Attachment F - Contractor Bid Form.pdf
PDF 670 KB Posted
- Attached to
- Champlain Administration Lobby Federal contract opportunity
- Solicitation number
- 47PC0220R0019
About this file
This document contains a contractor bid form and details of a related federal contract opportunity for renovations to the Champlain Passenger Administration Building located at the Land Port of Entry in Champlain, New York. The renovation project includes finish work, ballistic protections, electrical, minor mechanical, limited fire protection, and temporary facilities for a total project area of approximately 5,400 square feet. The bid form provides line item estimates for labor, materials, and equipment for the demolition of existing areas and construction of new spaces. Relevant work includes installation of temporary facilities for Customs and Border Protection, ballistic glazing, casework, finishes, signage, and life safety and mechanical system modifications. The related federal contract opportunity is solicitation number 47PC0220R0019 issued by the General Services Administration to furnish and install all work required by the contract documents for the interior renovation.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL SERVICES ADMINISTRATION Date: Date of Proposal
Public Building Service / Property Management Division
Special Projects Division Final Design Submission
GSA Solicitation No: 47PC1119r0008 Project: Champlain Passenger Admin Area Modifications
Contractor: Contractor Name Trade: All
CONTRACT AMOUNT
No. GSA CSI SHELL T.I. TOTAL
01000 0 0 $0
02000 0 0 $0
03000 0 0 $0
04000 0 0 $0
05000 0 0 $0
06000 0 0 $0
07000 0 0 $0
08000 0 0 $0
09000 0 0 $0
10000 0 0 $0
11000 0 0 $0
12000 0 0 $0
13000 0 0 $0
14000 0 0 $0
21000 0 0 $0
22000 0 0 $0
23000 0 0 $0
25000 0 0 $0
26000 0 0 $0
27000 0 0 $0
28000 0 0 $0
31000 0 0 $0
32000 0 0 $0
33000 0 0 $0
34000 0 0 $0
35000 0 0 $0
41000 0 0 $0
44000 0 0 $0
46000 0 0 $0
48000 0 0 $0
SUBCONTRACTOR MARKUP 0.0% 0 0 $0
SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES
0 0 $0
0 0 $0
OVERHEAD 0.0% 0 0 $0
PROFIT 0.0% 0 0 $0
TOTALS (ECCA) $0 $0 $0
BONDING 0.0% $0 $0 $0
TOTALS (ECC) $0 $0 $0
SUBTOTAL
SUBTOTAL
SUMMARY - Shell / Tenant
MATERIAL PROCESSING & HANDLING
POLLUTION & WASTE CONTROLL EQUIP.
WATER & WASTEWATER EQUIPMENT
PLUMBING
DESCRIPTION
EARTHWORK
EXTERIOR IMPROVEMENTS
UTILITIES
TRANSPORTATION
HVAC
INTEGRATED AUTOMATION
ELECTRICAL
GENERAL CONDITIONS
EXISTING CONDITIONS
CONCRETE
MASONRY
METALS
EQUIPMENT
ELECTRICAL POWER GENERATION
WATERWAY & MARINE
WOOD & PLASTIC
THERMAL & MOISTURE PROTECTION
DOORS & WINDOWS
FINISHES
SPECIALTIES
FURNISHINGS
SPECIAL CONSTRUCTION
CONVEYING EQUIPMENT
FIRE PROTECTION
COMMUNICATIONS
ELECTRONIC SAFETY & SECURITY
ChAL-Contractor Bid Form.xlsx Page 1 of 17 Printed 12:09 PM 9/27/2019
CONTRACTOR BID FORM
MatthewGSbordone Text Box
47PC0220R0019
GENERAL SERVICES ADMINISTRATION Date: Date of Propos
Special Projects Division Final Design Submission
GSA Solicitation No: 47PC1119r0008 Project: Champlain Passenger Admin Area Modifications
Contractor: Contractor Name Trade: All
No. GSA CSI LABOR MATERIAL EQUIP TOTAL
01000 0.00 0.00 0.00 $0
02000 0.00 0.00 0.00 $0
03000 0.00 0.00 0.00 $0
04000 0.00 0.00 0.00 $0
05000 0.00 0.00 0.00 $0
06000 0.00 0.00 0.00 $0
07000 0.00 0.00 0.00 $0
08000 0.00 0.00 0.00 $0
09000 0.00 0.00 0.00 $0
10000 0.00 0.00 0.00 $0
11000 0.00 0.00 0.00 $0
12000 0.00 0.00 0.00 $0
13000 0.00 0.00 0.00 $0
14000 0.00 0.00 0.00 $0
21000 0.00 0.00 0.00 $0
22000 0.00 0.00 0.00 $0
23000 0.00 0.00 0.00 $0
25000 0.00 0.00 0.00 $0
26000 0.00 0.00 0.00 $0
27000 0.00 0.00 0.00 $0
28000 0.00 0.00 0.00 $0
31000 0.00 0.00 0.00 $0
32000 0.00 0.00 0.00 $0
33000 0.00 0.00 0.00 $0
34000 0.00 0.00 0.00 $0
35000 0.00 0.00 0.00 $0
41000 0.00 0.00 0.00 $0
44000 0.00 0.00 0.00 $0
46000 0.00 0.00 0.00 $0
48000 0.00 0.00 0.00 $0
SUBCONTRACTOR MARKUP 0.0% 0.00 0.00 0.00 $0
SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES
0 0 0 $0
0 0 0 $0
0% 0 0 0 $0
0% 0 0 0 $0
$0 $0 $0 $0
0.0% $0 $0 $0 $0
$0 $0 $0 $0
DESCRIPTION
TOTALS (ECC)
SUBTOTAL
OVERHEAD
PROFIT
METALS
TOTALS (ECCA)
BONDING
SUBTOTAL
ELECTRONIC SAFETY & SECURITY
EARTHWORK
EXTERIOR IMPROVEMENTS
UTILITIES
FURNISHINGS
SPECIAL CONSTRUCTION
CONVEYING EQUIPMENT
WATER & WASTEWATER EQUIPMENT
ELECTRICAL POWER GENERATION
FIRE PROTECTION
PLUMBING
HVAC
INTEGRATED AUTOMATION
ELECTRICAL
COMMUNICATIONS
CONTRACT AMOUNT
TRANSPORTATION
WATERWAY & MARINE
MATERIAL PROCESSING & HANDLING
POLLUTION & WASTE CONTROLL EQUIP.
WOOD & PLASTIC
THERMAL & MOISTURE PROTECTION
DOORS & WINDOWS
FINISHES
SPECIALTIES
EQUIPMENT
SUMMARY - Labor / Material / Equipment
GENERAL CONDITIONS
EXISTING CONDITIONS
CONCRETE
MASONRY
ChAL-Contractor Bid Form.xlsx Page 2 of 17 Printed 12:09 PM 9/27/2019
GENERAL SERVICES ADMINISTRATION Date: Date of Proposal
Special Projects Division
Final Design Submission
GSA Solicitation No: 47PC1119r0008 Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
CONTRACT AMOUNT
No. GSA CSI DESCRIPTION SUB UM QTY LABOR MATERIAL EQUIP TOTAL
01000 GENERAL CONDITIONS
SHELL
General Conditions LS 1 $0.00 $0.00 $0.00 $0
Security Clearances HR $0.00 $0.00 $0.00 $0
Full-Time Superintendent HR $0.00 $0.00 $0.00 $0
Interim Life Safety Measures (Sprinkler) LS $0.00 $0.00 $0.00 $0
Interim Life Safety Measures (Fire Alarm) LS $0.00 $0.00 $0.00 $0
Subtotal $0
TENANT IMPROVEMENTS
General Conditions LS 1 $0.00 $0.00 $0.00 $0
Security Clearnances LS 1 $0.00 $0
Part-Time Superintendent HR 0 $0.00 $0.00 $0.00 $0
Interim Life Safety Measures (Sprinkler) LS 1 $0.00 $0.00 $0
Interim Life Safety Measures (Fire Alarm) LS 1 $0.00 $0.00 $0
Temporary construction barrier - Type 913 SF 1,690 $0.00 $0.00 $0
Temporary Power & Data in Secondary Bldg LS 1 $0.00 $0.00 $0
Temporary processing building (incl. furn.) YR 1 $0.00 $0
Temporary Facilities (portable toilets) LS 1 $0.00 $0.00 $0
Subtotal $0
TOTALS $0 $0 $0 $0
ChAL-Contractor Bid Form.xlsx Page 3 of 17 Printed 12:09 PM 9/27/2019
GENERAL SERVICES ADMINISTRATION Date: Date of Prop
Special Projects Division
Final Design Submission GGSA Solicitation No: 47PC1119r0008 Project: Champlain Passenger Admin Area Modifications
Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
02000
$0
$0
$0
$0.00 $0.00 $0.00 $0
Remove and store seating for reuse EA 67 $0.00 $0.00 $0.00 $0
Remove vestibule glazing Y SF 100 $0.00 $0.00 $0.00 $0
Demolish terminal casework EA 19 $0.00 $0.00 $0.00 $0
Remove existing countertops LF 97 $0.00 $0.00 $0.00 $0
Demolish casework at security platform SF 87.5 $0.00 $0.00 $0.00 $0
Remove existing metal cabinets EA 33 $0.00 $0.00 $0.00 $0
Remove office equipment for reuse EA 20 $0.00 $0.00 $0.00 $0
Salvage existing cubicles; turn over to tenant EA 5 $0.00 $0.00 $0.00 $0
Demolish existing casework SF 22 $0.00 $0.00 $0.00 $0
Remove screening panels LF 57 $0.00 $0.00 $0.00 $0
Demolish partitions LF 50 $0.00 $0.00 $0.00 $0
Demolish existing glazing Y SF 85 $0.00 $0.00 $0.00 $0
Salvage door from Hard Secondary EA 1 $0.00 $0.00 $0.00 $0
Remove existing rubber flooring SF 2,650 $0.00 $0.00 $0.00 $0
Remove existing terrazo flooring Y SF 1,750 $0.00 $0.00 $0.00 $0
Remove existing sand bed for terrazo floor Y SF 1,750 $0.00 $0.00 $0.00 $0
Remove existing supervisor podium Y SF 200 $0.00 $0.00 $0.00 $0
Demo portion of partition for new glazing SF 35 $0.00 $0.00 $0.00 $0
Remove AEDs & First aid kits for reuse EA 4 $0.00 $0.00 $0.00 $0
Remove ATM for reuse EA 1 $0.00 $0.00 $0.00 $0
Protect drinking fountain during construction EA 1 $0.00 $0.00 $0.00 $0
Remove ceiling mount TV's for reuse EA 10 $0.00 $0.00 $0.00 $0
Communication Removals $0
- Wire Y LF 6,000 $0.00 $0.00 $0.00 $0
- Raceways Y LF 2,000 $0.00 $0.00 $0.00 $0
- Boxes/Devices Y EA 48 $0.00 $0.00 $0.00 $0
Electrical Removals Y LS 1 $0.00 $0.00 $0.00 $0
EXISTING SPRINKLER HEAD REMOVAL Y EA 12 $0.00 $0.00 $0.00 $0
HVAC REMOVALS Y LS 1 $0.00 $0.00 $0.00 $0
$0.00 $0.00 $0.00 $0
TOTALS $0 $0 $0 $0
DESCRIPTION
EXISTING CONDITIONS
SHELL
Subtotal
Subtotal
TENANT IMPROVEMENTS
ChAL-Contractor Bid Form.xlsx Page 4 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
03000
$0
$0
$0
$0.00 $0.00 $0.00 $0
New concrete slab infill at old terrazzo floor Y CY 32 $0.00 $0.00 $0.00 $0
Prep concrete for new flooring finish SF 5,022 $0.00 $0.00 $0.00 $0
$0
$0.00 $0.00 $0.00 $0
TOTALS $0 $0 $0 $0
DESCRIPTION
Subtotal
Subtotal
TENANT IMPROVEMENTS
CONCRETE
SHELL
ChAL-Contractor Bid Form.xlsx Page 5 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
06000
$0
$0
$0
$0.00 $0.00 $0.00 $0
LS 1 $0.00 $0.00 $0.00 $0
$0
$0
$0.00 $0.00 $0.00 $0
TOTALS $0.00 $0.00 $0.00 $0
DESCRIPTION
Subtotal
Subtotal
TENANT IMPROVEMENTS
Blocking in walls for wall hung equipment
WOOD AND PLASTIC
ChAL-Contractor Bid Form.xlsx Page 6 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
07000
$0
$0
$0
0 0 0 $0
LS 1 $0.00 $0.00 $0.00 $0
$0
$0
0 0 0 $0
TOTALS $0.00 $0.00 $0.00 $0
DESCRIPTION
Subtotal
Subtotal
TENANT IMPROVEMENTS
Miscellaneous Sealants
THERMAL & MOISTURE PROTECTION
ChAL-Contractor Bid Form.xlsx Page 7 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
08000
$0
$0
$0
$0.00 $0.00 $0.00 $0
New half door in processing line Y EA 3 $0.00 $0.00 $0.00 $0
New door hardware Y EA 3 $0.00 $0.00 $0.00 $0
Ballistic glazing in vestibule storefront Y SF 90 $0.00 $0.00 $0.00 $0
Balistic glazing dividers at processing counter Y SF 153 $0.00 $0.00 $0.00 $0
Reinstall door salvaged from Hard Secondary EA 1 $0.00 $0.00 $0.00 $0
One-way window at Supervisor Podium Y SF 39 $0.00 $0.00 $0.00 $0
New plexiglass wall covering @ Hard Sec Y SF 344 $0.00 $0.00 $0.00 $0
$0.00 $0.00 $0.00 $0
TOTALS $0.00 $0.00 $0.00 $0
DESCRIPTION
Subtotal
Subtotal
TENANT IMPROVEMENTS
SHELL
DOORS AND WINDOWS
ChAL-Contractor Bid Form.xlsx Page 8 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
09000
$0
$0
$0
$0.00 $0.00 $0.00 $0
New partition type 910 SF 452 $0.00 $0.00 $0.00 $0
New partition type 911 SF 27 $0.00 $0.00 $0.00 $0
New partition type 912 SF 99 $0.00 $0.00 $0.00 $0
New partition type 920 SF 643 $0.00 $0.00 $0.00 $0
Paint Y SF 7232 $0.00 $0.00 $0.00 $0
New monolithic quartz floor coating Y SF 0 $0.00 $0.00 $0.00 $0
New rubber base LF 250 $0.00 $0.00 $0.00 $0
New raised flooring at supervisor platform Y SF 260 $0.00 $0.00 $0.00 $0
$0.00 $0.00 $0.00 $0
TOTALS $0.00 $0.00 $0.00 $0
TENANT IMPROVEMENTS
FINISHES
Subtotal
SHELL
DESCRIPTION
CONTRACT AMOUNT
Subtotal
ChAL-Contractor Bid Form.xlsx Page 9 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
10000
$0
$0
$0
$0.00 $0.00 $0.00 $0
Storage Lockers (By Owner; Install by GC) EA 30 $0.00 $0.00 $0.00 $0
New stainless steel corner guards LF 45 $0.00 $0.00 $0.00 $0
New stainless steel wall guards SF 497 $0.00 $0.00 $0.00 $0
New PA system Y EA 12 $0.00 $0.00 $0.00 $0
Signage Y EA 24 $0.00 $0.00 $0.00 $0
Signage - 11"x17" Y EA 2 $0.00 $0.00 $0.00 $0
Reinstall AED & First Aid cabinets EA 4 $0.00 $0.00 $0.00 $0
$0.00 $0.00 $0.00 $0
TOTALS $0 $0 $0 $0
DESCRIPTION
Subtotal
Subtotal
TENANT IMPROVEMENTS
SHELL
SPECIALTIES
ChAL-Contractor Bid Form.xlsx Page 10 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
11000
$0
$0
$0
$0.00 $0.00 $0.00 $0
Reinstall existing office equipment LS 1 $0.00 $0.00 $0.00 $0
Reinstall ATM EA 1 $0.00 $0.00 $0.00 $0
Reinstall TV's & TV mounts EA 2 $0.00 $0.00 $0.00 $0
Install pedestrian control (provided by CBP) LS 1 $0.00 $0.00 $0.00 $0
$0.00 $0.00 $0.00 $0
TOTALS $0 $0 $0 $0
EQUIPMENT
SHELL
DESCRIPTION
Subtotal
Subtotal
TENANT IMPROVEMENTS
ChAL-Contractor Bid Form.xlsx Page 11 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
12000
$0
$0
$0
$0.00 $0.00 $0.00 $0
Reinstall existing steel shelving EA 8 $0.00 $0.00 $0.00 $0
Reinstall existing steel cabinets EA 2 $0.00 $0.00 $0.00 $0
New casework at processing terminals Y EA 20 $0.00 $0.00 $0.00 $0
New stainless steel counter top Y SF 355 $0.00 $0.00 $0.00 $0
New Casework at processing corners Y EA 4 $0.00 $0.00 $0.00 $0
Relocate existing seating in waiting area LS 1 $0.00 $0.00 $0.00 $0
Reinstall info center/magazine rack EA 1 $0.00 $0.00 $0.00 $0
Casework @ Supervisor Podium Y EA 5 $0.00 $0.00 $0.00 $0
New Counter @ Supervisor Podium Y SF 35 $0.00 $0.00 $0.00 $0
New Casework at custom corner @ supervisor Y EA 1 $0.00 $0.00 $0.00 $0
$0.00 $0.00 $0.00 $0
TOTALS $0 $0 $0 $0
TENANT IMPROVEMENTS
DESCRIPTION
Subtotal
SHELL
FURNISHINGS
ChAL-Contractor Bid Form.xlsx Page 12 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
13000
$0
$0
$0
$0.00 $0.00 $0.00 $0
Y SF 314 $0.00 $0.00 $0.00 $0
$0
$0
$0.00 $0.00 $0.00 $0
TOTALS $0 $0 $0 $0
DESCRIPTION
Subtotal
Subtotal
TENANT IMPROVEMENTS
New fiberglass balistic backup panels
SPECIAL CONSTRUCTION
ChAL-Contractor Bid Form.xlsx Page 13 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GGSA Solicitation No: 47PC1119r0008 Project: Champlain Passenger Admin Area Modifications
Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
21000
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0
SPRINKLERS Y EA 8 $0.00 $0.00 $0.00 $0.00
PIPE AND FITTINGS $0.00
1" SCH.40 PIPE Y LF 15 $0.00 $0.00 $0.00 $0.00
1 1/4" SCH.40 PIPE Y LF 30 $0.00 $0.00 $0.00 $0.00
1 1/2" SCH.40 PIPE Y LF 15 $0.00 $0.00 $0.00 $0.00
FITTINGS 1 $0.00 $0.00 $0.00 $0.00
FIRE WATCH, INSPECTION AND TESTING Y HR 40 $0.00 $0.00 $0.00 $0.00
TESTING Y HR 8 $0.00 $0.00 $0.00 $0.00
SHUT DOWN AND REFILL SYSTEM Y EA. 2 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0
TOTALS $0.00 $0.00 $0.00 $0.00
DESCRIPTION
Subtotal
Subtotal
TENANT IMPROVEMENTS
FIRE PROTECTION
ChAL-Contractor Bid Form.xlsx Page 14 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
23000
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0
PIPING INSULATION Y LF 160 $0.00 $0.00 $0.00 $0.00
PIPING Y LF 160 $0.00 $0.00 $0.00 $0.00
PIPE FITTINGS Y LS 1 $0.00 $0.00 $0.00 $0.00
HYDRONIC SPECIALTIES Y LS 1 $0.00 $0.00 $0.00 $0.00
DUCTWORK Y LS 1 $0.00 $0.00 $0.00 $0.00
DUCTWORK ACCESSORIES Y LS 1 $0.00 $0.00 $0.00 $0.00
DDC TEMPERATURE CONTROLS Y LS 1 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0
TOTALS $0.00 $0.00 $0.00 $0.00
DESCRIPTION
Subtotal
Subtotal
TENANT IMPROVEMENTS
HVAC
ChAL-Contractor Bid Form.xlsx Page 15 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008
Project: Champlain Passenger Admin Area Modifications Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
26000 `
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0
Lighting Reconfiguration Y LS 1 $0.00 $0.00 $0.00 $0.00
Normal Power Duplex Recptacles Y EA 10 $0.00 $0.00 $0.00 $0.00
Normal Power Quad Recptacles Y EA 25 $0.00 $0.00 $0.00 $0.00
Isolated Ground Quad Recptavles Y EA 25 $0.00 $0.00 $0.00 $0.00
Surface Raceway Y LS 1 $0.00 $0.00 $0.00 $0.00
Feeds to relocated equipment Y EA 10 $0.00 $0.00 $0.00 $0.00
Power Panels Re-work/Wireway/PB/JB Y LS 1 $0.00 $0.00 $0.00 $0.00
Trenching in Electrical Room Y LS 1 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0
TOTALS $0.00 $0.00 $0.00 $0.00
DESCRIPTION
Subtotal
Subtotal
TENANT IMPROVEMENTS
ELECTRICAL
ChAL-Contractor Bid Form.xlsx Page 16 of 17 Printed 12:09 PM 9/27/2019
Special Projects Division
Final Design Submission GSA Solicitation No: 47PC1119r0008 Project: Champlain Passenger Admin Area Modifications
Contractor: Contractor Name Trade: All
SUB CONTRACT AMOUNT
No. GSA CSI Y/N UM QTY LABOR MATERIAL EQUIP TOTAL
27000
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0
Tele/Data Outlets Y EA 65 $0.00 $0.00 $0.00 $0.00
LAN & Tele Room Rework Y LS 1 $0.00 $0.00 $0.00 $0.00
Temporary Data (See Division 1) $0.00 $0.00 $0.00 $0.00
New PA system Y EA 10 $0.00 $0.00 $0.00 $0.00
Integrate PA system into workstation comms. Y LS 1 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0
TOTALS $0.00 $0.00 $0.00 $0.00
DESCRIPTION
Subtotal
SHELL
TENANT IMPROVEMENTS
COMMUNICATIONS
ChAL-Contractor Bid Form.xlsx Page 17 of 17 Printed 12:09 PM 9/27/2019
File details come from the government source that posted it. Updated .