This document is a Preliminary Pavement Design Report Addendum prepared by GRI for the Oregon Parks and Recreation Department (OPRD) for the GO Bond Nehalem Bay State Park Projects in Tillamook County, Oregon. The report provides recommendations for the reconstruction and widening of the entrance road to the park. For partial-depth reconstruction, GRI recommends 4 inches of new asphalt concrete pavement in two equal lifts over the reconditioned existing aggregate base. For full-depth repairs and roadway widening, GRI recommends 4 inches of new asphalt concrete pavement over 6 inches of new aggregate base with a non-woven subgrade geotextile. The recommendations are based on a 20-year design period and assume construction will occur in 2025. If construction is delayed until 2027, the recommendations should be reevaluated. GRI also provides opinions on the use of reclaimed asphalt pavement in the base course and shoulder material, as well as guidance on stabilization of unbound materials, wet weather construction, and subgrade stabilization.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Preliminary Pavement
Design Report Addendum GO Bond Nehalem Bay State Park Projects
Tillamook County, Oregon
June 5, 2024
Prepared for
Parametrix 700 NE Multnomah St., Suite 1000
Portland, OR 97232
Prepared by
16520 SW Upper Boones Ferry Road, Suite 100
Tigard, OR 97224-7661
(503) 641-3478 | www.gri.com
DRAFT
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Page i June 5, 2024
EXECUTIVE SUMMARY
I PROJECT DESCRIPTION
GRI previously completed preliminary geotechnical, geologic, and pavement investigations in several areas of Nehalem Bay State Park in Tillamook, Oregon. As requested by Parametrix, GRI conducted an additional investigation into proposed improvements consisting of reconstruction and widening of the entrance road to the park.
II PAVEMENT-DESIGN APPROACH AND METHODOLOGY
GRI completed pavement-design analyses in accordance with the guidelines provided in the 1993 American Association of State Highway and Transportation Officials Guide for Design of Pavement Structures and the 2019 Oregon Department of Transportation Pavement Design Guide. We based the structural analysis on our field explorations, dynamic cone penetrometer testing, visual assessment of the roadway segment, and traffic-loading analyses.
III PAVEMENT-DESIGN RECOMMENDATIONS
Our analyses indicate that partial-depth reconstruction of the entrance road to the park is feasible. However, we observed several areas where the roadway segment exhibits distresses indicative of base and/or subgrade failure that should be repaired full depth.
Our recommendations for full-depth repairs apply equally to roadway widening.
III.I Partial-Depth Reconstruction Our recommendations for partial-depth reconstruction of the entrance road to the park, based on a 20-year design period, are as follows:
• 2.0-inch-thick, Level 2, ½-inch, Dense Asphalt Concrete Pavement (ACP) Wearing Course with Performance Grade (PG) 58-22 Binder (one lift)
• 2.0-inch-thick, Level 2, ½-inch, Dense ACP Base Course with PG 58-22 Binder (one lift)
• Optional 2.0-inch-thick Aggregate Base (¾-inch-0); see Section 5.3 of the report for additional details
• Reconditioned Existing Aggregate Base
• Cold Plane Pavement Removal (approximately 2 inches)
• Full-Depth Repairs (as warranted)
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page ii June 5, 2024
III.II Full-Depth Repairs and Roadway Widening Based on a 20-year design period, our recommendations for full-depth repairs along the entrance road to the park and widening of the roadway segment are as follows:
• 2.0-inch-thick, Level 2, ½-inch, Dense ACP Wearing Course with PG 58-22 Binder (one lift)
• 2.0-inch-thick, Level 2, ½-inch, Dense ACP Base Course with PG 58-22 Binder (one lift)
• 6.0-inch-thick Aggregate Base (1-inch-0 or ¾-inch-0)
• Subgrade Geotextile (non-woven)
• Undisturbed Subgrade
IV DURATION OF REHABILITATION RECOMMENDATIONS
The findings and recommendations for pavement reconstruction are based on the traffic-loading estimates, assuming construction will occur in the year 2025. If the recommended reconstruction work is not accomplished prior to the year 2027, our recommendations will need to be reevaluated to determine if modifications are necessary to account for the increase in traffic loading and potential additional pavement distress occurring after the date of this report.
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum
TABLE OF CONTENTS
I PROJECT DESCRIPTION ..................................................................................................... I II PAVEMENT-DESIGN APPROACH AND METHODOLOGY ................................................ I III PAVEMENT-DESIGN RECOMMENDATIONS ..................................................................... I
III.I Partial-Depth Reconstruction .................................................................................................................... i III.II Full-Depth Repairs and Roadway Widening ...................................................................................... ii
IV DURATION OF REHABILITATION RECOMMENDATIONS ............................................... II
1 INTRODUCTION
2 PROJECT DESCRIPTION
3 PAVEMENT DESIGN APPROACH
4 SITE DESCRIPTION AND CONDITIONS
4.1 Site Description
4.2 Existing Pavement Surface Conditions
4.3 Existing Subsurface Conditions
4.4 Traffic Loading
5 PAVEMENT DESIGN ANALYSIS AND RECOMMENDATIONS
5.1 Overview
5.2 Flexible Pavement Analysis and Design
5.3 Pavement Design Recommendations
5.4 Duration of Pavement Design Recommendations
5.5 Recommendations for Pavement Materials and Construction
5.6 Stabilization of Unbound Materials
5.7 Use of Reclaimed Asphalt Pavement as Base and Shoulder Material
5.8 Opening to Traffic
6 LIMITATIONS
7 REFERENCES
TABLES
Table 4-1: Summary of Pavement Thickness at Boring Explorations Table 5-1: Specifications for the Entrance Road to Nehalem Bay State Park
FIGURES
Figure 1: Vicinity Map Figure 2: Site Plan
June 5, 2024
APPENDICES
Appendix A: Field Explorations and Laboratory Testing Appendix B: Traffic Analysis Worksheet Appendix C: Pavement Design Calculation Worksheets
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page 1 June 5, 2024
1 INTRODUCTION
GRI previously completed preliminary pavement, geotechnical, and geologic investigations at Nehalem Bay State Park in Tillamook County, Oregon, as documented in the following preliminary reports provided to Parametrix under separate cover:
• “Preliminary Pavement Design Report, GO Bond Nehalem Bay State Park Projects, Tillamook County, Oregon,” dated March 14, 2023.
• “Preliminary Geotechnical Investigation, GO Bond Nehalem Bay State Park Projects, Tillamook County, Oregon,” dated March 16, 2023.
• “Geologic Hazard Report, GO Bond Nehalem Bay State Park Projects, Tillamook County, Oregon,” dated January 17, 2023.
In addition to the abovementioned reports, GRI also provided the following documents to Parametrix as part of the overall project:
• “95% Plan Review, New Staff Housing Site Development,” April 27, 2023.
• “Cabin Foundation Review, New Staff Housing,” dated June 29, 2023.
• “Summary of Geotechnical Construction Observation for Staff Housing Foundations,” dated October 18, 2023.
As requested, GRI conducted an additional investigation into proposed improvements to the entrance road pavement at the park. This report documents our investigations, findings, engineering analyses, and recommendations for the entrance road pavement and serves as an addendum to our previous preliminary pavement design report for the project. The general location of the park is shown on the Vicinity Map, Figure 1.
2 PROJECT DESCRIPTION
In addition to the proposed improvements documented in our reports cited above, we understand that the Oregon Parks and Recreation Department (OPRD) is considering reconstruction and widening of the entrance road to Nehalem Bay State Park in Tillamook County, Oregon. The approximate limits of the proposed improvements to the entrance road are shown on the Site Plan, Figure 2. We also understand that OPRD would like to salvage the existing aggregate base (if feasible) and incorporate the reclaimed asphalt pavement (RAP) into the existing aggregate base, as well as use the RAP as shoulder material. In addition, based on e-mail communications, a Parametrix representative requested our opinion regarding stabilization of the unbound subsurface materials (existing aggregate base and subgrade soil) with cement, lime, fly ash, or bituminous emulsion.
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page 2 June 5, 2024
3 PAVEMENT DESIGN APPROACH
GRI completed pavement-design analyses in accordance with the guidelines provided in the 1993 American Association of State Highway and Transportation Officials (AASHTO) Guide for Design of Pavement Structures (AASHTO Guide) and the 2019 Oregon Department of Transportation (ODOT) Pavement Design Guide (ODOT PDG). We based the structural analyses on our field investigations provided in Appendix A, the visual assessment of roadway imagery described below in Section 4.2, traffic-loading analysis summarized in Appendix B, and pavement-design calculations shown in Appendix C.
4 SITE DESCRIPTION AND CONDITIONS
4.1 Site Description
Nehalem Bay State Park is located between the Pacific Ocean to the west and Nehalem Bay to the east. The town of Manzanita is located adjacent to and to the north and west of the park. The proposed project area includes partially and heavily vegetated sand dunes, including heavily forested areas with dense groves of Lodgepole pine trees as well as coastal grasses and shrubs. The developed portion of the park includes campgrounds improved for recreational vehicle use, multiple bathroom facilities, a meeting hall, playground areas, a day use area, several parking lots, a boat launch to Nehalem Bay, a ranger station/registration kiosk, an RV dump station, and maintenance and administrative facilities. An airstrip is located east of the main park development. There are several paved roadways throughout the developed portion of the park and a paved multi-use pathway looping around the airstrip to the east of the main campground area. South of the developed park area is a narrow, north-south-oriented sand spit that extends to the mouth of the Nehalem River at its confluence with the Pacific Ocean. The entire western boundary of the park includes a broad, windswept sandy beach fronting the Pacific Ocean.
4.2 Existing Pavement Surface Conditions
As requested by Parametrix, a representative from GRI photographed locations exhibiting distress indicative of pavement base and/or subgrade failure along the entrance road of Nehalem Bay State Park on April 2, 2024. We photographed and obtained approximate geographic coordinates of the locations using an Apple iPhone 13 with iOS version 17.4.1.
The approximate geographic coordinates of the photographs are presented in Table 1A;
the approximate locations of the photographs are shown spatially on Figures 1A and 2A;
and copies of the photographs are shown on Figures 3A through 18A in Appendix A. Prior to construction, we recommend field marking areas for full-depth (dig-out) repairs at the locations shown on Figures 1A and 2A in Appendix A.
4.3 Existing Subsurface Conditions
GRI completed subsurface explorations for pavement investigation purposes at the site on April 8, 2024. Our explorations consisted of pavement borings and dynamic cone
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page 3 June 5, 2024 penetrometer (DCP) testing. Additional details of our surface investigations and summaries of our findings are presented below.
4.3.1 Pavement Borings
GRI completed four pavement borings, designated PB-9 through PB-12, to depths ranging from approximately 4 feet to approximately 5 feet below ground surface (bgs). We also collected samples of the subgrade soil from each boring location for further evaluation in our laboratory. The approximate locations of the pavement borings are shown on Figure 2.
We observed AC thickness ranging from about 1¾ inches to about 2 inches. The relative condition of the recovered pavement cores is poor to good. We drilled all cores on cracks and the crack extended to the full depth of AC at each location. We encountered aggregate base (AB) with thickness ranging from about 8¼ inches to about 20 inches beneath the AC at all core locations.
A summary of pavement layer thicknesses encountered at our exploration locations is provided in Table 4.1 below. Boring logs are shown on Figures 19A through 22A;
photographs of the boring locations and core samples are shown on Figures 23A through 26A; and a plot summarizing the thickness and relative condition of the pavement cores is provided on Figure 27A in Appendix A.
Table 4-1: SUMMARY OF PAVEMENT THICKNESS AT BORING EXPLORATIONS
Boring/Core
Thickness, inches
Drilled on Crack? Drilled on Patch? Cracking Depth(s), inches AC AB PB-9/C-9 1¾ 12¼ Yes No 1¾
PB-10/C-10 1¾ 8¼ Yes No 1¾
PB-11/C-11 2 10 Yes No 2
PB-12/C-12 2 20 Yes No 2 Abbreviations: AC = Asphalt Concrete; AB = Aggregate Base
Based on our observations of the subgrade soils at the pavement borings, the native subgrade beneath the pavement generally consists of loose to medium-dense, fine-grained sand (dune sand) with trace silt at all boring locations and trace gravel at boring location PB-12.
4.3.2 Dynamic Cone Penetrometer Testing
We conducted DCP testing at boring locations PB-10 through PB-12. In an attempt to conduct DCP testing at boring location PB-9, the rod of the testing instrument broke at the connection with the handle. Accordingly, we were not able to complete DCP testing at boring location PB-9. The approximate locations of the pavement borings are shown on Figure 2. Additional details of our DCP testing are presented in Appendix A. Logs of the
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page 4 June 5, 2024 test data and the test results are provided on Figures 28A through 30A in Appendix A. A summary of the subgrade resilient moduli and the design subgrade resilient modulus values is provided in Table 3A in Appendix A.
4.3.3 Groundwater
We encountered groundwater at boring locations PB-9, PB-10, and PB-12. The depth of groundwater ranged from about 2 feet bgs at boring PB-12 to 3.5 feet bgs at borings PB-9 and PB-10.
4.4 Traffic Loading
We approximated the current annual 18-kip equivalent single-axle load (ESAL) repetitions of Federal Highway Administration (FHWA) Class 4 through 13 vehicles based on traffic and approximate vehicle class and frequency provided to us by an OPRD representative.
The calculation methodology and other inputs to approximate the cumulative ESAL repetitions for the design period are presented in Appendix B. The 20-year traffic-loading approximation used in our rehabilitation design analysis is 116,000 ESALs.
5 PAVEMENT DESIGN ANALYSIS AND RECOMMENDATIONS
5.1 Overview
We conducted pavement design analyses using flexible pavement to accommodate the approximated traffic loading over a 20-year design period for conventional flexible pavement (i.e., AC over AB). Details of our analysis approach, details of the design parameters used in our analyses, and the findings from our analyses are provided below.
5.2 Flexible Pavement Analysis and Design
5.2.1 Design Resilient Modulus Values for the Existing Aggregate Base and Subgrade Soil We used the DCP test data summarized in Appendix A to approximate the design resilient modulus values for the existing aggregate base and subgrade soil within the project limits.
The DCP test results are used to approximate the California bearing ratio, which is correlated to the resilient modulus based on the relationship developed by Chen et al.
(1999). Based on our analysis, we approximated design resilient modulus values of 22,720 pounds per square inch and 8,570 pounds per square inch (psi) for the existing aggregate base and subgrade soil, respectively, based on the average of the approximated resilient modulus values at each test location along the roadway segment.
5.2.2 Partial-Depth Reconstruction Analysis
As requested by OPRD, we evaluated a partial-depth reconstruction option consisting of removal of the existing AC, reconditioning the existing aggregate base, and placing new AC. Table 1C indicates that 4 inches of new AC over at least 6 inches of reconditioned aggregate base will provide adequate capacity to accommodate the approximated 20-year traffic loading. Given that our borings indicated that the existing aggregate base
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page 5 June 5, 2024 varied between about 8¼ inches and about 20 inches at the boring locations, it appears that there will likely be enough existing aggregate base along the roadway segment to satisfy the minimum 6-inch requirement.
5.2.3 Full-Depth Repairs and Roadway Widening
We used the methods described by Giroud and Han (2004) to develop the design thickness of AB needed above the subgrade in combination with a geotextile to support construction traffic and the procedures presented in the AASHTO Guide for the design of the AC thickness above the AB. Results of our analysis for geotextile-reinforced aggregate of the entrance road are provided in Table 2C in Appendix C.
5.2.4 Other Analysis Parameters for Flexible Pavement Design
Based on values approximated from our field investigations and values presented in the ODOT PDG, we used the analysis parameters listed at the top of Tables 1C and 2C in Appendix C for the design of flexible pavement. Design parameters listed at the top of Table 1C correspond to our partial-depth reconstruction analysis, whereas design parameters listed at the top of Table 2C correspond to our full-depth repair and pavement widening analysis.
5.3 Pavement Design Recommendations
5.3.1 Partial-Depth Reconstruction for the Entrance Road to the Park Our analysis presented in Table 1C assumes removal of the existing AC, reconditioning the existing aggregate base, and placing 4 inches of new AC in two equal lifts. Our recommendations for partial-depth reconstruction of the entrance road are as follows:
• 2.0-inch-thick, Level 2, ½-inch, Dense Asphalt Concrete Pavement (ACP) Wearing Course with Performance Grade (PG) 58-22 Binder (one lift)
• 2.0-inch-thick, Level 2, ½-inch, Dense ACP Base Course with PG 58-22 Binder (one lift)
• Optional 2.0-inch-thick Aggregate Base (¾-inch-0)
• Reconditioned Existing Aggregate Base
• Full-Depth Repairs (as warranted)
The item for the optional 2-inch-thick aggregate base layer shown above is based on our recommendations provided previously, as requested by OPRD, in our preliminary pavement design report dated March 14, 2023, for other areas of the park. Given our evaluation and analysis of data obtained from our field investigations along the entrance
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page 6 June 5, 2024 road, it is our opinion that the optional 2-inch-thick aggregate base layer is not necessary.
However, we include the optional recommendation based on e-mail communications with a representative from Parametrix. If the design team desires to include the optional 2-inch-thick aggregate base layer, the design team should evaluate the implications, in terms of finished grade and cost, of including this layer.
5.3.2 Full-Depth Repairs and Roadway Widening
We understand that preliminary plans call for reconstruction and widening of the entrance road to the park. Our recommendations for full-depth repairs and widening are as follows:
• 2.0 -inch-thick, Level 2, ½-inch, Dense ACP Wearing Course with PG 58-22 Binder (one lift)
• 2.0-inch-thick, Level 2, ½-inch, Dense ACP Base Course with PG 58-22 Binder (one lift)
• 6.0-inch-thick Aggregate Base (1-inch-0 or ¾-inch-0)
• Subgrade Geotextile (non-woven)
• Undisturbed Subgrade
5.4 Duration of Pavement Design Recommendations
The findings and recommendations for pavement reconstruction and widening are based on the condition of the existing pavement and subgrade encountered at the time of our investigation and our traffic-loading approximations, which assume construction will occur in the year 2025. If the recommended pavement rehabilitation and reconstruction work are not accomplished prior to the year 2027, our recommendations should be reevaluated to determine if modifications are necessary to account for additional deterioration of the pavement condition and the increase in traffic loading or environmental impacts following the date of this report.
5.5 Recommendations for Pavement Materials and Construction
5.5.1 Specifications
Construction materials and procedures should comply with the applicable sections of the 2024 ODOT Oregon Standard Specifications for Construction (OSSC) and the modifications given in Table 5-1 below.
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page 7 June 5, 2024
Table 5-1: SPECIFICATIONS FOR THE ENTRANCE ROAD TO NEHALEM BAY STATE PARK
Materials/Activity OSSC Specification
Preparation of Roadbed Foundation
Special Provision 00330.
Subgrade Stabilization Special Provision 00331.
Subgrade Geosynthetics Special Provision 00350. Non-woven Separation Geotextile.
Aggregate Base Reconditioning
Special Provision 00610.
Aggregate Base Special Provision 00641 (1-inch-0 or ¾-inch-0)
Asphalt Concrete Special Provision 00744, Level 2 mixture. Minimum and maximum lift thicknesses should be 2 inches and 3 inches, respectively.
Asphalt Binder Asphalt binder should be PG 58-22.
Abbreviation: OSSC = Oregon Standard Specifications for Construction
5.5.2 Wet Weather Construction
The pavement sections provided above for full-depth repairs and widening are based on the assumption that pavement construction will be accomplished during warm, dry conditions and that all workmanship and materials will conform to the applicable specifications. An experienced geotechnical engineer should evaluate the exposed subgrade conditions during construction. During periods of wet weather or when wet-ground conditions exist, it may be necessary to place additional aggregate base to support construction equipment and protect the subgrade soils from disturbance. If unsuitable conditions are observed, the area should be over excavated using hoe-type equipment equipped with a smooth-edged bucket and stabilized using the recommendations given below in the following section of this report for subgrade stabilization. For extremely soft conditions, an additional thickness of aggregate base beyond that recommended below may be required.
5.5.3 Subgrade Stabilization for Wet Weather Construction or Unstable Subgrade Conditions
• Minimum 12-inch-thick Aggregate Base
• Subgrade Geotextile
• Undisturbed Subgrade
5.6 Stabilization of Unbound Materials
Through e-mail communications, a Parametrix representative asked for our opinion regarding stabilization of the unbound subsurface materials (existing aggregate base and subgrade soil) with cement, lime, fly ash, or bituminous emulsion. Our analyses indicate that reuse of the existing aggregate base is feasible without incorporating stabilization
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page 8 June 5, 2024 materials. In addition, it may be difficult to obtain Permit 1200-C from the State of Oregon Department of Environmental Quality (DEQ) due to the proximity of wetland areas to the roadway segment as well as shallow groundwater observed during our subsurface investigation.
5.7 Use of Reclaimed Asphalt Pavement as Base and Shoulder Material According to Federal Highway Administration (FHWA) publication number FHWA-RD-97- 148 (FHWA, 2016), at least 13 state agencies, including ODOT, have used RAP as aggregate in the base course. The publication indicates that “overall, the performance of RAP as a granular base or subbase aggregate, or as an additive to granular base or subbase, has been described as satisfactory, good, very good, or excellent” (Ahmed, 1991; Collins and Ciesielski, 1994). The publication provides guidelines for material processing requirements (including placement by in-place processing), important engineering properties to consider, design considerations, construction procedures, and unresolved issues. The latter speaks to the “need to establish standard specifications for the incorporation of RAP into granular base and standard methods for determining in-place compacted density” and the “need to resolve some environmental concerns regarding leachability characteristics for RAP, as well as various RAP-aggregate blends, in order to develop procedures for the stockpiling and placing of base or subbase materials containing RAP in situations where there may be groundwater contact.”
Regarding establishing a standard specification for incorporation of RAP into granular base, ODOT has a special provision (Special Provision 00645) for use of recycled asphalt products in the base course, but it indicates that the recycled asphalt product (e.g., RAP) must come from agency-provided stockpiles. Accordingly, ODOT Special Provision 00645 cannot be used for this project without modification. Based on a “Fact Sheet” published by DEQ (DEQ, 2015), Oregon Administrative Rule (OAR) 340-093-0270(5) exempts “asphalt grindings from road projects” from DEQ regulation, provided that the “asphalt grindings” are “covered or compacted within roadway prisms.”
To this end, we are of the opinion that use of RAP within the roadway prism (i.e., within the base course and on the shoulders) does not require solid waste permitting if compliance with OAR 340-093-0270(5) is satisfied and maintained, but it will require development of contract specifications, which is currently outside of our scope of services.
Given that GRI has substantial experience in assisting agencies in the development of specifications, we recommend engaging GRI for specification development if OPRD would like to pursue incorporation of RAP in the base course and/or on the shoulder of the reconstructed roadway segment.
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page 9 June 5, 2024
5.8 Opening to Traffic
Traffic, other than construction traffic, may be allowed on the top lift of the asphalt concrete pavement base course for a period of up to 30 calendar days.
6 LIMITATIONS
This report addendum has been prepared to aid the project team in the design of this project and should not be relied upon by any other entity without the written permission of an authorized representative. The scope is limited to the specific project and location described within this report addendum, and our description of the project represents our understanding of the significant aspects of the project relevant to the design and construction of the pavement at the time of publication. In the event that any changes in the design and location of the improvements as outlined in this report addendum are planned, we should be given the opportunity to review the changes and modify or reaffirm the conclusions and recommendations of this report addendum in writing.
The conclusions and recommendations submitted in this report addendum are based on the data obtained from our field and laboratory investigations at the locations indicated on Figure 2 and other sources of information discussed in this report addendum. In the performance of pavement testing and subsurface investigations, specific information is obtained at specific locations at specific times. However, it is acknowledged that variations in pavement strength, thickness, and soil conditions may exist between tests and explorations. This report addendum does not reflect any variations that may occur between these test and exploration locations. The nature and extent of variation may not become evident until construction. If, during construction, conditions are found that are different from those reported herein, we should be advised at once, so we can observe and review these conditions and revise our recommendations where necessary.
Submitted for GRI, Todd V. Scholz, PhD, PE Shashwath Sreedhar, PhD, PE Ana-Maria Coca, PhD Principal Staff Engineer Engineering Staff
This document has been submitted electronically.
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page 10 June 5, 2024
7 REFERENCES
Ahmed, Imtiaz, 1991, Use of Waste Materials in Highway Construction. Federal Highway
Administration, Report No. FHWA/IN/JHRP-91/3, Washington, DC.
American Association of State Highway and Transportation Officials (AASHTO), 1993, AASHTO Guide for Design of Pavement Structures, Washington, D.C.
Chen, J., Hossain, M., Latorella, T., 1999, Use of falling weight deflectometer and dynamic cone penetrometer in pavement evaluation, Transportation Research Board, vol.
1655, issues 1, pp. 145-151.
Collins, R. J. and S. K. Ciesielski, 1994, Recycling and Use of Waste Materials and By- Products in Highway Construction, National Cooperative Highway Research Program Synthesis of Highway Practice 199, Transportation Research Board, Washington, DC.
Giroud, J. P., and Han, J., 2004, Design method for geogrid-reinforced unpaved roads. I.
Development of design methods and design method for geogrid-reinforced unpaved roads. II. Calibration and applications, J. Geotech., Eng. Div., Am. Soc. Civ.
Eng., 130(8), pp. 775-797.
Federal Highway Administration, 2016, User Guidelines for Waste and Byproduct Materials in Pavement Construction, FHWA-RD-97-148, page last modified 03/08/2016, https://www.fhwa.dot.gov/publications/research/infrastructure/structures/97148/ rap134.cfm#:~:text=and%20culvert%20backfill.- ,(,standard%20practice%20in%20many%20areas accessed 5/29/2024.
Oregon Department of Environmental Quality Fact Sheet, Beneficial Use of Reclaimed Asphalt Grindings, 2015, https://www.oregon.gov/deq/FilterDocs/benuse-asphalt.pdf accessed 5/29/2024.
Oregon Department of Transportation (ODOT), 2019, ODOT Pavement Design Guide, Pavement Services Unit, Salem, OR.
ODOT, 2024, Oregon Standard Specifications for Construction, Salem, OR.
https://www.fhwa.dot.gov/publications/research/infrastructure/structures/97148/rap134.cfm%23:%7E:text=and%20culvert%20backfill.-,(,standard%20practice%20in%20many%20areas https://www.fhwa.dot.gov/publications/research/infrastructure/structures/97148/rap134.cfm%23:%7E:text=and%20culvert%20backfill.-,(,standard%20practice%20in%20many%20areas https://www.fhwa.dot.gov/publications/research/infrastructure/structures/97148/rap134.cfm%23:%7E:text=and%20culvert%20backfill.-,(,standard%20practice%20in%20many%20areas https://www.oregon.gov/deq/FilterDocs/benuse-asphalt.pdf https://www.oregon.gov/deq/FilterDocs/benuse-asphalt.pdf
Ol
PACIFIC OCEAN
Imagery Sources: Stats NZ, Esri, TomTom, Garmin, Foursquare, METI/NASA, USGS, Esri, NASA, NGA, USGS, Esri, NASA, NGA, USGS, FEMA, Oregon State Parks, State of Oregon GEO, WA State Parks GIS, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METIi NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, USFWS l/1 a.
l/1 � l/1 u
G
Manzanita Golf Course
1;70)(
Sandpiper Ln
.. 44ft
45ft l/1
OJ
0.
-0
-0 r
Nehalem Bay State Park
PROJECT SITE
mrno
Q) c,:
Vl C
Q)
.c
� 0
"' f-
I.!)
Q) -0
Vl
NEHALEM BAY
Buell Ave Cheviot Creek
769 ft
0.5
1 INCH = 0.5 MILES
PARAMETRIX
GO BOND NEHALEM BAY STATE PARK
VICINITY MAP
JUN. 2024 JOB NO. 6730-A FIG. 1
SITE PLAN
JOB NO. 6730-AJUN. 2024 FIG. 2
PARAMETRIX
GO BOND NEHALEM BAY STATE PARK
�/�(�*�(�1�'��
101+00
100+00
102+00
103+00
104+00
105+00
106+00
107+00
108+00
109+00
110+00
111+00
112+00
113+00
115+00114+00
116+00
117+00
118+00
119+00
120+00 121+00122+00123+00
124+00
127+00 126+00
125+00
128+00
129+00
130+00131+00132+00 133+00
Sandpiper Lane Centerline Stripe
B-9
B-10
B-11
B-12
PAVEMENT BORINGS COMPLETED BY GRI (APRIL 8, 2024) �m 0 400 800
1 INCH = 400 FEET
Imagery Source: Oregon Statewide Imagery Program (OSIP) - Oregon Imagery Framework Implementation Team
APPENDIX A
Field Explorations and Laboratory Testing
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page A-1 June 5, 2024
APPENDIX A
FIELD EXPLORATIONS AND LABORATORY TESTING
A.1 FIELD INVESTIGATIONS
A.1.1 General
GRI conducted field investigations to evaluate pavement surface and pavement subsurface conditions on April 2 and 8, 2024, respectively. Evaluation of pavement surface conditions involved photographing areas with suspected base and/or subgrade failure whereas evaluation of pavement subsurface conditions involved completing four pavement borings and four dynamic cone penetration (DCP) tests, as described in further detail below. Our laboratory-testing program on selected samples obtained during our field explorations is also described below.
A.1.2 Pavement Surface Conditions As requested by Parametrix, a representative from GRI photographed areas indicative of pavement base and/or subgrade failure along the entrance road to Nehalem Bay State Park on April 2, 2024. We photographed locations and obtained approximate geographic coordinates of the photographs using an Apple iPhone 13 with operating system iOS version 17.4.1. The approximate geographic coordinates of the photographs are presented in Table 1A, approximate locations are shown spatially on Figures 1A and 2A, and copies of the photographs are shown on Figures 3A through 18A of this appendix.
A.1.3 Borings We retained Dan J. Fischer Excavating, Inc. (Fischer) to complete the pavement borings within the project limits. Fischer used a trailer-mounted drill rig and a 5-inch-diameter, diamond-tipped core barrel to drill through the pavement surfacing and then advanced the borings below the pavement surfacing through the underlying aggregate base and into the subgrade to assist in evaluation of the type, thickness, and condition of the cores and underlying materials encountered. Fischer completed the pavement boring explorations on April 8, 2024. Approximate locations of the pavement boring explorations are shown on Figure 2.
An experienced member of the GRI engineering team directed the explorations and maintained logs of the materials and conditions encountered during the boring operations. Our staff examined the soil samples in the field and retained portions of the materials encountered in zip-top bags for further examination. Boring logs are presented on Figures 19A through 22A, photographs of the boring locations and core samples are provided on Figures 23A through 26A, and a plot summarizing the thickness and relative condition of the pavement cores is provided on Figure 27A in this appendix. The terms
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page A-2 June 5, 2024 and symbols used to describe the subsurface materials encountered in the explorations are defined in Table 2A of this appendix.
A.1.4 Dynamic Cone Penetrometer Tests We completed DCP testing in general accordance with ASTM International (ASTM) D6951 to depths of about 32 inches to about 34 inches below the top of the existing aggregate base using a Kessler dynamic cone penetrometer manufactured by KSE Testing Equipment.
We completed the testing at the pavement test and pavement boring locations shown on Figure 2 by driving a ⅝-inch-diameter steel rod with a cone tip into the unbound subsurface materials using a 17.6-pound sliding hammer dropped from a fixed height of
22.6 inches. We recorded the number of hammer drops or blows required to advance the cone tip at approximately one- to two-inch increments.
Using the recorded test data, we plotted cumulative blows against cumulative penetration depths and visually assessed the resulting curve to delineate regions with approximately linear slopes. We then used least square regression to calculate the slope of the approximately linear regions along the curve and used the procedures described by Chen et al. (1999) to approximate the resilient modulus for each region. Where a curve exhibited more than one slope within the aggregate base or subgrade soil, we used Odemark’s Method of Equivalent Thickness described by Ullidtz (1998) to calculate an equivalent modulus value for the entire data set of similar material types. Plots of the data are shown on Figures 28A through 30A, and a summary of the moduli and the design resilient modulus value is provided in Table 3A in this appendix.
A.2 LABORATORY TESTING
A.2.1 General
We transported all samples obtained from the field explorations to our laboratory, where we noted the physical characteristics of the samples, and modified the field classifications where necessary. At the time of classification, we determined the natural moisture content of select samples. The following section describes the laboratory-testing program in more detail.
A.2.2 Natural Moisture Content We determined natural moisture content in conformance with ASTM D2216. The results are provided on Figures 19A through 22A and in Table 4A.
GRI 6730-A – GO Bond Nehalem Bay State Park Projects Pavement Report Addendum Page A-3 June 5, 2024
A.3 REFERENCES
Chen, J., Hossain, M., Latorella, T., 1999, Use of falling weight deflectometer and dynamic cone penetrometer in pavement evaluation, Transportation Research Board, vol.
1655, issues 1, pp. 145-151.
Per Ullidtz, Modelling Flexible Pavement Response and Performance, Tech Univ. of Denmark Polytekn, 1998.
June 5, 2024
Table 1A: APPROXIMATE GEOGRAPHIC COORDINATES OF PHOTOGRAPHS OF AREAS WITH
SUSPECTED BASE AND/OR SUBGRADE FAILURE
Photograph
Filename Latitude, degrees
Longitude, degrees
Photograph Filename
Latitude, degrees
Longitude, degrees
IMG_5141.JPG 45.707906 -123.931481 IMG_5168.JPG 45.703300 -123.930275
IMG_5142.JPG 45.707906 -123.931489 IMG_5169.JPG 45.703706 -123.929664
IMG_5143.JPG 45.707797 -123.931411 IMG_5170.JPG 45.703706 -123.929611
IMG_5144.JPG 45.707797 -123.931411 IMG_5171.JPG 45.704042 -123.929222
IMG_5145.JPG 45.707669 -123.931350 IMG_5172.JPG 45.703889 -123.929367
IMG_5146.JPG 45.707675 -123.931336 IMG_5173.JPG 45.704936 -123.929322
IMG_5147.JPG 45.707683 -123.931328 IMG_5174.JPG 45.704947 -123.929267
IMG_5148.JPG 45.707858 -123.931289 IMG_5175.JPG 45.704844 -123.929139
IMG_5149.JPG 45.690411 -123.936797 IMG_5176.JPG 45.704814 -123.929175
IMG_5150.JPG 45.690394 -123.936792 IMG_5177.JPG 45.704814 -123.929175
IMG_5151.JPG 45.691783 -123.934853 IMG_5178.JPG 45.704814 -123.929175
IMG_5152.JPG 45.692036 -123.934303 IMG_5179.JPG 45.705322 -123.929436
IMG_5153.JPG 45.692147 -123.934097 IMG_5180.JPG 45.705333 -123.929436
IMG_5154.JPG 45.693128 -123.932289 IMG_5183.JPG 45.705556 -123.929597
IMG_5155.JPG 45.708436 -123.936356 IMG_5184.JPG 45.705517 -123.929672
IMG_5156.JPG 45.708436 -123.936356 IMG_5185.JPG 45.706089 -123.930192
IMG_5157.JPG 45.701983 -123.932547 IMG_5186.JPG 45.706058 -123.930108
IMG_5158.JPG 45.702056 -123.932206 IMG_5187.JPG 45.706058 -123.930108
IMG_5159.JPG 45.704906 -123.930275 IMG_5188.JPG 45.706183 -123.930267
IMG_5160.JPG 45.702931 -123.931114 IMG_5189.JPG 45.706989 -123.930953
IMG_5161.JPG 45.702933 -123.931153 IMG_5190.JPG 45.706989 -123.930953
IMG_5162.JPG 45.702928 -123.931161 IMG_5191.JPG 45.706803 -123.930908
IMG_5163.JPG 45.702756 -123.931433 IMG_5192.JPG 45.706856 -123.930917
IMG_5164.JPG 45.703144 -123.930650 IMG_5194.JPG 45.707458 -123.931214
IMG_5165.JPG 45.703178 -123.930656 IMG_5195.JPG 45.708492 -123.931464
IMG_5166.JPG 45.703231 -123.930419 IMG_5196.JPG 45.708467 -123.931464
IMG_5167.JPG 45.703269 -123.930314 IMG_5197.JPG 45.708594 -123.931494
Note: Latitude and longitude coordinates are based on World Geodetic System 1984 (WGS 84) obtained using an Apple iPhone 13 with operating system iOS version 17.4.1.
Table 2A: GUIDELINES FOR CLASSIFICATION OF SOIL
Description of Relative Density for Granular Soil
Relative Density Standard Penetration Resistance (N-values) blows per ft
Very Loose 0 - 4
Loose 4 - 10
Medium Dense 10 - 30
Dense 30 - 50
Very Dense over 50
Description of Consistency for Fine-Grained (Cohesive) Soils
Consistency
Standard Penetration Resistance (N-values) blows per ft
Torvane or Undrained Shear
Strength, tsf
Very Soft 0 - 2 less than 0.125
Soft 2 - 4 0.125 - 0.25
Medium Stiff 4 - 8 0.25 - 0.50
Stiff 8 - 15 0.50 - 1.0
Very Stiff 15 - 30 1.0 - 2.0
Hard over 30 over 2.0
Grain-Size Classification Modifier for Subclassification
Boulders:
>12 in.
Cobbles:
3-12 in.
Gravel:
¼ - ¾ in. (fine) ¾ - 3 in. (coarse) Sand:
No. 200 - No. 40 sieve (fine) No. 40 - No. 10 sieve (medium) No. 10 - No. 4 sieve (coarse) Silt/Clay:
Pass No. 200 sieve
Adjective
Primary Constituent SAND or GRAVEL
Primary Constituent SILT or CLAY
Percentage of Other Material (By Weight) trace: 5 - 15 (sand, gravel) 5 - 15 (sand, gravel) some: 15 - 30 (sand, gravel) 15 - 30 (sand, gravel) sandy, gravelly: 30 - 50 (sand, gravel) 30 - 50 (sand, gravel) trace: <5 (silt, clay)
Relationship of clay and silt determined by plasticity index test some: 5 - 12 (silt, clay) silty, clayey: 12 - 50 (silt, clay)
June 5, 2024
Table 3A: APPROXIMATED RESILIENT MODULI BASED ON DCP TESTING
Approximated Resilient Modulus, psi
Test Location Aggregate Base Subgrade Soil
PB-10 21,000 8,950
PB-11 25,200 10,710
PB-12 21,960 6,060
Average 22,720 8,570
Abbreviation: psi = pounds per square inch.
PB-9 S-2 1.5 -- 10 -- -- -- -- SAND
S-3 3.0 -- 21 -- -- -- -- SAND
PB-10 S-2 1.0 -- 8 -- -- -- -- SAND
S-3 2.5 -- 19 -- -- -- -- SAND
PB-11 S-2 1.0 -- 5 -- -- -- -- SAND
S-3 2.5 -- 6 -- -- -- -- SAND
PB-12 S-3 2.0 -- 23 -- -- -- -- SAND
S-3 3.5 -- 23 -- -- -- -- SAND
Table 1
SUMMARY OF LABORATORY RESULTS
Sample Information Atterberg Limits
Sheet 1 of 1
Soil Type Fines
Content, % Plasticity Index, %
Liquid Limit, %
Dry Unit Weight, pcf
Moisture Content, %Elevation, ftSampleLocation Depth, ft
4A
Imagery Sources: Oregon Statewide Imagery Program (OSIP) - Oregon Imagery Framework Implementation Team, Stats NZ, Esri, TomTom, Garmin, Foursquare, METI/NASA, USGS, Esri, NASA, NGA, USGS
NOTE: See Table 1A for approximate geographic coordinates and Figures 3A through 18A for the photographs.
LEGEND:
e APPROXIMATE PHOTOGRAPH LOCATIONS OF SUSPECTED BASE AND/OR SUBGRADE FAILURE
0 50 100
1 INCH = 50 FEET
mrno
APPROXIMATE PHOTOGRAPH LOCATIONS
JUN. 2024 JOB NO. 6730-A FIG. 1A
Imagery Sources: Oregon Statewide Imagery Program (OSIP) - Oregon Imagery Framework Implementation Team, Stats NZ, Esri, TomTom, Garmin, Foursquare, METI/NASA, USGS, Esri, NASA, NGA, USGS
NOTE: See Table 1A for approximate geographic coordinates and Figures 3A through 18A for the photographs.
LEGEND:
e APPROXIMATE PHOTOGRAPH LOCATIONS OF SUSPECTED BASE AND/OR SUBGRADE FAILURE
0 50 100
1 INCH = 50 FEET
mrno
APPROXIMATE PHOTOGRAPH LOCATIONS
JUN. 2024 JOB NO. 6730-A FIG. 2A
PHOTOGRAPHS OF AREAS WITH SUSPECTED
BASE AND/OR SUBGRADE FAILURE
JUN. 2024 JOB NO. 6730-A FIG. 3A
Filename = IMG_5141.JPG Filename = IMG_5142.JPG Filename = IMG_5143.JPG
Filename = IMG_5144.JPG Filename = IMG_5145.JPG Filename = IMG_5146.JPG
Note: See Table 1A for Approximate Geographic Coordinates of Photographs.
JUN. 2024 JOB NO. 6730-A FIG. 4A
Filename = IMG_5147.JPG Filename = IMG_5148.JPG Filename = IMG_5149.JPG
JUN. 2024 JOB NO. 6730-A FIG. 5A
Filename = IMG_5150.JPG Filename = IMG_5151.JPG Filename = IMG_5152.JPG
Filename = IMG_5153.JPG Filename = IMG_5154.JPG Filename = IMG_5155.JPG
JUN. 2024 JOB NO. 6730-A FIG. 6A
Filename = IMG_5156.JPG Filename = IMG_5157.JPG Filename = IMG_5158.JPG
JUN. 2024 JOB NO. 6730-A FIG. 7A
Filename = IMG_5159.JPG Filename = IMG_5160.JPG Filename = IMG_5161.JPG
JUN. 2024 JOB NO. 6730-A FIG. 8A
Filename = IMG_5162.JPG Filename = IMG_5163.JPG Filename = IMG_5164.JPG
JUN. 2024 JOB NO. 6730-A FIG. 9A
Filename = IMG_5165.JPG Filename = IMG_5166.JPG Filename = IMG_5167.JPG
JUN. 2024 JOB NO. 6730-A FIG. 10A
Filename = IMG_5168.JPG Filename = IMG_5169.JPG Filename = IMG_5170.JPG
JUN. 2024 JOB NO. 6730-A FIG. 11A
Filename = IMG_5171.JPG Filename = IMG_5172.JPG Filename = IMG_5173.JPG
JUN. 2024 JOB NO. 6730-A FIG. 12A
Filename = IMG_5174.JPG Filename = IMG_5175.JPG Filename = IMG_5176.JPG
JUN. 2024 JOB NO. 6730-A FIG. 13A
Filename = IMG_5177.JPG Filename = IMG_5178.JPG Filename = IMG_5179.JPG
JUN. 2024 JOB NO. 6730-A FIG. 14A
Filename = IMG_5180.JPG Filename = IMG_5183.JPG Filename = IMG_5184.JPG
JUN. 2024 JOB NO. 6730-A FIG. 15A
Filename = IMG_5185.JPG Filename = IMG_5186.JPG Filename = IMG_5187.JPG
JUN. 2024 JOB NO. 6730-A FIG. 16A
Filename = IMG_5188.JPG Filename = IMG_5189.JPG Filename = IMG_5190.JPG
JUN. 2024 JOB NO. 6730-A FIG. 17A
Filename = IMG_5191.JPG Filename = IMG_5192.JPG Filename = IMG_5194.JPG
JUN. 2024 JOB NO. 6730-A FIG. 18A
Filename = IMG_5195.JPG Filename = IMG_5196.JPG Filename = IMG_5197.JPG
GRAVEL; clean to some silt, clay, and sand
Sandy GRAVEL; clean to some silt and clay
Silty GRAVEL; up to some clay and sand
Clayey SAND; up to some silt and gravel
Gravelly CLAY; up to some silt and sand
Sandy CLAY; up to some silt and gravel
Silty CLAY; up to some sand and gravel
Symbol Description
Flush-mount monument set in concrete
Concrete, well casing shown where applicable
Filter pack, machine-slotted well casing shown where applicable
1-in.-diameter solid PVC
FIELD MEASUREMENTS
Typical Description
Groundwater level after drilling and date measured
Symbol Typical Description
BASALT
MUDSTONE
SILTSTONE
PEAT
Symbol
FILL
Clayey GRAVEL; up to some silt and sand
SAND; clean to some silt, clay, and gravel
SILT; up to some clay, sand, and gravel
Gravelly SILT; up to some clay and sand
Sandy SILT; up to some clay and gravel
Clayey SILT; up to some sand and gravel
CLAY; up to some silt, sand, and gravel
Grab Sample
Rock core sample interval
Sonic core sample interval
INSTALLATION SYMBOLS
Symbol
Bentonite seal, well casing shown if applicable
Vibrating-wire pressure transducer
SymbolBEDROCK SYMBOLS
SOIL SYMBOLS
Typical Description
SAMPLER SYMBOLS
Sampler DescriptionSymbol
LANDSCAPE MATERIALS
Gravelly SAND; clean to some silt and clay
Silty SAND; up to some clay and gravel
Shelby tube sampler with recovery
(ASTM D1587)
Grout, vibrating-wire transducer cable shown where applicable
1-in.-diameter hand-slotted PVC
Grout, inclinometer casing shown where applicable
Groundwater level during drilling and date measured
SANDSTONE
SURFACE MATERIAL SYMBOLS
Symbol Typical Description
BORING AND TEST PIT LOG LEGEND
Rock quality designation (RQD, %)
Asphalt concrete PAVEMENT
Portland cement concrete PAVEMENT
Crushed rock BASE COURSE
2.0 in. O.D. split-spoon sampler and Standard Penetration Test with recovery (ASTM D1586)
3.0 in. O.D. split-spoon sampler with recovery
(ASTM D3550)
Push probe sample interval
Rock/sonic core or push probe recovery (%)
B O
R
IN
G A
N D
T E
S T
P
IT
L O
G L
E G
E N
D G
R I D
A T
A T
E M
P
LA
T E
.G D
T
/7 /2
ASPHALT CONCRETE (1-3/4 inches) over AGGREGATE BASE (12-1/4 inches)
SAND, trace silt, light brown, medium dense, fine-grained
-- loose below 3 feet
(4/8/2024)
Geogrid / Fabric encountered at 3 feet
Energy Ratio:
SA
M
PL
E
N O
Big Beaver Portable Drill
Surface Elevation:
Hammer Type:
1.0
Weight:
Not Available IN
ST
AL
LA
TI
O
N
0.5
Logged By:
Drilling Method:
4/8/24
IN
ST
AL
LA
TI
O
N
PLASTIC LIMIT, %
LIQUID LIMIT, %
FINES CONTENT, %
BLOWS PER FOOT
MOISTURE CONTENT, %
Solid-Stem Auger
Drilled by:
140 lb Drop:
Not AvailableSee Legend for Explanation of Symbols
SA
M
PL
E
TY
PE
BL
O
W C
O U
N T
Date Started: Coordinates:
Note:
A. Maria Coca Dan J. Fischer Excavating, Inc.
Equipment:
G R
AP
H
IC
L
O G
EL
EV
AT
IO
N , F
T D
EP
TH
, F T
Cat Head
Hole Diameter:
CLASSIFICATION OF MATERIAL
30 in.
TORVANE SHEAR STRENGTH, TSF
UNDRAINED SHEAR STRENGTH, TSF
D
EP
TH
, F
T
45.707712° N -123.931336° W
COMMENTS AND
ADDITIONAL TESTS
BORING PB-9
FIG. 19A
G R
I B O
R
IN
G L
O G
L
A T
/L O
N G
' P
P G
R I D
A T
A T
E M
P
LA
T E
.G D
T
/2
/2
C-9
S-1
S-2
S-3
1.2
4.5
3.5 ft (4/8/2024)
JUN. 2024 JOB NO. 6730-A
0 100
ASPHALT CONCRETE (1-3/4 inches) over AGGREGATE BASE (8-1/4 inches)
SAND, trace silt, light brown, medium dense, fine-grained
-- loose below 2.5 feet
(4/8/2024)
Energy Ratio:
SA
M
PL
E
N O
Big Beaver Portable Drill
Surface Elevation:
Hammer Type:
1.0
Weight:
Not Available IN
ST
AL
LA
TI
O
N
0.5
Logged By:
Drilling Method:
4/8/24
IN
ST
AL
LA
TI
O
N
PLASTIC LIMIT, %
LIQUID LIMIT, %
FINES CONTENT, %
BLOWS PER FOOT
MOISTURE CONTENT, %
Solid-Stem Auger
Drilled by:
140 lb Drop:
Not AvailableSee Legend for Explanation of Symbols
SA
M
PL
E
TY
PE
BL
O
W C
O U
N T
Date Started: Coordinates:
Note:
A. Maria Coca Dan J. Fischer Excavating, Inc.
Equipment:
G R
AP
H
IC
L
O G
EL
EV
AT
IO
N , F
T D
EP
TH
, F T
Cat Head
Hole Diameter:
CLASSIFICATION OF MATERIAL
30 in.
TORVANE SHEAR STRENGTH, TSF
UNDRAINED SHEAR STRENGTH, TSF
D
EP
TH
, F
T
45.7075821° N -123.929962° W
COMMENTS AND
ADDITIONAL TESTS
BORING PB-10
FIG. 20A
G R
I B O
R
IN
G L
O G
L
A T
/L O
N G
' P
P G
R I D
A T
A T
E M
P
LA
T E
.G D
T
/2
/2
C-10
S-1
S-2
S-3
0.8
4.0
3.5 ft (4/8/2024)
JUN. 2024 JOB NO. 6730-A
0 100
ASPHALT CONCRETE (2 inches) over AGGREGATE BASE (10 inches)
SAND, trace silt, light brown, medium dense, fine-grained
(4/8/2024)
Energy Ratio:
SA
M
PL
E
N O
Big Beaver Portable Drill
Surface Elevation:
Hammer Type:
1.0
Weight:
Not Available IN
ST
AL
LA
TI
O
N
0.5
Logged By:
Drilling Method:
4/8/24
IN
ST
AL
LA
TI
O
N
PLASTIC LIMIT, %
LIQUID LIMIT, %
FINES CONTENT, %
BLOWS PER FOOT
MOISTURE CONTENT, %
Solid-Stem Auger
Drilled by:
140 lb Drop:
Not AvailableSee Legend for Explanation of Symbols
SA
M
PL
E
TY
PE
BL
O
W C
O U
N T
Date Started: Coordinates:
Note:
A. Maria Coca Dan J. Fischer Excavating, Inc.
Equipment:
G R
AP
H
IC
L
O G
EL
EV
AT
IO
N , F
T D
EP
TH
, F T
Cat Head
Hole Diameter:
CLASSIFICATION OF MATERIAL
30 in.
TORVANE SHEAR STRENGTH, TSF
UNDRAINED SHEAR STRENGTH, TSF
D
EP
TH
, F
T
45.703488° N -123.929804° W
COMMENTS AND
ADDITIONAL TESTS
BORING PB-11
FIG. 21A
G R
I B O
R
IN
G L
O G
L
A T
/L O
N G
' P
P G
R I D
A T
A T
E M
P
LA
T E
.G D
T
/2
/2
C-11
S-1
S-2
S-3
1.0
4.0
JUN. 2024 JOB NO. 6730-A
0 100
ASPHALT CONCRETE (2 inches) over AGGREGATE BASE (20 inches)
SAND, trace silt, trace gravel, light brown, loose, fine-grained
(4/8/2024)
Energy Ratio:
SA
M
PL
E
N O
Big Beaver Portable Drill
Surface Elevation:
Hammer Type:
1.0
Weight:
Not Available IN
ST
AL
LA
TI
O
N
0.5
Logged By:
Drilling Method:
4/8/24
IN
ST
AL
LA
TI
O
N
PLASTIC LIMIT, %
LIQUID LIMIT, %
FINES CONTENT, %
BLOWS PER FOOT
MOISTURE CONTENT, %
Solid-Stem Auger
Drilled by:
140 lb Drop:
Not AvailableSee Legend for Explanation of Symbols
SA
M
PL
E
TY
PE
BL
O
W C
O U
N T
Date Started: Coordinates:
Note:
A. Maria Coca Dan J. Fischer Excavating, Inc.
Equipment:
G R
AP
H
IC
L
O G
EL
EV
AT
IO
N , F
T D
EP
TH
, F T
Cat Head
Hole Diameter:
CLASSIFICATION OF MATERIAL
30 in.
TORVANE SHEAR STRENGTH, TSF
UNDRAINED SHEAR STRENGTH, TSF
D
EP
TH
, F
T
45.702356° N -123.932004° W
COMMENTS AND
ADDITIONAL TESTS
BORING PB-12
FIG. 22A
G R
I B O
R
IN
G L
O G
L
A T
/L O
N G
' P
P G
R I D
A T
A T
E M
P
LA
T E
.G D
T
/2
/2
C-12
S-2
S-3
S-3
1.8
5.0
2.0 ft (4/8/2024)
JUN. 2024 JOB NO. 6730-A
0 100
BORING LOCATION AND PAVEMENT
CORE PHOTOGRAPHS
JUN. 2024 JOB NO. 6730-A FIG. 23A
a. Boring PB-9 Location
b. Core C-9 Sample
JUN. 2024 JOB NO. 6730-A FIG. 24A
a. Boring PB-10 Location
b. Core C-10 Sample
JUN. 2024 JOB NO. 6730-A FIG. 25A
a. Boring PB-11 Location
b. Core C-11 Sample
JUN. 2024 JOB NO. 6730-A FIG. 26A
a. Boring PB-12 Location
b. Core C-12 Sample
0.0
1.0
2.0
3.0
105+68 113+48 123+15 130+16
Northbound Southbound Northbound Northbound
C-9 C-10 C-11 C-12
Y Axis = Depth, inches | X Axis = Core Number / Approximate Station
Good Asphalt Concrete Fair Asphalt Concrete Poor Asphalt Concrete Cracking
CORE SUMMARY CHART
MAY 2024 JOB NO. 6730-A FIG. 27A
JOB NO. 6730-A FIG. 27AJUN. 2024
CORE SUMMARY
CHART
JOB NO. 6730-A DRAWN BY AMC
DCP PB-10
Nehalem Bay State Park, Oregon
0.0 0 0
1.3 32 10
2.5 64 25
3.7 95 40
5.3 135 55
7.5 190 70
9.8 250 85
11.3 286 95
12.4 316 100
13.5 342 110