This is Amendment 0005 to solicitation 36C77626R0008, a construction solicitation issued by the Department of Veterans Affairs, Program Contracting Activity Central, located in Independence, Ohio. The amendment extends the offer due date from March 20, 2026 to March 30, 2026 at 2:00 PM Eastern Standard Time and makes nine substantive changes to the original solicitation.

The amendment revises the A.3 Price/Cost Schedule to change from a single lump sum line item (0001) for all work to 16 separate line items (0001-0016), with each line item corresponding to specific buildings or site work at what appears to be a Veterans Affairs facility. Each line item requires a lump sum price for work as identified in drawings and specifications, with a period of performance of 731 calendar days after Notice to Proceed. Pricing must be submitted in whole dollar values without cents. The amendment removes divisional pricing requirements and the divisional pricing attachment (Attachment I) that were previously required. The price evaluation methodology is revised to award based on the grand total price for all line items 0001-0016 rather than individual pricing. Additionally, the amendment incorporates two VA Acquisition Regulation (VAAR) clauses: VAAR 852.204-70 (Personal Identity Verification of Contractor Personnel) and VAAR 852.204-72 (Personnel Vetting and Credentialing), which establish background investigation and security clearance requirements for contractor personnel requiring physical access to VA facilities or logical access to VA information systems. The amendment also provides answers to Requests for Information (RFI), an addendum to specifications, and brand name justification and approval documentation as three separate attachments.

View the file

Other files

File Type Posted
36C77626R0008 0008.pdf PDF
36C77626R0008 0008 Attachment 1 - Key Personnel.docx DOCX document
36C77626R0008 0007.pdf PDF
36C77626R0008 0007 Attachment 3 - Revised IFC Set Vol 1.zip ZIP file
36C77626R0008 0007 Attachment 6 - Revised IFC Set Vol 4.zip ZIP file
36C77626R0008 0007 Attachment 5 - Revised IFC Set Vol 3.zip ZIP file
36C77626R0008 0007 Attachment 1 - RFI Responses.docx DOCX document
36C77626R0008 0007 Attachment 2 - Bldg 21 as builts.zip ZIP file
36C77626R0008 0007 Attachment 4 - Revised IFC Set Vol 2.zip ZIP file
36C77626R0008 0006.pdf PDF
36C77626R0008 0006 - Attachment 2 Addendum1_MCR Structured Cabling Detail.pdf PDF
36C77626R0008 0006 Attachment 1 - RFI Responses.docx DOCX document
36C77626R0008 0005 Attachment 2 - Addendum to specifications.zip ZIP file
36C77626R0008 0005 Attachment 3 - Brand Name Justification.pdf PDF
36C77626R0008 0005 Attachment 1 - RFI Responses.docx DOCX document
36C77626R0008 0004.pdf PDF
36C77626R0008 0003.pdf PDF
36C77626R0008 0002 Attachment A - Sign In Sheets_Site Visit - 29 January 2026.pdf PDF
36C77626R0008 0002 Attachment B - Sign In Sheets_Site Visit - 05 February 2026.pdf PDF
36C77626R0008 0002.pdf PDF
36C77626R0008 0001.pdf PDF
36C77626R0008_1.pdf PDF
Attachment A - Wage Rates.pdf PDF
Attachment E - Limitations on Subcontracting - Construction.docx DOCX document
Attachment H - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Attachment I - Division Pricing Template.xlsx XLSX spreadsheet
Attachment B - Specifications.zip ZIP file
Attachment D - Drawings Volume II.zip ZIP file
Attachment G - Key Personnel.docx DOCX document
Attachment F - KSI.docx DOCX document
Attachment C - Drawings Volume I.zip ZIP file
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 10

0005 03-11-2026 565-22-700

36C776

Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

36C776

Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

To all Offerors/Bidders

36C77626R0008

01-21-2026

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-30-2026 14:00 EDT x 1

The purpose of this amendment is to:

1. Provide answers to request for information (RFI) received

2. Provide addendum to the specifications

3. Provide brand name justification and approval (J&A)

4. Extend the offer due date from 3/20/26 to 3/30/26 at 2pm Eastern Standard Time

5. Provide a revised A.3 Price/Cost Schedule with updated CLIN structure

6. Remove the divisional pricing requirement.

7. Remove the divisional pricing attachment.

8. Provide a revised language for Factor 4, Price Evaluation Methodology.

9. Incorporate DEV to VAAR 852.204-70 and VAAR Clause 852.204-72. All other terms and conditions remain unchanged.

Scott Elias Contracting Officer

The purpose of this amendment is to:

1. Provide answers to request for information (RFI) received.

2. Provide addendum to the specifications.

3. Provide brand name justification and approval (J&A).

4. Extend the offer due date from 3/20/26 to 3/30/26 at 2pm Eastern Standard Time

5. Provide a revised A.3 Price/Cost Schedule with updated CLIN structure

The following price schedule in solicitation 36C77626R0008, section A.3:

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1.00 JB ___________

ITEM I, BASE BID: Work includes, but is not limited to general construction, carpentry, mechanical, electrical, plumbing, telecommunications, utilities, cabling, necessary removal of existing structures and construction and certain other items as noted in the drawings and specifications.

Period of Performance: 731 Calendar Days after NTP

GRAND TOTAL _________________

NOTICE

1. Line Item 0001 (Base) contains all the work for this project.

2. Offerors must provide a lump sum price for Line Item 0001 (Base). Failure to do so may render their offeror as unacceptable.

3. Award will be made on Grand Total (Line Item 0001- Base).

4. Pricing shall be submitted in whole dollar values. Please do NOT include pricing in cents.

5. Contractor is required to fill in their Unique Entity Identifier number associate with SAM.gov in

Block No. 14 on Standard Form (SF) 1442.

6. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.

Shall be revised as follows:

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1.00 JB ___________

All work as identified by the drawings and specifications for Building 01

Period of Performance: 731 Calendar Days after NTP

0002 1.00 JB ___________

All work as identified by the drawings and specifications for Building 03

Period of Performance: 731 Calendar Days after NTP

0003 1.00 JB ___________

All work as identified by the drawings and specifications for Building 09

Period of Performance: 731 Calendar Days after NTP

0004 1.00 JB ___________

All work as identified by the drawings and specifications for Building 10

Period of Performance: 731 Calendar Days after NTP

0005 1.00 JB ___________

All work as identified by the drawings and specifications for Building 11

Period of Performance: 731 Calendar Days after NTP

0006 1.00 JB ___________

All work as identified by the drawings and specifications for Building 21

Period of Performance: 731 Calendar Days after NTP

0007 1.00 JB ___________

All work as identified by the drawings and specifications for Building 45

Period of Performance: 731 Calendar Days after NTP

0008 1.00 JB ___________

All work as identified by the drawings and specifications for

Building 46

Period of Performance: 731 Calendar Days after NTP

0009 1.00 JB ___________

All work as identified by the drawings and specifications for Building 47

Period of Performance: 731 Calendar Days after NTP

0010 1.00 JB ___________

All work as identified by the drawings and specifications for Building 48

Period of Performance: 731 Calendar Days after NTP

0011 1.00 JB ___________

All work as identified by the drawings and specifications for Building 50

Period of Performance: 731 Calendar Days after NTP

0012 1.00 JB ___________

All work as identified by the drawings and specifications for Building 57

Period of Performance: 731 Calendar Days after NTP

0013 1.00 JB ___________

All work as identified by the drawings and specifications for Building 70

Period of Performance: 731 Calendar Days after NTP

0014 1.00 JB ___________

All work as identified by the drawings and specifications for Building 71

Period of Performance: 731 Calendar Days after NTP

0015 1.00 JB ___________

All work as identified by the drawings and specifications for Building 73

Period of Performance: 731 Calendar Days after NTP

0016 1.00 JB ___________

All work as identified by the drawings and specifications for Site Work

Period of Performance: 731 Calendar Days after NTP

GRAND TOTAL 0001-0016 _________________

NOTICE

1. Line Items 0001 – 0016 (Base) contains all the work for this project.

2. Offerors must provide a lump sum price for each Line Item and a lump sum price for Line

Items 0001 - 0016 Grand Total (Base). Failure to do so may render their offeror as unacceptable.

3. Award will be made on Grand Total Line Items 0001- 0016 (Base).

4. Pricing shall be submitted in whole dollar values. Please do NOT include pricing in cents.

5. Contractor is required to fill in their Unique Entity Identifier number associate with SAM.gov in

Block No. 14 on Standard Form (SF) 1442.

6. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.

6. Remove the divisional pricing requirement.

The following language in solicitation 36C77626R0008 section 2.12 Proposal Requirements, B Proposal Format, 3 Volume II Price, letter d shall be removed in its entirety.

d. In addition to the Price Schedule, offerors shall submit a complete breakdown of the Division Pricing for Line Items (0001).

The following language in solicitation 36C77626R0008 section 2.12 Proposal Requirements, D Volume II – Price Proposal Requirements, letter b shall be removed in its entirety.

b. In addition to the pricing schedule, Offerors shall submit a complete Breakdown of the Division Pricing for Line Items (0001). The Division Pricing will be used to determine price reasonableness (Attachment I). The Government also reserves the right to use this Division Pricing breakdown as part of negotiations during the competitive range, if they are required.

7. Remove the divisional pricing attachment.

Solicitation 36C77626R0008, attachment I, division pricing template is no longer required and shall be removed in its entirety.

8. Provide a revised language for Factor 4, Price Evaluation Methodology.

The following language in solicitation 36C77626R0008 section 2.12, E Evaluation Methodology, Factor 4 Price:

Factor 4 Price: The total evaluated price will be determined by the Offeror's price provided on the Price Schedule. The Offeror who provides the lowest price will be determined to be the lowest priced Offeror.

Shall be revised as follows:

Factor 4 Price: The total evaluated price will be determined by the Offeror's price provided on the Price Schedule for the grand total of line items 0001-0016. The Offeror who provides the lowest grand total price for line items 0001-0016 will be determined to be the lowest priced Offeror.

9. Incorporate DEV to VAAR 852.204-70 and VAAR Clause 852.204-72 as follows:

VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (MAR

2026)

(a) Definitions. As used in this clause –

VA Information system is the same as information system and means, pursuant to 38 U.S.C. 5727, a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information whether automated or manual.

VA sensitive information means all VA data, on any storage media or in any form or format, which requires protection due to the risk of harm that could result from inadvertent or deliberate disclosure, alteration, or destruction of the information and includes sensitive personal information. The term includes information where improper use or disclosure could adversely affect the ability of VA to accomplish its mission, proprietary information, records about individuals requiring protection under various confidentiality provisions such as the Privacy Act and the HIPAA Privacy Rule, and information that can be withheld under the Freedom of Information Act. Examples of VA sensitive information include the following:

individually-identifiable medical, benefits, and personnel information; financial, budgetary, research, quality assurance, confidential commercial, critical infrastructure, investigatory, and law enforcement information; information that is confidential and privileged in litigation such as information protected by the deliberative process privilege, attorney work-product privilege, and the attorney-client privilege; and other information which, if released, could result in violation of law or harm or unfairness to any individual or group, or could adversely affect the national interest or the conduct of Federal programs.

(b) General. Contractor personnel assigned to work for or on behalf of VA must undergo a background investigation commensurate with the risk and sensitivity level designation associated with the work to be performed at the level indicated in the contract. The Contractor and subcontractors shall comply with VA Directive/Handbook 0710, Personnel Security and Suitability Program, which can be accessed at:

https://vaww.va.gov/vapubs/index.cfm

(c) Risk and Sensitivity Levels. The following table identifies the risk and sensitivity levels that apply to any personnel providing services under this contract.

*VA Administrations, organizations and staff offices will use the OPM Position Designation Tool.

Positions/Tasks Designated as Non-Sensitive Positions - Tier 1/Low Risk

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 1/Low Risk]

Positions/Tasks Designated as Non-Sensitive Positions - Tier 2/Mod Risk

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 2/Mod Risk]

Positions/Tasks Designated as Non-Sensitive Positions - Tier 4/High Risk

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]

[Contracting Officer to enter position or task number, if all positions fulfilling a task are Tier 4/High Risk]

Security clearances are granted to individuals with a specific requirement for access to classified material (for example, Confidential, Secret and Top Secret). Contractor personnel that are required to obtain a security clearance will be subject to a Tier 3 or Tier 5 investigation. The following sensitivity designations have been assigned for the identified Tier 3 and Tier 5 required by this contract:

Tier 3: [Contracting Officer to enter “Non-Critical” or “Not Applicable” if no positions are identified as Tier 3]

Tier 5: [Contracting Officer to enter either Critical Sensitive and/or Special Sensitive, or “Not Applicable” if no positions are identified as Tier 5]

(d) Fitness. The results from a background investigation are used to determine if an individual’s fitness is sufficient for that individual to perform work for or on behalf of VA in the position identified in this contract. Contractor fitness determinations are made in accordance with 5 CFR Part 731.202.

Fitness requirements for employment are separate and distinct from job qualifications. If a Contractor or subcontractor employee is found to be unsuitable or unfit to provide services under this contract, the Contractor shall immediately remove the employee from working on this contract and take those necessary steps that restrict the employee’s logical access to VA data, information, VA sensitive information, or information technology or VA information systems containing such data or information.

The Contractor shall advise the employee that they are not permitted to access any VA controlled building or real property in relation to this contract.

The removal of an unfit Contractor or subcontractor employee does not alleviate the Contractor from satisfying the requirements of this contract. The Government will not reimburse the Contractor for any costs associated with the recruitment/replacement of an employee or subcontractor employee who is found to be unfit.

(e) Identification Cards. The Government will provide a Personal Identification Verification (PIV) card or other identification card, as necessary, to fit Contractor personnel who require physical access to VA facilities and/or logical access to VA data, information, VA sensitive information, or information technology or VA information systems containing such data or information. Contractor and subcontractor personnel shall prominently display their PIV/identification card on their persons while working at a VA facility and shall present their PIV/identification card for inspection upon request by a VA official. The Contractor must surrender the employee or subcontractor employee’s PIV/identification card in accordance with the requirements set forth in Directive/Handbook 0735 when any of the following events occur:

1. When no longer needed for contract performance.

2. Upon completion of the Contractor/subcontractor employee’s employment.

3. Upon contract completion or termination.

(f) Lost/stolen. Immediately upon detection, the Contractor shall report a lost or stolen PIV/identification card to the Government authorities as identified in Directive/Handbook 0735. Within 48 hours of reporting the lost/stolen PIV/identification card, the Contractor shall submit to the Program Manager an incident report that describes the relevant facts and circumstances regarding the loss/theft. If the loss/theft was reported by the Contractor to the local police, the Contractor shall further submit a copy of the final police report to the Program Manager within 48 hours of the report being made available by the local police department. The Government will not reimburse the Contractor for any costs that result from lost/stolen PIV/identification card(s).

(g) Regular Reporting. The Contractor shall submit a status report to PIV Sponsor within 5 working days after the end of each calendar quarter and as requested by the Government in order to initiate contract closeout procedures. The report must provide the status of each contractor/subcontractor employee who is required to have a PIV/identification card during the performance of the contract. The report shall identify the Contractor and the contract number, and list the following status for each contractor/subcontractor employee who holds a PIV/identification card under this contract:

1. Contractor/subcontractor employee name..

2. Name of VA facility where Contractor/subcontractor employee works, if applicable.

3. Date background check submitted for Contractor/subcontractor employee.

4. Date PIV/identification card issued to Contractor/subcontractor employee.

5. Contractor/subcontractor employee’s PIV/identification card number, as applicable.

6. Date Contractor/subcontractor employee no longer has need for

PIV/identification card.

7. Date Contractor notified VA that PIV/identification card is no longer required.

8. Date Contractor returned PIV/identification card was returned to VA.

(h) Flow down of clause. The Contractor shall include the substance of this clause in subcontracts, third-party agreements, and BAA’s, in which subcontractors, third-party servicers/employees, and business associates will perform functions where they will have physical access to a VA facility or logical access to VA data, information, VA sensitive information, or information technology or VA information system containing such data or information.

(End of Clause)

VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020) (DEVIATION MAR 2026)

(a) The Contractor shall comply with current Department of Veterans Affairs policy for personal identity verification of all employees performing under this contract when physical access to VA facilities, and/or logical access to VA information and VA information systems is required.

(b) The Contractor shall insert this clause in all subcontracts when the subcontractor’s employees will require physical access to VA facilities, and/or logical access to VA information and VA information systems is required.

(End of Clause)

All other terms and conditions remain unchanged.

End of Document

See attached document: 36C77626R0008 0005 Attachment 1 - RFI Responses.

See attached document: 36C77626R0008 0005 Attachment 2 - Addendum to specifications.

See attached document: 36C77626R0008 0005 Attachment 3 - Brand Name Justification.

VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (MAR 2026)
VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) (DEVIATION MAR 2026)

File details come from the government source that posted it. Updated .