Attachment E - Utility Permit - P602.pdf

PDF 93 KB Posted

Attached to
P602U MSRON TWO Combatant Craft Maintenance Facility
Solicitation number
N4008524R2592
Issued by

About this file

This document contains a utility permit application and related federal contract opportunity. The utility permit application requests approval for utility connections for the P602 UMC Cover Boat and Maintenance Facility project at Joint Expeditionary Base Little Creek - Fort Story in Virginia Beach, Virginia. It details the type and size of new domestic water and fire protection connections as well as new sanitary sewer laterals and mains required. The related federal contract opportunity is solicitation number N4008524R2592 for the P602U MSRON Two Combatant Craft Maintenance Facility at the same location. The solicitation is restricted to the 8(a) Multiple Award Construction Contractors in the Hampton Roads area of Virginia under NAVFAC MID-ATLANTIC contract numbers N4008523D0030/0031/0032/0033/0034/0035/0036/0037/0038.

View the file

Other files

File Type Posted
0005_Attachment G-REV3 - VA20240167 21JUN24.pdf PDF
Amendment_0005.pdf PDF
Amendment_004.pdf PDF
003_Attachment R - DON_REA.pdf PDF
Amendment_003.pdf PDF
003_Attachment M - Price Proposal Form_rev1.pdf PDF
Amendment_002.pdf PDF
002_Attachment L - PPI Responses_29FEB24.pdf PDF
001_Attachment Q - S-505.pdf PDF
Amendment_001.pdf PDF
001_Attachment L - PPI_Responses_27FEB24.pdf PDF
001_Attachment O - SiteVisitLog_27Feb24.pdf PDF
001_Attachment P - S-101.pdf PDF
001_Attachment G - VA20240167_23FEB24.pdf PDF
Attachment I - Site Location and Parking.pdf PDF
Attachment C - Schedule of Special Inspections.pdf PDF
Attachment K - ONE DAY PASS FORM.xls XLS spreadsheet
Attachment N - Solicitation Provisions.pdf PDF
Attachment L - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment M - Price Proposal Form.pdf PDF
Attachment J - SECNAV 5512.pdf PDF
Attachment G - VA20240167_05JAN2024.pdf PDF
24R2592 General Requirements.pdf PDF
Attachment D - Statement_of_Special_Inspections.pdf PDF
Attachment A - 1717512 SPEC COMPLETE.pdf PDF
Attachment H - CJA.pdf PDF
Attachment F - REGISTER.pdf PDF
Attachment B - 1717512 DRAWINGS.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTILITY CONNECTION PERMIT APPLICATION Tracking #:___________

SECTION A - GENERAL INFORMATION

1. Requesting Activity: ____________________________________________________

2. Point of Contact: _____________________ Phone Number: ___________________

3. Project Location: _______________________________________________________

4. Type of Work: (Check all that apply.)

New Construction Building Addition Renovation

Demolition/Utility Disconnection Repair Utility Upgrade

5. Work will involve the following utilities: (Check all that apply.)

Water Sewer Electric Steam Gas

a. If Sewer is checked, will the connection be permanent or temporary?

Permanent Temporary (Proceed to question 6)

b. If a permanent connection is required and this project involves construction, contact the NAVFAC XXXXXX Environmental Business Line (Code

EV) to determine if Certificate to Construct/Certificate to Operate

(CTC/CTO) is required before proceeding.

6. Work to be performed by:

ROICC Contract NAVFAC XXXXXX Maintenance Department

Contract NAVFAC XXXXXX Utilities and Energy

Management Product Line

Other: ______________________________________________________________

7. Contract Title: ________________________________________________________

Contract/J.O./MAXIMO Number: ______________Drawing Number: _____________

NAVFAC NAVFAC XXXXXX Design Activity Other:____________

NOTE: Submit a complete set of drawings with the application. Include specifications if available.

SPECIFICATIONS INCLUDED: YES NO

DESIGN CALCULATIONS INCLUDED: YES NO

8. Designed by Firm/Activity: _____________________________________________

Point of Contact: _____________________________ Phone: _________________

9. Submitted by: (This is usually the Engineer in Charge (EIC) or AIC.):

Name: __________________________ Signature: __________________________

Title: __________________ Request Date: ________ Phone: __________

10. Reviewed by: __________________________ Date: ________

Approved Disapproved zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box

NECC

zachary.a.stacy1 Text Box

LITTLE CREEK

zachary.a.stacy1 Text Box

RICHARD HOYT

zachary.a.stacy1 Text Box 757-636-7179 zachary.a.stacy1 Text Box

UMC COVER BOAT AND MAINTENANCE FACILITY (P602)

zachary.a.stacy1 Text Box

G3CGFN

zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box

NAVFAC MIDLANT

zachary.a.stacy1 Text Box

ZACHARY STACY

zachary.a.stacy1 Text Box 757-462-4777 zachary.a.stacy1 Text Box

RON SILVA

zachary.a.stacy1 Text Box

SUPERVISORY

zachary.a.stacy1 Text Box 4/4/23 zachary.a.stacy1 Text Box 757-462-5404 zachary.a.stacy1 Text Box

DESIGN MANAGER

zachary.a.stacy1 Text Box X zachary.a.stacy1

TBD

SECTION B - WATER

PART A - DOMESTIC WATER SERVICE CONNECTIONS

Complete the following for all domestic water service connections to water distribution system lines.

1. Number of Domestic Water Service Connections

(a) Existing service connections disconnected from water line __________

(b) New service connections connected to water line ___________

2. List the following for all new domestic water service connections to water distribution system lines. See Instructions for clarification.

(a) Pipe Size(s) _________________________________________

(b) Pipe Material(s) _________________________________________

(c) Pipe Class or Schedule _________________________________________

(d) Required Capacity (in gpm) _________________________________________

(e) Required Pressure (in psi) _________________________________________

(f) Meter Size(s) _________________________________________

(g) Meter Type(s) _________________________________________

(h) Backflow Preventer (Yes/No) _________________________________________

Text Box zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box 2" zachary.a.stacy1 Text Box

TYPE K COPPER

zachary.a.stacy1 Text Box

CLASS 350

zachary.a.stacy1 Text Box 2" zachary.a.stacy1 Text Box

POSITIVE DISPLACEMENT

zachary.a.stacy1 Text Box

YES

zachary.a.stacy1 Text Box

BASED ON DEMAND

zachary.a.stacy1

BASED ON DEMAND

PART B - FIRE PROTECTION (HIGH PRESSURE/NON-POTABLE) WATER SERVICE

CONNECTIONS

Complete the following for all fire protection (high pressure/non-potable) water service connections to fire protection system lines.

1. Number of Fire Protection (High Pressure/Non-Potable) Water Service

Connections

(a) Number of existing service connections disconnected from fire protection line _________

(b) Number of new service connections connected to fire protection line

2. List the following for all new fire protection (high pressure/non-potable) water service connections to fire protection system lines. See

Instructions for clarification.

(a) Pipe Size(s) ________________________________________

(b) Pipe Material(s) ________________________________________

(c) Pipe Class or Schedule ________________________________________

(d) Required Capacity (in gpm) _________________________________________

(e) Required Pressure (in psi) _________________________________________

(f) Backflow Preventer (Yes/No) _________________________________________

Text Box zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box 8" zachary.a.stacy1 Text Box

DUCTILE IRON

zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box

YES

zachary.a.stacy1 Text Box

CLASS 350

zachary.a.stacy1

SECTION C - SANITARY SEWER

PART A - SANITARY SEWER LATERAL CONNECTIONS

Complete the following information for work involving all sanitary sewer lateral connections to sanitary sewer mains.

1. Number of Sanitary Sewer Laterals

(a) Existing laterals disconnected from sanitary sewer main __________

(b) New laterals connected to sanitary sewer main __________

2. List the following for all new sanitary sewer lateral connections. See

Instructions for clarification.

(a) Pipe Size(s) _________________________________________

(b) Pipe Material(s) _________________________________________

(c) Pipe Class or Schedule _________________________________________

(d) Total Added Design Capacity (gpm)____________________________________

3. Type of Discharge from New Sanitary Sewer Laterals

(a) Building Type: (Check all that apply)

Office Residential Housing Recreational

Warehouse Food Service Fuel Depot

Commercial Barracks Trng. Facility

Medical Industrial Aircraft Hangar

Other (Specify)________________________________

(b) Indicate below any of the operations occurring in the above buildings: (Please check all that apply. If none of these apply, check N/A.)

N/A

Food Preparation Operations

Photo Processing or X-Ray Operations

Laboratory or Clinics

Industrial Laundry or Dry Cleaning

Printing Operations (other than copy machines for office use)

Handling or Collecting Used Oils, Solvents, Degreasers, or HW

Grease Traps zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box 4" zachary.a.stacy1 Text Box

PVC

zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box

SCHEDULE 40

zachary.a.stacy1

PART B - SANITARY SEWER MAINS

Complete the following information for work involving all sanitary sewer mains.

1. Number of sanitary sewer manholes abandoned __________

2. Number of sanitary sewer manholes installed __________

3. Linear feet of sanitary sewer main abandoned __________

4. Linear feet of sanitary sewer main installed __________

5. List the following for all new sanitary sewer mains:

(a) Pipe Size(s) _____________________________________________________

(b) Pipe Material(s)_____________________________________________________

(c) Pipe Class or Schedule_______________________________________________

PART C - SANITARY SEWER PUMP STATIONS

Complete the following information for work involving all sanitary sewer pump stations.

1. Number of sanitary sewer pump stations abandoned __________

2. Number of sanitary sewer pump stations installed __________

3. Number of pumps installed at each pump station _________________________

4. Size of each pump installed ____________________________________________

5. Attach details for pump station cut sheets, pump/ system curves, visible and audible alarms/ channels, bypass pump connections, valve and check valve connections, and wet well level monitoring systems.

zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box N/A zachary.a.stacy1 Text Box N/A zachary.a.stacy1 Text Box N/A zachary.a.stacy1 Text Box N/A zachary.a.stacy1 Text Box N/A zachary.a.stacy1 Text Box N/A zachary.a.stacy1

N/A

File details come from the government source that posted it. Updated .