This document is a Scope of Work Outline for a state and local construction project in Michigan. The project, titled "Parnall Vocational Heavy Diesel" (Project # 472/22019.SMD), involves the addition of truck bays to Building 30, renovation of Building 30, and related site work and infrastructure improvements at the Parnall Correctional Facility in Jackson County. The project consists of various elements, including demolition, new construction, mechanical and plumbing work, electrical upgrades, and technology improvements. The Scope of Work outlines the specific items, quantities, and estimated costs for these project components.

The total estimated construction cost is provided, along with additional fees for the project, including a 4% DTMB Fee and an 8% Contingency. Pricing details are not included in this document; however, this project is part of a larger state and local contract opportunity (Contract # 472/22091.SMD) that is seeking a Construction Manager for the Parnall CF - New Heavy Diesel Program. The contract opportunity involves work in Jackson County, Michigan.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 12/15/2022

Project: 472/22019.SMD - Parnall Vocational Heavy Diesel

Item # Description Units Quantity Unit Cost Extended Cost

Addition of truck bays to Building 30

Renovation of Building 30

Fencing Renovations

Fence costs Allowance 1

Demo of old sallyport and installation of new gate slider Allowance 1

Subtotal $0

Site

Demolition of existing structures (buildings, docks, etc.) Allowance 1

Soil Overexcavation TBD

6" FP / Domestic Water line LF 170

6" valve EA 1

Fire Hydrant Assembly EA 1

Storm catch basins (water quality unit) and piping Allowance 1

Sanitary sewer LF 207

Oil/Water Separator EA 1

Concrete paving SFT 3,500

Aggregate Base CYD 1,800

HMA Paving Ton 387

Restoration - topsoil & seed Allowance 1

Misc site (bollards, signage) EA 10

Grading Allowance 1

Subtotal $0

Structural / Architectural

New Construction 24' High Bay SF 4,533

New Construction 15' Connection / Tool Room SF 1,030

New/Reno Interior SF 12,872

Unassigned area floor seal and paint SF 0

Demolition of Existing Interiors Building 30 SF 12,872

New Roof Existing Building SF 12,360

Subtotal $0

Mechanical / Plumbing

Parnall Vocational Heavy Diesel

Budget Scope Outline

472.22019.SMD - Parnall Heavy Diesel Budget Scope Outline - 2022 1215

Date: 12/15/2022

Project: 472/22019.SMD - Parnall Vocational Heavy Diesel

Item # Description Units Quantity Unit Cost Extended Cost

Parnall Vocational Heavy Diesel

Budget Scope Outline

Mechanical (AHUs, ducts and accessories, terminal boxes, exhaust fans)

SF 17,924

Plumbing (piping, fixtures, water heater, water softener) SF 17,924

Fire Protection (new system and new service) SF 17,924

Subtotal $0

Electrical

Power/Lighting (New Service, New Lighting, Upgrade) SF 17,924

Fire Alarm (New System and New Service) SF 17,924

Fiber service SF 17,924

Subtotal $0

Technology

Cameras Allowance

Audio / Visual Allowance

Personal Protection Devices Allowance

Fence detection Allowance

Subtotal $0

Construction Subtotal $0

Contractor General Conditions $0

Contractor Estimate $0

Contingency (8% of Construction Budget) 8% $0

PSC Fee * Includes Design and Construction Administration

Services

Sub-Total $0

DTMB Fee 4% $0

Demolition and Rebuild Total $0

Owner Cost

Owner equipment (Furniture, Monitors, etc.)

472.22019.SMD - Parnall Heavy Diesel Budget Scope Outline - 2022 1215