472.22019.SMD Parnall CF VV - New Diesel Mechanic Program - 50% Design Development MP Drawings .pdf
PDF 2 MB Posted
- Solicitation number
- RFP - 171 - 230000000652
- Issued by
- Jackson County, Michigan
About this file
This document contains construction drawings and specifications for a new heavy diesel mechanical program facility at the Parnall Correctional Facility in Jackson, Michigan. The project involves the demolition and installation of new plumbing, HVAC, and fire protection systems for the 17,800 square foot facility, including water closets, urinals, lavatories, service sinks, water heaters, air compressors, furnaces, unit heaters, infrared heaters, exhaust fans, and air conditioning units. The work is divided into two phases, with Phase 300 work to be completed by September 9, 2022 and Phase 400 work to be completed by December 14, 2022.
The related state and local contract opportunity is for construction management services for the new heavy diesel program facility project at the Parnall Correctional Facility in Jackson County, Michigan. The project is funded by the State of Michigan and no set-asides or incumbent information is provided. The contract term and any renewal options are not specified in the available information.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
T
T
T
C0
T
T T
T
T C0
T
T
7654321
B
C
COMPRESSOR RM
HEAVY DIESEL LAB
HEAVY DIESEL CLASSROOM
CDL CLASSROOM
TRUCK BAYS
TOOL CRIB
MAIN ENTRY
AUTO SHOP
STAFF OFFICES
AUTO CLASSROOM
INMATE TOILETS
STAFF TOILETS
CORRIDOR
CORRIDOR
7654321
B
C
B
C
MECH. MEZZANINE
B
C
LIGHT HAZARD
ORDINARY HAZARD II
FIRE PROTETION LEGEND
LOCATION OF DOMESTIC WATER SERVICE INTO BUILDING AND NEW FIRE
RISER.
FIRE PROTECTION KEYNOTES
DE
SIG
N
AN
D
CO
NS
TR
UC
TIO
N
DI
VIS
IO
N
DE
PA
RT
M
EN
T
OF
T
EC
HN
OL
OG
Y, M
AN
AG
EM
EN
T, A
ND
B
UD
GE
T
ST
AT
E
OF
M
IC
HI
GA
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
ST
AT
E
FA
CI
LI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
REV
IEW
DR
AW
ING
NO
T F
OR
CO
NST
RU
CTI
ON
PLO
T D
ATE
: 12
/13/
M at ri x
M at ri x
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
FA
X:
(5
) 4
-2
PH
ON
E:
(5
) 4
-2
LA
NS
IN
G, I 4
E
. C
ES
AR
E
. C
HA
VE
Z
AV
E.
W
EB
: w ww
.m at rix ce in c.
co m
SHEET NUMBERSHEET NUMBER
file no.file no.
funding codefunding code contractor order no.contractor order no.
consultant job no.consultant job no.
472/22019.SMD
472/MaintProj sheet descriptionsheet description consultantconsultant drawn bydrawn by checked bychecked by issue dateissue date
AT
RI
X
PR
OJ
EC
T:
/13
/20
:18 :03
A M
Au tod es k D oc s:/ /D
TM
B
PA
RN
AL
L D
IE
SE
L B
LD
G/ 9_
BL
DG
_M
EP
.rv t
CAT
NLF
PA
RN
AL
L
CO
RR
EC
TI
O N
AL
F
AC
IL
IT
Y
N
EW
D
IE
SE
L M
EC
H
AN
IC
AL
P
RO
GR
AM
E P
AR
N
AL
L
RD
JA
CK
SO
N , M
IC
H
IG
AN
F-400
22139.00
9.
9.
FIRE PROTECTION
PLAN
N 0 1 124 8
SCALE: 1/8" 1'-0"
FIRE PROTECTION PLAN - MEZZANINEN
0 1 124 8
SCALE: 1/8" 1'-0"
FIRE PROTECTION DEMOLITION PLAN - MEZZANINE
PHASE 300 09-09-2022
PHASE 400 12-14-2022
ITEM
PLUMBING ABBREVIATIONS
AD AREA DRAIN
ASR AUTOMATIC SPRINKLER RISER
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
BFS ELOW FLOOR SLAB
BWV BACK WATER VALVE
CB CATCH BASIN
CI CAST IRON
C.O. CLEAN OUT
CV CONTROL VALVE
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWH DOMESTIC WATER HEATER
E.T.C. ELECTRICAL TRADES CONTRACTOR
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FC FINAL CONNECTIONS
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FF FINISH FLOOR
FHV FIRE HOSE VALVE
FT FEET
GAL GALLON
GD GARBAGE DISPOSAL
GI GREASE INTERCEPTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIBB
HD HEAD (FT)
HP HORSE POWER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
LAV LAVATORY
LT LAUNDRY TUB
MA MEDICAL AIR
MAX MAXIMUM
MGC MEDICAL GAS CONSOLE
MH MANHOLE
MIN MINIMUM
MS MOP SINK
M.T.C. MECHANICAL TRADES CONTRACTOR
NTS NOT TO SCALE
ORD OVERFLOW ROOF DRAIN
OXY OXYGEN
P PUMP
PD PRESURE DROP
PVC POLY-VINYL-CHLORIDE
RC RAIN CONDUCTOR
RD ROOF DRAIN
REQ'D REQUIRED
RI ROUGH-IN
SAN SANITARY
SHWR SHOWER
SK SINK
SP STAND PIPE
SQ. FT. SQUARE FEET
SS SERVICE SINK
ST STORM
STR STRAINER
SV STACKED VENT
S&W SEWER & WASTE
TYP TYPICAL
UR URINAL
VB VACUUM BREAKER
VFD VARIABLE FREQUENCY DRIVE
VS VENT STACK
VTR VENT THRU ROOF
W WASTE
WB WET BULB
WC WATER CLOSET
WH WALL HYDRANT
WS WASTE STACK
W&V WASTE & VENT
X-CW EXISTING CW PIPING
EXISTING
1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN PLUMBING CODE,
LATEST APPLICABLE EDITION.
2. INSTALL ISOLATION BALL VALVES @ ALL FIXTURE WATER SUPPLY LINES.
3. SITE CONTRACTOR TO RUN UTILITIES TO 5'-0" FROM BUILDING LINE
4. ALL INVERT ELEVATIONS ARE BASED ON A FINISH FLOOR LEVEL OF ?'-?".
5. ALL ELEVATIONS SHOWN ARE INVERTS OF PIPING. THE SLEEVES SHALL
BE COORDINATED WITH THESE ELEVATIONS.
6. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE SLEEVES FOR
1" CLEAR SPACE BETWEEN PIPE AND SLEEVE FOR INSTALLATION OF MECHANICAL
SEAL.
7. CONTRACTOR TO VERIFY LOCATIONS OF EXISTING UNDERGROUND
UTILITIES BEFORE BEGINNING WORK.
8. CONTRACTOR SHALL DEMOLISH & REMOVE EXISTING PIPING, FITTINGS, &
EQUIPMENT AS REQUIRED FOR NEW INSTALLATIONS. VALVE & CAP PIPING TO
REMAIN.
9. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY CONFLICT WITH
NEW CONSTRUCTION AND RELOCATE AS NEEDED.
10. NOTIFY OWNER OF ANY PIPING DEMOLITION THAT MAY AFFECT NORMAL
OPERATION OF OTHER AREAS.
11. PROVIDE MECHANICAL SEAL FOR ALL SLEEVES INSTALLED BELOW FLOOR SLAB.
12. ALL FLOOR DRAINS TO BE EQUIPPED WITH TRAP PRIMERS, UNLESS OTHERWISE
NOTED.
13. MIN. 1% SLOPE FOR ALL SANITARY & RAIN CONDUCTOR PIPING.
14. FIRE SUPPRESSION DESIGN & PIPING SHALL BE BY CERTIFIED FIRE SUPPRESSION
CONTRACTOR
15. PROVIDE SHOCK STOPS FOR EVERY PLUMBING GROUP.
16. PROVIDE AIR ELIMINATION DEVICES FOR EACH PLUMBING SYSTEM.
17. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION, ELEVATIONS, AND
DETAILS OF ALL EXISTING CONDITIONS THAT MAY AFFECT THE WORK.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF
ALL EQUIPMENT AND MATERIALS IN A "NEW" CONDITION DURING CONSTRUCTION.
19. ALL WORK SHALL BE PERFORMED BY LICENSED CONTRACTORS AND
SUBCONTRACTORS AS REQUIRED BY LAW.
20. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CODES AND
REGULATIONS ENFORCED BY LOCAL BUILDING OFFICIALS.
21. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF TERMINATION OF PIPES
AND SUGGESTED ROUTES. IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO CONFORM TO STRUCTURE,
AVOID OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP OPENINGS AND
PASSAGEWAYS CLEAR. DO NOT SCALE FROM DRAWINGS.
GENERAL PLUMBING NOTES PLUMBING SYMBOL LEGEND
MISCELLANEOUS
FP
G
LP
ARV
ARW
RC
ARW
RC
ORC
ORC
SAN
V
V
SAN
CA
NO
N2
MA
VAC
PIPING SYMBOLS
FLOW DIRECTION
EXISTING FLOW DIRECTION
PIPING DROP
PIPING RISE
FLOOR CLEANOUT
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
INLINE CLEANOUT
PLUMBING TRAP
THERMOMETER
CLEAN OUT & WALL CLEAN OUT
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
FLOOR DRAIN & FLOOR SINK
BACK FLOW PREVENTER
FLANGE END CONNECTION
WALL HYDRANT & HOSE BIBB
REGULAR & OVERFLOW ROOF DRAIN
PIPE CAP
PIPE BREAK
WATER METER
GAS METER
PRESSURE GAUGE
FIRE HYDRANT
SPRINKLER HEAD (PENDANT)
SPRINKLER HEAD (UPRIGHT)
SPRINKLER HEAD (SIDEWALL)
FIRE DEPARTMENT CONNECTION
PIPING FLEXIBLE CONNECTOR
SIGHT GLASS
PIPE EXPANSION
COMPENSATOR FLOW SENSOR DEVICE
FLOW METER
FLOW SWITCH
PRESSURE SWITCH
SUPERVISORY SWITCH INVERTED
BUCKET TRAP
FLOAT & THERMOSTATIC TRAP
FLEXIBLE GAS CONNECTION
FCO
CO
PIPING
SW
CW
SW
SWR
SWR
TW
TW
TWR
TWR
DI
DI
RO
RO
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
OS&Y VALVE
SOLENOID VALVE
EXPANSION VALVE WITH THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FT
BT
SS
FS
COLD WATER
COLD WATER BELOW FINISH SLAB
HOT WATER
HOT WATER BELOW FINISH SLAB
HOT WATER RETURN
HOT WATER RETURN BELOW FINISH
SLAB
FILTERED SOFTENED COLD WATER
SOFTENED HOT WATER
SOFTENED WATER
SOFTENED WATER BELOW FINISH SLAB
SOFTENED WATER RETURN
SOFTENED WATER RETURN
BELOW FINISH SLAB
TEMPERED WATER
TEMPERED WATER BELOW FINISH SLAB
TEMPERED WATER RETURN
TEMPERED WATER RETURN BELOW
FINISH SLAB
DEIONIZED WATER
DEIONIZED WATER BELOW FINISH SLAB
REVERSE OSMOSIS WATER
REVERSE OSMOSIS WATER RETURN
BELOW FINISH SLAB
FIRE PROTECTION
GAS (NATURAL)
GAS (LIQUID PETROLEUM)
ACID RESISTANT VENT
ACID RESISTANT WASTE
ACID RESISTANT WASTE BELOW FINISH
SLAB
RAIN CONDUCTOR
STORM BELOW FINISH SLAB
OVERFLOW RAIN CONDUCTOR
OVERFLOW RAIN CONDUCTOR BELOW
FINISH SLAB
SANITARY WASTE
SANITARY WASTE BELOW FINISH SLAB
VENT PIPING
VENT PIPING BELOW FINISH SLAB
COMPRESSED AIR
OXYGEN
NITROUS OXIDE
NITROGEN
MEDICAL AIR
VACUUM
DEMOLITION
FSCW
M
M
P
VALVES
CW
HWR
SHW
HW
HWR
HW
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND
EXISTING TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
ADDENDUM NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
X
PS
CO
X
X
DE
SIG
N
AN
D
CO
NS
TR
UC
TIO
N
DI
VIS
IO
N
DE
PA
RT
M
EN
T
OF
T
EC
HN
OL
OG
Y, M
AN
AG
EM
EN
T, A
ND
B
UD
GE
T
ST
AT
E
OF
M
IC
HI
GA
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
ST
AT
E
FA
CI
LI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
ING
NO
RU
CTI
ON
PLO
T D
ATE
: 12
/13/
M at ri x
M at ri x
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
FA
X:
(5
) 4
-2
PH
ON
E:
(5
) 4
-2
LA
NS
E
. C
ES
AR
E
. C
HA
VE
Z
AV
E.
W
EB
: w ww
.m at rix ce in c.
co m
SHEET NUMBERSHEET NUMBER
file no.file no.
funding codefunding code contractor order no.contractor order no.
consultant job no.consultant job no.
472/22019.SMD
472/MaintProj sheet descriptionsheet description consultantconsultant drawn bydrawn by
X
PR
OJ
EC
T:
/13
/20
:18 :12
A M
Au tod es k D oc s:/ /D
TM
B
PA
RN
AL
L D
IE
SE
L B
LD
G/ 9_
BL
DG
_M
EP
.rv t
CAT
NLF
PA
RN
AL
L
CO
RR
EC
TI
O N
AL
F
AC
IL
IT
Y
N
EW
D
IE
SE
L M
EC
H
AN
IC
AL
P
RO
GR
AM
E P
AR
N
AL
L
RD
JA
CK
SO
N , M
IC
H
IG
AN
P-100
22139.00
9.
9.
PLUMBING
LEGENDS
PLUMBING FIXTURE SCHEDULE
MARK MANUFACTURER MODEL DESCRIPTIONS MINIMUM ROUGH-IN SIZES FAUCET TYPE FIXTURE
SIZE ACCESSORIES & COMMENTSCW HW SAN VENT
WC-1 WILLOUGHBY EWTS-1490-OF ADA WALL-MOUNTED
WATER CLOSET 1" - 4" 2" - -
STAINLESS STEEL, REAR-MOUNTED,
WALL OUTLET, SIPHON JET SERIES,
WATER CLOSET CARRIER. SECURITY
PRODUCT.
WC-2 AMERICAN STANDARD 2257.101 ADA WALL-MOUNTED
WATER CLOSET 1" - 4" 2"
AMERICAN STANDARD
6065.565.002 SENSOR
OPERATED FLUSH VALVE
- COMMERCIAL SOFT CLOSE SEAT,
WATER CLOSET CARRIER
UR-1 WILLOUGHBY UW-1317-HEU WALL-MOUNTED
URINAL 3/4" - 2" 1-1/2" - -
STAINLESS STEEL, REAR-MOUNTED,
WASHOUT FLUSH, URINAL CARRIER.
SECURITY PRODUCT.
LAV-1 WILLOUGHBY HS-1014-96-HC-FA ADA WALL-MOUNTED
LAVATORY 1/2" 1/2" 1-1/2" 1-1/2" - 18"x18"x12-1/2"
STAINLESS STEEL, FRONT-MOUNTED,
LAVATORY CARRIER. SECURITY
PRODUCT.
LAV-2 AMERICAN STANDARD 9140.047 ADA WALL-MOUNTED
LAVATORY 1/2" 1/2" 1-1/2" 1-1/2"
AMERICAN STANDARD
5500.140 CENTERSET
LAVATORY.
21"x18"x12" LAVATORY CARRIER
MS-1 AMERICAN STANDARD 7745.811
ENAMELED CAST-IRON
FLOOR-MOUNTED
SERVICE SINK
1/2" 1/2" 1-1/2" 1-1/2"
AMERICAN STANDARD
8344.012 EXPOSED YOKE
WALL-MOUNTED UTILITY
FAUCET.
28"x28"x13" -
EEW-1 HAWS 7260B
WALL-MOUNTED
EMERGENCY EYE
WASH
1/2" 1/2" 1-1/2" 1-1/2" - - MODEL 9201EW AXION EMERGENCY
TEMPERING VALVE
EWC-1 ELKAY LZSTLG8WSSK
ELECTRIC WATER
COOLER WALL HUNG
BI-LEVEL
1/2" - 3" 2" - - WATER COOLER CARRIER
FD-1 ZURN Z415S BODY ASSEMBLY WITH
TYPE "S" STRAINER - - - - - -
TYPE S POLISHED NICKEL BRONZE,
SQUARE HEEL-PROOF, LIGHT DUTY
STRAINER. SEE PLAN FOR SANITARY
SIZE
DOMESTIC WATER HEATER SCHEDULE
MARK MODEL CAPACITY
(GALLONS)
GPH @
70°F RISE
VENT
SIZE
ELECTRICAL HOT WATER
TEMP COMMENTSVOLTAGE PHASE FLA DISC. BY STARTER BY
DWH-1 SWR125 65 208 3" 120 1 2.5 EC EC 120 1, 2, 3
NOTES:
1.
2.
3.
BASED ON LOCHINVAR
HORIZONTAL CONCENTRIC VENT KIT
CONDENSATE NEUTRALIZATION KIT
ELECTRICAL NOTES:
EC - ELECTRICAL CONTRACTOR
MC - MECHANCIAL CONTRACTOR
NR - NOT REQUIRED
COMPRESSOR SCHEDULE
MARK MODEL PRESSURE
(PSIG)
MOTOR
(HP)
DIMENSIONS
LxWxH
(INCHES)
ELECTRICAL
WEIGHT COMMENTSVOLTAGE PHASE DISC. BY
COMP-1 SX 5.0
AIRCENTER 160 3.0 23.25x42.87x61.375 480 3 EC 639 1, 2, 3, 4, 5
NOTES:
1.
2.
3.
4.
BASED ON KAESER
MANUFACTURER TO PROVIDE OIL REMOVAL FILTER, KAESER KOR-60, 60 CFM
SIGMA CONTROL BASIC CONTROL SYSTEM WITH USER INTERFACE
MANUFACTURER TO PROVIDE CONDENSATE FILTRATION SYSTEM AND
MANIFOLD.
ELECTRICAL NOTES:
EC - ELECTRICAL CONTRACTOR
MC - MECHANCIAL CONTRACTOR
NR - NOT REQUIRED
5. PACKAGED AIR COMPRESSOR TO BE
PROVIDED PRE-ASSEMBLED TO INCLUDE
DRYER, HORIZONTAL RECEIVER TANK,
FILTERS, AND CONDENSATE DRAINS
(KAESER AIRCENTER OPTION).
T
7654321
B
C
3/4" 3/4"
3/4"
3/4"
X-CA
X-CW & X-HW
3/4"
3/4"
3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
3/4" 3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
1 1
3/4"
7654321
B
C
B
C
X-CW & X-HW
X-CA
3/4" 3/4"
3/4"
3/4"
B
C
DISCONNECT, REMOVE, AND DEMONLISH EXISTING PLUMBING
FIXTURES ENTIRELY. INCLUDING ALL PIPING, FITTINGS, VALVES,
CARRIERS, AND ACCESSORIES.
DISCONNECT, REMOVE, AND DEMOLISH EXISTING DOMESTIC COLD
AND HOT WATER ENTIRELY, INCLUDING ALL FITTINGS, VALVES,
HANGERS, SUPPORTS, AND ACCESSORIES
DISCONNECT, REMOVE, AND DEMOLISH EXISTING COMPRESSED AIR
ENTIRELY, INCLUDING ALL FITTINGS, VALVES, HANGERS, SUPPORTS,
AND ACCESSORIES
DISCONNECT, REMOVE, AND DEMOLISH X-WH ENTIRELY, INCLUDING
ALL ASSOCIATED PIPING, FITTINGS, VALVES, VENT, ELECTRICAL, AND
ALL OTHER ACCESSORIES
PLUMBING DEMOLITION KEYNOTES
DE
SIG
N
AN
D
CO
NS
TR
UC
TIO
N
DI
VIS
IO
N
DE
PA
RT
M
EN
T
OF
T
EC
HN
OL
OG
Y, M
AN
AG
EM
EN
T, A
ND
B
UD
GE
T
ST
AT
E
OF
M
IC
HI
GA
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
ST
AT
E
FA
CI
LI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
ING
NO
RU
CTI
ON
PLO
T D
ATE
: 12
/13/
M at ri x
M at ri x
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
FA
X:
(5
) 4
-2
PH
ON
E:
(5
) 4
-2
LA
NS
E
. C
ES
AR
E
. C
HA
VE
Z
AV
E.
W
EB
: w ww
.m at rix ce in c.
co m
SHEET NUMBERSHEET NUMBER
file no.file no.
funding codefunding code contractor order no.contractor order no.
consultant job no.consultant job no.
472/22019.SMD
472/MaintProj sheet descriptionsheet description consultantconsultant drawn bydrawn by
X
PR
OJ
EC
T:
/13
/20
:18 :14
A M
Au tod es k D oc s:/ /D
TM
B
PA
RN
AL
L D
IE
SE
L B
LD
G/ 9_
BL
DG
_M
EP
.rv t
CAT
NLF
PA
RN
AL
L
CO
RR
EC
TI
O N
AL
F
AC
IL
IT
Y
N
EW
D
IE
SE
L M
EC
H
AN
IC
AL
P
RO
GR
AM
E P
AR
N
AL
L
RD
JA
CK
SO
N , M
IC
H
IG
AN
P-300
22139.00
9.
9.
PLUMBING
DEMOLITION PLAN
N 0 1 124 8
SCALE: 1/8" 1'-0"
PLUMBING DEMOLITION PLAN - MAIN LEVEL
N 0 1 124 8
SCALE: 1/8" 1'-0"
PLUMBING DEMOLITION PLAN - MEZZANINE
T
T
T
T
T
C0
T
T T
T
T C0
T
T
7654321
B
C
COMP-1
WC-2
EWC-1
LAV-1
EEW-1
TRUCK BAYS
TOOL CRIB
HEAVY DIESEL LAB
COMPRESSOR RM
HEAVY DIESEL CLASSROOM
CDL CLASSROOM
CORRIDOR
CORRIDOR
INMATE TOILETS
STAFF TOILETS
AUTO CLASSROOM
AUTO SHOP
STAFF OFFICES
CORRIDOR
MAIN ENTRY
55 GALLON DRUM (GREASE)
55 GALLON DRUM (OIL)
55 GALLON DRUM (WASTE)
CA
CA
CA
CA
7654321
B
C
WATER SERV. RM.
FURN. CLOS.
AUTO TOOL CRIB
TECH CLOS.
ELECTRICAL CLOSET
J.C.
CORRIDOR
UNASSIGNED
MULTIPURPOSE
VEST. / COAT ROOM
LAV-1
EEW-1
IR-5
IR-3IR-2IR-1
IR-4
IR-6
IR-7
IR-8
995 350
2" G
2" G
2" G
2" G
2" G
1 1/2" G 1 1/4" G
3/4" G
1 1/4" G
1" G
1 1/4" G
1" G 3/4" G
3/4" G 3/4" G
3/4" G
3/4" G
3/4" G
1 1/4" G 1 1/4" G
B
C
B
C
32 32
MS-1
WC-2
WC-1WC-1 UR-1UR-1UR-1
EWC-1
LAV-1LAV-1 LAV-1LAV-1
LAV-2
3/4" G
3/4" G
1 1/2" CW
1" HW 3/4" HW
1 1/2" CW
2" CW
3/4" G
1 1/2" CW
1" HW
1" HW
DWH-1
DE
SIG
N
AN
D
CO
NS
TR
UC
TIO
N
DI
VIS
IO
N
DE
PA
RT
M
EN
T
OF
T
EC
HN
OL
OG
Y, M
AN
AG
EM
EN
T, A
ND
B
UD
GE
T
ST
AT
E
OF
M
IC
HI
GA
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
ST
AT
E
FA
CI
LI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
ING
NO
RU
CTI
ON
PLO
T D
ATE
: 12
/13/
M at ri x
M at ri x
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
FA
X:
(5
) 4
-2
PH
ON
E:
(5
) 4
-2
LA
NS
E
. C
ES
AR
E
. C
HA
VE
Z
AV
E.
W
EB
: w ww
.m at rix ce in c.
co m
SHEET NUMBERSHEET NUMBER
file no.file no.
funding codefunding code contractor order no.contractor order no.
consultant job no.consultant job no.
472/22019.SMD
472/MaintProj sheet descriptionsheet description consultantconsultant drawn bydrawn by
X
PR
OJ
EC
T:
/13
/20
:18 :18
A M
Au tod es k D oc s:/ /D
TM
B
PA
RN
AL
L D
IE
SE
L B
LD
G/ 9_
BL
DG
_M
EP
.rv t
CAT
NLF
PA
RN
AL
L
CO
RR
EC
TI
O N
AL
F
AC
IL
IT
Y
N
EW
D
IE
SE
L M
EC
H
AN
IC
AL
P
RO
GR
AM
E P
AR
N
AL
L
RD
JA
CK
SO
N , M
IC
H
IG
AN
P-400
22139.00
9.
9.
PLUMBING PLANS
N 0 1 124 8
SCALE: 1/8" 1'-0"
PLUMBING PLAN - MAIN LEVELN
0 1 124 8
SCALE: 1/8" 1'-0"
PLUMBING PLAN - MEZZANINE
1/4" 1'-0"P-400
3 ENLARGED PLUMBING PLAN
GENERAL HVAC NOTES
1. LOCATE EXHAUST OUTLETS OF VENTILATION SYSTEMS, COMBUSTION EQUIPMENT
STACKS, MEDICAL - SURGICAL VACUUM SYSTEMS, & PLUMBING VENTS AT LEAST 25
FEET FROM OUTDOOR AIR INTAKES.
2. LOCATE OUTDOOR INTAKES AT LEAST 6 FEET ABOVE GROUND LEVEL OR 3 FEET
ABOVE ROOF LEVEL. UNLESS OTHERWISE INDICATED.
3. ALL EXISTING SYSTEMS (INCLUDING EXHAUST FANS; AIR HANDLING UNITS; PUMPS)
THAT SERVES AREAS BEING RENOVATED SHALL BE REBALANCED AS REQUIRED.
4. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION THAT MAY AFFECT
NORMAL OPERATION OF OTHER AREAS.
5. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY CONFLICT WITH NEW
CONSTRUCTION AND RELOCATE AS NEEDED.
6. LOCATIONS OF THE THERMOSTATS TO BE VERIFIED IN FIELD.
7. PROVIDE BALANCE DAMPERS FOR EACH DIFFUSER/GRILLE AND BRANCH DUCT.
8. FLEXIBLE DUCT IS PERMITTED IN ACCESSIBLE CEILINGS. 6FT MAX LENGTH. KEEP
BENDS TO A MINIMUM.
9. FIRE DAMPERS & COMBINATION FIRE SMOKE DAMPERS SHALL MATCH RATING OF
WALL.
10. INTERLOCK FIRE/SMOKE DAMPERS BY ELECTRICAL TRADES. PROVE OPEN BEFORE
AIR HANDLING UNITS FAN(S) START.
11. ALL REHEAT COIL HS&R RUNOUT PIPES SHALL BE 3/4" UNLESS OTHERWISE NOTED.
12. PROVIDE ACCESS PANELS ON EACH SIDE OF REHEAT COILS.
13. PROVIDE 5FT MIN BEFORE ANY DUCT TAKEOFF FOR DUCTWORK DOWNSTREAM OF
VAV BOXES.
14. LINE TRUNK DUCT DOWNSTREAM OF VAV BOXES.
15. PROVIDE 1-1/2" DUCT DIAMETERS MIN. DUCT LENGTH OF HIGH PRESSURE BRANCH
DUCTWORK ON THE UPSTEAM SIDE OF VAV BOXES.
16. RADIANT CEILING PANELS HS&R BRANCH RUNOUT PIPES SHALL BE 1/2" UNLESS
NOTED OTHERWISE.
17. COORDINATE LOUVER SIZES WITH ARCHITECTURAL TRADES PRIOR TO
CONSTRUCTION.
18. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER DISCIPLINES PRIOR TO
CONSTRUCTION TO AVOID CONFLICTS.
19. PROVIDE MANUAL AIR VENTS 3/4" HOSE CONNECTION WITH AT ALL HIGH POINTS.
20. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
21. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION, ELEVATIONS, AND
DETAILS OF ALL EXISTING CONDITIONS THAT MAY AFFECT THE WORK.
22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE INTEGRITY OF ALL
EQUIPMENT AND MATERIALS IN A "NEW" CONDITION DURING CONSTRUCTION.
23. ALL WORK SHALL BE PERFORMED BY LICENSED CONTRACTORS AND
SUBCONTRACTORS AS REQUIRED BY LAW.
24. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE, LATEST APPLICABLE
EDITION.
25. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT FITTINGS IN ACCORDANCE
WITH SMACNA. (WYES, RADIUSED OR VANED TEES, ETC.) DUCTWORK SHALL BE
GALVANIZED SHEET METAL, MIN 26 GA.
26. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSION.
27. CONSTRUCT ALL TRANSFER DUCTS WITH 1" THICK LINING.
28. ALL EXPOSED ROUND DUCTWORK SHALL BE SPIRAL.
29. LINE 10'-0" OF SUPPLY DUCTWORK AFTER EACH VAV BOX.
30. ALL EXTERNALLY ISOLATED HVAC EQUIPMENT SHALL HAVE FLEXIBLE DUCT
CONNECTORS.
31. ALL CONDENSATE DRAIN PIPING SET @ MIN. 1% SLOPE.
32. ALL CONDENSATE DRAIN PIPING TO TERMINATE TO DRAIN VIA AIR GAP.
33. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR SPECIFICATIONS THE
MORE STRINGENT AND GREATER COST ITEM SHALL BE USED.
34. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF TERMINATION OF PIPES AND
DUCTS AND SUGGESTED ROUTES. IT IS NOT INTENTION OF DRAWINGS TO INDICATE
ALL NECESSARY OFFSETS. INSTALL WORK IN MANNER TO CONFORM TO
STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP OPENINGS
AND PASSAGEWAYS CLEAR. DO NOT SCALE FROM DRAWINGS.
35. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT IN THE SPECIFICATIONS, OR
FOUND IN SPECIFICATIONS AND NOT IN THE DRAWINGS, SHALL BE CONSTRUED AS
TO BE INCLUDED IN BOTH THE SPECIFICATIONS AND THE DRAWINGS. ANY CONFLICT
BETWEEN THE PLANS AND THE SPECIFICATIONS WILL BE INTERPRETED BY THE
ARCHITECT. IN THE EVENT OF CONFLICT, FOR THE PURPOSE OF BIDDING, THE
CONTRACTOR SHALL PRESUME THE MOST EXPENSIVE COMBINATION OF QUALITY
AND QUANTITY OF WORK SHALL PREVAIL.
36. ABUSE OF THE REQUEST FOR INFORMATION (RFI) PROCESS WILL NOT BE
TOLERATED. RFI'S REQUESTING INFORMATION ALREADY CONTAINED IN THE DESIGN
DOCUMENTS, INVOLVING MEANS AND METHODS OF CONSTRUCTION, COORDINATION
OF WORK BETWEEN TRADES, OR ITEMS NOT PREVIOUSLY AND THOROUGHLY
INVESTIGATED AND RESEARCHED BY THE GENERAL CONTRACTOR WILL BE
RETURNED UNANSWERED THE GENERAL CONTRACTOR. ALLOW TWO WEEKS FOR
RFI RESPONSES FROM THE DESIGN TEAM.
ITEM
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES
CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DRG DIFFUSER, REGIRSTER &GRILLE
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILL
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
F FAN
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RATIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR
CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMP CONDENSATE RETURN
PD PRESURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VFD VARIABLE FREQUENCY DRIVE
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
W WASTE
WB WET BULB
WC WATER CLOSET
WH WALL HYDRANT
WS WASTE STACK
W&V WASTE & VENT
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
EXISTING
HVAC PIPING SYMBOLSHVAC PIPING
HVAC DUCTWORK
F/S
F/S
TEMPERATURE CONTROL SYMBOLS
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES
THERMOSTAT
PROGRAMMABLE THERMOSTAT
THERMOSTAT (W/ NIGHT SETBACK)
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXISTING EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE / SMOKE DAMPER
HORIZONTAL FIRE / SMOKE DAMPER
DUCT SMOKE DETECTOR, INSTALLED BY
M.T.C., PROVIDED & WIRED BY E.T.C.
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
SCP
SC
DXS
DXL
HR
CR
CD
CS
DX
CTR
HPR
HS
HPS
CTS
CHWR
CHWS
S
L
LPS
MPS
HPS
SC (BF)
TAG CFM
NECK
SIZE
REMARKS
SD-1 250
8"ø ---
MECHANICAL SYMBOLS LEGEND
XX
XXXX
XX
XXXX
FLOW DIRECTION
EXISTING FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
EXPANSION COMPENSATOR
FLOAT & THERMOSTATIC STEAM TRAP
INVERTED BUCKET STEAM TRAP
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
DIRECT EXPANSION
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
SUCTION (REFRIGERANT)
LIQUID (REFRIGERANT)
SUCTION (DIRECT EXPANSION)
LIQUID (DIRECT EXPANSION)
LOW PRESSURE STEAM (0-20 LBS.)
MEDIUM PRESSURE STEAM (21-75 LBS.)
HIGH PRESSURE STEAM (76 LBS. & ABV.)
STEAM CONDENSATE (GRAVITY)
PUMPED STEAM CONDENSATE
STEAM CONDENSATE BOILER FEED
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND
EXISTING TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
INDICATED ADDENDUM
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
S
S
SD
X
S
H
T
T P
T N
P
M
M
FT
BT
DE
SIG
N
AN
D
CO
NS
TR
UC
TIO
N
DI
VIS
IO
N
DE
PA
RT
M
EN
T
OF
T
EC
HN
OL
OG
Y, M
AN
AG
EM
EN
T, A
ND
B
UD
GE
T
ST
AT
E
OF
M
IC
HI
GA
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
ST
AT
E
FA
CI
LI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
ING
NO
RU
CTI
ON
PLO
T D
ATE
: 12
/13/
M at ri x
M at ri x
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
FA
X:
(5
) 4
-2
PH
ON
E:
(5
) 4
-2
LA
NS
E
. C
ES
AR
E
. C
HA
VE
Z
AV
E.
W
EB
: w ww
.m at rix ce in c.
co m
SHEET NUMBERSHEET NUMBER
file no.file no.
funding codefunding code contractor order no.contractor order no.
consultant job no.consultant job no.
472/22019.SMD
472/MaintProj sheet descriptionsheet description consultantconsultant drawn bydrawn by
X
PR
OJ
EC
T:
/13
/20
:18 :03
A M
Au tod es k D oc s:/ /D
TM
B
PA
RN
AL
L D
IE
SE
L B
LD
G/ 9_
BL
DG
_M
EP
.rv t
CAT
NLF
PA
RN
AL
L
CO
RR
EC
TI
O N
AL
F
AC
IL
IT
Y
N
EW
D
IE
SE
L M
EC
H
AN
IC
AL
P
RO
GR
AM
E P
AR
N
AL
L
RD
JA
CK
SO
N , M
IC
H
IG
AN
M-100
22139.00
9.
9.
MECHANICAL
LEGENDS
T T
T
T
T
T
T
T
T
7654321
B
C
12"x12"6"Ø
2"
2"
X-HS & X-HR
2"
2"
2" 2"
3/4"
3/4" 2"
2"
2"
2"
2"
2"
3/4" 3/4"
2" 2"
2"
2"
6"Ø
6"Ø
6"Ø
6"Ø
12"x12" 12"x12"
12"x12"12"x12"
6"Ø6"Ø6"Ø
6"Ø
6"Ø 6"Ø 6"Ø
2"
2" 2"
2"
3/4"
3/4" 2" 2"
2" 2"
3/4" 3/4" 3/4" 3/4"
2" 2" 2"
2"
3/4"
3/4"
3/4"
3/4" 2" 2"
2"
2"
2"
2" 2"
2" 2"
2"
2" 2"
2"
2"
2"
3/4"
2" 2"
3/4"
3/4" 3/4"
2"
2" 3/4"
3/4"
2"
2"
2" 3/4"
3/4"
X-SA
2 2
2 2
X-SA
X-SA
X-SA
X-HS & X-HR
X-HS & X-HR
X-HS & X-HR
X-HS & X-HR
X-HS & X-HR
X-HS & X-HR
7654321
B
C
B
C
X-SA
12"x12" 6"Ø
6"Ø
6"Ø
6"Ø
12"x12"
12"x12"
2" 2"
2"
2"
X-HS & X-HR
B
C
DISCONNECT, REMOVE, AND DEMOLISH EXISTING MECHANICAL
EQUIPMENT, CONTROLS, ASSOCIATED DUCTWORK, PIPING, AND
ELECTRICAL ENTIRELY
DICONNECT, REMOVE AND DEMOLISH EXISTING THERMOSTAT AND
ASSOCIATED WIRING ENTIRELY
DISCONNECT, REMOVE AND DEMOLISH DUCTWORK THROUGHOUT
THE ENTIRE BUILDING, INCLUDING ALL FITTINGS, HANGERS,
SUPPORTS, AND ACCESSORIES
DISCONNECT, REMOVE AND DEMOLISH HYDRONIC PIPING
THROUGHOUT THE ENTIRE BUILDING, INCLUDING ALL FITTINGS,
HANGERS, SUPPORTS, AND ACCESSORIES
MECHANICAL DEMOLITION KEYNOTES
DE
SIG
N
AN
D
CO
NS
TR
UC
TIO
N
DI
VIS
IO
N
DE
PA
RT
M
EN
T
OF
T
EC
HN
OL
OG
Y, M
AN
AG
EM
EN
T, A
ND
B
UD
GE
T
ST
AT
E
OF
M
IC
HI
GA
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
ST
AT
E
FA
CI
LI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
ING
NO
RU
CTI
ON
PLO
T D
ATE
: 12
/13/
M at ri x
M at ri x
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
FA
X:
(5
) 4
-2
PH
ON
E:
(5
) 4
-2
LA
NS
E
. C
ES
AR
E
. C
HA
VE
Z
AV
E.
W
EB
: w ww
.m at rix ce in c.
co m
SHEET NUMBERSHEET NUMBER
file no.file no.
funding codefunding code contractor order no.contractor order no.
consultant job no.consultant job no.
472/22019.SMD
472/MaintProj sheet descriptionsheet description consultantconsultant drawn bydrawn by
X
PR
OJ
EC
T:
/13
/20
:18 :05
A M
Au tod es k D oc s:/ /D
TM
B
PA
RN
AL
L D
IE
SE
L B
LD
G/ 9_
BL
DG
_M
EP
.rv t
CAT
NLF
PA
RN
AL
L
CO
RR
EC
TI
O N
AL
F
AC
IL
IT
Y
N
EW
D
IE
SE
L M
EC
H
AN
IC
AL
P
RO
GR
AM
E P
AR
N
AL
L
RD
JA
CK
SO
N , M
IC
H
IG
AN
M-300
22139.00
9.
9.
MECHANICAL
DEMOLITION PLAN
N 0 1 124 8
SCALE: 1/8" 1'-0"
MECHANICAL DEMOLITION PLAN - MAIN LEVELN
0 1 124 8
SCALE: 1/8" 1'-0"
MECHANICAL DEMOLITION PLAN - MEZZANINE
T
T
T
T
T
C0
T
T T
T
T C0
T
T
7654321
B
C
F-1
UH-1
UH-2
IR-1 IR-2 IR-3 IR-5
IR-4
24"x24" EA UP THRU
ROOF TO EF-1
8"x8" EA UP THRU
ROOF TO EF-2
UH-3
UH-4
AC-1
CU-1
7654321
B
C
373 SF
STAFF OFFICES
220 SF
INMATE TOILETS
360 SF
COMPRESSOR RM
620 SF
MULTIPURPOSE
3086 SF
AUTO SHOP
4096 SF
HEAVY DIESEL
TRUCK BAYS
599 SF
TOOL CRIB
27 SF
FURN. CLOS.
110.1
18 SF
FURN. CLOS.
715 SF
HEAVY DIESEL
CLASSROOM
951 SF
AUTO CLASSROOM
146 SF
ELECTRICAL
CLOSET
151 SF
TECH CLOS.
455 SF
AUTO TOOL CRIB
137 SF
WATER SERV. RM.
69 SF
MEZZ ACCESS
1648 SF
CDL CLASSROOM
172 SF
MAIN ENTRY
211 SF
ENTRY / COAT
ROOM
103 SF
J.C.
69 SF
STAFF TOILETS
107 SF
CORRIDOR
231 SF
CORRIDOR
356 SF
CORRIDOR
649 SF
HEAVY DIESEL LAB
239 SF
CORRIDOR
AC-2
6"x6"
SG-1 100 CFM
1, 2
6"x6"
SG-1 110 CFM
1, 2
6"Ø
SD-1 50 CFM
1, 2
6"x6"
SG-1 50 CFM
1, 2
8"Ø
SD-1 150 CFM
1, 2
8"Ø
SD-1 200 CFM
1, 2
AC-3B
8"Ø
SD-1 200 CFM
1, 2
CU-3
IR-6
IR-7
IR-8
AC-3A
16"x10" SA
10"x10" SA 20"x12" SA 12"x12" SA 16"x10" SA
14"x10" SA
14"x20" SA
8"Ø
SD-1 175 CFM
1, 2 8"Ø
SD-1 200 CFM
1, 2
6"x6"
EG-1 70 CFM
1, 2
0 CFM
10"x10"
EG-2
1, 2
F-2F-3
F-5
L S
16"x36" EA DN
8"x8" EA DN
20"x12" SA
22"x14"
RG-1 0 CFM
1, 2
22"x14"
RG-1 0 CFM
1, 2
22"x14"
RG-1 0 CFM
1, 2
22"x14"
RG-1 0 CFM
1, 2
CU-4
B
F-4 1
B
INSTALL NEW FURNACE IN LOCATION SHOWN.
INSTALL NEW UNIT HEATER IN LOCATION SHOWN. MINIMUM 8'-0" AFF.
INSTALL NEW INFRARED HEATER IN LOCATION SHOWN. MINIMUIM 12'-0"
AFF.
MECHANICAL KEYNOTES
DE
SIG
N
AN
D
CO
NS
TR
UC
TIO
N
DI
VIS
IO
N
DE
PA
RT
M
EN
T
OF
T
EC
HN
OL
OG
Y, M
AN
AG
EM
EN
T, A
ND
B
UD
GE
T
ST
AT
E
OF
M
IC
HI
GA
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
ST
AT
E
FA
CI
LI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
ING
NO
RU
CTI
ON
PLO
T D
ATE
: 12
/13/
M at ri x
M at ri x
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
FA
X:
(5
) 4
-2
PH
ON
E:
(5
) 4
-2
LA
NS
E
. C
ES
AR
E
. C
HA
VE
Z
AV
E.
W
EB
: w ww
.m at rix ce in c.
co m
SHEET NUMBERSHEET NUMBER
file no.file no.
funding codefunding code contractor order no.contractor order no.
consultant job no.consultant job no.
472/22019.SMD
472/MaintProj sheet descriptionsheet description consultantconsultant drawn bydrawn by
X
PR
OJ
EC
T:
/13
/20
:18 :08
A M
Au tod es k D oc s:/ /D
TM
B
PA
RN
AL
L D
IE
SE
L B
LD
G/ 9_
BL
DG
_M
EP
.rv t
CAT
NLF
PA
RN
AL
L
CO
RR
EC
TI
O N
AL
F
AC
IL
IT
Y
N
EW
D
IE
SE
L M
EC
H
AN
IC
AL
P
RO
GR
AM
E P
AR
N
AL
L
RD
JA
CK
SO
N , M
IC
H
IG
AN
M-400
22139.00
9.
9.
MECHANICAL PLAN
N 0 1 124 8
SCALE: 1/8" 1'-0"
MECHANICAL PLAN - MAIN LEVEL
N 0 1 124 8
SCALE: 1/8" 1'-0"
MECHANICAL PLAN - MEZZANINE
7654321
B
C
EF-1
EF-2
7654321
B
C
EF-3
EF-4
EF-5
DE
SIG
N
AN
D
CO
NS
TR
UC
TIO
N
DI
VIS
IO
N
DE
PA
RT
M
EN
T
OF
T
EC
HN
OL
OG
Y, M
AN
AG
EM
EN
T, A
ND
B
UD
GE
T
ST
AT
E
OF
M
IC
HI
GA
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
ST
AT
E
FA
CI
LI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
ING
NO
RU
CTI
ON
PLO
T D
ATE
: 12
/13/
M at ri x
M at ri x
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
FA
X:
(5
) 4
-2
PH
ON
E:
(5
) 4
-2
LA
NS
E
. C
ES
AR
E
. C
HA
VE
Z
AV
E.
W
EB
: w ww
.m at rix ce in c.
co m
SHEET NUMBERSHEET NUMBER
file no.file no.
funding codefunding code contractor order no.contractor order no.
consultant job no.consultant job no.
472/22019.SMD
472/MaintProj sheet descriptionsheet description consultantconsultant drawn bydrawn by
X
PR
OJ
EC
T:
/13
/20
:18 :08
A M
Au tod es k D oc s:/ /D
TM
B
PA
RN
AL
L D
IE
SE
L B
LD
G/ 9_
BL
DG
_M
EP
.rv t
CAT
NLF
PA
RN
AL
L
CO
RR
EC
TI
O N
AL
F
AC
IL
IT
Y
N
EW
D
IE
SE
L M
EC
H
AN
IC
AL
P
RO
GR
AM
E P
AR
N
AL
L
RD
JA
CK
SO
N , M
IC
H
IG
AN
M-401
22139.00
9.
9.
MECHANICAL PLAN
- ROOF
N 0 1 124 8
SCALE: 1/8" 1'-0"
MECHANICAL PLAN - ROOF
DE
SIG
N
AN
D
CO
NS
TR
UC
TIO
N
DI
VIS
IO
N
DE
PA
RT
M
EN
T
OF
T
EC
HN
OL
OG
Y, M
AN
AG
EM
EN
T, A
ND
B
UD
GE
T
ST
AT
E
OF
M
IC
HI
GA
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
ST
AT
E
FA
CI
LI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
ING
NO
RU
CTI
ON
PLO
T D
ATE
: 12
/13/
M at ri x
M at ri x
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
CO
N
SU
LT
IN
G
EN
GI
N
EE
RS
, I N C
FA
X:
(5
) 4
-2
PH
ON
E:
(5
) 4
-2
LA
NS
E
. C
ES
AR
E
. C
HA
VE
Z
AV
E.
W
EB
: w ww
.m at rix ce in c.
co m
SHEET NUMBERSHEET NUMBER
file no.file no.
funding codefunding code contractor order no.contractor order no.
consultant job no.consultant job no.
472/22019.SMD
472/MaintProj sheet descriptionsheet description consultantconsultant drawn bydrawn by
X
PR
OJ
EC
T:
/13
/20
:18 :10
A M
Au tod es k D oc s:/ /D
TM
B
PA
RN
AL
L D
IE
SE
L B
LD
G/ 9_
BL
DG
_M
EP
.rv t
CAT
NLF
PA
RN
AL
L
CO
RR
EC
TI
O N
AL
F
AC
IL
IT
Y
N
EW
D
IE
SE
L M
EC
H
AN
IC
AL
P
RO
GR
AM
E P
AR
N
AL
L
RD
JA
CK
SO
N , M
IC
H
IG
AN
M-900
22139.00
9.
9.
MECHANICAL
SCHEDULES
CONDENSING UNIT SCHEDULE
GENERAL CAPACITY
(TONS) EER REFRIGERANT ELECTRICAL WEIGHT COMMENTSMARK MODEL VOLTAGE PHASE MCA MOCP DISCONNECT
CU-1 NTYSST12A112A 1 R-410A 208 1 EC 1, 3, 4
CU-2 NTYSST12A112A 1 R-410A 208 1 EC 1, 3, 4
CU-3 NTYSST12A112A 1 R-410A 208 1 EC 1, 3
CU-4 4 R-410A 208 1 EC 2, 3
FURNACE SCHEDULE
GENERAL SUPPLY FAN GAS HEAT EXCHANGER DX COOLING COIL COMBUSTION & VENT ELECTRICAL
COMMENTSMARK MODEL AIRFLOW
(CFM)
OA FLOW
(CFM)
ESP
(IN-WG)
INPUT CAPACITY
(MBH)
OUTPUT CAPACITY
(MBH) AFUE DELTA
T MODEL CAPACITY
(MBH) DIAMETER MAX
LENGTH VOLTAGE PHASE FLA MCA DISCONNECT STARTER
F-1 59TN6A080-14 1375 0.5 80 78 96.2 70 - - 3 175 120 1 15 15 EC EC 1, 2, 3, 4
F-2 59TN6A100-22 2160 0.5 100 98 96.1 75 CNP 48 3 175 120 1 20 20 EC EC 1, 2, 3, 4
F-3 59TN6A060-14 1335 0.5 60 58 96.3 65 - - 2 100 120 1 15 15 EC EC 1, 2, 3, 4
F-4 59TN6A080-14 1375 0.5 80 78 96.2 70 - - 3 175 120 1 15 15 EC EC 1, 2, 3, 4
F-5 59TN6A080-14 1375 15 0.5 80 78 96.2 70 - - 3 175 120 1 15 15 EC EC 1, 2, 3, 4
DRG SCEHDULE
MARK MODEL DESCRIPTION MATERIAL COMMENTS
EG-1 50F 2'x2' EGGCRATE, LAY-IN CEILING GRILLE. ALUMINUM 1, 2
EG-2 350F WALL OR DUCT MOUNTED LOUVERED
EXHAUST AIR GRILLE. ALUMINUM 1, 2
RG-1 30RL WALL OR DUCT MOUNTED LOUVERED
RETURN AIR GRILLE. STEEL 1, 2
SD-1 TMS 2'x2' THREE-CONE LAY-IN CEILING
DIFFUSER STEEL 1, 2
SG-1 272 DUCT MOUNTED DOUBLE DEFLECTION
SUPPLY GRILLE. STEEL 1, 2
NOTES:
1.
2.
3.
4.
BASED ON MITSUBISHI
BASED ON CARRIER
COOLING DESIGN BASED ON 80°F DB, 67°F WB, 50% RH
POWER SUPPLIED FROM OUTDOOR UNIT TO INDOOR UNIT
NOTES:
1.
2.
3.
4.
BASED ON CARRIER
DO NOT EXCEED 5 ELBOWS FOR COMB/VENT PIPING
INSULATED COMB/VENT IN UNCONDITIONED SPACES
PROVIDE CONCENTRIC VENT TERMINATION
ELECTRICAL NOTES:
EC - ELECTRICAL CONTRACTOR
MC - MECHANICAL CONTRACTOR
NR - NOT REQUIRED
UNIT HEATER SCHEDULE
GENERAL PERFORMANCE ELECTRICAL
COMMENTSMARK MODEL AIRFLOW
(CFM)
INPUT CAPACITY
(MBH)
OUTPUT CAPACITY
(MBH) DELTA T VOLTAGE PHASE FLA DISCONNECT STARTER
UH-1 UDX-030 450 30 24.6 50 120 1 1.9 EC EC 1,2
UH-2 UDX-045 630 45 37.3 55 120 1 2.4 EC EC 1,2
UH-3 UDX-030 450 30 24.6 50 120 1 1.9 EC EC 1,2
UH-4 UDX-030 450 30 24.6 50 120 1 1.9 EC EC 1,2
INFRARED HEATER SCHEDULE
GENERAL STANDARD
MODULATING
RANGE
FUEL STRAIGHT
LENGTH WEIGHT COMMENTSMARK MODEL
IR-1 MP-40-80 52-80 G 41'-1" 190 1,2
IR-2 MP-40-80 52-80 G 41'-1" 190 1,2
IR-3 MP-40-80 52-80 G 41'-1" 190 1,2
IR-4 MP-25-80 52-80 G 26'-5" 145 1,2
IR-5 MP-60-150 97.5-150 G 60'-5" 265 1,2
IR-6 MP-25-80 52-80 G 26'-5" 145 1,2
IR-7 MP-40-80 52-80 G 41'-1" 190 1,2
IR-8 MP-40-80 52-80 G 41'-1" 190 1,2
NOTES:
1.
2.
BASED ON RE-VERBER-RAY
MOUNT 16'-0" AFF
NOTES:
1.
2.
3.
4.
BASED ON: GREENHECK
MOTORIZED DAMPER
BACKDRAFT DAMPER
MANUFACTURER CURB
EXHAUST FAN SCHEDULE
GENERAL AIRFLOW
(CFM)
ESP
(IN-WG)
SPEED
(RPM) HP VOLTAGE PHASE DISCONNECT STARTER COMMENTSMARK MODEL
EF-1 GB-220 4050 0.5 677 3/4 120 1 EC EC 1, 2, 4
EF-2 G-060 200 0.5 1,550 1/20 120 1 EC EC 1, 2, 4
EF-3 GB-220 3100 0.5 594 1/2 120 1 EC EC 1, 2, 4
EF-4 G-090 155 0.5 1,725 1/15 120 1 EC EC 1, 2, 4
EF-5 G-090 420 0.5 1,550 1/15 120 1 EC EC 1, 3, 4
ELECTRICAL NOTES:
EC - ELECTRICAL CONTRACTOR
MC - MECHANCIAL CONTRACTOR
NR - NOT REQUIRED
NOTES:
1.
2.
BASED ON TITUS
COLOR: WHITE
NOTES:
1.
2.
BASED ON REZNOR
SUSPEND MINIMUM 8'-0" AFF UNLESS NOTED OTHERWISE
ELECTRICAL NOTES
EC - ELECTRICAL CONTRACTOR
MC - MECHANICAL CONTRACTOR
NR - NOT REQUIRED
ELECTRICAL NOTES:
EC - ELECTRICAL CONTRACTOR
MC - MECHANICAL CONTRACTOR
NR - NOT REQUIRED
AIR CONDITIONING UNIT SCHEDULE
GENERAL CAPACITY
(TONS)
AIRFLOW
(CFM) EER REFRIGERANT ELECTRICAL WEIGHT COMMENTSMARK MODEL VOLTAGE PHASE MCA MOCP DISCONNECT
AC-1 NTWST12A112A 1 400 R-410A 208 1 - - EC 1, 2, 3, 4
AC-2 1 400 R-410A 208 1 - - EC 1, 2, 3, 4
AC-3A 1/2 200 R-410A 208 1 EC 1, 2, 3, 5
AC-3B 1/2 200 R-410A 208 1 EC 1, 2, 3, 5
NOTES:
1.
2.
3.
4.
5.
BASED ON MITSUBISHI
COOLING DESIGN BASED ON 80°F DB, 67°F WB, 50% RH
ROUTE CONDENSATE TO NEAREST MOP SINK
POWER SUPPLIED FROM OUTDOOR UNIT
REQUIRES SEPARATE POWER FEED
ELECTRICAL NOTES:
EC - ELECTRICAL CONTRACTOR
MC - MECHANCIAL CONTRACTOR
NR - NOT REQUIRED
| Sheets: F-400 - FIRE PROTECTION PLAN |
| Sheets: M-100 - MECHANICAL LEGENDS |
| Sheets: M-300 - MECHANICAL DEMOLITION PLAN |
| Sheets: M-400 - MECHANICAL PLAN |
| Sheets: M-401 - MECHANICAL PLAN - ROOF |
| Sheets: M-900 - MECHANICAL SCHEDULES |
| Sheets: P-100 - PLUMBING LEGENDS |
| Sheets: P-300 - PLUMBING DEMOLITION PLAN |
| Sheets: P-400 - PLUMBING PLANS |
File details come from the government source that posted it. Updated .