Attachment F - KSI.docx

DOCX document 98 KB Posted

Attached to
Z1DA--565-22-7005 | EHRM Infras Upgrades | Fayetteville, NC
Solicitation number
36C77626R0008
Issued by

About this file

This is a Key Subcontractor Information (KSI) form template for Solicitation 36C77626R0008, an EHRM Infrastructure Upgrades project in Fayetteville, NC, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The form is designed for prime contractors to collect and incorporate KSI documentation from their key subcontractors into their proposals, with each KSI counting toward the page limitation specified in the CON 100 Instructions to Offerors. Offerors must submit one KSI form for each of three eligible projects; no additional projects beyond the three specified will be accepted, and each project cannot be assigned more than one system project number.

The KSI form requires submission of specific project information including installation location, project title, contract number, contract value, prime contractor name, client contact information, project start and final acceptance dates, and system project number. Additionally, offerors must provide a detailed project description for each system addressing function, operation, and installation procedures. All projects submitted must be furnished and installed by a communications installer, demonstrate Division 27 complexity in the project description, meet or exceed $5 million in Division 27 complexity work, and include a final acceptance date. This form serves as a template for prime contractors to gather and standardize subcontractor qualifications and project experience relevant to the solicitation requirements.

View the file

Other files

File Type Posted
36C77626R0008 0008.pdf PDF
36C77626R0008 0008 Attachment 1 - Key Personnel.docx DOCX document
36C77626R0008 0007.pdf PDF
36C77626R0008 0007 Attachment 3 - Revised IFC Set Vol 1.zip ZIP file
36C77626R0008 0007 Attachment 6 - Revised IFC Set Vol 4.zip ZIP file
36C77626R0008 0007 Attachment 1 - RFI Responses.docx DOCX document
36C77626R0008 0007 Attachment 2 - Bldg 21 as builts.zip ZIP file
36C77626R0008 0007 Attachment 4 - Revised IFC Set Vol 2.zip ZIP file
36C77626R0008 0007 Attachment 5 - Revised IFC Set Vol 3.zip ZIP file
36C77626R0008 0006.pdf PDF
36C77626R0008 0006 - Attachment 2 Addendum1_MCR Structured Cabling Detail.pdf PDF
36C77626R0008 0006 Attachment 1 - RFI Responses.docx DOCX document
36C77626R0008 0005 Attachment 1 - RFI Responses.docx DOCX document
36C77626R0008 0005.pdf PDF
36C77626R0008 0005 Attachment 2 - Addendum to specifications.zip ZIP file
36C77626R0008 0005 Attachment 3 - Brand Name Justification.pdf PDF
36C77626R0008 0004.pdf PDF
36C77626R0008 0003.pdf PDF
36C77626R0008 0002 Attachment A - Sign In Sheets_Site Visit - 29 January 2026.pdf PDF
36C77626R0008 0002 Attachment B - Sign In Sheets_Site Visit - 05 February 2026.pdf PDF
36C77626R0008 0002.pdf PDF
36C77626R0008 0001.pdf PDF
36C77626R0008_1.pdf PDF
Attachment A - Wage Rates.pdf PDF
Attachment E - Limitations on Subcontracting - Construction.docx DOCX document
Attachment H - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Attachment I - Division Pricing Template.xlsx XLSX spreadsheet
Attachment C - Drawings Volume I.zip ZIP file
Attachment B - Specifications.zip ZIP file
Attachment D - Drawings Volume II.zip ZIP file
Attachment G - Key Personnel.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION 36C77626R0008 | EHRM INFRASTRUCTURE UPDGRADES FAYETTEVILLE, NC.

KEY SUBCONTRACTOR INFORMATON (KSI)

*KSIs should be provided back to the PRIME to incorporate into their proposal, all KSIs should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.

KEY SUBCONTRACTOR INFORMATION – Offeror to complete 1 form for each project #1-3. No other projects beyond projects 1-3 will be accepted. Projects cannot have more than one system project number. Projects submitted shall be furnished and installed by the communications installer. Shall have a final acceptance date. Shall demonstrate division 27 complexity in the project description and meet or exceed 5 million dollars of division 27 complexity work.

1. PROJECT INFORMATION

· Installation location

· Project Title

· Contract Number

· Contract Value

· Prime Contractor Name

· Client’s name and contact information as listed below

· Address:

· Telephone and E-mail

· Date of Project Start

· Date of Final Acceptance.

· System Project Number.

2. PROJECT DESCRIPTION

Description of each system related to this project; include function, operation, and installation image1.tiff

File details come from the government source that posted it. Updated .