36C77626R0008 0007 Attachment 4 - Revised IFC Set Vol 2.zip

ZIP file 121 MB Posted

Attached to
Z1DA--565-22-7005 | EHRM Infras Upgrades | Fayetteville, NC
Solicitation number
36C77626R0008
Issued by

About this file

This file is a zipped archive containing a revised Issued for Construction (IFC) Set Volume 2 for the EHRM Infrastructure Upgrades project located in Fayetteville, NC. The IFC set consists of construction drawings and specifications that define the technical requirements for the infrastructure upgrade work at the Department of Veterans Affairs facility. This document package provides detailed architectural and engineering plans necessary for contractors to prepare bids and execute the construction work associated with the solicitation 36C77626R0008.

As an IFC (Issued for Construction) document set, this attachment serves as the technical specifications and drawings that contractors must reference when submitting proposals and performing the required infrastructure work. The "Revised" designation indicates this is an updated version of previously issued construction documents, likely incorporating changes or corrections from an earlier version. Contractors responding to this solicitation should review the complete contents of this zipped archive to understand all technical requirements, dimensions, material specifications, and construction methodologies necessary to accurately bid on and complete the EHRM infrastructure upgrade project for the VA facility in Fayetteville, North Carolina.

Other files

File Type Posted
36C77626R0008 0008.pdf PDF
36C77626R0008 0008 Attachment 1 - Key Personnel.docx DOCX document
36C77626R0008 0007.pdf PDF
36C77626R0008 0007 Attachment 1 - RFI Responses.docx DOCX document
36C77626R0008 0007 Attachment 3 - Revised IFC Set Vol 1.zip ZIP file
36C77626R0008 0007 Attachment 5 - Revised IFC Set Vol 3.zip ZIP file
36C77626R0008 0007 Attachment 6 - Revised IFC Set Vol 4.zip ZIP file
36C77626R0008 0007 Attachment 2 - Bldg 21 as builts.zip ZIP file
36C77626R0008 0006 - Attachment 2 Addendum1_MCR Structured Cabling Detail.pdf PDF
36C77626R0008 0006 Attachment 1 - RFI Responses.docx DOCX document
36C77626R0008 0006.pdf PDF
36C77626R0008 0005 Attachment 1 - RFI Responses.docx DOCX document
36C77626R0008 0005.pdf PDF
36C77626R0008 0005 Attachment 3 - Brand Name Justification.pdf PDF
36C77626R0008 0005 Attachment 2 - Addendum to specifications.zip ZIP file
36C77626R0008 0004.pdf PDF
36C77626R0008 0003.pdf PDF
36C77626R0008 0002 Attachment A - Sign In Sheets_Site Visit - 29 January 2026.pdf PDF
36C77626R0008 0002 Attachment B - Sign In Sheets_Site Visit - 05 February 2026.pdf PDF
36C77626R0008 0002.pdf PDF
36C77626R0008 0001.pdf PDF
Attachment A - Wage Rates.pdf PDF
Attachment G - Key Personnel.docx DOCX document
Attachment E - Limitations on Subcontracting - Construction.docx DOCX document
Attachment H - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Attachment F - KSI.docx DOCX document
36C77626R0008_1.pdf PDF
Attachment C - Drawings Volume I.zip ZIP file
Attachment I - Division Pricing Template.xlsx XLSX spreadsheet
Attachment D - Drawings Volume II.zip ZIP file
Attachment B - Specifications.zip ZIP file
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .