This submittal register outlines the required submissions for a project to construct a Combatant Craft Maintenance Facility at Joint Expeditionary Base Little Creek - Fort Story in Virginia Beach, Virginia. The facility will support MSRON TWO.
The submittal register lists over 100 technical submittals required across 47 specification sections involving civil, architectural, structural, mechanical, electrical and low voltage systems. It identifies submittal paragraphs in the specifications, provides columns to track review status and due dates for government and contractor actions, and specifies the classification of each submittal. Key submittals include accident prevention plans, quality control plans, shop drawings, product data, test reports, certificates of compliance, operation and maintenance manuals and as-built drawings.
The Naval Facilities Engineering Command is the contracting agency for this project. Only the 8(a) Multiple Award Construction Contractors in the Hampton Roads area of Virginia that hold the identified contract numbers may provide a proposal.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 47 PAGES
UMC Cover Boat & Maintenance Facility
01 11 00 SD-01 Preconstruction Submittals
1.7 GSalvage Plan
01 14 00 SD-01 Preconstruction Submittals 1.3.1.1List of Contact Personnel
01 20 00 SD-01 Preconstruction Submittals
1.3 GSchedule of Prices
01 30 00 SD-01 Preconstruction Submittals 1.3View Location Map 1.4Progress and Completion
Pictures 01 31 23.13 20 SD-01 Preconstruction Submittals
1.4.2 GList of Contractor's Personnel
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GBaseline Construction Schedule
SD-07 Certificates
1.4Monthly Updates 01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.8.1 GAPP - Construction
1.17 GDive Operations Plan
1.8 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.13Notifications and Reports
1.13.2 GAccident Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 47 PAGES
01 35 26 1.13.3LHE Inspection Reports SD-07 Certificates
1.5Contractor Safety Self-Evaluation Checklist
1.7.1.4Crane Operators/Riggers
1.8.3.2 GStandard Lift Plan
GCritical Lift Plan GNaval Architecture Analysis
1.9Activity Hazard Analysis (AHA) 1.10.1Confined Space Entry Permit 1.10.1Hot Work Permit 1.13.4Certificate of Compliance
Third Party Certification of Floating Cranes and Barge-Mounted Mobile Cranes
1.15License Certificates
1.15.1 GRadiography Operation Planning
Work Sheet
1.15.1 GPortable Gauge Operations
Planning Worksheet 01 35 40.00 20 SD-01 Preconstruction Submittals
1.8 GEnvironmental Protection Plan
1.9.1Instructor Qualifications
SD-06 Test Reports 3.2Field Quality Control Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 47 PAGES
01 35 40.00 20 1.6Environmental Regulatory Requirements
SD-08 Manufacturer’s Instructions 1.7.1Safety Data Sheets
SD-11 Closeout Submittals 1.9.3Training Program 3.1Protection of Natural Resources
01 45 00.00 20 SD-01 Preconstruction Submittals
1.6.1 GConstruction Quality Control (QC)
Plan
1.16 GIndoor Air Quality (IAQ)
Management Plan SFinal IAQ Management Plan
01 45 35 SD-06 Test Reports 3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates 2.1AISC Certified Steel Fabricator 2.1Certificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals GInterim Report
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 47 PAGES
01 50 00 2.2.1 GHaul Road Plan
1.6.1.4 GContractor Computer
Cybersecurity Compliance Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance Statements
SD-06 Test Reports 3.5Backflow Preventer Tests
SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey
1.10 GSolid Waste Management Permit
1.6.2 GRegulatory Notifications
1.7 GEnvironmental Protection Plan
GStormwater Pollution Prevention Plan
GStormwater Notice of Intent
1.7.9.1 GDirt and Dust Control Plan
1.6.5 GEmployee Training Records
1.6.4 GEnvironmental Manager
Qualifications SD-06 Test Reports Laboratory Analysis
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 47 PAGES
01 57 19 Inspection Reports
1.10.1 GMonthly Solid Waste Disposal
Report SD-07 Certificates
1.6.5 GEmployee Training Records
1.4.1.2 GECATTS Certificate Of
Completion 1.6.5Erosion and Sediment Control
Inspector SD-11 Closeout Submittals
GStormwater Pollution Prevention Plan Compliance Notebook
GStormwater Notice of Termination
3.6.1 GWaste Determination
Documentation
3.6.3.5 GDisposal Documentation for
Hazardous and Regulated Waste
1.6.5 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
GProject Solid Waste Disposal Documentation Report
3.7.1 GContractor Hazardous Material
Inventory Log
3.6.3.1 GHazardous Waste/Debris
Management
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 47 PAGES
01 57 19 1.6.2 GRegulatory Notifications GSales Documentation
As-Built Topographic Survey 01 58 00 SD-02 Shop Drawings
GPreliminary One Line
1.4.1 GPreliminary Drawing Indicating
Layout And Text Content SD-04 Samples
GFacility Recognition Plaque 01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report 01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan 1.6.4Warranty Tags 3.4Final Cleaning 1.5Spare Parts Data
SD-08 Manufacturer’s Instructions 1.6.1Instructions
SD-10 Operation and Maintenance Data
3.3 GOperation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 47 PAGES
01 78 00 SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2 GRecord Drawings
1.6.1As-Built Record of Equipment and Materials
2.1 GCertification of EPA Designated
Items
2.2 GCertification Of USDA
Designated Items
3.5.1 GInterim DD FORM 1354
3.5.2 GChecklist for DD FORM 1354
3.5.2 GHigh Performance and
Sustainable Building (HPSB) Checklist
01 78 23 SD-10 Operation and Maintenance Data
GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 78 24.00 20 SD-11 Closeout Submittals
1.4.1 GeOMSI, Progress Submittal
1.4.2 GeOMSI, Prefinal Submittal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 47 PAGES
01 78 24.00 20 1.4.3 GeOMSI, Final Submittal 01 78 30.00 22 SD-01 Preconstruction Submittals
1.4.1 GTechnical Approach Document
SD-05 Design Data
1.4.1 GPreliminary Gis Deliverable
SD-11 Closeout Submittals
1.4.2 GGIS Data Deliverables
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
02 61 13 SD-01 Preconstruction Submittals
1.3 GWork Plan
SD-06 Test Reports 3.5.2Compaction
02 81 00 SD-03 Product Data 2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management 3.3Notices of Non-Compliance and
Notices of Violation SD-06 Test Reports
3.5 GRecordkeeping
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 47 PAGES
02 81 00 3.5 GException Report 3.6Spill Response
SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
1.4.3Certification
3.3.3 GShipping Documents and
Packagings Certification 3.3.4Security Plan 3.3.5Certificates of Disposal 3.4Waste Minimization
03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications 1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
3.3.10Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data 2.4.4Joint Sealants 2.4.3Joint Filler
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 47 PAGES
03 30 00 2.1Formwork Materials 2.3.3.3Recycled Aggregate Materials 2.3.1Cementitious Materials 2.4.5Vapor Retarder and Vapor
Barrier 2.4.1Concrete Curing Materials 2.6Reinforcement 2.3.4Admixtures 2.6.2Mechanical Reinforcing Bar
Connectors 2.2.1Waterstops 1.8.1Local/Regional Materials 2.2.2Biodegradable Form Release
Agent 1.6.3.2Pumping Concrete 2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Slag Cement 1.6.4.3Aggregates
3.13.3.3 GCompressive Strength Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 47 PAGES
03 30 00 3.13.3.5Unit Weight of Structural Concrete
3.13.3.4Air Content 3.13.3.1Slump Tests 2.3.2Water
SD-07 Certificates 2.6.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.3Safety Data Sheets 1.8.2Forest Stewardship Council
(FSC) Certification 1.6.7.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
2.4.4Joint Sealants 2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2.2.1 GCement
2.4.1.1 GCementitious Materials
SD-04 Samples
2.2.2.2 GConcrete Masonry Units (CMU)
2.4.1.2 GAdmixtures for Masonry Mortar
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 47 PAGES
04 20 00 2.6.2 GAnchors, Ties, and Bar Positioners
2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SD-06 Test Reports
2.2.2.3Fire-Rated Concrete Masonry Units
3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.3Single-Wythe Masonry Wall
Water Penetration Test SD-07 Certificates
1.3.1Special Masonry Inspector Qualifications
2.2.2.2Concrete Masonry Units (CMU) 2.4.1.1Cementitious Materials 2.4.1.2Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar
Positioners 2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions 2.4.1.2Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 47 PAGES
04 20 00 SD-10 Operation and Maintenance Data
3.8Take-Back Program SD-11 Closeout Submittals
2.2.2.2.2 SRecycled Content
05 12 00 SD-01 Preconstruction Submittals
1.3.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.3.2 GFabrication Drawings
SD-03 Product Data 2.5.2Shop Primer 2.4.1Welding Electrodes and Rods 2.3.1.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.2Tension Control Bolts
SD-05 Design Data
1.3.3 GDesign Calculations for Steel
Connections
1.3.2 GShoring and Temporary Bracing
SD-06 Test Reports 2.5.2Class B Coating 2.3Bolts, Nuts, and Washers 3.6.1.2Weld Inspection Reports 3.6.2.1Direct Tension Indicator Washer
Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 47 PAGES
05 12 00 3.6.3.1Bolt Testing Reports SD-07 Certificates
2.2Steel 2.3Bolts, Nuts, and Washers 1.3.4.1Welding Procedures and
Qualifications 2.4.1Welding Electrodes and Rods 3.6.1.1Certified Welding Inspector 3.6.1.2NDT Technician 3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.3 GFabrication Drawings
SD-03 Product Data
2.2Accessories 2.1Deck Units 2.1.3Galvanizing Repair Paint 2.2.7Mechanical Fasteners 2.1.3Touch-Up Paint 1.3.2Welding Equipment 1.3.2Welding Rods and Accessories
SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.3Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 47 PAGES
05 30 00 SD-07 Certificates 1.3.2Welder Qualifications 1.3.2Welding Procedures 1.3.1Manufacturer's Certificate
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data 2.1Studs, Joists
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates 1.4Load-Bearing Cold-Formed Metal
Framing 3.1.1Welds
05 51 33 SD-02 Shop Drawings 2.3Ladders
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
2.1 GIron and Steel Hardware
3.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars and
Strips
3.1 GSteel Shapes, Plates, Bars and
Strips SD-03 Product Data
1.2.1 GSteel Guardrails
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 47 PAGES
05 52 00 2.6 GSteel Guardrails
1.2.1 GAnchorage and Fastening
Systems SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.1 GInstallation Instructions
07 21 16 SD-03 Product Data 2.1Blanket insulation 2.3Vapor retarder
SD-08 Manufacturer’s Instructions 3.2.1Insulation
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates 1.4.2Inspector Qualifications 2.1Firestopping Materials
1.4.1 GInstaller Qualifications
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 47 PAGES
07 92 00 SD-07 Certificates 3.3.6Sealant
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.2Accessories 2.6Weatherstripping
SD-03 Product Data
2.1 GDoors
2.4 GFrames
2.2Accessories 2.6Weatherstripping
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.2Accessories 2.3.7Water-resistant sealer 1.5warranty
SD-04 Samples 2.1Doors
2.3.6.3 GDoor finish colors
SD-06 Test Reports 2.4Cycle-slam
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 47 PAGES
08 14 00 2.4Hinge loading resistance 08 33 23 SD-02 Shop Drawings
2.3 GOverhead Coiling Doors
1.4 GCounterbalancing Mechanism
2.5 GCounterbalancing Mechanism
1.4 GManual Door Operators
2.6 GManual Door Operators
1.4 GElectric Door Operators
2.7 GElectric Door Operators
2.3.2Bottom Bars 1.3Guides 2.5.1Mounting Brackets 2.3.7Overhead Drum
Hood 1.4Painting
1.3 GInstallation Drawings
SD-03 Product Data
2.3 GOverhead Coiling Doors
2.4 GHardware
1.4 GCounterbalancing Mechanism
2.5 GCounterbalancing Mechanism
1.4 GManual Door Operators
2.6 GManual Door Operators
1.4 GElectric Door Operators
2.7 GElectric Door Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 47 PAGES
08 33 23 SD-10 Operation and Maintenance Data
3.4 GOperation and Maintenance
Manuals
1.4 GMaterials
1.4 GDevices
1.4 GProcedures
1.4 GManufacture's Brochures
1.4 GParts Lists
3.3.2 GCleaning
08 51 23 SD-02 Shop Drawings 2.2Windows
SD-03 Product Data Hardware
2.1Materials 2.5.2Fasteners 2.5Accessories
SD-04 Samples
2.6.2 GColor coating
SD-06 Test Reports 1.3.1Air infiltration 1.3.1Water infiltration
SD-10 Operation and Maintenance Data
2.2 GWindows
08 71 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 47 PAGES
08 71 00 1.3 GManufacturer's Detail Drawings
1.5 GHardware Schedule
2.3.6 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting 08 91 00 SD-02 Shop Drawings
1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data 2.1.6Accessories 2.1.1Gypsum Board 2.1.5Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 47 PAGES
09 29 00 2.1.3Joint Treatment Materials SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions
2.1Material Safety Data Sheets SD-10 Operation and Maintenance Data
2.1Manufacturer maintenance instructions
3.8Waste Management 09 30 13 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1 GTile
2.1 GTile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.4 GGrout
SD-07 Certificates 2.1Tile 2.4Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 47 PAGES
09 30 13 SD-10 Operation and Maintenance Data
3.2 GInstallation
09 51 00 SD-03 Product Data
Acoustical Ceiling Systems SD-07 Certificates
2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles
09 65 00 SD-02 Shop Drawings
2.8 GResilient Flooring and
Accessories SD-03 Product Data
2.8 GResilient Flooring and
Accessories
2.4Adhesives 2.1Vinyl Composition Tile 2.2Wall Base
SD-04 Samples
2.8 GResilient Flooring and
Accessories SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 47 PAGES
09 65 00 SD-10 Operation and Maintenance Data
2.8 GResilient Flooring and
Accessories
09 90 00 SD-02 Shop Drawings 3.8Piping Identification
SD-03 Product Data
2.1 GCoating
Sealant SD-04 Samples
GColor SD-07 Certificates
1.4Applicator's Qualifications GQualification Testing
2.1Indoor Air Quality for Paints and Primers
SD-08 Manufacturer’s Instructions Application Instructions
3.5.2Mixing 1.7.2Manufacturer's Safety Data
Sheets SD-10 Operation and Maintenance Data
2.1 GCoatings
10 22 13 SD-02 Shop Drawings
1.4Wire mesh partitions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 47 PAGES
10 22 13 SD-03 Product Data 1.4Wire mesh partitions
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-07 Certificates 2.2Accessory Items
13 34 19 SD-01 Preconstruction Submittals
1.6.3 GManufacturer's Qualifications
SD-02 Shop Drawings
1.2.1.7 GDetail Drawings
1.6.1 GDetail Drawings
SD-03 Product Data
1.6.1 GManufacturer's catalog data
SD-04 Samples
1.6.1 GCoil Stock
2.1.8 GCoil Stock
1.2.1.9 GRoof Panels
1.2.1.9 GWall Panels
2.5.2 GFasteners
2.8.1 GMetal Closure Strips
1.4.7 GInsulation
1.6.9 GVapor Barrier
2.4.3 GManufacturer's color charts and
chips SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 47 PAGES
13 34 19 1.6.1 Gdescriptive and technical literature
1.6.1 Gbuilding design analysis
SD-06 Test Reports
1.6.1 Gtest reports
1.6.1 GCoatings and base metals
1.6.1 GFactory Color Finish Performance
Requirements SD-07 Certificates
1.6.1 Gsystem components
1.6.1 GCoil Stock
2.1.8 GCoil Stock
1.6.1 GEnamel Repair Paint
1.6.1 GQualification of Manufacturer
1.6.1 GQualification of Erector
SD-08 Manufacturer’s Instructions
1.6.2 GInstallation of Roof and Wall
panels 1.7shipping, handling, and storage
SD-11 Closeout Submittals
3.14.1 GManufacturer's Warranty
3.14.2 GContractor's Warranty for
Installation 22 00 00 SD-03 Product Data
2.4 GFixtures
2.4.1 GFlush valve water closets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 47 PAGES
22 00 00 2.4.2 GCountertop lavatories 2.4.3Semi-Circular Wash Fountain
2.4.4 GService sinks
2.4.5 GDrinking-water coolers
2.9 GWater heaters
3.8.1.1 GBackflow prevention assemblies
2.6.2 GShower Faucets
SD-06 Test Reports 3.8Tests, Flushing and Disinfection
3.8.1.1 GTest of Backflow Prevention
Assemblies SD-07 Certificates
1.3 GMaterials and Equipment
SD-10 Operation and Maintenance Data
3.8.1 GPlumbing System
22 15 14.00 40 SD-03 Product Data
1.4 GEquipment and Performance
Data
1.4 GEquipment and Performance
Data
2.3 GPiping Specialties
2.4 GAir Compressors
2.5 GValves
3.1.1 GAccessories
2.4 GDryers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 47 PAGES
22 15 14.00 40 2.4 GVibration Isolation SD-06 Test Reports
2.4.4 GAir Receiver (Tank air
compressor is mounted on)
3.2 GCompressed Air Systems Testing
3.2.1 GValve-Operating Tests
3.2.1 GDrainage Tests
3.2.1 GPneumatic Testing
SD-10 Operation and Maintenance Data
1.5 GOperation and Maintenance
Manuals
23 00 00 SD-03 Product Data
2.8.1.1 GInsulated Nonmetallic Flexible
Duct Runouts
2.8.1.1 GDuct Connectors
2.8.1.2 GDuct Connectors
2.8.1.2 GDuct Connectors
2.8.2 GManual Balancing Dampers
2.8.5.1 GDiffusers
2.8.5.2 GReturn Grilles
2.8.6Air Vents, Penthouses, and
Goosenecks
2.9.1.1 GCentrifugal Fans
2.9.1.2 GIn-Line Centrifugal Fans
2.9.1.3 GCeiling Exhaust Fans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 47 PAGES
23 00 00 2.10 GAir Handling Units
2.11 GEnergy Recovery Devices
2.13 GEnergy Recovery Ventilators
1.4.5 GTest Procedures
1.2.1.1 GDiagrams
3.11 GPerformance Tests
SD-08 Manufacturer’s Instructions
3.13.2 GOperation and Maintenance
Training
3.13.1 GOperation and Maintenance
Manuals
2.9.1.2 GIn-Line Centrifugal Fans
2.9.1.3 GCeiling Exhaust Fans
2.10 GAir Handling Units
2.11 GEnergy Recovery Devices
23 05 93 SD-06 Test Reports
1.2 GTAB Firm
1.2 GTAB team assistants
1.2 GTAB team engineer
1.2 GTAB team field leader
1.6.1 GDALT and TAB Submittal and
Work Schedule
3.7 GDALT and TAB Work Execution
Schedule
3.7 GDALT and TAB Procedures
Summary
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 47 PAGES
23 05 93 3.7 GDesign review report
3.3.5 GPre-Final DALT report
3.3.8 GFinal DALT report
3.7 GTAB report for Season 1
3.7 GTAB report for Season 2
SD-07 Certificates
1.5.1 GIndependent TAB agency and
personnel qualifications
3.3.2 GAdvance notice of Pre-Final
DALT field work
3.7 GCompleted Pre-Final DALT Work
Checklist
3.7 GCompleted Pre-Final DALT Work
Checklist
3.7 GAdvance Notice of Season 1 TAB
Field Work
3.7 GCompleted Season 1 Pre-TAB
Work Checklist
3.7 GCompleted Season 1 Pre-TAB
Work Checklist
3.7 GAdvance Notice of Season 2 TAB
Field Work
3.7 GCompleted Season 2 Pre-TAB
Work Checklist
3.7 GCompleted Season 2 Pre-TAB
Work Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 47 PAGES
23 07 00 SD-03 Product Data
3.3 GDuct Insulation Systems
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2 GDraft As-Built Drawings
3.2 GFinal As-Built Drawings
SD-03 Product Data
1.8.3 GProgramming Software
1.8.4 GController Application Programs
1.8.1 GConfiguration Software
1.8.2 GController Configuration Settings
2.2 GManufacturer's Product Data
SD-06 Test Reports Existing Conditions Report
3.4.2 GStart-Up Testing Report
3.5.1 GPVT Procedures
3.5.3 GPVT Report
1.9.1 GPre-Construction Quality Control
(QC) Checklist
1.9.2 GPost-Construction Quality Control
(QC) Checklist
3.6.5 GPerformance Verification Testing
Plan
3.6.3.1 GEquipment Supplier’s
Performance Verification Testing Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 47 PAGES
23 09 00 3.6.8.3 GEndurance Testing Results
3.6.9 GPerformance Verification Test
Report SD-10 Operation and Maintenance Data
3.7 GOperation and Maintenance
(O&M) Instructions
3.8.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
3.1.6.1 GPassword Summary Report
1.9.3 GCloseout Quality Control (QC)
Checklist 23 11 25 SD-03 Product Data
1.5 GPipe and Fittings
2.2.7 GFlexible Connectors
2.1 GPipe Coating Materials and
application procedures
2.3 GValves
2.2.3 GWarning and identification tape
SD-06 Test Reports
3.15 GTesting
3.15.1 GPressure Tests
SD-08 Manufacturer’s Instructions
2.1 Gpipe coating materials and
application procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 47 PAGES
23 11 25 SD-10 Operation and Maintenance Data
1.2.1 GGas facility equipment
maintenance
23 35 00.00 10 SD-02 Shop Drawings
1.4.1 GDetail Drawings
SD-03 Product Data 1.4.2Related Submittals 2.1Materials and Equipment 1.6Spare Parts
3.5 GField Instructions
3.5 GOnsite Training
1.4.2 GExhaust System Specialist
SD-06 Test Reports
3.6 GFinal Acceptance Tests
SD-07 Certificates
3.3 GInspection
SD-10 Operation and Maintenance Data
1.2 GExhaust System
3.5 GOperation and Maintenance
Manuals 23 54 16.00 10 SD-02 Shop Drawings
3.2Installation SD-03 Product Data
1.4Spare Parts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 47 PAGES
23 54 16.00 10 SD-06 Test Reports 3.4Testing, Adjusting, and Balancing
SD-10 Operation and Maintenance Data
3.3Operation and Maintenance Instructions
23 82 46.00 40 SD-03 Product Data
2.1 GEquipment and Performance
Data
2.1 GElectric Unit Heaters
25 05 11 SD-01 Preconstruction Submittals
3.1.5.3 GWireless Communication
Request
3.1.2.2 GDevice Account Lock Exception
Request
3.9 GMultiple IP Connection Device
Request
1.8.1.4 GContractor Computer
Cybersecurity Compliance Statements
1.8.6 GContractor Temporary Network
Cybersecurity Compliance Statements
SD-02 Shop Drawings
3.1.3.1 GUser Interface Banner Schedule
1.6.2 GNetwork Communication Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 47 PAGES
25 05 11 1.6.5 GCybersecurity Riser Diagram
1.6.3 GControl System Inventory Report
1.6.1 GCybersecurity Interconnection
Schedule SD-03 Product Data
1.6.6 GControl System Cybersecurity
Documentation
SD-06 Test Reports
3.1.5.4 GWireless Communication Test
Report SD-07 Certificates
1.7 GSoftware Licenses
SD-11 Closeout Submittals
3.5.2.2.5 GPassword Summary Report
1.6.4 GSoftware Recovery And
Reconstitution Images
3.2.2.1 GDevice Audit Record Upload
Software 26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure 26 12 19.10 SD-03 Product Data
2.2 GPad-mounted Transformers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 47 PAGES
26 12 19.10 SD-06 Test Reports
3.6.1 GAcceptance Checks and Tests
26 13 00 SD-03 Product Data
2.1 GInsulated High-Voltage
Connectors
2.2 GSurge Arresters
SD-06 Test Reports
3.2.1 GAcceptance Checks and Tests
26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.3 GCable trays
3.1.9.1 GMarking strips
SD-03 Product Data
2.11 GReceptacles
2.12.3 GCircuit breakers
2.9 GSwitches
2.13 GManual motor starters
2.16.3 GGrounding Busbar
2.22 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.4 GGrounding system test
3.5.3 GGround-fault receptacle test
SD-07 Certificates
2.10 GFuses
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 47 PAGES
26 20 00 SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
26 27 14.00 20 SD-02 Shop Drawings
1.4.1 GInstallation Drawings
SD-03 Product Data
2.1.3 GElectricity meters
2.1.2 GCurrent transformer
2.2 Gcommunications
3.1.3 GConfiguration Software
SD-06 Test Reports
3.2.1 GAcceptance checks and tests
3.2.2 GSystem functional verification
3.2.1 GBuilding meter installation sheet, per building
3.2.1 GCompleted meter installation
schedule
3.2.1 GCompleted meter data schedule
2.1.1 GMeter configuration template
3.2.1 GMeter configuration report
SD-10 Operation and Maintenance Data
1.5.1 GElectricity Meters and
Accessories
SD-11 Closeout Submittals
3.2.2 GSystem functional verification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 47 PAGES
26 51 00 SD-02 Shop Drawings
1.5.1 GLuminaire Drawings
1.5.8 GOccupancy/Vacancy Sensor
Coverage Layout
1.7.2 GLighting Control System
One-Line Diagram
2.5.1 GSequence of Operation for
Lighting Control System SD-03 Product Data
2.2 GLuminaires
2.3 GLight Sources
2.4 GLED Drivers
1.6.1 GLuminaire Warranty
1.6.2 GLighting Controls Warranty
2.5.1.1.1 GLocal Area Controller
2.5.2.4 GLighting Contactor
2.5.2.1 GSwitches
2.5.2.2 GWall Box Dimmers
2.5.2.3 GOccupancy/Vacancy Sensors
2.5.2.6 GPhotocell
2.5.2.5 GTimeswitch
2.5.2.3.4 GPower Packs
2.6.1 GExit Signs
2.6.3 GEmergency Drivers
SD-05 Design Data
1.5.2 GLuminaire Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 47 PAGES
26 51 00 SD-06 Test Reports
1.5.3 GANSI/IES LM-79 Test Report
1.5.4 GANSI/IES LM-80 Test Report
1.5.5 GANSI/IES TM-21 Test Report
1.5.6 GANSI/IES TM-30 Test Report
3.2.1.1 GOccupancy/Vacancy Sensor
Verification Test
3.2.1.1 GPhotocell Verification Test
SD-07 Certificates
1.5.7 GLED Driver and Dimming Switch
Compatibility Certificate SD-10 Operation and Maintenance Data
1.7.1 GLighting System
1.7.2 GLighting Control System
3.3.2.1 GMaintenance Staff Training Plan
3.3.2.2 GEnd-User Training Plan
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings SD-03 Product Data
2.3 GTelecommunications cabling
2.4.5 GPatch panels
2.5 GTelecommunications
outlet/connector assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 47 PAGES
27 10 00 2.4.2 GEquipment support frame
2.4.3 GConnector blocks
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer Qualifications
1.6.3 GTest plan
SD-09 Manufacturer’s Field Reports
2.10.1 GFactory reel tests
SD-10 Operation and Maintenance Data
1.10.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
28 08 10 SD-05 Design Data
3.1 GTest Plan
SD-06 Test Reports 3.2.2Draft Test Report
3.4 GFinal Test Report
SD-07 Certificates 1.5.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 47 PAGES
28 10 05 SD-02 Shop Drawings
1.3.3.1 GESS Components
1.3.3.2 GOverall System Schematic
SD-03 Product Data
2.3.4 GAccess Control Unit
2.3.5 GAccess Control Devices
2.4 GCommunications Interface
Devices
2.5.1 GBatteries
2.7 GComponent Enclosure
SD-05 Design Data
1.5.1 GBackup Battery Capacity
Calculations
2.3.2 GThroughput Rates
SD-07 Certificates
1.3.4.1 GContractor Qualifications
1.3.4.2 GInstructor Qualifications
SD-10 Operation and Maintenance Data
3.6.1 GTraining Plan
3.6 GTraining Content
1.3.3.1 GESS Components
1.6 GESS Software
SD-11 Closeout Submittals
1.7 GAs-Built Drawings
31 23 00.00 20 SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 47 PAGES
31 23 00.00 20 1.6Borrow Site Testing 3.11.2.1Fill and backfill 3.11.2.2Select material 3.11.2.3Density tests
31 31 16 SD-03 Product Data
3.3.6 GTermiticide Application Plan
2.1Termiticides 3.1Verification of Measurement 3.4.1Application Equipment 1.6Warranty
SD-06 Test Reports 3.4.1Equipment Calibration and Tank
Measurement 1.5.1Soil Moisture 1.3Quality Assurance
SD-07 Certificates 1.3.1Qualifications
32 10 01 SD-05 Design Data 1.3.2Job mix formula
SD-07 Certificates 2.1.2Stone Base Course
32 31 13.53 SD-02 Shop Drawings 1.3.2Fence Installation 3.1Fence Installation 1.3.2Installation Drawings 1.3.2Gate Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 47 PAGES
32 31 13.53 2.6.1Gate Assembly 2.6.1Gate Assembly 1.3.2Gate Hardware and Accessories 2.6.3Gate Hardware and Accessories
SD-03 Product Data 1.3.2Fence Installation 3.1Fence Installation 1.3.2Gate Assembly 2.6.1Gate Assembly 2.6.1Gate Assembly 1.3.2Gate Hardware and Accessories 2.6.3Gate Hardware and Accessories 2.1.1Fabric 2.2Posts 2.2.2Post Caps 2.3Braces 2.4.2Barbed Wire 2.2.2Barbed Wire Supporting Arms 2.1.1Stretcher Bars 2.1.1Gate Posts 2.4.1Wire Ties 2.2.1Chain Link Fence 1.3.1Reports 1.3.1Reports 1.3.1Zinc Coating 1.3.1PVC coating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 47 PAGES
32 31 13.53 1.3.1aluminum alloy coating 2.5Concrete
SD-08 Manufacturer’s Instructions 1.3.2Fence Installation 3.1Fence Installation 1.3.2Gate Assembly 2.6.1Gate Assembly 2.6.1Gate Assembly 3.5Hardware Assembly 1.3.1Accessories
SD-10 Operation and Maintenance Data
2.8Electro-Mechanical Locks 2.7Gate Operator 3.5operating and maintenance instructions 33 11 00 SD-03 Product Data
2.1.1Piping Materials 2.1Water distribution main 2.2Water service line 2.1.2.3Indicator posts 2.2.2.1Corporation stops 2.1.2.4Valve boxes 2.2.2.7Valve boxes 2.2.2.9Disinfection 2.1.1.1Lining
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 47 PAGES
33 11 00 2.1.2.2hydrants 1.4Delivery, storage, and handling 3.1.1Installation
33 30 00 SD-01 Preconstruction Submittals 1.6Existing Conditions
SD-02 Shop Drawings 1.4.2Drawings…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .