This federal contract opportunity is for a solicitation to renovate a portion of the first floor passenger administration building at the Land Port of Entry in Champlain, New York. The scope of work includes finish work, ballistic protections, electrical work, minor mechanical work, limited fire protection work, and temporary facilities for a total project area of approximately 5,400 square feet. The project will require installation of temporary facilities for the client agency Customs and Border Protection during construction, demolition of the existing administration area, construction of the new facility, and removal of the temporary facilities. The solicitation number is 47PC0220R0019 and was issued by the General Services Administration Public Buildings Service Region 2.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #2
JULY 7, 2020
Project: Champlain Passenger Admin. Area Modifications
Owner: GSA
GSA Point of Contact: Tom Lucas (518) 360-9806
Prepared by: N.K. BHANDARI, Architecture & Engineering, P.C.
TO ALL BIDDERS:
The following additions, deletions, and/or changes or clarifications to the drawings, specifications, and bidding documents for this project, shall become and are hereby made part of the Contract Documents. They change the original documents only in the manner and to the extent stated. Each bidder shall acknowledge receipt of this ADDENDUM in the appropriate location on the bid proposal form.
This ADDENDUM consists of fourteen (14) pages, including this page, and two (2) attachments All requirements of the original Specifications and Drawings and previous Addendum, if applicable, shall remain in force except as noted by this ADDENDUM.
THE PURPOSE OF THIS ADDENDUM IS TO CHANGE THE FOLLOWING ITEMS:
PROJECT MANUAL
See next page for modifications
Specification: Description of Change:
01 50 00 Temporary Facilities and Controls
1. CHANGE section 3.2.A.9 Temporary Utilities / Sanitary Facilities to read:
“Sanitary Facilities: Provide for toilets, wash facilities and drinking water fixtures in compliance with regulations and health codes for type, number, location, operation and maintenance of fixtures and facilities. Provide toilet tissue, paper towels, paper cups and similar disposable materials as appropriate for each facility, and provide covered waste containers for used materials.
a. Toilets: Use of the Government's existing toilet facilities will be permitted for construction personnel only. Clean and maintain facilities in a condition acceptable to the Contracting Officer and, at completion of construction, restore facilities to condition prevalent at the time of initial use.
b. Public Use Temporary Toilets:
1) Install separate self-contained ABAAS-compliant toilet units for male and female personnel. Shield toilets to ensure privacy. A single trailer which contains multiple stations is the preferred approach to provide temporary public use restrooms.
2) Public use toilets shall be located in first bay of bus canopy.
3) Clean and maintain public use facilities in a condition acceptable to the Contracting Officer and have collection tanks emptied at regular intervals to ensure continuous use by the public is uninterrupted.
4) Recommended temporary public restrooms is an ADA accessible trailer with at least two stations.
5) Provide all temporary facilities required for restroom use including:
a) Water (weather-proof water supply to ensure continued use throughout winter months)
b) Electric to be supplied from main bus terminal building via overhead cables to the bus canopy then connected to the restroom trailer.
c) Sanitary is stored in a collection tank within the temporary restroom trailer and shall be emptied by contractor at a regular interval to ensure continuous operation of temporary restrooms.
d) Each temporary public restroom shall include: toilet, sink, soap dispenser, toilet paper dispenser, paper towel dispenser or electric hand dryer.
e) At least one temporary public restroom shall include a baby changing station.
c. Wash Facilities: Install wash facilities supplied with potable water at convenient locations for construction personnel involved in handling materials that require wash-up for a healthy and sanitary condition.
1) Dispose of drainage per regulations.
2) Supply cleaning compounds appropriate for each condition.
Include safety showers, eyewash fountains and similar facilities for the convenience, safety, and sanitation of all personnel.”
DRAWINGS
Sheet number:
ADD101:
1. ADD Note regarding the installation of temporary restroom and temporary utilities for temporary public restrooms.
ATTACHMENTS
Spec Section 01 50 00
ADD101
END OF Addendum #2
Champlain LPOE ADDENDUM #2 Champlain Passenger Admin Area Modifications 07/07/2020 GSA Project No. RWA N1074462
TEMPORARY FACILITIES AND CONTROLS 015000 - 1
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 SUMMARY
A. This section includes requirements for temporary utilities, support facilities and protection.
1. Temporary utilities include but are not limited to the following:
a. Temporary water service and distribution.
b. Temporary electric power and lighting.
c. Temporary heat and ventilation.
d. Temporary telephone service.
e. Temporary sanitary facilities, including drinking water.
2. Support facilities include but are not limited to the following:
a. Field offices, storage sheds and fabrication shops.
b. Temporary office space for tenant use.
c. Temporary paving.
d. Temporary enclosures, roofs and other building envelopes.
e. Temporary lifts and hoists.
f. Project identification and other temporary signs.
g. Waste disposal services.
h. Rodent and pest control.
i. Other construction aids and miscellaneous services and facilities.
3. Protection includes but is not limited to the following:
a. Temporary fire protection.
b. Barricades, warning signs, and lights.
c. Enclosure fence.
d. Environmental protection.
e. Enclosure partitions.
B. Provide temporary facilities and controls required for construction activities except, for facilities and controls indicated as existing or provided by the Government or others.
1.2 UTILITY USE CHARGES
A. Unless otherwise specified, Contractor shall pay utility service use charges for temporary utilities used by all entities engaged in construction activities at the Project site. Costs for these services are included in the Contract price.
B. Water Service: The Contractor may use water from the Government's existing water system, without metering and without payment of use charges.
C. Sewer Service: Contractor may use the Government's existing sewer system, without payment of use charges.
TEMPORARY FACILITIES AND CONTROLS 015000 - 2
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
D. Electric Power Service: Contractor may use electric power from the Government's existing electric power system, without metering and without payment of use charges.
1.3 SUBMITTALS
A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for construction personnel.
B. Reports: Submit reports of tests, inspections, meter readings and similar procedures for temporary utilities.
C. Implementation and Termination Schedule: Within 15 calendar days after the date established for the submittal of the Contractor's Construction Schedule, submit a schedule indicating implementation and termination of each temporary utility.
D. Weather Protection:
1. Provide protection for work areas affected by moisture and thermal change. Including building floor areas, masonry scaffolds and fabrication areas. Covering, enclose and heat to maintain a relatively dry work area with a minimum temperature of 40F at the working surface. Weather protection is not required for excavation, pile driving, steel erection, and similar operations normally completed in the open.
2. Submit weather protection plan to GSA for approval. Future changes must be approved by GSA.
3. Provide accurate Fahrenheit thermometers for every 2,000 square feet of floor space located as directed.
1.4 QUALITY ASSURANCE
A. Standards and Regulations: In temporary facilities, comply with industry standards, applicable laws, and regulations of authorities having jurisdiction, including but not limited to the following:
1. Building code requirements.
2. Health and Safety regulations.
3. Utility company regulations.
4. Police, fire department, local fire marshal and rescue squad rules.
5. Environmental protection regulations.
6. For temporary egress, ABAAS regulations.
7. NFPA 241 "Standards for Safeguarding Construction, Alterations and Demolition
Operations".
8. ANSI-A10 Series standards for "Safety Requirements for Construction and Demolition".
9. NECA Electrical Design Library "Temporary Electrical Facilities", NFPA 70, and NEMA, NECA and UL standards and regulations for temporary electric service.
B. Inspections: Arrange for authorities having jurisdiction to inspect and test each temporary utility before use. Obtain required certifications and permits.
1.5 PROJECT CONDITIONS
TEMPORARY FACILITIES AND CONTROLS 015000 - 3
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
A. Install, operate, maintain and protect temporary facilities and controls.
1. Keep temporary facilities clean and neat in appearance.
2. Operate temporary facilities in a safe and efficient manner.
3. Relocate temporary facilities if needed as Work progresses.
4. Do not overload temporary services and facilities or permit them to interfere with progress.
5. Provide fire prevention.
6. Do not allow hazardous, dangerous or unsanitary conditions, or public nuisances to be on-site.
B. At the earliest feasible time, when acceptable to GSA, change over from temporary services to use of permanent services and remove temporary facilities when no longer needed.
C. Temporary Use of Permanent Facilities and Services: Contractor shall assume responsibility for the operation, maintenance and protection of the facility and each permanent service during its use as a construction facility prior to the Government's acceptance.
D. Existing Equipment and Items: Cover or otherwise protect and provide security for existing equipment and other items that are to remain in place, to prevent soiling, damage and loss, the cost of which is the responsibility of the Contractor.
1. Temporarily move equipment and other items that interfere with the performance of required work.
2. Store equipment and other items that have been temporarily removed. Upon reinstallation, clean and, if damaged, repair or replace equipment and items to match their condition prior to removal.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Provide undamaged materials in serviceable conditions and suitable for use intended.
B. Tarpaulins: Waterproof, fire-resistant UL labeled with flame spread rating of 15 or less. For temporary enclosures, provide translucent, nylon-reinforced, laminated polyethylene fire-retardant tarpaulins.
C. Water: Shall be potable and approved by local health authorities.
D. Wood: Lumber complying with DOC PS 20 and applicable grading rules of an inspection agency certified by ALSC's Board of Review for specific use. Provide preservative treated lumber where partially or fully in contact with the earth, concrete or masonry. Provide fire retardant treated lumber for temporary purposes where fire rated products are normally required.
E. Sign, Directory and Other Graphic Panel Materials: Unless otherwise indicated, products shall be as follows:
1. Panels: Exterior type Grade B-B high density concrete-form-overlay plywood.
2. Paint: Exterior primer and exterior grade alkyd gloss enamel top coat.
3. (Other)
TEMPORARY FACILITIES AND CONTROLS 015000 - 4
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
F. Safety Barrier and Covered Walkway Materials: Unless otherwise indicated, products shall be as follows.
1. Panels: Minimum 5/8 inch (16 mm) thick exterior plywood.
2. Paint: Exterior primer and exterior grade acrylic-latex emulsion top coat.
3. (Other)
G. Wood Fencing and Vision Panel Materials: Unless otherwise indicated, products shall comply as follows:
1. Panels: Minimum 3/8 inch (9.5 mm) thick exterior plywood.
2. Paint: Exterior primer and exterior grade acrylic-latex emulsion top coat.
H. Open-Mesh Fencing: Minimum 0.12 inch (3 mm) thick galvanized 2 inch (50 mm) chain link fabric fencing with galvanized steel pipe posts, 1-1/2 inches (38 mm) inside diameter for line posts and 2-1/2 inches (64 mm) inside diameter for corner posts.
1. Fence height: 6 feet (2 m).
2. Top Protection: Galvanized barbed-wire top strand.
I. Dust control:
1. Dust Control Adhesive-Surface Walk-off Mats: Provide mats minimum 36 by 60 inches (914 by 1624 mm ).
2. Polyethylene Sheet: Reinforced, fire-resistive sheet, 0.25 mm (10 mils) minimum thickness, with flame-spread rating of 15 or less per ASTM E 84 and passing NFPA 701 Test 2.
J. Job-Built Temporary Office, Shop and Shed Materials: Unless otherwise indicated, products shall be as follows:
1. Framing, Sheathing and Siding: UL labeled fire-treated lumber and plywood.
2. Roofing: UL Class A standard weight asphalt shingles, or UL Class C mineral surfaced roll roofing.
3. Exterior Paint: Exterior primer and exterior grade acrylic-latex emulsion top coat.
4. Interior Wall Panels for Offices: Minimum half inch (12.7 mm) thick by 48 inches (1219
mm) wide by maximum available lengths, regular type gypsum board with tapered edges, complying with ASTM C 36.
5. Interior Paint for Offices: 2 coats interior latex-flat wall paint.
K. Temporary Lighting
2.2 EQUIPMENT
A. Provide equipment in serviceable condition and suitable for use intended.
1. Water Hoses: 3/4" (19 mm) heavy duty abrasive-resistant flexible rubber hoses, 100 feet (30 m) long with pressure rating greater than the maximum pressure of the water distribution system. Provide adjustable shutoff nozzles at hose discharge
2. Electric Outlets: NEMA-polarized outlets to prevent insertion of 110 to 120 Volt plugs into higher voltage outlets. Provide receptacle outlets equipped with ground fault circuit interrupters, reset button and pilot light for connection of power tools and equipment.
3. Electric Power Cords: Grounded extension cords.
TEMPORARY FACILITIES AND CONTROLS 015000 - 5
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
a. Provide hard-service cords where exposed to abrasion or traffic.
b. Provide waterproof connectors to connect separate lengths of electric cords where single lengths will not reach areas of construction activity.
c. Do not exceed safe length-voltage ratio.
4. Lamps and Light Fixtures: General service lamps of wattage required for adequate illumination.
a. Provide guard cages or tempered glass enclosures where exposed to breakage.
b. Provide exterior fixtures when exposed to moisture.
5. Heating Units: Temporary heating units that have been tested and labeled by UL, FM or another recognized trade association related to the type of fuel consumed.
B. Temporary Offices: A temporary space MAY be provided by GSA to the contractor at GSA’s discretion.
C. Temporary Offices for use by tenant: Prefabricated or mobile units, inclusive of but not limited to lockable entrances, ADA accessibility, operable windows, serviceable finishes, heating and air conditioning, electric power and lighting, and foundations adequate for the loads.
1. Power and data as required for the function of the tenant. Provide connections to nearest buildings as shown on the drawings.
2. Self-Contained Toilet Units: Temporary single-occupant toilet units of the chemical, aerated recirculation, or combustion type for use by construction personnel. Units shall be vented and enclosed with a glass-fiber-reinforced polyester shell or similar nonabsorbent material.
3. Fire Extinguishers: Hand-carried portable UL-rated fire extinguishers.
a. Comply with NFPA 10 and NFPA 241 for classification, extinguishing agent and size required by location and class of fire exposure.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Use qualified personnel for installation of temporary facilities.
B. Locate facilities where they will serve the project with minimum interference to performance of construction activities. Maintain, relocate and modify facilities as required for the duration of the performance of the Work.
3.2 TEMPORARY UTILITIES
A. Engage the appropriate local utility companies to install temporary services or connect to existing services. Where a utility company provides only part of a service, provide the remainder with matching and compatible materials and equipment in compliance with utility company recommendations. Coordinate interruptions and outages with GSA Building Manager and any affected stakeholders, provide adequate utility capacities, and obtain easements if necessary. At Substantial Completion, restore these facilities to condition existing before initial use.
1. Electric Power Service: Provide weatherproof grounded electric power service and distribution system of sufficient size, capacity and power characteristics for construction
TEMPORARY FACILITIES AND CONTROLS 015000 - 6
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed needs. Include meters, transformers, overload-protected disconnects, automatic ground-fault interrupters and main distribution switch gear.
2. Lighting: Install and operate temporary lighting that will fulfill security and protection requirements without operating the entire system. Provide lighting that provides adequate illumination for construction operations and traffic conditions.
a. Provide lighting for the Project identification signs.
b. Install and operate temporary lighting that fulfills security and protection requirements of GSA without operating entire system.
3. Heat and Cooling and Ventilation: Provide temporary heat and Cooling and ventilation required for the construction activities, including but not limited to curing or drying completed installations and protecting construction from adverse effects of low temperatures and high humidity. Use safe equipment that will not have a harmful effect on elements being installed and on completed installations. Coordinate ventilation requirements to produce the ambient condition required for the work and to minimize energy consumption, and to protect personnel from fumes and other harmful effects. Avoid storing any odor producing equipment or materials near fresh air intakes.
4. Heating Facilities: Provide vented self-contained heaters with individual space thermostatic control. Do not use gasoline-burning space heaters or other open flame devices.
5. Telephone Service: Minimally provide a separate telephone hard line for each temporary office and first-aid station, and provide a dedicated telephone hard line for a fax machine in the Contractor's field office.
6. Provide data/internet and/or WIFI service.
7. Water Service: Install temporary water service and distribution piping of sizes and pressures adequate for construction needs. Sterilize water piping prior to use.
8. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.
9. Sanitary Facilities: Provide for toilets, wash facilities and drinking water fixtures in compliance with regulations and health codes for type, number, location, operation and maintenance of fixtures and facilities. Provide toilet tissue, paper towels, paper cups and similar disposable materials as appropriate for each facility, and provide covered waste containers for used materials.
a. Toilets: Use of the Government's existing toilet facilities will be permitted for construction personnel only. Clean and maintain facilities in a condition acceptable to the Contracting Officer and, at completion of construction, restore facilities to condition prevalent at the time of initial use.
b. Public Use Temporary Toilets:
1) Install separate self-contained ABAAS-compliant toilet units for male and female personnel. Shield toilets to ensure privacy. A single trailer which contains multiple stations is the preferred approach to provide temporary public use restrooms.
2) Public use toilets shall be located in first bay of bus canopy.
3) Clean and maintain public use facilities in a condition acceptable to the
Contracting Officer and have collection tanks emptied at regular intervals to ensure continuous use by the public is uninterrupted.
4) Recommended temporary public restrooms is an ADA accessible trailer with at least two stations.
5) Provide all temporary facilities required for restroom use including:
a) Water (weather-proof water supply to ensure continued use throughout winter months)
b) Electric to be supplied from main bus terminal building via overhead cables to the bus canopy then connected to the restroom trailer.
TEMPORARY FACILITIES AND CONTROLS 015000 - 7
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
c) Sanitary is stored in a collection tank within the temporary restroom trailer and shall be emptied by contractor at a regular interval to ensure continuous operation of temporary restrooms.
d) Each temporary public restroom shall include: toilet, sink, soap dispenser, toilet paper dispenser, paper towel dispenser or electric hand dryer.
e) At least one temporary public restroom shall include a baby changing station.
c. Wash Facilities: Install wash facilities supplied with potable water at convenient locations for construction personnel involved in handling materials that require wash-up for a healthy and sanitary condition.
1) Dispose of drainage per regulations.
2) Supply cleaning compounds appropriate for each condition.
3) Include safety showers, eyewash fountains and similar facilities for the convenience, safety and sanitation of personnel.
10. Drinking Water Facilities: Provide drinking water fountains or containerized tap-dispenser bottled-drinking water units, complete with paper cup supplies for construction personnel.
Where power is accessible, provide electric water coolers to maintain dispensed water temperature at 50 to 60 degF (10 to 15 deg C).
B. Sewers and Drainage: If sewers are available, provide temporary connections to remove effluent that can be discharged lawfully. If sewers cannot be used, provide drainage ditches, dry wells, stabilization ponds and similar facilities. If neither sewers nor drainage facilities can be lawfully used for discharge of effluent, provide containers to remove and dispose of effluent off-site in a lawful manner.
C. Sewers and Drainage: Where sewers are available, provide temporary connections to remove effluent that can be discharged lawfully. If sewers are not available, provide containers to remove and dispose of effluent off-site in a lawful manner.
1. Filter out excessive amounts of soil, construction debris, chemicals, oils and similar contaminants that might clog sewers or pollute waterways.
2. Connect temporary sewers as directed by sewer utility officials.
3. Maintain temporary sewers and facilities in a clean, sanitary condition. Following heavy use, promptly restore sewers and facilities to normal conditions.
D. Storm Water Controls: Provide earthen embankments and similar barriers in and around excavations and subgrade construction, sufficient to prevent flooding by runoff of storm water from heavy rains.
E. Telephone: Provide a cellular phone for the Contractor’s Superintendent’s use. Distribute cellular phone number to Contracting Officer’s Representative and Field Office personnel during the pre-construction meeting. Contractor’s and subcontractor’s personnel are not permitted to use existing telephone system in the building
3.3 TEMPORARY SUPPORT FACILITIES
A. Locate field offices, storage sheds, sanitary facilities and other temporary construction and support facilities for easy access.
TEMPORARY FACILITIES AND CONTROLS 015000 - 8
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
B. Provide incombustible construction per ASTM E 136 for offices, shops and sheds located within the construction area or within 9 m (30') of building lines. Comply with . NFPA 241.
C. Storage Sheds and Fabrication Shops: Provide sheds and shops that are sized, furnished and equipped to accommodate materials and equipment involved. Include complete temporary utility services for intended use. Sheds and shops may be open shelters or fully enclosed spaces, as appropriate for protection of equipment and materials.
D. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress or completed, from exposure, inclement weather, other construction operations and similar conditions.
1. Where heat is needed and the building enclosure is not complete, provide temporary enclosures where there is no other provision for containment of heat. Coordinate enclosure with ventilating and material drying or curing requirements to avoid dangerous conditions or unacceptable effects to the materials.
2. Install tarpaulins securely with incombustible framing. Close openings of 25 sq. ft. (2.3 sq.
m.) or less with plywood or similar materials.
3. Close openings through floor or roof decks and other horizontal surfaces with load-bearing wood-framed construction.
4. Where enclosure exceeds 100 sq. ft. (9.2 sq. m) in plan area, use UL labeled fire-retardant-treated wood and plywood for framing and sheathing.
E. Temporary Cranes, Lifts and Hoists: Provide protection of facilities, personnel and landscaping for hoisting materials.
F. Existing Elevator Use: Use of GSA's existing freight or passenger elevators will be not be permitted unless approved by the GSA Building Manager. If allowed, elevators must be protected, cleaned and maintained in a condition acceptable to GSA. At Substantial Completion, restore elevators to condition existing before initial use, including replacing worn cables, guide shoes, and similar items of limited life. See Division 14.
1. Do not load elevators beyond their rated weight capacity.
2. Provide protective coverings, barriers, devices, signs, or other procedures to protect elevator car and entrance doors and frame. If, despite such protection, elevators become damaged, engage elevator Installer to restore damaged work so no evidence remains of correction work. Return items that cannot be refinished in field to the shop, make required repairs and refinish entire unit, or provide new units as required.
3. If required by local jurisdiction or union, provide temporary phones for elevators.
Coordinate with Elevator maintenance contractor and GSA Building Manager.
G. Temporary Use of Permanent Stairs: Use of new stairs for construction traffic will be permitted, provided stairs are protected and finishes restored to new condition at time of Substantial Completion. If permanent stairs are unavailable, provide temporary stairs where ladders are not adequate.
H. Collection and Disposal of Waste/Salvaged Material: Collect waste from construction areas and elsewhere daily. Collect salvaged/recycled material from construction areas and elsewhere as necessary. Enforce requirements strictly and dispose of material lawfully.
1. Comply with NFPA 241 for removal of combustible waste material and debris.
2. Do not hold waste materials more than 7 days during periods when the ambient temperature remains continuously less than 80F (27C), or more than 3 days when the temperature exceeds or is expected to rise above 80 (27C).
TEMPORARY FACILITIES AND CONTROLS 015000 - 9
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
3. Handle and properly containerize hazardous, dangerous or unsanitary waste materials separately from other waste.
4. Comply with Construction Waste Management and Disposal requirements in Section 017419.
I. Rodent and Pest Control: Retain a local exterminator or pest control company to recommend practices to minimize attraction and harboring of rodents, roaches and other pests. Employ this service to perform extermination and control procedures at regular intervals so the project will be free of pests and their residue at completion. Perform control operations lawfully, using environmentally safe materials. Segregate hazardous and unsanitary waste from other waste materials.
3.4 TEMPORARY PROTECTION FACILITIES
A. Temporary Facility Changeover: Except for using permanent fire protection facilities as soon as available, do not change over from temporary protection facilities until authorized by GSA.
B. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, stormwater, sanitary, waterway, and subsoil contamination or pollution or other undesirable effects. Restrict use of noise-making tools and equipment to hours that will minimize complaints from persons near the site. When working in or near existing facilities, provide dustproof enclosures for protection where dirty work is performed. Dampen debris when removed to avoid dusting.
1. Comply with work restrictions specified in Division 01 Section "Summary."
C. Temporary Fire Protection: Until fire protection needs are supplied by permanent facilities, install and maintain temporary fire protection measures and devices of types needed to protect against reasonably predictable and controlled fire losses.
1. Comply with NFPA 10 "Standard for Portable Fire Extinguishers" and NFPA 241 "Standard for Safeguarding Construction, Alterations, and Demolition Operations".
2. Locate fire extinguishers where convenient and effective for their intended purpose, but not less than one extinguisher at or near each access route exit or entrance, including stairwells on each floor.
3. Store combustible materials in containers in fire-safe locations.
4. Maintain unobstructed access to fire extinguishers, fire hydrants, temporary fire protection facilities and access routes. Prohibit smoking in hazardous fire-exposure areas.
5. Provide supervision of welding operations, combustion-type temporary heating units and other sources of fire ignition.
D. Permanent Fire Protection: At the earliest feasible date in each area of the Project, complete installation of the permanent fire protection facilities including connected services, and place into operation and use. Instruct key personnel in the use of the facilities.
E. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and the public of the hazard involved. Where appropriate and needed, provide lighting, including flashing red or amber lights.
F. Security Enclosure and Lockup: Install substantial temporary enclosure of partially completed areas of construction. Provide locking entrances to prevent unauthorized entrance, vandalism, theft and similar violations of security.
TEMPORARY FACILITIES AND CONTROLS 015000 - 10
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
1. Storage: Provide a secure lockup for valuable stored materials and equipment.
2. Enforce discipline in connection with the installation and release of material to minimize the opportunity for theft and vandalism.
3.5 MOISTURE CONTROL
A. Contractor's Moisture-Protection Plan: Avoid trapping water in finished work. Document visible signs of mold that may appear during construction. Remove and replace any materials contaminated by mold in accordance with applicable environmental procedures by EPA, OSHA or any other regulating authorities.
3.6 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. Limit availability of temporary facilities to essential uses to minimize waste and abuse.
B. Maintenance: Maintain facilities in good operating condition until removal. Protect from damage by freezing temperatures and similar elements.
1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis to avoid possibility of damage.
2. Protection: Prevent water-filled piping from freezing. Maintain markers for underground lines. Protect underground lines from damage during excavation operations.
C. Termination and Removal: Unless GSA requests that a temporary facility be maintained longer, each temporary facility shall be removed not later than at Substantial Completion when the need for its service has ended and can be replaced by use of a permanent facility. Complete, restore, and replace permanent construction that may have been delayed and damaged because of interference with the temporary facility.
1. Materials and facilities that constitute temporary facilities are the property of the Contractor, except the Government reserves the right to take possession of project identification signs.
2. Remove temporary paving not intended for or acceptable for integration into permanent paving. Where the area is intended for landscape development, remove soil and aggregate fill that do not comply with requirements for subsoil or fill in the area. Remove materials contaminated with road oil, asphalt and other petrochemical compounds, and other substances that might impair growth of plant materials or lawns. Repair or replace street paving, curbs, and sidewalks at temporary entrances, in accordance with the requirements of the governing authority.
3. Prior to project completion, replace, clean, and restore permanent facilities used during the construction period including, but not limited to, the following:
a. Replace air filters and clean inside of ductwork and housings.
b. Replace significantly worn parts and parts subject to unusual operating conditions.
c. Replace lamps burned out or noticeably dimmed by hours of use.
d. Comply with Division 01 Closeout Procedures.
END OF SECTION 015000
J
I
H
G
F
D
C
E
B
A
60.00
J
I
H
G
F
D
C
E
B
A
C x2
WP
T
60'-0"
T
W P
T
PC
WP
PC
NOTE:
1. TEMPORARY OFFICE LOCATION SHOWN IS SCHEMATIC AND SHALL BE FINALIZED BY CONTRACTOR IN COORDINATION WITH GSA AND TENANT.
2. ALL NECESSARY TEMPORARY UTILITIES (POWER, DATA, ETC.) CONNECTIONS SHALL BE PROVIDED BY THE CONTRACTOR TO THE TEMPORARY OFFICE SPACE.
EXACT ROUTING SHALL BE FIELD COORDINATED, BUT SHALL BE WEATHER TIGHT, AND SHALL BE OVERHEAD (PROVIDE DOT COMPLIANT CLEARANCE FOR
BUSSES AND TRUCKS) BACK TO THE MAIN BUILDING. SCHEMATIC ROUTING IS SHOWN.
INTERIOR CONNECTION
POINT (POWER IN RM A128
/DATA & VOICE IN RM A163),
SEE MEP DRAWINGS
SCHEMATIC
UTILITY ROUTING
TEMPORARY PAVING IN MEDIAN TO
EXISTING SIDEWALK. RESTORE
LANDSCAPING UPON TRAILER REMOVAL
TEMPORARY PAVING IN MEDIAN TO
EXISTING CURB. RESTORE
LANDSCAPING UPON TRAILER REMOVAL
TEMPORARY PAVING AT CURB TO
CREATE RAMP. RESTORE ROADWAY
UPON TRAILER REMOVAL
GC TO CLOSE BUS LANE FOR
DURATION OF CONSTRUCTION
TEMPORARY BUS LANE &
DROP OFF
TYPICAL EXISTING
LIGHT POLE
AREA OF INTERIOR RENOVATION.
SEE SHEET AD101 FOR INTERIOR
PHASING
NOTE:
1. CONTRACTOR SHALL PROVIDE TEMPORARY OFFICE SPACE FOR TENANT ONGOING OPERATIONS DURING THE DURATION OF THE CONSTRUCTION.
2. TEMPORARY OFFICE SPACE SHALL INCLUDE, BUT IS NOT LIMITED TO, HVAC SYSTEMS, LIGHTING, POWER, IT INFRASTRUCTURE (COORDINATED W/ CBP OIT), AND TELEPHONE. CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY WIRING CONNECTIONS TO THE EXISTING INFRASTRUCTURE.
3. CONTRACTOR SHALL PROVIDED A MINIMUM OF (2) ADA COMPLIANT PORTABLE TOILETS ADJACENT TO THE TEMPORARY OFFICE SPACE.
4. FINAL LOCATION OF TEMPORARY OFFICE TRAILERS IS TO BE COORDINATED WITH CPB OPERATIONS AND GSA MANAGEMENT.
5. PROVIDE TEMPORARY ADA RAMPS TO ENTRY/ EXIT DOORWAYS.
G.C. TO PROVIDE WORKSTATION
ALONG WITH TRAILER.
COORDINATE WITH CBP ON FINAL
REQUIREMENTS, TYP OF 14
WORKSTATIONS.
5' - 0"
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDING SERVICE
PROPERTY MANAGEMENT DIVISION
UPSTATE NY SERVICE CENTER
RENOVATION
SCOTT ST. JOSEPH
SHEET SIZE: 30 X 42
DRAWING NO.
CHECKED BY
DRAWN BY
FLOOR NO.
FILE NAME
DRAWING TITLE
SUB. DATE
SUBMISSION
GSA PM
PROJECT NO.
PROJECT
DESCRIPTION
PROJECT
TITLE
FACILITY CODE
OTHER
BUILDING NOs.
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
CONSTR. FIRM
SUB A/E
PRIME A/E
A/E CON. NO.
D R
A W
IN
G
P R
O J E
C T
B U
IL
D
IN
G
C O
N T
R A
C T
O R
S G
R A
P H
IC
S C
A L
E R
E V
IS
IO
N N
O T
E S
C E
R T
IF
IC
A T
IO
N
S
MARK DATE DESCRIPTION
SHEET OF
NK BHANDARI ARCHITECTURE
RAM TECH ENGINEERS
GSA# GS-07-P-16-UC-D-7008
CHAMPLAIN LPOE
237 W. SERVICE ROAD
CHAMPLAIN, NY 12919
NY0390CB
K E
Y P
L A
N
SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
Syracuse, NY Buffalo, NY Philadelphia, PA www. ramtechengineers.com
RAM-TECH
RAM-TECH Engineers
E N G I N E E R S phone: 315-463-7716 fax: 315-463-7758 of Syracuse, P.C.
DATE:
1 2 3 4 5 6
E
D
C
B
A
1 2 3 4 5 6
SUB A/E
CONSTR. CON. -
NYS EDUCATION LAW, SECTION 7209 AND 69.5(B)
PROHIBITS ANY PERSON TO ALTER THESE DRAWINGS
OTHER THAN A LICENSED ARCHITECT OR THE DESIGN
ENGINEER. INFORMATION ON THESE DRAWINGS FOR
GSA ONLY, AND CAN BE UTILIZED BY GSA AS THEY
DEEM NECESSARY.
COPYRIGHT 2019
N. K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C.
1005 W. Fayette Street, Suite 500 Syracuse, NY 13204
Phone Fax www.nkbpc.com
315.428.1177 315.428.9822
C:\Users\JLH\Desktop\R17_GSA Champ Bus_Central_jlh_May 2019.rvt
/2
/2
:1
:5
A
M
PHASING PLAN & NOTES
CHAMPLAIN PASSENGER
ADMIN. AREA MODIFICATIONS
ADC
KRS 08/16/2019
RWA N1074462
08/16/2019
4 26
FINAL CONSTRUCTION DOCS.
A-003
1/32" = 1'-0"--301A A-003
2 SITE PLAN - PHASING
1/4" = 1'-0"A-003
1 PHASING PLAN - TEMPORARY TRAILERS
CONTRACTOR TO PROVIDE ACCESSIBLE TEMPORARY
2-STATION PUBLIC RESTROOM. CONTRACTOR TO
PROVIDE TEMPORARY WATER AND ELECTRIC
CONNECTION FROM EXISTING BUS TERMINAL TO
TEMPORARY RESTROOMS FOR DURATION OF
CONSTRUCTION. PROVIDE WASTE REMOVAL
SERVICES FROM TEMPORARY RESTROOMS AT AN
INTERVAL WHICH ENSURES CONTINUOUS
OPERATION OF RESTROOMS.
ADD-101
07/07/2020
TOM LUCAS
1 1