 | $0.00 | $0.00 | |||
| 0026 | SE0000173 | Monthly Maintenance Facility Fee (MMFF) Year 6 | 09/15/2031 -09/14/2032 | EA | 12 | $0.00 | $0.00 | |
| MMFF Year 7 | 09/15/2032 -09/14/2033 | EA | 12 | $0.00 | $0.00 | |||
| MMFF Year 8 | 09/15/2033 -09/14/2034 | EA | 12 | $0.00 | $0.00 | |||
| MMFF Year 9 | 09/15/2034 -09/14/2035 | EA | 12 | $0.00 | $0.00 | |||
| MMFF Year 10 | 09/15/2035 -09/14/2036 | EA | 12 | $0.00 | $0.00 | |||
| 0027 | SE0000160 | Non-Routine Lab Analysis | 09/15/2031 -09/14/2036 | EA | 5 | $0.00 | $0.00 | |
| 0028 | SE0000118 | Reprocessing Reclaimable Product | 09/15/2031 -09/14/2036 | LB | 500 | $0.00 | $0.00 | |
| 0029 | SE0000159 | DOT 110A500W Cylinder Recertification Testing | 09/15/2031 -09/14/2036 | EA | 5 | $0.00 | $0.00 | |
| 0030 | SE0000119 | DOT 110A500W Cylinder Precision Cleaning to level 100A | 09/15/2031 -09/14/2036 | EA | 5 | $0.00 | $0.00 | |
| 0031 | SE0000159 | 4BW Cylinder Maintenance Recertification Testing | 09/15/2031 -09/14/2036 | EA | 5 | $0.00 | $0.00 | |
| 0032 | SE0000119 | Precision Cleaning to Level 100A, 4 BW Cylinder | 09/15/2031 -09/14/2036 | EA | 5 | $0.00 | $0.00 | |
| 0033 | SE0000188 | General Repair / Maintenance | 09/15/2031 -09/14/2036 | EA | 5 | $0.00 | $0.00 | |
| 0034 | SE0000120 | Passivation | 09/15/2031 -09/14/2036 | EA | 5 | $0.00 | $0.00 | |
| 0035 | SE0000185 | Trailer Evacuate and Purge | 09/15/2031 -09/14/2036 | EA | 5 | $0.00 | $0.00 | |
| $0.00 | ||||||||
| ******NOTE: OFFERED PRICES SHALL NOT EXCEED SECOND DECIMAL PLACE AND PRICING WORKSHEET SHALL REMAIN UNLOCKED.****** |
File details come from the government source that posted it. Updated .