Addendum 4 to ITB 11551 Nehalem Bay State Park Utility Road Improvement Project.docx

DOCX document 119 KB Posted

Attached to
ITB 11551 Nehalem Bay State Park Utility and Road Improvements
Solicitation number
S-63400-00011346
Issued by
Tillamook County, Oregon

About this file

This document is Addendum 4 to ITB 11551 for the Nehalem Bay State Park Utility and Road Improvement Project issued by the Oregon Parks and Recreation Department (OPRD). The addendum modifies the original Invitation to Bid (ITB) documents, changing the ITB closing date and time to September 26, 2024 at 2:00 PM (PT). The project scope includes sewer system, electrical, pathway lighting, landscaping, entrance road paving, bollards, gate, and fee machine installation work. Prospective bidders have until September 20, 2024 to submit written questions, requests for change, or protests regarding this addendum.

The addendum also clarifies that the Tillamook Public Utility District line extension agreement and policy fee of $140,519.65 will be paid for by the Owner (OPRD), not the contractor. Additionally, the addendum states that panelboards and breakers must be fully rated, with no series rated equipment allowed, and that 100% rated circuit breakers are required where specified on the plan sheets. This change may impact material lead times and costs for bidders.

View the file

Other files

File Type Posted
Attachment B Drawings Sheets E1.0 to E8.3.pdf PDF
Addendum 3 Attachment E TPUD LEA.pdf PDF
00011348_ESB_RFCQ_Attachments.pdf PDF
Addendum 2 Exibit 1 Bid Pricing Submittal rev.xlsx XLSX spreadsheet
Intent to Award~12.docx DOCX document
Addendum2 Attachment B Revised Drawings.pdf PDF
Attachment B Drawings Sheets EC0.1 to EC5.0.pdf PDF
Attachment E DEQ 1200-CA General Permit.pdf PDF
11551 pre-bid sign-in.docx DOCX document
Attachment E SHPO Permit.pdf PDF
Attachment C Inadertent Discovery Plan.docx DOCX document
Attachment G Structural Calculations.pdf PDF
Addendum 3 to ITB 11551 Nehalem Bay State Park Utility Road Improvement Project.docx DOCX document
Attachment B Drawings Sheets G1.0 to L.2.pdf PDF
Attachment A Technical Specifications~19.pdf PDF
ITB 11551 Nehalem Bay Utility and Paving Improvement Project.pdf PDF
Bid Tab~3.docx DOCX document
Attachment E Nehalem Bay Wastewater Agency Sewer Connection Permit Application.pdf PDF
Attachment E Archaeological Excavation and Collection Permit.pdf PDF
Addendum 3 Attachment B Revised Sheets.pdf PDF
Addendum 1 to ITB 11551 Nehalem Bay Utility & Road Improvement Project.docx DOCX document
Exibit 1 Bid Pricing Submittal.xlsx XLSX spreadsheet
Attachment F Preliminary Pavement Design Report Addendum.pdf PDF
Attachment F Geotech Memorandum dated June 6 2024.pdf PDF
Addendum 2 to ITB 11551 Nehalem Bay State Park Utility Road Improvement Project~1.pdf PDF
Attachment H CXT Restroom Installatoin Suggestions.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #4

OregonBuys # S-63400-00011346

ITB # 11551

Nehalem Bay State Park Utility and Road Improvement Project

This Addendum 4 modifies the Invitation to Bid (“ITB”) document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this Addendum 4 shall remain in full force. This Addendum 4 shall be added as a part of the original ITB document(s) and shall become part of the work required.

ADDENDUM

1. Attachment A Technical Specifications, Part A GENERAL AND ADMINISTRATIVE SPECIFICATIONS is amended as follows:

A. Section 16050 BASIC ELECTRICAL MATERIALS AND METHODS, Part 2 – PRODUCTS, Section 2.08 PANELBOARDS is modified as follows:

i. DELETE paragraph C in its entirety and REPLACE with:

C. Panelboards and breakers shall be fully rated. Series rated equipment is not acceptable. Circuit breakers shall be 100 percent rated where specified on the plan sheets.

All references to the ITB CLOSING DATE AND TIME are changed to:

September 26, 2024 at 2:00 PM (PT)

Addendum prepared by:

Melody Waight Sr. Contracts Specialist melody.waight@oprd.oregon.gov

Prospective Bidders have until 2:00 PM on September 20, 2024 to submit written questions, requests for change, or protests regarding this Addendum.

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

5.

6.

This Addendum constitutes a MATERIAL change to the solicitation document. Its receipt by the Offeror shall be acknowledged per Section H of the ITB.

End of Addendum 4

CLARIFICATIONS AND RESPONSE(S) TO QUESTIONS

The following provides OPRD’s answers to questions received from potential Bidders. The information provided below is for clarification purposes only and does NOT constitute a change to the solicitation documents or requirements.

QUESTION:

Another question I need clarification on; is OPRD paying Tillamook PUD the $140,519.65 fee, or is the contractor?

OPRD RESPONSE: See Section 01062 Permits, Part 1, 1.02, B., 3. for the Tillamook Public Utility District Line Extension Agreement and Policy, which will be paid for by Owner. This list includes all permits to be paid for by Owner.

See paragraph 1.02, C. for Contractor’s permit responsibilities. The Contractor is responsible for any other permits required to complete the Work not listed in paragraph B. above including, but not limited to, Tillamook County Mechanical, Electrical, Plumbing permits which shall be pulled by Contractor/Subcontractor prior to commencement of work.

QUESTION: Specifications are Calling for All Breakers to be 100% Rated, the Standard 80% Rated Breakers are not allowed. This will Drive up Costs, And Extend Lead Times Dramatically. What may not be understood is that a 100 Amp 2 Pole Breaker when specified at 100% Rated, it becomes a 400 Amp Frame Breaker which makes a Single Section Panelboard in the case of “MPP-D1” a Very Large 3 Section Panelboard (See Snip Below MPP-D1 @ 126” Wide) due to the 100% Rated Breaker Requirements. While I understand the Need for a 100% Rated Main Breaker as Heavily Loaded as some of these panels are, is it Possible to talk about Proposing Panels with 100% Rated main Breakers, and 80% Rated Branch Breakers as the 100 Amp Loads appear to just be RV Pedestals anyway?

OPRD RESPONSE: See Addendum 4, Item 1.

QUESTION: LEAD ESTIMATED TIMES: A Standard I-Line Distribution Panelboard could have an Estimated Lead Time of about 36 – 42 weeks to ship after release. However when we add all the 100% rated Breakers AND the NEMA 3R/4X Stainless Steel Enclosures Could Bump out to an Estimated 52-62 weeks to ship after release Or More. (NOTE: ALL Estimated Lead Times are Subject To Change)

OPRD RESPONSE: See Addendum 2, Question 9 response.

Addendum #4ITB #11551
OregonBuys #S-63400-00011346Nehalem Bay State Park Utility and Road Improvement Project

image1.jpeg