This document contains a utility permit application and related federal contract opportunity. The utility permit application requests approval for utility connections for the P602 UMC Cover Boat and Maintenance Facility project at Joint Expeditionary Base Little Creek - Fort Story in Virginia Beach, Virginia. It details the type and size of new domestic water and fire protection connections as well as new sanitary sewer laterals and mains required. The related federal contract opportunity is solicitation number N4008524R2592 for the P602U MSRON Two Combatant Craft Maintenance Facility at the same location. The solicitation is restricted to the 8(a) Multiple Award Construction Contractors in the Hampton Roads area of Virginia under NAVFAC MID-ATLANTIC contract numbers N4008523D0030/0031/0032/0033/0034/0035/0036/0037/0038.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UTILITY CONNECTION PERMIT APPLICATION Tracking #:___________
SECTION A - GENERAL INFORMATION
1. Requesting Activity: ____________________________________________________
2. Point of Contact: _____________________ Phone Number: ___________________
3. Project Location: _______________________________________________________
4. Type of Work: (Check all that apply.)
New Construction Building Addition Renovation
Demolition/Utility Disconnection Repair Utility Upgrade
5. Work will involve the following utilities: (Check all that apply.)
Water Sewer Electric Steam Gas
a. If Sewer is checked, will the connection be permanent or temporary?
Permanent Temporary (Proceed to question 6)
b. If a permanent connection is required and this project involves construction, contact the NAVFAC XXXXXX Environmental Business Line (Code
EV) to determine if Certificate to Construct/Certificate to Operate
(CTC/CTO) is required before proceeding.
6. Work to be performed by:
ROICC Contract NAVFAC XXXXXX Maintenance Department
Contract NAVFAC XXXXXX Utilities and Energy
Management Product Line
Other: ______________________________________________________________
7. Contract Title: ________________________________________________________
Contract/J.O./MAXIMO Number: ______________Drawing Number: _____________
NAVFAC NAVFAC XXXXXX Design Activity Other:____________
NOTE: Submit a complete set of drawings with the application. Include specifications if available.
SPECIFICATIONS INCLUDED: YES NO
DESIGN CALCULATIONS INCLUDED: YES NO
8. Designed by Firm/Activity: _____________________________________________
Point of Contact: _____________________________ Phone: _________________
9. Submitted by: (This is usually the Engineer in Charge (EIC) or AIC.):
Name: __________________________ Signature: __________________________
Title: __________________ Request Date: ________ Phone: __________
10. Reviewed by: __________________________ Date: ________
Approved Disapproved zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box
NECC
zachary.a.stacy1 Text Box
LITTLE CREEK
zachary.a.stacy1 Text Box
RICHARD HOYT
zachary.a.stacy1 Text Box 757-636-7179 zachary.a.stacy1 Text Box
UMC COVER BOAT AND MAINTENANCE FACILITY (P602)
zachary.a.stacy1 Text Box
G3CGFN
zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box
NAVFAC MIDLANT
zachary.a.stacy1 Text Box
ZACHARY STACY
zachary.a.stacy1 Text Box 757-462-4777 zachary.a.stacy1 Text Box
RON SILVA
zachary.a.stacy1 Text Box
SUPERVISORY
zachary.a.stacy1 Text Box 4/4/23 zachary.a.stacy1 Text Box 757-462-5404 zachary.a.stacy1 Text Box
DESIGN MANAGER
zachary.a.stacy1 Text Box X zachary.a.stacy1
TBD
SECTION B - WATER
PART A - DOMESTIC WATER SERVICE CONNECTIONS
Complete the following for all domestic water service connections to water distribution system lines.
1. Number of Domestic Water Service Connections
(a) Existing service connections disconnected from water line __________
(b) New service connections connected to water line ___________
2. List the following for all new domestic water service connections to water distribution system lines. See Instructions for clarification.
(a) Pipe Size(s) _________________________________________
(b) Pipe Material(s) _________________________________________
(c) Pipe Class or Schedule _________________________________________
(d) Required Capacity (in gpm) _________________________________________
(e) Required Pressure (in psi) _________________________________________
(f) Meter Size(s) _________________________________________
(g) Meter Type(s) _________________________________________
(h) Backflow Preventer (Yes/No) _________________________________________
Text Box zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box 2" zachary.a.stacy1 Text Box
TYPE K COPPER
zachary.a.stacy1 Text Box
CLASS 350
zachary.a.stacy1 Text Box 2" zachary.a.stacy1 Text Box
POSITIVE DISPLACEMENT
zachary.a.stacy1 Text Box
YES
zachary.a.stacy1 Text Box
BASED ON DEMAND
zachary.a.stacy1
BASED ON DEMAND
PART B - FIRE PROTECTION (HIGH PRESSURE/NON-POTABLE) WATER SERVICE
CONNECTIONS
Complete the following for all fire protection (high pressure/non-potable) water service connections to fire protection system lines.
1. Number of Fire Protection (High Pressure/Non-Potable) Water Service
Connections
(a) Number of existing service connections disconnected from fire protection line _________
(b) Number of new service connections connected to fire protection line
2. List the following for all new fire protection (high pressure/non-potable) water service connections to fire protection system lines. See
Instructions for clarification.
(a) Pipe Size(s) ________________________________________
(b) Pipe Material(s) ________________________________________
(c) Pipe Class or Schedule ________________________________________
(d) Required Capacity (in gpm) _________________________________________
(e) Required Pressure (in psi) _________________________________________
(f) Backflow Preventer (Yes/No) _________________________________________
Text Box zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box 8" zachary.a.stacy1 Text Box
DUCTILE IRON
zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box
YES
zachary.a.stacy1 Text Box
CLASS 350
zachary.a.stacy1
SECTION C - SANITARY SEWER
PART A - SANITARY SEWER LATERAL CONNECTIONS
Complete the following information for work involving all sanitary sewer lateral connections to sanitary sewer mains.
1. Number of Sanitary Sewer Laterals
(a) Existing laterals disconnected from sanitary sewer main __________
(b) New laterals connected to sanitary sewer main __________
2. List the following for all new sanitary sewer lateral connections. See
Instructions for clarification.
(a) Pipe Size(s) _________________________________________
(b) Pipe Material(s) _________________________________________
(c) Pipe Class or Schedule _________________________________________
(d) Total Added Design Capacity (gpm)____________________________________
3. Type of Discharge from New Sanitary Sewer Laterals
(a) Building Type: (Check all that apply)
Office Residential Housing Recreational
Warehouse Food Service Fuel Depot
Commercial Barracks Trng. Facility
Medical Industrial Aircraft Hangar
Other (Specify)________________________________
(b) Indicate below any of the operations occurring in the above buildings: (Please check all that apply. If none of these apply, check N/A.)
N/A
Food Preparation Operations
Photo Processing or X-Ray Operations
Laboratory or Clinics
Industrial Laundry or Dry Cleaning
Printing Operations (other than copy machines for office use)
Handling or Collecting Used Oils, Solvents, Degreasers, or HW
Grease Traps zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box 4" zachary.a.stacy1 Text Box
PVC
zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box X zachary.a.stacy1 Text Box
SCHEDULE 40
zachary.a.stacy1
PART B - SANITARY SEWER MAINS
Complete the following information for work involving all sanitary sewer mains.
1. Number of sanitary sewer manholes abandoned __________
2. Number of sanitary sewer manholes installed __________
3. Linear feet of sanitary sewer main abandoned __________
4. Linear feet of sanitary sewer main installed __________
5. List the following for all new sanitary sewer mains:
(a) Pipe Size(s) _____________________________________________________
(b) Pipe Material(s)_____________________________________________________
(c) Pipe Class or Schedule_______________________________________________
PART C - SANITARY SEWER PUMP STATIONS
Complete the following information for work involving all sanitary sewer pump stations.
1. Number of sanitary sewer pump stations abandoned __________
2. Number of sanitary sewer pump stations installed __________
3. Number of pumps installed at each pump station _________________________
4. Size of each pump installed ____________________________________________
5. Attach details for pump station cut sheets, pump/ system curves, visible and audible alarms/ channels, bypass pump connections, valve and check valve connections, and wet well level monitoring systems.
zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box zachary.a.stacy1 Text Box N/A zachary.a.stacy1 Text Box N/A zachary.a.stacy1 Text Box N/A zachary.a.stacy1 Text Box N/A zachary.a.stacy1 Text Box N/A zachary.a.stacy1 Text Box N/A zachary.a.stacy1
N/A