472.22019.SMD Parnall CF VV - New Diesel Mechanic Program - 50% Design Development A Drawings.pdf

PDF 5 MB Posted

Attached to
472/22091. SMD; Parnall CF - New Heavy Diesel Program (CM)
Solicitation number
RFP - 171 - 230000000652
Issued by
Jackson County, Michigan

About this file

This document contains architectural design drawings and specifications for the new Diesel Mechanics Program at the Parnall Correctional Facility in Jackson, Michigan. The project is being managed by the Design and Construction Division of the Department of Technology, Management, and Budget for the State of Michigan. The drawings provide details on the demolition, construction, and layout of the new diesel mechanics training facility, including classrooms, labs, tool cribs, offices, and support spaces. The project will involve renovations and additions to an existing building on the Parnall Correctional Facility campus.

The related state and local contract opportunity is for a Construction Manager (CM) to oversee the construction of the new Diesel Mechanics Program facility. The contract opportunity is open to qualified firms to provide construction management services. The solicitation details were not provided in the documentation reviewed, but typical requirements for a CM contract of this nature would likely include project scheduling, cost estimating, subcontractor management, quality control, and coordination with the design team and facility operators.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T T

T

T

T

T

T

T

T

T

7654321

B

C

A-300

A-300

A-300

AD101

2 2

33 3

14 3

15 15

7 7 7 7

14 3

7654321

B

C

A-301

A

A-301

D

A-301

B

A-301

C

AD101

FIRST FLOOR

100' - 0"

FIRST FLOOR

100' - 0"

B C

MECH. MEZZANINE

108' - 4"

MECH. MEZZANINE

108' - 4"

A-311 B C

FIRST FLOOR

100' - 0"

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

REVIE

W

DRAW

IN

G

NOT FOR

CONSTRUCTIO

N

PLOT D

ATE: 1

1-18-2022

M a t r ix C

O N

S U

L T

IN

G E

N G

IN

E E R

S

IN

C

F A

X (5

-2

P H

O N

E (5

-2

L A

N S

IN

G

M

I

E

C

E S

A R

E

W E

B w w w

.m a tr ix c e in c .c o m

S H E E T N U M B E R file no.

funding code contractor order no.

consultant job no.

472/22019.SMD

472/MaintProj sheet description consult drawn checked issue

M A

T R

IX

P

R O

J E

C T

/7

/2

:2

:2 P

M A u to d e sk D o cs

/D

T M

B P

A R

N A

L L D

IE

S

E L B

L D

G /2

B

L D

G

A

R C

H .r vt

Approver

Author

P A

R N

A L L C

O R

R E C

T

IO

N A

L F

A C

IL

IT

Y

N E W

D

IE

S E L M

E C

H A

N

IC

S P

R O

G R

A M

E

P A

R N

A L L R

D

JA

C

K S O

N M

IC

H

IG

A

N

AD101

22-167.00

-1

.0

FIRST FLOOR

DEMOLITION PLAN

1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN

KEYED NOTES - DEMOLITION

1 REMOVE EXISTING MASONRY WALL(S) SHOWN DASHED.

2 REMOVE EXISTING STUD WALL AND RELATED DOORS ETC. AS SHOWN.

3 REMOVE PORTION OF EXISTING WALL FOR NEW OPENING - COORDINATE DIMENSIONS

AND LOCATION WITH NEW WORK.

4 REMOVE EXISTING POLE BARN STRUCTURE IN ITS ENTIRETY.

5 REMOVE EXISTING BLOCK SHED AND RELATED SECURITY FENCING IN ITS ENTIRETY.

6 REMOVE EXISTING STEEL FRAMED CANOPY STRUCTURE IN ITS ENTIRETY.

7 REMOVE EXISTING CEILING IN ITS ENTIRETY INCLUDING ALL ADJACENT METAL STUD &

GYP. BD. BULKHEADS

8 REMOVE CASEWORK AND RELATED APPLIANCES / PLUMBING. CAP SANITARY BELOW

SLAB. REMOVE PLUMBING SUPPLY BACK TO AND INCLUDING MAIN IF NO LONGER

USED.

9 REMOVE EXISTING STEEL FENCING / CAGE / GATE INCLUDING ALL SHELVING &

SECUREMENTS TO ADJACENT STRUCTURE.

10 REMOVE EXISTING OVERHEAD SECTIONAL DOOR INCLUDING ALL RELATED HANGERS,

WEATHERSTRIPING AND OPERATORS. PREP. HEAD AND JAMBS AS REQUIRED FOR NEW

WORK.

11 REMOVE EXISTING STEEL SHIP LADDER ASSEMBLY AND ANY RELATED SECUREMENTS

TO WALLS & FLOORS THAT REMAIN.

12 REMOVE EXISTING SLAB (SHOWN AS DIAGONAL HATCH) AND UNDERGROUND SANITARY

PIPING RELATED TO PLUMBING FIXTURES TO BE DEMO'D AS SHOWN DASHED.

COORDINATE WITH NEW UNDERGROUND PLUMBING FOR ADDITIONAL CUTTING &

REMOVING THAT WILL BE REQUIRED.

13 REMOVE EXISTING ABANDON HYDRONIC PIPING TO BELOW GRADE. FILL EXISTING PIT

WITH ENGINEERED FILL. PLACE 4" CONCRETE SLAB DOWELED INTO EXISTING.

14 REMOVE EXISTING DOOR, FRAME AND ALL RELATED HARDWARE INCLUDING

ELECTRONIC DEVICES.

15 REMOVE EXISTING 3/4" PLYWOOD FROM FACE OF CMU. FILL ANY FASTENER HOLES

AND PREP FOR PAINT.

16 REMOVE PAINT FROM GLASS ON WINDOWS.

17 REMOVE EXISTING DEPRESSED CONCRETE TRUCK DOCK AND RELATED CONCRETE

PADS / RAMPS IN ITS ENTIRETY.

18 REMOVE ENTIRETY OF EXISTING METAL ROOF (APPROX. 12,100 S.F.) AND RELATED

INSULATION, FASCIA AND GUTTERS AND PREP FOR NEW INSTALLATION.

19 REMOVE EXISTING FLOOR COVERING AND ADHESIVES. PREP FOR NEW WORK.

20 REMOVE EXISTING STAINLESS STEEL KITCHEN EQUIPMENT STYLE SINK AND RETAIN FOR

REINSTALLATION. REFER TO PLUMBING DRAWINGS FOR NEW FAUCET ETC.

21 REMOVE EXISTING STEEL SHIP LADDER ASSEMBLY AND ANY RELATED SECUREMENTS

TO WALLS & FLOORS THAT REMAIN. SAVE LADDER ASSEMBLY FOR REINSTALLATION.

22 REMOVE EXISTING ALUMINUM FRAMED WINDOW.

23 REMOVE ENTIRETY OF EXISTING RUBBER ROOFING (APPROX. 400 S.F.) AND RELATED

PLYWOOD DECKING, 2x RAFTERS AND INSULATION FOR INSTALLATION OF NEW.

1/4" = 1'-0"AD101

2 DEMOLITION SECTION

PHASE 300 09/09/2022

1/4" = 1'-0"AD101

3 DEMOLITION SECTION

T

T

T

T

T

C

T

T T

T

T C

T

T

7654321

B

C

A-311

A-311

A-421

A

A

D

A-311

A-311

6' - 8" 14' - 0" 6' - 0" 14' - 0" 6' - 0" 14' - 0" 6' - 8" 1' - 6"

1' - 4" 20' - 4" 67' - 4"

7' - 4" 6' - 4" 6' - 8" 6' - 8" 3' - 4" 36' - 8" 14' - 0" 6' - 8"

20' - 4" 67' - 4"

TOOL CRIB

HEAVY DIESEL

LAB

HEAVY DIESEL

CLASSROOM

CDL

CLASSROOM

MULTIPURPOSE

CORRIDOR

STAFF OFFICES

AUTO SHOP

MAIN ENTRY

102 TRUCK BAYS

COMPRESSOR

RM

J.C.

CORRIDOR

INMATE

TOILETS

AUTO TOOL

CRIB

AUTO

CLASSROOM

ELECTRICAL

CLOSET

WATER SERV.

RM.

TECH CLOS.

7654321

B

C

VEST. / COAT

ROOM

106B

105B

105A

MEZZ ACCESS

B

A

B

110C

5' - 7"

CORRIDOR

CORRIDOR

STAFF TOILETS

FURN. CLOS.

110.1

A-301

A

A-301

D

A-301

B

A-301

C

1' - 4"

3' - 4" 3' - 4" 8' - 8" 5' - 4" 8' - 8" 3' - 4" 3' - 4"

1' - 4"

1K

1G

1G

1K

2G

1G1G

1G

2G

2G

104A 104B 104C

104E

104D

F

115A

B

124C

124A

B

112B

112A

B

A

107A

107B

FURN. CLOS.

9' - 6"

1G

1K

1G

6' - 10"

1G

1G

1G1G

RELOCATED ALIGNMENT RACK

RELOCATED

CAR LIFT

A-311

A-311

A-321

SIM

A-321

SIM

F.E.

F.E.

F.E.

F.E.

F.E.

F.E.

F.E.F.E.

F.E.

FURN. CLOS.

108.1

(10) ROLLING

TOOL CHESTS

SHADOW BOARDS

(2) TALL LOCKABLE TOOL

STORAGE CABINETS

STEEL TOP

INVENTORY

TABLE

TIRE CHANGING

STATION

RELOCATED

CAR LIFT

(8) ENGINE STANDS

(1) TALL LOCKABLE TOOL

STORAGE CABINETS

SPRING

COMPRESSOR

WELDING

STATION

ELECTRICAL

DIAGNOSTICS

STATIONS

COAT

HOOKS

(3) TALL LOCKABLE TOOL

STORAGE CABINETS

BRAKE

LATHE

BRAKE

DRUM

CART

DIFFERENTIAL

REBUILDING

(2) WORK BENCHES

(1) TALL

LOCKABLE TOOL

STORAGE

CABINET

(5) ROLLING

TOOL CHESTS

STEEL TOP

INVENTORY

TABLE

SHADOW

BOARDS

CDL SIMULATOR

48" HIGH, 3 5/8" STUD KNEE WALL.

12' - 0" 6" 19' - 8" 6"

6" STUD WALL FOR CONDUIT

RUNS FROM ABOVE. SECURE TO

STRUCTURE ABOVE CEILING.

PRINTER

CABINET

(1) TALL LOCKABLE

STORAGE CABINET

6' MARKER

BOARD

4' TACK

BOARD

12' MARKER

BOARD

12' MARKER

BOARD

12' MARKER

BOARD

(2) TALL LOCKABLE TOOL

STORAGE CABINETS

TRUCK LIFTS

(WHEEL TYPE)

TIRE CHANGING

MACHINE

WELDING

STATION

BRAKE

ROTOR

LIFT

OXY / ACET.

TORCHES

TIRE BALANCER

MACHINE

REFERIGERENT

RECOVERY /

CHARGING

STATION

PARTS

WASHER

LAPTOP

COMPUTER

CHARGING

STATION

TECH WORK /

DIAGNOSTICS

STATIONS

TECH WORK /

DIAGNOSTICS

STATIONS

1' - 4" 4' - 8"

1' - 4"

6' - 4"

1' - 4"

4' - 8"

1' - 4 3/8"

EXT. CORNERS OF DCMU TO

BE SQUARE - TYPICAL U.N.O.

INT. CORNERS OF CMU TO BE

BULLNOSE - TYPICAL U.N.O.

AT O.H. DOORS THE INTERIOR

CORNERS OF CMU TO BE

SQUARE FOR WEATHER SEAL

AND DOOR TRACK ASSEMBLY

SECUREMENT.

(1) TALL

LOCKABLE

STORAGE

CABINETS

1G 1K1G

TIRE

BALANCER

EMERGENCY

EYE WASH

HAND SINK

DIESEL

ENGINE

STAND

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

G

NOT FOR

CONSTRUCTIO

N

PLOT D

ATE: 1

1-18-2022

M a t r ix C

O N

S U

L T

IN

G E

N G

IN

E E R

S

IN

C

F A

X (5

-2

P H

O N

E (5

-2

L A

N S

IN

G

M

I

E

C

E S

A R

E

W E

B w w w

.m a tr ix c e in c .c o m

S H E E T N U M B E R file no.

funding code contractor order no.

consultant job no.

472/22019.SMD

472/MaintProj sheet description consult drawn checked issue

M A

T R

IX

P

R O

J E

C T

/1

/2

:2 :2

A

M A u to d e sk D o cs

/D

T M

B P

A R

N A

L L D

IE

S

E L B

L D

G /2

B

L D

G

A

R C

H .r vt

Approver

Author

P A

R N

A L L C

O R

R E C

T

IO

N A

L F

A C

IL

IT

Y

N E W

D

IE

S E L M

E C

H A

N

IC

S P

R O

G R

A M

E

P A

R N

A L L R

D

JA

C

K S O

N M

IC

H

IG

A

N

A-101

22-167.00

-1

.0

FIRST FLOOR PLAN

1/8" = 1'-0"

FIRST FLOOR PLAN

kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle kendra.daniel Rectangle

A-311

A-311

A-311

67' - 4"

6' - 8" 14' - 0" 6' - 0" 14' - 0" 6' - 0" 14' - 0" 6' - 8"

6' - 8" 14' - 0" 6' - 0" 14' - 0" 6' - 0" 14' - 0" 6' - 8"

A-301

D

A-301

C

A-311

B

C

AD101

A-311

B

C

F.E.

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

G

NOT FOR

CONSTRUCTIO

N

PLOT D

ATE: 1

1-18-2022

M a t r ix C

O N

S U

L T

IN

G E

N G

IN

E E R

S

IN

C

F A

X (5

-2

P H

O N

E (5

-2

L A

N S

IN

G

M

I

E

C

E S

A R

E

W E

B w w w

.m a tr ix c e in c .c o m

S H E E T N U M B E R file no.

funding code contractor order no.

consultant job no.

472/22019.SMD

472/MaintProj sheet description consult drawn checked issue

M A

T R

IX

P

R O

J E

C T

/7

/2

:2

:1 P

M A u to d e sk D o cs

/D

T M

B P

A R

N A

L L D

IE

S

E L B

L D

G /2

B

L D

G

A

R C

H .r vt

Approver

Author

P A

R N

A L L C

O R

R E C

T

IO

N A

L F

A C

IL

IT

Y

N E W

D

IE

S E L M

E C

H A

N

IC

S P

R O

G R

A M

E

P A

R N

A L L R

D

JA

C

K S O

N M

IC

H

IG

A

N

A-102

22-167.00

-1

.0

MEZZANINE AND

CLERESTORY

PLANS

1/8" = 1'-0"

CLERESTORY PLAN

1/8" = 1'-0"

MEZZANINE FLOOR PLAN

7654321

B

C

A-300

A-300

A-300

A-311

AD101

A-311

A-311

A-311

7654321

B

C

A-301

A

A-301

D

A-301

B

A-301

C

AD101 5

A-311

A-311

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

G

NOT FOR

CONSTRUCTIO

N

PLOT D

ATE: 1

1-18-2022

M a t r ix C

O N

S U

L T

IN

G E

N G

IN

E E R

S

IN

C

F A

X (5

-2

P H

O N

E (5

-2

L A

N S

IN

G

M

I

E

C

E S

A R

E

W E

B w w w

.m a tr ix c e in c .c o m

S H E E T N U M B E R file no.

funding code contractor order no.

consultant job no.

472/22019.SMD

472/MaintProj sheet description consult drawn checked issue

M A

T R

IX

P

R O

J E

C T

/7

/2

:2

:3 P

M A u to d e sk D o cs

/D

T M

B P

A R

N A

L L D

IE

S

E L B

L D

G /2

B

L D

G

A

R C

H .r vt

Approver

Author

P A

R N

A L L C

O R

R E C

T

IO

N A

L F

A C

IL

IT

Y

N E W

D

IE

S E L M

E C

H A

N

IC

S P

R O

G R

A M

E

P A

R N

A L L R

D

JA

C

K S O

N M

IC

H

IG

A

N

A-103

22-167.00

-1

.0

ROOF PLAN

1/8" = 1'-0"A-103

1 ROOF PLAN

TO

GYPSUM BOARD

LAY-IN ACOUSTICAL TILE GRID

OR LIGHTING - REFER TO ELECTRICAL LIGHTING PLAN

MECHANICAL - REFER TO MECHANICAL SHEET METAL PLAN

REFLECTED CEILING KEY

PLASTER CEILING

TECTUM CEILING

WOOD CEILING

"K-13" SPRAY APPLIED INSULATION

GENERAL NOTES - REFLECTED CEILINGS

1. WHERE CEILING TILE IS LESS THAN 3" AT PERIMETER OF ROOM PROVIDE A CUT 2x4

TILE IN LIEU OF FULL 2x2 TILE AND SMALL PIECE OF TILE OR DOUBLE GRID - MATCH

2x2 FOR STYLE AND COLOR.

2. AT AREAS OF EXPOSED CEILING PAINT ALL STRUCTURE, DUCTWORK, PIPING, CONDUIT,

HANGERS ETC., COORDINATE WITH MECHANICAL, ELECTRICAL AND PLUMBING

SPECIFICATIONS. REFER TO THE REFLECTED CEILING PLANS FOR PAINT COLORS.

7654321

B

C

/4

A-300

A-300

A-300

A-311

AD101

A-311

A-311

A-311

7654321

B

C

A-301

A

A-301

D

A-301

B

A-301

C

AD101

A-311

A-311

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

G

NOT FOR

CONSTRUCTIO

N

PLOT D

ATE: 1

1-18-2022

M a t r ix C

O N

S U

L T

IN

G E

N G

IN

E E R

S

IN

C

F A

X (5

-2

P H

O N

E (5

-2

L A

N S

IN

G

M

I

E

C

E S

A R

E

W E

B w w w

.m a tr ix c e in c .c o m

S H E E T N U M B E R file no.

funding code contractor order no.

consultant job no.

472/22019.SMD

472/MaintProj sheet description consult drawn checked issue

M A

T R

IX

P

R O

J E

C T

/7

/2

:2

:4 P

M A u to d e sk D o cs

/D

T M

B P

A R

N A

L L D

IE

S

E L B

L D

G /2

B

L D

G

A

R C

H .r vt

Approver

Author

P A

R N

A L L C

O R

R E C

T

IO

N A

L F

A C

IL

IT

Y

N E W

D

IE

S E L M

E C

H A

N

IC

S P

R O

G R

A M

E

P A

R N

A L L R

D

JA

C

K S O

N M

IC

H

IG

A

N

A-201

22-167.00

-1

.0

FIRST FLOOR

REFLECTED

CEILING PLAN

FIRST FLOOR REFLECTED CEILING PLAN

DCMU 1

COLOR: SADDLE (DARK BROWN)

MANUF: CONSUMERS CONCRETE

EXTERIOR ELEVATION KEY

CMU-EXIST: TO BE PAINTED - MATCH DCMU 1

CJ = CONTROL JOINT, COLOR:

EJ - BUILDING EXPANSION JOINT, COLOR:

DCMU 2

COLOR: SESAME (LIGHT BROWN)

MANUF: CONSUMERS CONCRETE

CMU-EXIST: TO BE PAINTED - MATCH DCMU 2

FIRST FLOOR

100' - 0"

B C

T.O. WALL

127' - 4"

A-311

B C

PAINT EX. CMU TO MATCH NEW DCMU 2.

PAINT EX. CMU TO MATCH

NEW DCMU 1.

INSULATED GLASS IN ANOD. ALUM.

STOREFRONT FRAMING SYSTEM.

PROVIDE NEW ROOF, ROOF INSULATION

AND FASCIAS ON EXISTING BUILDING.

PROVIDE NEW GUTTERS AND

DOWNSPOUTS ON EXISTING BUILDING.

FIRST FLOOR

100' - 0"

7 6 5 4 3 2 1

CLERESTORY WINDOW

121' - 0"

A-311

AD101

A-311

T.O. WALL

127' - 4"

A-311

7 6 5 4 3 2 1

AD101

A-311

A-311

FIRST FLOOR

100' - 0"

7654321

CLERESTORY WINDOW

121' - 0"

A-311

AD101

A-311

T.O. WALL

127' - 4"

A-311

7654321

AD101

A-311

A-311

INSULATED GLAZING IN THERMALLY

BROKEN STOREFRONT FRAMING SYSTEM.

METAL ROOF SYSTEM.

1/2

BUILDING IDENTIFICATION SIGN TO REMAIN.

NEW METAL ROOF, ROOF INSULATION,

GUTTERS AND DOWNSPOUTS.

FIRST FLOOR

100' - 0"

BC

T.O. WALL

127' - 4"

A-311

BC

DCMU 1

DCMU 2

PAINT EX. O.H. SECTIONAL

DOOR TO MATCH NEW DARK

BRONZE ANOD. ALUM. DOORS.

PAINT EX. CMU WALL TO MATCH

NEW DCMU 2.

PAINT EX. CMU WALL TO MATCH

NEW DCMU 1.

PAINT EX. CMU WALL TO MATCH

NEW DCMU 1.

CONC. FILLED PIPE BOLLARD.

PAINT OSHA YELLOW.

GUTTERS AND DOWNSPOUTS

TO TIE-INTO STORM SEWER.

PROVIDE NEW GUTTERS AND

DOWNSPOUTS ON EXISTING BUILDING.

PROVIDE NEW ROOF, ROOF INSULATION

AND FASCIAS ON EXISTING BUILDING.

TOOTH-IN CMU INFILL

AT REMOVED DOOR TO

MATCH ADJACENT.

PAINT EX. HOLLOW METAL DOOR AND

FRAME TO MATCH NEW DARK BRONZE

ANOD. DOORS AND FRAMES.

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

G

NOT FOR

CONSTRUCTIO

N

PLOT D

ATE: 1

1-18-2022

M a t r ix C

O N

S U

L T

IN

G E

N G

IN

E E R

S

IN

C

F A

X (5

-2

P H

O N

E (5

-2

L A

N S

IN

G

M

I

E

C

E S

A R

E

W E

B w w w

.m a tr ix c e in c .c o m

S H E E T N U M B E R file no.

funding code contractor order no.

consultant job no.

472/22019.SMD

472/MaintProj sheet description consult drawn checked issue

M A

T R

IX

P

R O

J E

C T

/1

/2

:0 :3

P

M A u to d e sk D o cs

/D

T M

B P

A R

N A

L L D

IE

S

E L B

L D

G /2

B

L D

G

A

R C

H .r vt

Approver

Author

P A

R N

A L L C

O R

R E C

T

IO

N A

L F

A C

IL

IT

Y

N E W

D

IE

S E L M

E C

H A

N

IC

S P

R O

G R

A M

E

P A

R N

A L L R

D

JA

C

K S O

N M

IC

H

IG

A

N

A-301

22-167.00

-1

.0

EXTERIOR

ELEVATIONS

1/8" = 1'-0"A-301

A EXTERIOR ELEVATION LOOKING EAST

1/8" = 1'-0"A-301

D EXTERIOR ELEVATION LOOKING SOUTH

1/8" = 1'-0"A-301

B EXTERIOR ELEVATION LOOKING NORTH

1/8" = 1'-0"A-301

C EXTERIOR ELEVATION LOOKING WEST

FIRST FLOOR

100' - 0"

CLERESTORY WINDOW

121' - 0"

MECH. MEZZANINE

108' - 4"

T.O. WALL

128' - 8"

A-311

TRUCK BAYS

A-321

FIRST FLOOR

100' - 0"

7654321

CLERESTORY WINDOW

121' - 0"

A-311

A-311

T.O. WALL

128' - 8"

A-311

JOIST BRG.

TOOL CRIB

TRUCK BAYS

HEAVY DIESEL

LAB

HEAVY DIESEL

CLASSROOM

125' - 4"

A-321

7654321

A-321

A-311

A-311

FIRST FLOOR

100' - 0"

BC

MECH. MEZZANINE

108' - 4"

A-311

HEAVY DIESEL

CLASSROOM

CORRIDOR

AUTO SHOP

BC

A-321

RELOCATED

CAR LIFT IN

FOREGROUND.

FIRST FLOOR

100' - 0"

T.O. WALL

128' - 8"

A-311

FIRST FLOOR

100' - 0"

B

A-311

B

COMPRESSOR

RM

HEAVY DIESEL

LAB

CORRIDOR

FIRST FLOOR

100' - 0"

B

MECH. MEZZANINE

108' - 4"

A-311

B

TOOL CRIB

MAIN ENTRY

VEST. / COAT

ROOM

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

G

NOT FOR

CONSTRUCTIO

N

PLOT D

ATE: 1

1-18-2022

M a t r ix C

O N

S U

L T

IN

G E

N G

IN

E E R

S

IN

C

F A

X (5

-2

P H

O N

E (5

-2

L A

N S

IN

G

M

I

E

C

E S

A R

E

W E

B w w w

.m a tr ix c e in c .c o m

S H E E T N U M B E R file no.

funding code contractor order no.

consultant job no.

472/22019.SMD

472/MaintProj sheet description consult drawn checked issue

M A

T R

IX

P

R O

J E

C T

/7

/2

:2

:4 P

M A u to d e sk D o cs

/D

T M

B P

A R

N A

L L D

IE

S

E L B

L D

G /2

B

L D

G

A

R C

H .r vt

Approver

Author

P A

R N

A L L C

O R

R E C

T

IO

N A

L F

A C

IL

IT

Y

N E W

D

IE

S E L M

E C

H A

N

IC

S P

R O

G R

A M

E

P A

R N

A L L R

D

JA

C

K S O

N M

IC

H

IG

A

N

A-311

22-167.00

-1

.0

BUILDING

SECTIONS

1/8" = 1'-0"A-311

3 TRUCK BAY LOOKING WEST

1/8" = 1'-0"A-311

1 TRUCK BAY LOOKING NORTH

1/8" = 1'-0"A-311

2 SECTION THROUGH EXISTING BUILDING

1/8" = 1'-0"A-311

6 CONNECTOR AREA LOOKING EAST AT TRUCK BAY

1/8" = 1'-0"A-311

5 SECTION THROUGH COMPRESSOR ROOM

1/8" = 1'-0"A-311

4 CONNECTOR AREA LOOKING WEST AT EXISTING

S E A T

124' - 0"

JOIST BRG.

/8

2 4

2' - 0"

124' - 11"

T.O.CHANNEL

PREFINISHED BREAK METAL WITH

INTEGRAL DRIP OVER 5/8" P.T. PLYWOOD.

NO EXPOSED FASTENERS.

PREFINISHED METAL SOFFIT WITH ' L '

TRIM AT LEADING EDGE AND ' F ' CHANNEL

SECURED TO CMU VENEER.

5°

CONT. 1/4" BENT PLATE WELDED TO JOIST SEAT

EXTENSIONS AND BACK FACE OF MC 12x10.6.

STANDING SEAM METAL ROOFING SYSTEM OVER

5/8" PLYWOOD SECURED TO DECK THROUGH (2)

LAYERS OF 2 1/2" RIGID INSULATION.

TERMINATION BAR AND SEALANT.

DCMU VENEER.

SELF-ADHERED MEMBRANE FLASHING

OVER S/S METAL SUPPORT FLASHING

ABOVE FERO BRACKET.

CAVITY DRAINAGE MESH.

HEAD JOINT WEEPS AT 24" O.C. W/

PLASTIC HONEY-COMB INSERTS.

2-PIECE METAL FLASHING / COUNTER

FLASHING TO COVER TERMINATION BAR

FOR METAL ROOFING.

STANDING SEAM METAL ROOFING

SYSTEM OVER 5/8" PLYWOOD

SECURED TO DECK THROUGH (2)

LAYERS OF 2 1/2" RIGID INSULATION.

(2) PIECE PINTLE & EYE TYPE VENEER

TIES.

METAL ROOF DECK - REFER TO

STRUCTURAL FOR SIZE.

DECK ANGLE - REFER TO STRUCTURAL.

CMU WALL W/ HORIZ. REINF. AT 16"

O.C. VERT. REFER TO STRUCTURAL

DRAWINGS FOR ADDITIONAL

REINFORCING REQUIREMENTS. PAINT

PER ROOM FINISHES PLAN.

BRICK SUPPORT ANGLE AND BRACKET

BASED ON FERO 'FAST BRACKET'

SYSTEM SECURED TO FULLY GROUTED

CMU WALL. SEE ALSO STRUCTURAL

DETAILS.

2 1/2" THICKNESS RIGID INSULATION -

FRICTION FIT BETWEEN BRICK HANGER

BRACKETS AND PLYWOOD DECK BEFORE

PLACEMENT OF FOAMED-IN-PLACE

INSULATION.

2 1/2" THICKNESS RIGID INSULATION -

FRICTION FIT BETWEEN BRICK HANGER

BRACKETS AND PLYWOOD DECK BEFORE

PLACEMENT OF FOAMED-IN-PLACE

INSULATION.

DECK BRG.

VARIES

FIRST FLOOR

100' - 0"

CLERESTORY WINDOW

121' - 0"

T.O. WALL

128' - 8"

A-321

2C

A-321

2B

A-321

2A

1' - 4" 1' - 0"

8" DIA. CONC. FILLED PIPE

BOLLARDS. DOME TOP OF

CONCRETE. PAINT OSHA

YELLOW.

DCMU VENEER.

ANOD. ALUM.

STOREFRONT FRAMING.

2 1/2" THICKNESS

FOAMED-IN-PLACE

INSULATION.

STUFF MINERAL INSULATION BETWEEN DECK

FLUTES AND TOP OF MASONRY WALL PRIOR

TO FOAMED-IN-PLACE INSULATION INSTALL.

DECK ANGLE SECURED TO FACE OF

MASONRY. REFER TO STRUCTURAL

DRAWINGS FOR CONNECTION DETAIL.

METAL DECK - REFER TO STRUCT.

2 8

2 8

1' - 8"

CLERESTORY WINDOW

121' - 0"

114' - 0"

O.H. DOOR M.O.

1/2"

M

.O

PAINTED BULLNOSE SILL - TYP.

CMU WALL. PROVIDE HORIZONAL

REINFORCING AT 16" O.C. VERT. REFER

TO STRUCTURAL DRAWINGS FOR

ADDITIONAL REINFORCING

REQUIREMENTS.

GALV. H.S.S. W/ PLATE LINTEL. SEE

STRUCT. FOR SIZE REQUIREMENTS.

PAINT TO MATCH WALL INSIDE AND

OUTSIDE - TYP.

PERIMETER BACKER ROD AND

SEALANT - BOTH SIDES.3"

ANOD. ALUM. STOREFRONT FRAMING.

ALUM. SILL FLASHING SET IN BED OF

SEALANT OVER BEVELED CEDAR SIDING

BACKER ON 2x BLOCKING AS SHOWN.

FLEXIBLE FLASHING BASED ON YORK

'FLASH VENT'. RUN FROM OVER 2x

MATERIAL AND OUT FIRST MORTAR BED

JOINT.

CORRUGATED VENEER TIE.

HSS W/ PLATE LINTEL - GALV. AND

PAINTED TYPICAL.

FIRST FLOOR

100' - 0"

STANDING SEAM METAL ROOF SYSTEM OVER

EXISTING PURLINS.

PREFINISHED BREAK METAL TRIM W/ DRIP

OVER P.T. 2x8 ON 5/8" P.T. PLYWOOD.

PREFINISHED BREAK METAL TRIM W/ DRIP

OVER 1/2" P.T. PLYWOOD ON P.T. 2x MAT'L

OVER 1/2" P.T. PLYWOOD. NO EXPOSED

FASTNERS - TYP.

BACKER ROD AND SEALANT.

EXISTING CMU WALL. PAINT PER EXTERIOR

ELEVATIONS.

LAY-IN CEILING SYSTEM.

GRID WORK OF STEEL RETAINER

STRAPS SUPPORTING FABRIC LINER

WITH INSULATION ABOVE. BASIS OF

DESIGN: "SIMPLE SAVER SYSTEM".

EXISTING BUILDING STRUCTURE

TO REMAIN.

EXISTING CMU WALL. PAINT PER

FLOOR FINISHES PLAN.

THERMAL ISOLATORS BETWEEN

EXISTING PURLINS AND NEW METAL

ROOFING CLIPS. BASIS OF DESIGN:

"SIMPLE SAVER SYSTEM". NEW GUTTERS AND DOWNSPOUTS.

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

G

NOT FOR

CONSTRUCTIO

N

PLOT D

ATE: 1

1-18-2022

M a t r ix C

O N

S U

L T

IN

G E

N G

IN

E E R

S

IN

C

F A

X (5

-2

P H

O N

E (5

-2

L A

N S

IN

G

M

I

E

C

E S

A R

E

W E

B w w w

.m a tr ix c e in c .c o m

S H E E T N U M B E R file no.

funding code contractor order no.

consultant job no.

472/22019.SMD

472/MaintProj sheet description consult drawn checked issue

M A

T R

IX

P

R O

J E

C T

/7

/2

:2

:5 P

M A u to d e sk D o cs

/D

T M

B P

A R

N A

L L D

IE

S

E L B

L D

G /2

B

L D

G

A

R C

H .r vt

Approver

Author

P A

R N

A L L C

O R

R E C

T

IO

N A

L F

A C

IL

IT

Y

N E W

D

IE

S E L M

E C

H A

N

IC

S P

R O

G R

A M

E

P A

R N

A L L R

D

JA

C

K S O

N M

IC

H

IG

A

N

A-321

22-167.00

-1

.0

WALL SECTIONS

AND DETAILS

1 1/2" = 1'-0"A-321

3 TRUCK BAY ENLARGED DETAIL LOOKING NORTH

1/2" = 1'-0"A-321

2 WALL SECTION AT TRUCK BAY O.H. DOORS

1 1/2" = 1'-0"A-321

2C TRUCK BAY GABLE END RAKE DETAIL

1 1/2" = 1'-0"A-321

2B TRUCK BAY CLERESTORY WINDOW DETAIL

1 1/2" = 1'-0"A-321

2A TRUCK BAY WALL BASE DETAIL

1/2" = 1'-0"A-321

1 TRUCK BAY WALL SECTION LOOKING NORTH

1 1/2" = 1'-0"A-321

4 EXISTING BUILDING EAVE DETAIL

T

T

T T

T

T T

T

T

T

AUTO SHOP

STAFF OFFICES

INMATE

TOILETS

STAFF TOILETS

ELECTRICAL

CLOSET

TECH CLOS.

AUTO

CLASSROOM

AUTO TOOL

CRIB

FURN. CLOS.

WATER SERV.

RM.

CORRIDOR

112 J.C.

MULTIPURPOSE

CDL

CLASSROOM

CORRIDOR

HEAVY DIESEL

CLASSROOM

HEAVY DIESEL

LAB

106 TOOL CRIB

MAIN ENTRY

VEST. / COAT

ROOM

TRUCK BAYS

COMPRESSOR

RM

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1 P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

P-1

RB-1

RF-1

D E

S

IG

N A

N D

C O

N S

TR

U

C

TI

O N

D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T

A N

D B

U D

G E

T S

T A

T E

O F

M

IC

H

IG

A N

A D

A M

P

L A

C H

R

A

D

IR

E C

T O

R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

G

NOT FOR

CONSTRUCTIO

N

PLOT D

ATE: 1

1-18-2022

M a t r ix C

O N

S U

L T

IN

G E

N G

IN

E E R

S

IN

C

F A

X (5

-2

P H

O N

E (5

-2

L A

N S

IN

G

M

I

E

C

E S

A R

E

W E

B w w w

.m a tr ix c e in c .c o m

S H E E T N U M B E R file no.

funding code contractor order no.

consultant job no.

472/22019.SMD

472/MaintProj sheet description consult drawn checked issue

M A

T R

IX

P

R O

J E

C T

/1

/2

:5 :4

A

M A u to d e sk D o cs

/D

T M

B P

A R

N A

L L D

IE

S

E L B

L D

G /2

B

L D

G

A

R C

H .r vt

Approver

Author

P A

R N

A L L C

O R

R E C

T

IO

N A

L F

A C

IL

IT

Y

N E W

D

IE

S E L M

E C

H A

N

IC

S P

R O

G R

A M

E

P A

R N

A L L R

D

JA

C

K S O

N M

IC

H

IG

A

N

I-001

22-167.00

-1

.0

FIRST FLOOR

FINISH PLAN

- NO COMPARABLE PRODUCTS WILL BE REVIEWED FOR PRODUCTS DESIGNATED AS SINGLE SOURCE.

- COMPARABLE PRODUCTS WILL BE REVIEWED FOR ITEMS LISTED AS BASIS OF DESIGN. COMPARABLE PRODUCTS ARE REQUIRED TO MEET ANY MINIMUM PERFORMANCE REQUIREMENTS LISTED IN REMARKS AND DESIGN ATTRIBUTES OF SPECIFIED PRODUCT.

- REFER TO PRODUCT SPECIFICATION FOR TRIMS AND ACCESSORIES ASSOCIATED WITH SPECIFIED PRODUCTS ABOVE.

NOTES:

MATERIAL SELECTION SCHEDULE

ABBREV ITEM MANUFACTURER PATTERN COLOR PRODUCT NO. SIZE

SINGLE

SOURCE

BASIS OF

DESIGN

ADDITIONAL

MANUFACTURERS

REMARKS

ACP-1 ACOUSTIC CEILING PANEL ARMSTRONG OPTIMA WHITE 315 24 IN X 24 IN -- X CERTAINTEED, USG --

CPTL-1 CARPET TILE SHAW CONTRACT BASIC TILE 5T121 DOVE GREY 17557 24 IN X 24 IN -- X QUARTER TURN INSTALLATION

P-1 PAINT PPG -- DELICATE WHITE PPG1001-1 -- X -- -- --

P-2 PAINT PPG -- FLAGSTONE PPG1001-4 -- X -- FOR DOOR AND WINDOW FRAMES

RB-1 RUBBER BASE TARKETT JOHNSONITE DURACOVE BASE BLACK 40 4" -- X ROPPE, MANNINGTON, FLEXCO --

RF-1 RESINOUS FLOORING SHERWIN WILLIAMS RESUFLOR DECO FLAKE CRESCENT MOON -- -- -- X -- 1/8" FLAKE

1 REFER TO MATERIAL SELECTION SCHEDULE FOR FINISH INFORMATION.

2 REFER TO ARCHITECTURAL FLOOR PLANS AND SPECIFICATION FOR ADDITIONAL

INFORMATION ON CONSTRUCTION MATERIALS.

3 REFER TO ARCHITECTURAL FLOOR PLANS FOR VISUAL DISPLAY BOARD LOCATIONS AND

QUANTITIES.

4 REFER TO ARCHITECTURAL FLOOR PLANS FOR LOCKER LOCATIONS, FINISHES AND

QUANTITIES.

5 REFER TO REFLECTED CEILING PLANS FOR CEILING FINISH AND HEIGHTS.

6 REFER TO ENLARGED STAIR PLANS AND SECTIONS FOR FINISH COLORS OF STRINGERS

AND GUARDRAILS.

7 REFER TO DOOR SCHEDULE FOR FINISH ON DOORS AND FRAMES.

8 REFER TO ENLARGED FINISH PLANS FOR TOILET ROOM FINISHES.

9 FINISH TAGS APPLY TO LIKE MATERIALS IN ENTIRE ROOM. I.E. CASEWORK TAG MAY

ONLY CALLOUT ONE RUN OF CASEWORK, BUT ALL CASEWORK IN ROOM RECEIVE THE

SAME FINISHES, UNLESS TAGGED DIFFERENTLY.

10 CASEWORK FINISH TAGS DO NOT APPLY TO CUSTOM MILLWORK PIECES. REFER TO

ENLARGED MILLWORK DETAILS FOR FINISH MATERIALS.

11 WALL MOUNTED DIFFUSERS, GRILLES, ACCESS PANELS, ELECTRICAL PANELS, ETC. ARE

TO BE PAINTED WITH AN OIL-BASED PAINT TO MATCH THE ADJACENT WALL FINISH.

12 CEILING ACCESS PANELS ARE TO BE PAINTED TO MATCH ADJACENT CEILING FINISH.

13 ALL EXPOSED COLUMNS TO BE PAINTED P-X.

1 REFER TO SPECIFICATION FOR MORE INFORMATION.

2 WINDOW TREATMENT TAGS SHOWN ON PLAN REPRESENTS A SINGLE SHADE.

3 REFER TO FLOOR PLANS, EXTERIOR ELEVATIONS AND FRAME TYPES FOR HEIGHT AND

WIDTH OF OPENINGS.

4 WINDOW TREATMENTS ARE TO BE MOUNTED INSIDE OF THE WINDOW OPENING FROM

HEAD TO SILL AND JAMB TO JAMB, UNLESS NOTED OTHERWISE.

5 VERIFY ALL DIMENSIONS IN FIELD PRIOR TO FABRICATION.

WALL FINISH

BASE FINISH

FLOOR FINISH

COUNTER FINISH

CABINET FINISH (BASE AND UPPER)

INDICATES EXTENT OF ATYPICAL FINISH

INDICATES TRANSITION BETWEEN DISSIMILAR FLOOR

MATERIAL FINISHES

INDICATES MULTIPLE MATERIAL TYPES ON A SURFACE,

REFER TO DETAIL OR ELEVATION

INDICATES PATTERNED INSTILLATION OF A SINGLE

MATERIAL TYPE, REFER TO DETAIL OR ELEVATION

FINISH PLAN KEY

TYPE, FABRIC:COLOR, % OPEN

TYPE, FABRIC:COLOR, % OPEN

TYPE, FABRIC:COLOR, % OPEN

WT-#

WT-#

WT-#

GENERAL NOTES - INTERIOR

WINDOW TREATMENT KEY

X-#

X-#

X-#

X-#

X-#

X-#

MULTI

X-P(A)

X X

X-#

INDICATES MATERIAL TYPE

INDICATES CORRESPONDING SELECTION IN SCHEDULE

INDICATES PATTERN INTENT, REFER TO DETAIL OR

ELEVATION

FIRST FLOOR FINISH PLAN

34-AD101
36 - A-101
36 - A-102
36 - A-103
36 - A-201
36 - A-301
36 - A-311
36 - A-321
37 - INT - PARNALL

File details come from the government source that posted it. Updated .