Amendment 0002 Excel format Contractor Bid Form CLP.xlsx
XLSX spreadsheet 310 KB Posted
- Attached to
- Champlain Administration Lobby Federal contract opportunity
- Solicitation number
- 47PC0220R0019
About this file
This is a bid form for a federal construction contract to renovate the passenger administration building at the Land Port of Entry in Champlain, New York. The project includes demolishing the existing admin area, constructing a new facility, installing temporary facilities for Customs and Border Protection, and removing temporary facilities. Work will involve finish work, ballistic protections, electrical, minor mechanical, limited fire protection, and providing temporary facilities. Bidders must complete the form with line item descriptions, quantities, labor costs, material costs, and totals. Subcontractor markups and overhead/profit are also included in the calculations. The General Services Administration Public Buildings Service Region 2 is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | DESCRIPTION | SHELL | T.I. | TOTAL | ||
| SUMMARY - Shell / Tenant | ||||||||
| 01000 | GENERAL CONDITIONS | 0 | 0 | $0 | $0 | |||
| 02000 | EXISTING CONDITIONS | 0 | 0 | $0 | $0 | |||
| 03000 | CONCRETE | 0 | 0 | $0 | $0 | |||
| 04000 | MASONRY | 0 | 0 | $0 | $0 | |||
| 05000 | METALS | 0 | 0 | $0 | $0 | |||
| 06000 | WOOD & PLASTIC | 0 | 0 | $0 | $0 | |||
| 07000 | THERMAL & MOISTURE PROTECTION | 0 | 0 | $0 | $0 | |||
| 08000 | DOORS & WINDOWS | 0 | 0 | $0 | $0 | |||
| 09000 | FINISHES | 0 | 0 | $0 | $0 | |||
| 10000 | SPECIALTIES | 0 | 0 | $0 | $0 | |||
| 11000 | EQUIPMENT | 0 | 0 | $0 | $0 | |||
| 12000 | FURNISHINGS | 0 | 0 | $0 | $0 | |||
| 13000 | SPECIAL CONSTRUCTION | 0 | 0 | $0 | $0 | |||
| 14000 | CONVEYING EQUIPMENT | 0 | 0 | $0 | $0 | |||
| 21000 | FIRE PROTECTION | 0 | 0 | $0 | $0 | |||
| 22000 | PLUMBING | 0 | 0 | $0 | $0 | |||
| 23000 | HVAC | 0 | 0 | $0 | $0 | |||
| 25000 | INTEGRATED AUTOMATION | 0 | 0 | $0 | $0 | |||
| 26000 | ELECTRICAL | 0 | 0 | $0 | $0 | |||
| 27000 | COMMUNICATIONS | 0 | 0 | $0 | $0 | |||
| 28000 | ELECTRONIC SAFETY & SECURITY | 0 | 0 | $0 | $0 | |||
| 31000 | EARTHWORK | 0 | 0 | $0 | $0 | |||
| 32000 | EXTERIOR IMPROVEMENTS | 0 | 0 | $0 | $0 | |||
| 33000 | UTILITIES | 0 | 0 | $0 | $0 | |||
| 34000 | TRANSPORTATION | 0 | 0 | $0 | $0 | |||
| 35000 | WATERWAY & MARINE | 0 | 0 | $0 | $0 | |||
| 41000 | MATERIAL PROCESSING & HANDLING | 0 | 0 | $0 | $0 | |||
| 44000 | POLLUTION & WASTE CONTROLL EQUIP. | 0 | 0 | $0 | $0 | |||
| 46000 | WATER & WASTEWATER EQUIPMENT | 0 | 0 | $0 | $0 | |||
| 48000 | ELECTRICAL POWER GENERATION | 0 | 0 | $0 | $0 |
| SUBCONTRACTOR MARKUP | 0.0% | 0 | 0 | $0 |
| SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES |
| SUBTOTAL | 0 | 0 | $0 | $0 | |
| SUBTOTAL | 0 | 0 | $0 | $0 | |
| OVERHEAD | 0.0% | 0 | 0 | $0 | $0 |
| PROFIT | 0.0% | 0 | 0 | $0 | $0 |
| TOTALS (ECCA) | $0 | $0 | $0 | $0 | |
| BONDING | 0.0% | $0 | $0 | $0 | $0 |
| TOTALS (ECC) | $0 | $0 | $0 | $0 |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
SUMMARY - LME
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| CONTRACT AMOUNT | |||||||||
| No. | GSA | CSI | DESCRIPTION | LABOR | MATERIAL | EQUIP | TOTAL | ||
| SUMMARY - Labor / Material / Equipment | |||||||||
| 01000 | GENERAL CONDITIONS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 02000 | EXISTING CONDITIONS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 03000 | CONCRETE | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 04000 | MASONRY | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 05000 | METALS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 06000 | WOOD & PLASTIC | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 07000 | THERMAL & MOISTURE PROTECTION | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 08000 | DOORS & WINDOWS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 09000 | FINISHES | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 10000 | SPECIALTIES | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 11000 | EQUIPMENT | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 12000 | FURNISHINGS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 13000 | SPECIAL CONSTRUCTION | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 14000 | CONVEYING EQUIPMENT | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 21000 | FIRE PROTECTION | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 22000 | PLUMBING | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 23000 | HVAC | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 25000 | INTEGRATED AUTOMATION | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 26000 | ELECTRICAL | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 27000 | COMMUNICATIONS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 28000 | ELECTRONIC SAFETY & SECURITY | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 31000 | EARTHWORK | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 32000 | EXTERIOR IMPROVEMENTS | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 33000 | UTILITIES | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 34000 | TRANSPORTATION | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 35000 | WATERWAY & MARINE | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 41000 | MATERIAL PROCESSING & HANDLING | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 44000 | POLLUTION & WASTE CONTROLL EQUIP. | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 46000 | WATER & WASTEWATER EQUIPMENT | 0.00 | 0.00 | 0.00 | $0 | $0 | |||
| 48000 | ELECTRICAL POWER GENERATION | 0.00 | 0.00 | 0.00 | $0 | $0 |
| SUBCONTRACTOR MARKUP | 0.0% | 0.00 | 0.00 | 0.00 | $0 |
| SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES |
| SUBTOTAL | 0 | 0 | 0 | $0 | $0 | |
| SUBTOTAL | 0 | 0 | 0 | $0 | $0 | |
| OVERHEAD | 0% | 0 | 0 | 0 | $0 | $0 |
| PROFIT | 0% | 0 | 0 | 0 | $0 | $0 |
| TOTALS (ECCA) | $0 | $0 | $0 | $0 | $0 | |
| BONDING | 0.0% | $0 | $0 | $0 | $0 | $0 |
| TOTALS (ECC) | $0 | $0 | $0 | $0 | $0 |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
GENERAL CONDITIONS
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| CONTRACT AMOUNT | ||||||||||
| No. | GSA | CSI | DESCRIPTION | SUB | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
01000 GENERAL CONDITIONS
| SHELL | ||||||
| General Conditions | LS | 1 | $0.00 | $0.00 | $0.00 | $0 |
| Security Clearances | HR | $0.00 | $0.00 | $0.00 | $0 | |
| Full-Time Superintendent | HR | $0.00 | $0.00 | $0.00 | $0 | |
| Interim Life Safety Measures (Sprinkler) | LS | $0.00 | $0.00 | $0.00 | $0 | |
| Interim Life Safety Measures (Fire Alarm) | LS | $0.00 | $0.00 | $0.00 | $0 | |
| Subtotal | $0 |
| TENANT IMPROVEMENTS | ||||||
| General Conditions | LS | 1 | $0.00 | $0.00 | $0.00 | $0 |
| Security Clearnances | LS | 1 | $0.00 | $0 | ||
| Part-Time Superintendent | HR | 0 | $0.00 | $0.00 | $0.00 | $0 |
| Interim Life Safety Measures (Sprinkler) | LS | 1 | $0.00 | $0.00 | $0 | |
| Interim Life Safety Measures (Fire Alarm) | LS | 1 | $0.00 | $0.00 | $0 | |
| Temporary construction barrier - Type 913 | SF | 1,690 | $0.00 | $0.00 | $0 | |
| Temporary Power & Data in Secondary Bldg | LS | 1 | $0.00 | $0.00 | $0 | |
| Temporary processing building (incl. furn.) | YR | 1 | $0.00 | $0 | ||
| Temporary Facilities (portable toilets) | LS | 1 | $0.00 | $0.00 | $0 | |
| Subtotal | $0 |
TOTALS $0 $0 $0 $0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EXIST. COND.
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| SUB | CONTRACT AMOUNT | |||||||||
| No. | GSA | CSI | DESCRIPTION | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
02000 EXISTING CONDITIONS SUB MARKUP
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| Remove and store seating for reuse | EA | 67 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Remove vestibule glazing | Y | SF | 100 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Demolish terminal casework | EA | 19 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Remove existing countertops | LF | 97 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Demolish casework at security platform | SF | 87.5 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Remove existing metal cabinets | EA | 33 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Remove office equipment for reuse | EA | 20 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Salvage existing cubicles; turn over to tenant | EA | 5 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Demolish existing casework | SF | 22 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Remove screening panels | LF | 57 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Demolish partitions | LF | 50 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Demolish existing glazing | Y | SF | 85 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Salvage door from Hard Secondary | EA | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Remove existing rubber flooring | SF | 2,650 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Remove existing terrazo flooring | Y | SF | 1,750 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Remove existing sand bed for terrazo floor | Y | SF | 1,750 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Remove existing supervisor podium | Y | SF | 200 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Demo portion of partition for new glazing | SF | 35 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Remove AEDs & First aid kits for reuse | EA | 4 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Remove ATM for reuse | EA | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Protect drinking fountain during construction | EA | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Remove ceiling mount TV's for reuse | EA | 10 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Communication Removals | $0 | $0 | ||||||
| - Wire | Y | LF | 6,000 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| - Raceways | Y | LF | 2,000 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| - Boxes/Devices | Y | EA | 48 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Electrical Removals | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| EXISTING SPRINKLER HEAD REMOVAL | Y | EA | 12 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| HVAC REMOVALS | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
CONCRETE
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
03000 CONCRETE SUB MARKUP
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| New concrete slab infill at old terrazzo floor | Y | CY | 32 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Prep concrete for new flooring finish | SF | 5,022 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| $0 | $0 | |||||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0.00 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
MASONRY
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
04000 MASONRY SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||||||
| $0 | $0 | S | ||||
| $0 | $0 | |||||
| $0 | $0 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
METALS
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
05000 METALS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | ||||||
| $0 | $0 | S | ||||
| $0 | $0 | |||||
| $0 | $0 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
WOOD & PLASTIC
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
06000 WOOD AND PLASTIC SUB MARKUP
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||||
| Blocking in walls for wall hung equipment | LS | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| $0 | $0 | ||||||
| $0 | $0 | ||||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0.00 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
THERM. & MOIST. PROT.
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
07000 THERMAL & MOISTURE PROTECTION SUB MARKUP
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | 0 | 0 | 0 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||||
| Miscellaneous Sealants | LS | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| $0 | $0 | ||||||
| $0 | $0 | ||||||
| Subtotal | 0 | 0 | 0 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0.00 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
DOORS & WINDOWS
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
08000 DOORS AND WINDOWS SUB MARKUP
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| New half door in processing line | Y | EA | 3 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| New door hardware | Y | EA | 3 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Ballistic glazing in vestibule storefront | Y | SF | 90 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Balistic glazing dividers at processing counter | Y | SF | 153 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Reinstall door salvaged from Hard Secondary | EA | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| One-way window at Supervisor Podium | Y | SF | 39 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| New plexiglass wall covering @ Hard Sec | Y | SF | 344 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FINISHES
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
09000 FINISHES SUB MARKUP
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| New partition type 910 | SF | 452 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| New partition type 911 | SF | 27 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| New partition type 912 | SF | 99 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| New partition type 920 | SF | 643 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Paint | Y | SF | 7232 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| New monolithic quartz floor coating | Y | SF | 0 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| New rubber base | LF | 250 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| New raised flooring at supervisor platform | Y | SF | 260 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
SPECIALTIES
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
10000 SPECIALTIES SUB MARKUP
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| Storage Lockers (By Owner; Install by GC) | EA | 30 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| New stainless steel corner guards | LF | 45 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| New stainless steel wall guards | SF | 497 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| New PA system | Y | EA | 12 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Signage | Y | EA | 24 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Signage - 11"x17" | Y | EA | 2 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Reinstall AED & First Aid cabinets | EA | 4 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EQUIPMENT
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
11000 EQUIPMENT SUB MARKUP
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||||
| Reinstall existing office equipment | LS | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Reinstall ATM | EA | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Reinstall TV's & TV mounts | EA | 2 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Install pedestrian control (provided by CBP) | LS | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FURNISHINGS
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
12000 FURNISHINGS SUB MARKUP
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| Reinstall existing steel shelving | EA | 8 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Reinstall existing steel cabinets | EA | 2 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| New casework at processing terminals | Y | EA | 20 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| New stainless steel counter top | Y | SF | 355 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| New Casework at processing corners | Y | EA | 4 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Relocate existing seating in waiting area | LS | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Reinstall info center/magazine rack | EA | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| Casework @ Supervisor Podium | Y | EA | 5 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| New Counter @ Supervisor Podium | Y | SF | 35 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| New Casework at custom corner @ supervisor | Y | EA | 1 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
SPECIAL CONST.
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
13000 SPECIAL CONSTRUCTION SUB MARKUP
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| New fiberglass balistic backup panels | Y | SF | 314 | $0.00 | $0.00 | $0.00 | $0 | $0 |
| $0 | $0 | |||||||
| $0 | $0 | |||||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
CONVEYING
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
14000 CONVEYING EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FIRE PROTECTION
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
21000 FIRE PROTECTION SUB MARKUP
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| SPRINKLERS | Y | EA | 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPE AND FITTINGS | $0.00 | $0.00 | ||||||
| 1" SCH.40 PIPE | Y | LF | 15 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1 1/4" SCH.40 PIPE | Y | LF | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 1 1/2" SCH.40 PIPE | Y | LF | 15 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| FITTINGS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| FIRE WATCH, INSPECTION AND TESTING | Y | HR | 40 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TESTING | Y | HR | 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHUT DOWN AND REFILL SYSTEM | Y | EA. | 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
PLUMBING
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
22000 PLUMBING SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||
| $0.00 | $0.00 | S | ||||
| $0.00 | $0.00 | |||||
| $0.00 | $0.00 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS $0.00 $0.00 $0.00
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
HVAC
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
23000 HVAC SUB MARKUP
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| PIPING INSULATION | Y | LF | 160 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPING | Y | LF | 160 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPE FITTINGS | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| HYDRONIC SPECIALTIES | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| DUCTWORK | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| DUCTWORK ACCESSORIES | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| DDC TEMPERATURE CONTROLS | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
AUTOMATION
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
25000 INTEGRATED AUTOMATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||
| EA | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | |||||
| $0.00 | $0.00 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS $0.00 $0.00 $0.00
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
ELECTRICAL
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
26000 ELECTRICAL ` SUB MARKUP
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| Lighting Reconfiguration | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Normal Power Duplex Recptacles | Y | EA | 10 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Normal Power Quad Recptacles | Y | EA | 25 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Isolated Ground Quad Recptavles | Y | EA | 25 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Surface Raceway | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Feeds to relocated equipment | Y | EA | 10 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Power Panels Re-work/Wireway/PB/JB | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Trenching in Electrical Room | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
COMMUNICATIONS
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
27000 COMMUNICATIONS SUB MARKUP
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||||
| Tele/Data Outlets | Y | EA | 65 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| LAN & Tele Room Rework | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Temporary Data (See Division 1) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| New PA system | Y | EA | 10 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Integrate PA system into workstation comms. | Y | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
ELEC. S&S
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
28000 ELECTRONIC SAFETY & SECURITY SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EARTHWORK
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
31000 EARTHWORK SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EXT. IMP.
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
32000 EXTERIOR IMPROVEMENTS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| $0 | $0 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
UTILITIES
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
33000 UTILITIES SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||
| EA | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | |||||
| $0.00 | $0.00 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS $0.00 $0.00 $0.00
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
TRANSPORTATION
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
34000 TRANSPORTATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | ||||||
| EA | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | |||||
| $0.00 | $0.00 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS $0.00 $0.00 $0.00
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
MARINE
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
35000 MARINE SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | S | |||||
| $0.00 | $0.00 | |||||
| $0.00 | $0.00 | |||||
| $0.00 | $0.00 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
MATL PROC
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
41000 MATERIAL PROCESSING & HANDLING SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | S | |||||
| $0.00 | $0.00 | |||||
| $0.00 | $0.00 | |||||
| $0.00 | $0.00 | |||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
POLLUTION
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
44000 POLLUTION & WASTE CONTROL EQUIP. SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
WATER & WASTE
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
46000 WATER & WASTEWATER EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EGEN
| GENERAL SERVICES ADMINISTRATION | Date: | Date of Proposal | |
| Public Building Service / Property Management Division | |||
| Special Projects Division | |||
| Final Design Submission | |||
| GSA Contract No: | GS-07-P-16-UC-D-7008 | ||
| Project: | Champlain Passenger Admin Area Modifications | ||
| Contractor: | Contractor Name | Trade: | All |
| DESCRIPTION | SUB | CONTRACT AMOUNT | S/T | ||||||||
| No. | GSA | CSI | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
48000 ELECTRICAL POWER GENERATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | |||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
Instructions
| 1. | Enter the required information in the following cells: |
| No. - Sequentially number each item. | |
| GSA -select relevant system from GSA list (TABLES) | |
| CSI - select relevant spec. section from CSI list (TABLES) | |
| Description - maximum 27 characters, use standard abbreviations. Do not use punctuation such as periods, appostrophies or quotations. (feet = ft, inches = in)(example: 3/4in copper DHW) | |
| UM - select relevant unit from UM list (TABLES) Must be CAPS. | |
| Quantity - whole number, no decimals(do not use truncation to hide decimal portion of value. Round value to nearest dollar) | |
| Labor - whole number, no decimals(do not use truncation to hide decimal portion of value. Round value to nearest dollar) | |
| Material - whole number, no decimals(do not use truncation to hide decimal portion of value. Round value to nearest dollar) | |
| Total - no entry required, field will auto calculate. Shaded areas are auto calculating. | |
| 2. | To add lines to the sheet, select the last empty formatted line(above the red line) on the sheet(click in the left most column, the one EXCEL numbers) and from the Edit menu or the popup menu(right mouse button) select COPY(or use Ctrl-C). |
| From the Insert menu select Copied Cells or from the popup menu select Insert Copied Cells. | |
| 3. | Do not insert additional columns. |
| 4. | Do not add lines below the total line(red line). |
| 5. | Do not use header lines(Bldg names/numbers, floor numbers, elevation titles) Incorporate all titles in descriptions(example: Bld-1 Acc Ceilings) |
| 6. | Do not hide columns or rows. |
| 7. | Properly filled in TPB will facilitate CoA creation and upload of TPB into JDE/FMS by Cost Control. |
TABLES
| GSA Codes for TPB | CSI Codes for TPB | ||
| GSA Code | GSA Description | CSI Code | CSI Description |
| 01000 | Foundations | 00600 | Bonds and Certificates |
| 01100 | Standard Foundations | 00610 | Bonds |
| 01100 | Wall Foundations | 00620 | Insurance |
| 01120 | Col Fdtns & Pile Caps | 00700 | General Conditions |
| 01200 | Spec Fdtn Conditions | 00800 | Supplementary Conditions |
| 01210 | Pile Foundations | 01000 | General Requirements |
| 01220 | Caissons | 01100 | Summary |
| 01230 | Underpinning | 01200 | Price & Payment Procedures |
| 01240 | Dewatering | 01300 | Administrative Requirements |
| 01250 | Raft Foundations | 01400 | Quality Requirements |
| 01260 | Other Spec Fdtn Cond | 01500 | Temp Facilities & Controls |
| 02000 | Substructure | 01600 | Product Requirements |
| 02100 | Slab on Grade | 01700 | Execution Requirements |
| 02110 | Standard Slab on Grade | 01732 | Cutting and Patching |
| 02120 | Structural Slab on Grade | 01736 | Selective Demolition |
| 02130 | Inclined Slab on Grade | 01780 | Closeout Submittals |
| 02140 | Trenches, Pits & Bases | 01800 | Facility Operation |
| 02150 | Foundation Drainage | 01900 | Facility Decomissioning |
| 02200 | Basement Excavation | 02000 | Site Construction |
| 02210 | Excavation for Basements | 02050 | Basic Site Materials & Methods |
| 02220 | Structure Fill & Compact | 02100 | Site Remediation |
| 02230 | Shoring | 02200 | Site Preparation |
| 02300 | Basement Walls | 02300 | Earthwork |
| 02310 | Basement Wall Construction | 02400 | Tunneling, Boring, & Jacking |
| 02320 | Moisture Protection | 02450 | Fdtn & Load-Bearing Elements |
| 02330 | Basement Wall Insulation | 02500 | Utility Services |
| 03000 | Superstructure | 02600 | Drainage & Containment |
| 03100 | Floor Construction | 02700 | Base, Ballast, Pavmt, & Appurt |
| 03110 | Susp Basement Floor Const | 02800 | Site Improvements & Amenities |
| 03120 | Upper Floors Construction | 02900 | Planting |
| 03130 | Balcony Construction | 02950 | Site Restoration & Rehab |
| 03140 | Ramps | 03000 | Concrete |
| 03150 | Special Floor Const | 03050 | Basic Conc Materials & Methods |
| 03200 | Roof Construction | 03100 | Concrete Forms & Accessories |
| 03210 | Flat Roof Construction | 03200 | Concrete Reinforcement |
| 03220 | Pitched Roof Constr | 03300 | Cast-In-Place Concrete |
| 03230 | Canopies | 03310 | Structural Concrete |
| 03240 | Special Roof Systems | 03330 | Architectural Concrete |
| 03300 | Stair Construction | 03340 | Low Density Concrete |
| 03310 | Stair Structure | 03350 | Concrete Finishing |
| 04000 | Exterior Closure | 03360 | Concrete Finishes |
| 04100 | Exterior Walls | 03370 | Specially Placed Concrete |
| 04110 | Exterior Wall Const | 03380 | Post-Tensioned Concrete |
| 04120 | Exterior Louvers & Screens | 03390 | Concrete Curing |
| 04130 | Sun Control Devices(ext) | 03400 | Precast Concrete |
| 04140 | Balcony Walls & Handrails | 03500 | Cementit's Decks & Underlaymnt |
| 04150 | Exterior Soffits | 03600 | Grouts |
| 04200 | Ext Doors & Windows | 03700 | Mass Concrete |
| 04210 | Windows | 03900 | Conc Restoration & Cleaning |
| 04220 | Curtain Walls | 04000 | Masonry |
| 04230 | Exterior Doors | 04050 | Basic Masonry Mat'ls & Methods |
| 04240 | Storefronts | 04200 | Masonry Units |
| 05000 | Roofing | 04400 | Stone |
| 05010 | Roof Coverings | 04500 | Refractories |
| 05020 | Traf Topng & Pavng Membrane | 04600 | Corrosion-Resistant Masonry |
| GSA Codes for TPB | CSI Codes for TPB | ||
| GSA Code | GSA Description | CSI Code | CSI Description |
| 05030 | Roof Insulation & Fill | 04700 | Simulated Masonry |
| 05040 | Flashing & Trim | 04800 | Masonry Assemblies |
| 05050 | Roof Openings | 04900 | Masonry Restoration & Cleaning |
| 06000 | Interior Construction | 05000 | Metals |
| 06100 | Partitions | 05050 | Basic Metal Mat'ls & Methods |
| 06110 | Fixed Partitions | 05100 | Structural Metal Framing |
| 06120 | Demountable Partitions | 05200 | Metal Joists |
| 06130 | Retractable Partitions | 05300 | Metal Deck |
| 06140 | Compartments & Cubicles | 05400 | Cold-Formed Metal Framing |
| 06150 | Int Balustrades & Screens | 05500 | Metal Fabrications |
| 06160 | Interior Doors & Frames | 05600 | Hydraulic Fabrications |
| 06170 | Interior Storefronts | 05650 | Railroad Track & Accessories |
| 06200 | Interior Finishes | 05700 | Ornamental Metal |
| 06210 | Wall Finishes | 05800 | Expansion Control |
| 06220 | Floor | 05900 | Metal Restoration & Cleaning |
| 06230 | Ceiling Finishes | 06000 | Wood and Plastic |
| 06300 | Specialties | 06050 | Wood & Plastic Matls & Methds |
| 06310 | General Specialties | 06100 | Rough Carpentry |
| 06320 | Built-in Fittings | 06200 | Finish Carpentry |
| 06900 | Interior Demolition | 06400 | Architectural Woodwork |
| 06910 | Cut & Patch | 06500 | Structural Plastics |
| 06930 | Selective Demolition | 06600 | Plastic Fabrications |
| 07000 | Conveying Systems | 06900 | Wood & Plastic Restor' & Cl'ng |
| 07010 | Elevators | 07000 | Thermal & Moisture Protection |
| 07020 | Moving Stair & Walks | 07050 | Therml/Moist Prot Matls & Meth |
| 07030 | Dumbwaiters | 07100 | Dampproofing & Waterproofing |
| 07040 | Pneumatic Tube Systems | 07200 | Thermal Protection |
| 07050 | Other Conveying Systems | 07300 | Shingles, Roof Tiles & Covrngs |
| 07060 | General Construction Items | 07400 | Roofings & Siding Panels |
| 08000 | Mechanical | 07500 | Membrane Roofing |
| 08100 | Plumbing | 07600 | Flashing & Sheet Metal |
| 08110 | Domestic Water Supply Sys | 07700 | Roof Specialties & Accessories |
| 08120 | Sanitary Waste & Vent Sys | 07800 | Fire & Smoke Protection |
| 08130 | Rainwater Drainage Sys | 07900 | Joint Sealers |
| 08140 | Plumbing Fixtures | 08000 | Doors and Windows |
| 08200 | HVAC | 08050 | Door & Window Matls & Meth |
| 08210 | Energy Supply | 08100 | Metal Doors & Frames |
| 08220 | Heat Generating Sys | 08200 | Wood & Plastic Doors |
| 08230 | Cooling Generating Sys | 08300 | Specialty Doors |
| 08240 | Distribution Systems | 08400 | Entrances & Storefronts |
| 08250 | Terminal & Package Units | 08500 | Windows |
| 08260 | Controls & Instrumentation | 08600 | Skylights |
| 08270 | Systems Testing & Balancing | 08700 | Hardware |
| 08300 | Fire Protection | 08800 | Glazing |
| 08310 | Water Supply(Fire Protection) | 08900 | Glazed Curtain Wall |
| 08320 | Sprinklers | 09000 | Finishes |
| 08330 | Standpipe Systems | 09050 | Finishes Matls & Meth |
| 08340 | Fire Extinguishers | 09100 | Metal Support Assemblies |
| 08400 | Spec Mechanical Systems | 09200 | Plaster & Gypsum Board |
| 08410 | Special Plumbing Systems | 09300 | Tile |
| 08420 | Special Fire Protection Sys | 09400 | Terrazzo |
| 08430 | Misc Spec Sys & Devices | 09500 | Ceilings |
| 08440 | Gen Const Items(Mech) | 09600 | Flooring |
| 09000 | Electrical | 09700 | Wall Finishes |
| 09100 | Service & Distribution | 09800 | Acoustical Treatment |
| GSA Codes for TPB | CSI Codes for TPB | ||
| GSA Code | GSA Description | CSI Code | CSI Description |
| 09110 | High Tension Service & Dist | 09900 | Paints & Coatings |
| 09120 | Low Tension Service & Dist | 10000 | Specialties |
| 09200 | Lighting & Power | 10100 | Visual Display Boards |
| 09210 | Branch Wiring | 10150 | Compartments & Cubicles |
| 09220 | Lighting Equipment | 10200 | Louvers & Vents |
| 09300 | Spec Electrical Syst | 10240 | Grilles & Screens |
| 09310 | Communications & Alarm Sys | 10250 | Service Walls |
| 09320 | Grounding Systems | 10260 | Wall & Corner Guards |
| 09330 | Emergency Light & Power | 10270 | Access Flooring |
| 09340 | Electric Heating | 10290 | Pest Control |
| 09350 | Floor Raceway Systems | 10300 | Fireplaces & Stoves |
| 09360 | Other Spec Sys & Devices | 10340 | Manufactured Ext Specialties |
| 09370 | Gen Const Items(Elect) | 10350 | Flagpoles |
| 10000 | General Cond OH & Profit | 10400 | Identification Devices |
| 10010 | Mobilization & Init Expenses | 10450 | Pedestrian Control Devices |
| 10020 | Site Overhead | 10500 | Lockers |
| 10030 | Demobilization | 10520 | Fire Protection Specialties |
| 10040 | Main Off Expense & Profit | 10530 | Protective Covers |
| 10050 | Bldg/Syst Commissioning | 10550 | Postal Specialties |
| 11000 | Equipment | 10600 | Partitions |
| 11100 | Fixed & Movable Equip | 10670 | Storage Shelving |
| 11110 | Built-in Maintenance Equip | 10700 | Exterior Protection |
| 11120 | Checkroom Equipment | 10750 | Telephone Specialties |
| 11130 | Food Service Equipment | 10800 | Toilet, Bath, & Laundry Acc |
| 11140 | Vending Equipment | 10880 | Scales |
| 11150 | Waste Handling Equipment | 10900 | Wardrobe & Closet Specialties |
| 11160 | Loading Dock Equipment | 11000 | Equipment |
| 11170 | Parking Equipment | 11010 | Maintenance Equipment |
| 11180 | Detention Equipment | 11020 | Security & Vault Equipment |
| 11190 | Postal Equipment | 11030 | Teller & Service Equipment |
| 11195 | Other Specialized Equipment | 11040 | Ecclesiastical Equipment |
| 11200 | Furnishings | 11050 | Library Equipment |
| 11210 | Artwork | 11060 | Theater & Stage Equipment |
| 11220 | Window Treatment | 11070 | Instrumental Equipment |
| 11230 | Seating | 11080 | Registration Equipment |
| 11240 | Furniture | 11090 | Checkroom Equipment |
| 11250 | Rugs, Mats, & Furn Access | 11100 | Mercantile Eqipment |
| 11300 | Special Construction | 11110 | Comm Laundry & Dry Clean'g Eqp |
| 11310 | Vaults | 11120 | Vending Equipment |
| 11320 | Interior Swimming Pools | 11130 | Audio-Visual Equipment |
| 11330 | Modular Prefab Assemblies | 11140 | Vehicle Service Equipment |
| 11340 | Special Purpose Rooms | 11150 | Parking Control Equipment |
| 11350 | Other Special Construction | 11160 | Loading Dock Equipment |
| 12000 | Site Work | 11170 | Solid Waste Handling Equipment |
| 12100 | Site Preparation | 11190 | Detention Equipment |
| 12110 | Clearing | 11200 | Water Supply & Treatment Eqp |
| 12120 | Demolition | 11280 | Hydraulic Gates & Valves |
| 12130 | Site Earthwork | 11300 | Fl Waste Treatment & Disp Eqp |
| 12200 | Site Improvements | 11400 | Food Service Equipment |
| 12210 | Parking Lots | 11450 | Residential Equipment |
| 12220 | Roads, Walks, Terraces | 11460 | Unit Kitchens |
| 12230 | Site Development | 11470 | Darkroom Equipment |
| 12240 | Landscaping | 11480 | Athletic, Recr., & Therap. Eqp |
| 12300 | Site Utilities | 11500 | Industrial & Process Equipment |
| 12310 | Water Supply & Dist Sys | 11600 | Laboratory Equipment |
| GSA Codes for TPB | CSI Codes for TPB | ||
| GSA Code | GSA Description | CSI Code | CSI Description |
| 12320 | Drainage & Sewer Sys | 11650 | Planetarium Equipment |
| 12330 | Heating & Cooling Dist Sys | 11660 | Observatory Equipment |
| 12340 | Elec Dist & Lighting Sys | 11680 | Office Equipment |
| 12350 | Snow Melting Sys | 11700 | Medical Equipment |
| 12360 | Service Tunnels | 11780 | Mortuary Equipment |
| 12400 | Off-Site Work | 11850 | Navigation Equipment |
| 12410 | Railroad Work | 11870 | Agricultural Equipment |
| 12420 | Marine Work | 11900 | Exhibit Equipment |
| 12430 | Tunneling | 12000 | Furnishings |
| 12440 | Other Off-Site Work | 12010 | Air-Supported Structures |
| 13000 | Testing Program | 12050 | Fabrics |
| 12100 | Art | ||
| 12300 | Manufactured Casework | ||
| 12400 | Furnishings & Accessories | ||
| 12500 | Furniture | ||
| 12600 | Multiple Seating | ||
| 12700 | Systems Furniture | ||
| 12800 | Interior Plants & Planters | ||
| 12900 | Furnishings Rest & Repair | ||
| 13000 | Special Construction | ||
| 13020 | Building Modules | ||
| 13030 | Special Purpose Rooms | ||
| 13080 | Sound, Vibr., & Seismic Cont | ||
| 13090 | Radiation Protection | ||
| 13100 | Lightning Protection | ||
| 13110 | Cathodic Protection | ||
| 13120 | Pre-Engineered Structures | ||
| 13150 | Swimming Pools | ||
| 13160 | Aquariums | ||
| 13165 | Aquatic Park Facilities | ||
| 13170 | Tubs & Pools | ||
| 13175 | Ice Rinks | ||
| 13185 | Keensl & Animal Shelters | ||
| 13190 | Site-Constructed Incinerators | ||
| 13200 | Storage Tanks | ||
| 13220 | Filter Underdrains & Media | ||
| 13230 | Digester Covers & Appurt | ||
| 13240 | Oxygenation Systems | ||
| 13260 | Sludge Conditioning Systems | ||
| 13280 | Hazardous Material Remediation | ||
| 13400 | Measurement & Contrl Instr | ||
| 13500 | Recording Instrumentation | ||
| 13550 | Transportation Contrl Instr | ||
| 13600 | Solar & Wind Energy Equipment | ||
| 13700 | Security Access & Surveillance | ||
| 13800 | Building Automation & Control | ||
| 13850 | Detection & Alarm | ||
| 13900 | Fire Suppression | ||
| 14000 | Conveying Systems | ||
| 14100 | Dumbwaiters | ||
| 14200 | Elevators | ||
| 14300 | Escalators & Moving Walks | ||
| 14400 | Lifts | ||
| 14500 | Material Handling | ||
| 14600 | Hoists & Cranes | ||
| UM Codes for TPB | CSI Codes for TPB | ||
| UM | UM Desc | CSI Code | CSI Description |
| AC | Acres | 14700 | Turntables |
| BF | Board Feet | 14800 | Scaffolding |
| CF | Cubic Feet | 14900 | Transportation |
| CI | Cubic Inches | 15000 | Mechanical |
| CS | Hundred Square Feet | 15050 | Mechanical Materials & Methods |
| CY | Cubic Yard | 15100 | Building Services Piping |
| EA | Each | 15200 | Process Piping |
| FC | Hundred Feet | 15300 | Fire Protection Piping |
| FT | Feet | 15400 | Plumbing Fixtures & Equipment |
| GA | Gallons | 15500 | Heat-Generation Equipment |
| HR | Hour | 15600 | Refrigeration Equipment |
| IN | Inches | 15700 | Heatng, Ventilatng, & AC Equip |
| LB | Pounds | 15800 | Air Distribution |
| LF | Linear Feet | 15900 | HVAC Instrument' & Controls |
| LS | LumpSum | 15950 | Testing, Adjustng, & Balancng |
| LY | Linear Yard | 16000 | Electrical |
| MB | Thousand Board Feet | 16050 | Electrical Materials & Methods |
| MF | Thousand Feet | 16100 | Wiring Methods |
| MH | Man Hour | 16200 | Electrical Power |
| MI | Miles | 16300 | Transmission & Distribution |
| MO | Months | 16400 | Low-Voltage Distribution |
| NT | Not to Exceed | 16500 | Lighting |
| PC | Pieces | 16700 | Communications |
| SF | Square Feet | 16800 | Sound & Video |
| SI | Square Inch | 93310 | Asbestos Abatement |
| SQ | Square | ||
| SY | Square Yard | ||
| TN | Tons | ||
| WK | Weeks | ||
| YD | Yards |
Sheet1
| 10 | SEC24144 84" Support Post-Single Sided | $ 66.00 | $660.00 |
| 6 | SEC24147 40" wide back Panel Set | $ 363.00 | $2,178.00 |
| 6 | SEC24149 40" wide Base Cover | $ 59.40 | $356.40 |
| 6 | SEC24150 Base Cover end Caps | $ 30.60 | $183.60 |
| 6 | SEC24151 Wall Support Bracket | $ 9.60 | $57.60 |
| 48 | SEC24154 1 Capacity Stock Shelf | $ 10.80 | $518.40 |
| 9 | SEC24163 12 Capacity Stock Saddle | $ 97.80 | $880.20 |
| 54 | SEC24166 1 Capacity Barrel Saddle 5 1/2" | $ 10.80 | $583.20 |
| 54 | SEC24171 1 Capacity Barrel Saddle 7" | $ 10.80 | $583.20 |
| 3 | SEC34005 40'W Shelf for EWR, SWR (12 Spaces) | $ 63.60 | $190.80 |
| 1 | SECCAGE 8'x8' Cage Wall with sliding door (see details in quote) | $ 975.00 | $975.00 |
| 1 | SECINSTL Secureit Trained Installation | $ 1,295.00 | $1,295.00 |
| Subtotal | $8,461.40 | ||
| Freight | $ 350.00 | ||
| Total | $8,811.40 |
image1.jpeg